This is a technical specification document for joint sealing in concrete pavement at Tinker Air Force Base, Oklahoma, issued in April 2019. The specification establishes requirements for jet-fuel-resistant sealants applied to concrete pavement joints and is organized into three parts: General, Products, and Execution.
The specification requires sealants conforming to Federal Specification SS-S-1614A (hot-applied, jet-fuel-resistant sealants for Portland cement and tar concrete pavements) or SS-S-200E (two-component, jet-blast-resistant, cold-applied sealants). Sealants using the SS-S-200 specification must demonstrate satisfactory field performance for a minimum of two years. The specification details comprehensive equipment requirements, including sandblasting equipment with a minimum 150 cfm air capacity and 90 psi line pressure, concrete saws for joint preparation, and either hot-poured or cold-applied sealant application equipment with specific temperature and proportioning controls. Joint preparation involves power-driven sawing, sandblast cleaning to remove laitance and curing compounds, and installation of separating and blocking media to prevent sealant penetration below specified depths. Cold-applied sealants require two-component proportioning at a 1:1 volume ratio with ±5 percent accuracy. Installation must occur when ambient and pavement temperatures exceed 50°F, with joints filled from bottom to within 1/4 inch of the pavement surface. Sealants must achieve tack-free condition within three hours. The specification requires certified test reports prior to material use and inspections throughout joint cleaning, sealing operations, and final curing. Work is measured by linear feet of completed sealing, and rejected sealants must be removed and replaced at no additional cost to the government.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 1 Section 32 13 73
SECTION 32 13 73
JOINT SEALING IN CONCRETE PAVEMENT
JET-FUEL-RESISTANT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designations only. Unless specifically noted, the current edition of the reference shall be used.
SS-S-200E Sealants, Joint, Two-Component, Jet-Blast-
Resistant, Cold-Applied, for Portland Cement Concrete Pavement
SS-S-1614A Sealants, Joint, Jet-Fuel-Resistant, Hot-Applied, for Portland Cement and Tar Concrete Pavements
1.2 SUBMITTALS
Prior to the use of materials, certified copies of the test reports of all tests required shall be submitted and approved.
Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the materials, printed copies of these recommendations shall be furnished prior to use on the project. Installation of the material shall not be allowed until the recommendations are received.
1.3 EQUIPMENT
Machines, tools, and equipment used in the performance of the work required by this section will be approved by the Contracting Officer before the work is started and shall be maintained in satisfactory condition.
1.3.1 Joint-Cleaning Equipment
1.3.1.1 Sandblasting Equipment
Sandblasting equipment shall include an air compressor, hose, and venturi-type nozzles of sufficient capacity to furnish air at a rate of not less than 150 cfm and to maintain a line pressure of not less than 90 psi at the nozzle while in use. The compressor shall be equipped with traps that maintain the compressed air
April 2019 Page 2 Section 32 13 73 free of oil and water. Provide sand blasting hood with fresh air and chilled air in summer. Air shall be filtered and monitored for human consumption.
1.3.1.2 Concrete Saw
A self-propelled power saw shall be provided for cutting joints to the specified widths and depths and for removing filler embedded in the joints or adhering to the joint faces.
1.3.2 Sealing Equipment
1.3.2.1 Hot-Poured Sealant Equipment
Unit applicators used for heating and installing hot-poured sealing materials shall be mobile and shall be equipped with a double-boiler agitator-type kettle with an oil medium in the outer space for heat transfer, a direct-connected pressure-type extruding device with nozzle or nozzles shaped for insertion in the joints to be filled, positive temperature devices for controlling the temperature of oil and sealant, and a recording-type thermometer for indicating the temperature of the sealant.
Applicator unit shall be so designed that the sealant circulates through the delivery hose and returns to the inner kettle when not sealing joints. The heating kettle shall be equipped with at least one fully charged fire extinguisher of the proper type.
1.3.2.2 Cold-Applied Sealant Equipment
Equipment for proportioning, mixing, and installing cold-applied joint sealants shall be designed for delivering two semifluid components to a portable mixer through hoses at a preset ratio of 1 to 1 (by volume) by positive displacement pumps with an accuracy of plus or minus 5 percent for the quantity of each component. Reservoirs for each component shall be equipped with mechanical agitation devices that maintain the components in a uniform condition without entrapping air. Provisions shall be incorporated to permit thermostatically controlled indirect heating of the components when required; however, immediately prior to proportioning and mixing, the temperature of either component shall not exceed 90 degrees F. Screens shall be provided near the top of each reservoir to eliminate foreign particles or partially polymerized material that could clog fluid lines or otherwise cause misproportioning or improper mixing of the two components. The equipment shall be capable of thoroughly mixing the two components. Before using the equipment in this work, the contractor shall furnish the supplier’s certification that the specific equipment, model and serial number, is recommended for use with the sealing compound to be installed.
