Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Galena

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyNotesRC DateSC Date
GalenaGalenaCG001Million Gallon HillADECRA-OHorizontal well air sparging system for CG001 and CG002 installed in 2017 and one small vertical well air sparging system (CG001 only) installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews
CG001 and CG002 have been combined into one Cleanup PlanFY40FY40
GalenaGalenaCG002Missile Storage AreaADECRA-OHorizontal well air sparging system for CG001 and CG002 installed in 2017 will require O&M, LUC inspections, and Five-Year ReviewsCG001 and CG002 have been combined into one Cleanup PlanFY40FY40
GalenaGalenaCB001Galena Aviation Vocation Technical CenterADECRA-OHorizontal well air sparging system for ST005 and CB001 installed in 2017 will require O&M, LUC inspections, and Five-Year Reviews
Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&MST005 and CB001 have been combined into one Cleanup PlanFY35FY35
GalenaGalenaST005POL Tank FarmADECRA-OHorizontal well air sparging system for ST005 and CB001 installed in 2017 and one small SVE system (ST005 Area C) installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews

Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&M

ST005 and CB001 have been combined into one Cleanup PlanFY35FY35
GalenaGalenaST009West Unit JP-4 Fuel StandsADECRA-OOngoing O&M of SVE system installed in 2016, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017FY33FY33
GalenaGalenaST010Southeast Runway Fuel SpillADECRA-OOngoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year ReviewsFY35FY35
GalenaGalenaST020Building 1837 – Former USTADECRA-OOngoing O&M of SVE system installed in 2016, LUC inspections, and Five-Year ReviewsFY21FY21
GalenaGalenaSS005Wilderness Hall (Bldg 1872)ADECRA-OOngoing O&M of vertical air sparging system with SVE installed in 2016, LUC inspections, and Five-Year ReviewsFY28FY28
GalenaGalenaSS014Birchwood HangarADECRA-OOngoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017.SS014 and SS017, have been combined into one Cleanup PlanFY43FY43
GalenaGalenaSS016Building 2541 – Former POL Fuel LabADECRA-OOngoing O&M of bioventing system installed in 2017, LUC inspections, and Five-Year ReviewsFY36FY36
GalenaGalenaSS017Former Truck FillstandsADECRA-OOngoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017.SS014 and SS017 have been combined into one Cleanup PlanFY43FY43
GalenaGalenaCSS002Building 1812 Former Hazardous Waste Satellite Accumulation PointB1812ADECRA-OOngoing O&M of bioventing system installed in 2017, LUC inspections, and Five-Year Reviews. Excavation conducted in 2015. Sulfate injections conducted in 2017.FY35FY35
GalenaGalenaTU001Power Plant Tank 49ADECRA-OOngoing O&M of vertical well air sparging system and SVE system installed in 2016, LUC inspections, and Five-Year ReviewsFY32FY32
GalenaGalenaCPL006Old Abandoned PipelineOAPADECRA-OOngoing O&M of bioventing system at Area 3 installed in 2017 and expanded in 2018, LUC inspections, and Five-Year ReviewsCurrent PBR contractor will complete remediation at Area 2 and no further action is required at Areas 1 and 4.FY36FY36
GalenaGalenaCST011Combat Alert Cell USTsUST1428ADECRA-OOngoing groundwater monitoring at Area 2, LUC inspections, and Five-Year ReviewsCurrent PBR contractor will complete remediation at Area 1.FY33FY33
GalenaGalenaCST014Dining Facility USTUST1859ADECRA-OOngoing O&M of vertical well air sparging system and SVE system installed in 2016, LUC inspections, and Five-Year ReviewsFY33FY33
GalenaGalenaFT001Fire Protection Training AreaCERCLARA-OBioventing system installed in 2018 with plastic liner/soil cover over former fire training pit will require O&M, LUC inspections, and Five-Year ReviewsRemedy is under an interim ROD. ADEC will not close site until PFAS are addressed;
PFAS is not included in the TO.FY36FY36
GalenaGalenaSS006TCE Area (Bldg 1845)CERCLARA-OSVE system installed in 2018 with startup and operation in summer 2019 will require O&M, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections completed in 2018.SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006.
Payment for portion of GAC changeouts at City of Galena water treatment plant not included in this PBR.FY38FY38
GalenaGalenaSS015South Apron Maintenance AreaCERCLARA-OSVE system installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections completed in 2018.Payment for potable water provided to downgradient residents is not included in this PBR.FY25FY25
GalenaGalenaSS018Waste Accumulation Area - South of Bldg 1499AOC023CERCLARA-OExcavation and monitoring well installation completed in 2018. Post-excavation requirements include groundwater monitoring, LUC inspections, and Five-Year ReviewsFY27FY27
GalenaGalenaSS019Building 1700 – Refueler Maintenance ShopCERCLARA-OPilot test SVE system installed in 2015 is final remedy and requires O&M, LUC inspections, and Five-Year Reviews. Primary contamination is petroleum and small area of solvents at former dry well.SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006.
Closure of drywell to be completed by the current PBR contractor.FY31FY31
GalenaGalenaSS022Building 400 Former CAA- Air Force Weather StationB400CERCLARA-OPilot test SVE system installed in 2015 and expanded in 2017 is final remedy and requires O&M, LUC inspections, and Five-Year ReviewsFY26FY26
GalenaGalenaSS025West Perimeter Road TCE SpillCERCLARA-OPilot test SVE system installed in 2015 and expanded in 2018FY20FY20
GalenaGalenaDP023Former Disposal Site West of DikeDSWDCERCLARA-OGroundwater monitoring, LUC inspections, and Five-Year ReviewsUnder the current PBR, ROD and remedial action work plan to be completed by June 2019 and anticipated remedy of excavation to be completed in 2019.FY39FY39
GalenaGalenaFT001Fire Protection Training AreaPFOS/PFOA Site
GalenaGalenaCG109AFFF Release AreasPFOS/PFOA Site
GalenaKulisCAT56PPFC Research SitePFOS/PFOA Site

File details come from the government source that posted it. Updated .