TO2 PWS Attch 2 Central South - Base Specific Req Brooks Dft 20 SEP 19 v3.0.docx

DOCX document 54 KB Posted

Attached to
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS)
Solicitation number
FA8903
Issued by

View the file

Other files

File Type Posted
Northeast Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Griffiss 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Northeast Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req March Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
NorCal Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Williams Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Southwest Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Pease 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS IDIQ PWS Attachment 3 - Deliverable Review Process_Draft_18 Sept 19 v1.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req George Dft 20 SEP 19 v3.0.docx DOCX document
Northeast Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
NorCal Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
NORCAL Region BECOS IDIQ PWS_Draft_18 SEP 19 v4.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Gentile Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attachment 1 Dft Site List 25 SEP 19 v2.0.xlsx XLSX spreadsheet
DRAFT 10242019_Southwest IDIQ_TO1_TO2 CLIN Structure and Price Model.xlsx XLSX spreadsheet
IDIQ PWS Central South Dft 18 SEP 19 v4.0.docx DOCX document
TO2 PWS Attch 1 Central South - Site List Dft 25 SEP 19 v1.0.xlsx XLSX spreadsheet
Galena - Alaska Region BECOS IDIQ PWS Attachment 2 - Acronyms and Definitions_Draft_18 Sept 19 v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Kelly Dft 20 SEP 19 v3.0.docx DOCX document
Galena - Alaska Region BECOS IDIQ PWS Attachment 4 - Performance Objectives Defined_Draft_18 Sept 19 v1.0.docx DOCX document
Galena AK Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
TO1 PWS Central South Dft 17 OCT 19 v3.0.docx DOCX document
20191114_Section_M_Draft RFP.docx DOCX document
Midwest Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req KI Sawyer Dft 24 SEP 19 v3.0.docx DOCX document
IDIQ PWS Attch 1 Central South - Base Site List Dft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 1 PWS_Draft_17 OCT 19 v3.0.docx DOCX document
NorCal Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Draft RFP BECOS Questions and Answers Template.xlsx XLSX spreadsheet
Galena Alaska Region BECOS IDIQ_PWS Attachment 1 - Base Site_List_Draft 18 Sept 2019 v1.0.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Chanute Dft 24 SEP 19 v3.0.docx DOCX document
DRAFT 10242019_Galena IDIQ_TO1_TO2 CLIN Structure and Price Model_v2.xlsx XLSX spreadsheet
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Wurtsmith Dft 24 SEP 19 v3.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req England Dft 20 SEP 19 v3.0.docx DOCX document
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final –

BECOS TO 2

ATTACHMENT 2

20 September 2019

1.1 Scope

The former Brooks Air Force Base (AFB) (now known as Brooks-City Base [i.e., Brooks]) is not listed on the National Priorities List (NPL). On 22 July 2002, Brooks AFB was transferred from federal ownership to the Brooks Development Authority (BDA), a local defense base development authority under Texas statute. As a result of the property transfer, the name of the installation changed from Brooks AFB to Brooks City-Base. At this time, the Air Force leased the occupied land and facilities on Brooks City-Base from the BDA. In 2005, Brooks City-Base was recommended for closure in the 2005 Defense Base Closure and Realignment Report (United States 2005). The Air Force mission ceased at Brooks City-Base on 15 September 2011. The BDA is developing Brooks City-Base as a business center for research and technology.

The restoration program at Brooks is currently managed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Regulatory oversight is provided by the Texas Commission on Environmental Quality (TCEQ) and the United States Environmental Protection Agency (EPA). Remedial activities at CERCLA sites are being performed in accordance with the existing Record of Decision (ROD). There are two sites at Brooks included in this PBR TO which require preparation of a Five-Year Review and Land Use Control/Institutional Control (LUC/IC) inspection.

