Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
- Solicitation number
- FA8903
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Galena
| Region | Base | Site ID | Site Name | Site Alias | Operable Unit (OU) | Regulatory Program | Site Phase | Current Remedy | Notes | RC Date | SC Date |
| Galena | Galena | CG001 | Million Gallon Hill | ADEC | RA-O | Horizontal well air sparging system for CG001 and CG002 installed in 2017 and one small vertical well air sparging system (CG001 only) installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews |
| CG001 and CG002 have been combined into one Cleanup Plan | FY40 | FY40 | |||||||
| Galena | Galena | CG002 | Missile Storage Area | ADEC | RA-O | Horizontal well air sparging system for CG001 and CG002 installed in 2017 will require O&M, LUC inspections, and Five-Year Reviews | CG001 and CG002 have been combined into one Cleanup Plan | FY40 | FY40 |
| Galena | Galena | CB001 | Galena Aviation Vocation Technical Center | ADEC | RA-O | Horizontal well air sparging system for ST005 and CB001 installed in 2017 will require O&M, LUC inspections, and Five-Year Reviews |
| Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&M | ST005 and CB001 have been combined into one Cleanup Plan | FY35 | FY35 | ||||
| Galena | Galena | ST005 | POL Tank Farm | ADEC | RA-O | Horizontal well air sparging system for ST005 and CB001 installed in 2017 and one small SVE system (ST005 Area C) installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews |
Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&M
| ST005 and CB001 have been combined into one Cleanup Plan | FY35 | FY35 | |||||||||
| Galena | Galena | ST009 | West Unit JP-4 Fuel Stands | ADEC | RA-O | Ongoing O&M of SVE system installed in 2016, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017 | FY33 | FY33 | |||
| Galena | Galena | ST010 | Southeast Runway Fuel Spill | ADEC | RA-O | Ongoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews | FY35 | FY35 | |||
| Galena | Galena | ST020 | Building 1837 – Former UST | ADEC | RA-O | Ongoing O&M of SVE system installed in 2016, LUC inspections, and Five-Year Reviews | FY21 | FY21 | |||
| Galena | Galena | SS005 | Wilderness Hall (Bldg 1872) | ADEC | RA-O | Ongoing O&M of vertical air sparging system with SVE installed in 2016, LUC inspections, and Five-Year Reviews | FY28 | FY28 | |||
| Galena | Galena | SS014 | Birchwood Hangar | ADEC | RA-O | Ongoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017. | SS014 and SS017, have been combined into one Cleanup Plan | FY43 | FY43 | ||
| Galena | Galena | SS016 | Building 2541 – Former POL Fuel Lab | ADEC | RA-O | Ongoing O&M of bioventing system installed in 2017, LUC inspections, and Five-Year Reviews | FY36 | FY36 | |||
| Galena | Galena | SS017 | Former Truck Fillstands | ADEC | RA-O | Ongoing O&M of bioventing system installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews. Sulfate injections completed in 2017. | SS014 and SS017 have been combined into one Cleanup Plan | FY43 | FY43 | ||
| Galena | Galena | CSS002 | Building 1812 Former Hazardous Waste Satellite Accumulation Point | B1812 | ADEC | RA-O | Ongoing O&M of bioventing system installed in 2017, LUC inspections, and Five-Year Reviews. Excavation conducted in 2015. Sulfate injections conducted in 2017. | FY35 | FY35 | ||
| Galena | Galena | TU001 | Power Plant Tank 49 | ADEC | RA-O | Ongoing O&M of vertical well air sparging system and SVE system installed in 2016, LUC inspections, and Five-Year Reviews | FY32 | FY32 | |||
| Galena | Galena | CPL006 | Old Abandoned Pipeline | OAP | ADEC | RA-O | Ongoing O&M of bioventing system at Area 3 installed in 2017 and expanded in 2018, LUC inspections, and Five-Year Reviews | Current PBR contractor will complete remediation at Area 2 and no further action is required at Areas 1 and 4. | FY36 | FY36 | |
| Galena | Galena | CST011 | Combat Alert Cell USTs | UST1428 | ADEC | RA-O | Ongoing groundwater monitoring at Area 2, LUC inspections, and Five-Year Reviews | Current PBR contractor will complete remediation at Area 1. | FY33 | FY33 | |
| Galena | Galena | CST014 | Dining Facility UST | UST1859 | ADEC | RA-O | Ongoing O&M of vertical well air sparging system and SVE system installed in 2016, LUC inspections, and Five-Year Reviews | FY33 | FY33 | ||
| Galena | Galena | FT001 | Fire Protection Training Area | CERCLA | RA-O | Bioventing system installed in 2018 with plastic liner/soil cover over former fire training pit will require O&M, LUC inspections, and Five-Year Reviews | Remedy is under an interim ROD. ADEC will not close site until PFAS are addressed; | ||||
| PFAS is not included in the TO. | FY36 | FY36 | |||||||||
| Galena | Galena | SS006 | TCE Area (Bldg 1845) | CERCLA | RA-O | SVE system installed in 2018 with startup and operation in summer 2019 will require O&M, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections completed in 2018. | SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006. |
| Payment for portion of GAC changeouts at City of Galena water treatment plant not included in this PBR. | FY38 | FY38 | |||||||||
| Galena | Galena | SS015 | South Apron Maintenance Area | CERCLA | RA-O | SVE system installed in 2018 will require O&M, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections completed in 2018. | Payment for potable water provided to downgradient residents is not included in this PBR. | FY25 | FY25 | ||
| Galena | Galena | SS018 | Waste Accumulation Area - South of Bldg 1499 | AOC023 | CERCLA | RA-O | Excavation and monitoring well installation completed in 2018. Post-excavation requirements include groundwater monitoring, LUC inspections, and Five-Year Reviews | FY27 | FY27 | ||
| Galena | Galena | SS019 | Building 1700 – Refueler Maintenance Shop | CERCLA | RA-O | Pilot test SVE system installed in 2015 is final remedy and requires O&M, LUC inspections, and Five-Year Reviews. Primary contamination is petroleum and small area of solvents at former dry well. | SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006. |
| Closure of drywell to be completed by the current PBR contractor. | FY31 | FY31 | |||||||||
| Galena | Galena | SS022 | Building 400 Former CAA- Air Force Weather Station | B400 | CERCLA | RA-O | Pilot test SVE system installed in 2015 and expanded in 2017 is final remedy and requires O&M, LUC inspections, and Five-Year Reviews | FY26 | FY26 | ||
| Galena | Galena | SS025 | West Perimeter Road TCE Spill | CERCLA | RA-O | Pilot test SVE system installed in 2015 and expanded in 2018 | FY20 | FY20 | |||
| Galena | Galena | DP023 | Former Disposal Site West of Dike | DSWD | CERCLA | RA-O | Groundwater monitoring, LUC inspections, and Five-Year Reviews | Under the current PBR, ROD and remedial action work plan to be completed by June 2019 and anticipated remedy of excavation to be completed in 2019. | FY39 | FY39 | |
| Galena | Galena | FT001 | Fire Protection Training Area | PFOS/PFOA Site | |||||||
| Galena | Galena | CG109 | AFFF Release Areas | PFOS/PFOA Site | |||||||
| Galena | Kulis | CAT56P | PFC Research Site | PFOS/PFOA Site |
File details come from the government source that posted it. Updated .