LF007 (Landfill #5) is also identified as Solid Waste Management Unit (SWMU) 5 in semiannual monitoring reports. The landfill is estimated to be 25.4 acres and is located in the south-central portion of the base. The landfill was used from 1962 to 1970 and consisted of waste disposal trenches where glassware, used medical supplies, packing material, paper, paints, thinners, un-rinsed pesticide containers, oils, solvents, and contaminated fuels were disposed of. The trenches where materials were disposed of reportedly ran east-west and were 75 feet wide, 350 feet long, and approximately 20 feet deep. Approximately two feet of fill was placed over the trenches when the landfill was closed. The site is covered with a soil cap.

LF008 (Landfill #6) is located in the southeast corner of Brooks City-Base (south of the former runway) in an undeveloped commercial area and is estimated to be 15 acres. The landfill operated as a Municipal Solid Waste landfill from 1971 to 1985. Six trenches compose the landfill. Five were excavated for waste disposal and each was 50 feet wide, 20 feet deep, and 400 feet long. The trenches were filled with a variety of solid wastes, shop and laboratory wastes, and small quantities of hazardous wastes. One trench was used for the disposal of demolition material (hard fill). Unknown quantities of contaminated fuel and leaded gasoline were also disposed of in the landfill and oil contaminated soils were spread out in the area. The site is covered with native soil.

Upon review of the 2002 Deed transferring the Brooks AFB’s property to Brooks Development Authority, at a minimum, these IRP sites will require a Five-Year Review in 2020 and every five years thereafter (all other sites have been closed):

· LF007 – Site Name: Landfill #5 – Requires post-closure care and controls at the site to include no disturbance of the landfill cover, no development of water wells, no drilling for shallow groundwater, maintenance of the landfill cover and deed restricted to nonresidential development.

· LF008 – Site Name: Landfill #6 – Restrictions include maintenance of the landfill cover, limited groundwater well development and TCEQ approval prior to any ground-disturbing activities. No residential development is to occur on property and TCEQ approval prior to any industrial development.

In addition to the requirements presented in this PWS, this scope includes the following:

· No additional requirements.

Contractors are not responsible for the following:

· No additional base-specific exclusions.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Final 2017 Land Use Control/Institutional Control Site Inspection Report
AR 568689
December 2017
2.
Final Five-Year Review 2016
AR 537993
July 2016
3.
Decision Document to Support No Further Response Action Planned, Decision Document,

IRP Site Landfill 6

AR 310
October 2000
4.
Technical Document to Support No Further Action, Decision Document,

Landfill No. 5

AR 28
June 1990

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-16-D-0036, TO FA8903-17-F-0232
Fire Protection Training Area 2 (IRP Site FT002) Bioremediation, Evaluation, and Optimization, and Land Use Control/Institutional Control Inspections
7/12/2017
7/11/2018
FA8903-16-D-0036, TO FA8903-18-F-0261
Fire Protection Training Area 2 (IRP Site FT002) Evaluation, Optimization, and Land Use Control/Institutional Control Inspections
TBD
TBD

1.5 Remedial System Components

· See Attachment 1 regarding remedial system components.

2.6.1 Meeting/Teleconference Support

· There are no meetings or teleconference support requirements.

2.6.2 Public Meetings and Hearings

· There are no base-specific meetings or hearing requirements.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· There are no permit/easement requirements at the former Brooks AFB; however, coordination with the local reuse authority, Brooks Development Authority (BDA), is necessary when accessing any of the sites for Five-Year Reviews and LUC/IC inspections.

2.9 Contractor Documentation

· The Contractor shall provide copies of the AFCEC-approved LUC/IC Inspection Report to the TCEQ, EPA Region 6, and Brooks Development Authority.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct annual LUC/IC monitoring at all sites and prepare a report.

6.15 Five-Year Reviews

· The last Five-Year Review for IRP sites LF007, LF008, and FT002 was conducted in FY15 (also included IRP sites OT001, OT009, TU013, and SS012 which achieved site closeout in or before FY15). During FY20, LF007, LF008, and FT002, will be reviewed simultaneously and every five years thereafter. The expected site closeout date for FT002 is FY21.

· The next Five-Year Review is due October 2020.