Initially approved equipment shall be maintained in good working condition, serviced in accordance with the supplier’s
April 2019 Page 3 Section 32 13 73 instructions, and shall not be altered in any way without obtaining prior approval.
1.4 SAMPLING AND TESTING
Joint sealants shall be tested for conformance with the referenced applicable material specification. Contracting Officer shall be notified in writing of the proposed sources of joint sealants at least ten days prior to the date the materials will be required at the project site. Testing shall have been performed in an approved independent laboratory and certified copies of the test reports shall be submitted and approved. If the use of a primer is recommended for the proposed sealing system, the laboratory test for bond shall be conducted using the primer in accordance with the manufacturer’s instructions.
Conformance with the requirements of the laboratory tests specified will not constitute final acceptance of the sealing material. Final acceptance will be based on performance of the in-place sealant. The contractor shall furnish samples of materials, in sufficient quantity to be tested, upon request.
1.5 DELIVERY AND STORAGE
Materials delivered to the site shall be inspected for damage, unloaded and stored with a minimum of handling. Materials shall be handled in such a manner as to insure no damage to the joint sealant materials. Storage facilities shall be provided by the contractor at the job site for maintaining materials at temperatures recommended by the manufacturer.
1.6 MEASUREMENT
Work shall be measured by linear feet of work complete.
PART 2 PRODUCTS
2.1 SEALANTS
Sealants shall conform to Fed. Spec. SS-S-1614 or SS-S-200.
Sealant conforming to Fed. Spec. SS-S-200 shall be of a basic composition that has had satisfactory field performance for a period of not less than 2 years.
April 2019 Page 4 Section 32 13 73
2.2 PRIMERS
The use of primers when recommended by the manufacturer of the proposed sealant is authorized in accordance with the manufacturer’s instructions.
2.3 SEPARATING AND BLOCKING MEDIUM
The separating and blocking material used to seal off the lower portion of the joint shall be a readily compressible, non-shrinkable rope either plastic or rubber not reactive with the sealant. The separating and blocking medium shall not soften or melt at pouring temperature of the sealant.
PART 3 EXECUTION
3.1 PREPARATION OF JOINTS
Immediately before installation of the sealant, the joints shall be thoroughly cleaned until all laitance, curing compound, filler, and protrusions of hardened concrete are removed from the sides and upper edges of the joint space to be sealed.
3.1.1 Sawing
A power-driven concrete saw shall be used to saw through sawed and filler-type joints to loosen and remove material until the joint groove is clear and open to the full specified width and depth. Loosened material shall be blown from the joint.
3.1.2 Sandblast Cleaning
After sawing, the exposed concrete joint faces and the pavement surfaces extending 1/2 inch from the edges of joints shall be sandblasted until the surfaces are free of dust, dirt, curing compound, filler, and any other material that might prevent bonding of the sealant to the concrete. After cleaning and immediately prior to filling, the joints shall be blown out with compressed air and left completely free of sand and water.
3.1.3 Separating and Blocking Media
Top portion of the joint shall be sealed with sealant to the depth indicated. When sawed joints are used, the lower portion of the groove shall be plugged or sealed off to prevent entrance of the sealant.
April 2019 Page 5 Section 32 13 73
3.1.4 Installing Tape
Where inserts or filler materials used contain bitumen, a separating medium shall be inserted to prevent contact with cold-applied sealants unless the contractor certifies compatibility and assumes responsibility of replacing sealants that are not compatible. Separating medium shall be a nonreactive adhesive-backed tape shall be inserted on the top surface of the insert.
Tape shall be 1/8 inch wider than the nominal width of the joint, and shall be securely bonded so it will not float up into the new sealant.
3.1.5 Rate of Progress
The stages of joint preparation, which include sandblasting of the joint faces, air pressure cleaning of joint, and placement of separating or blocking media, shall be limited to only that lineal footage of joint that can be sealed during the same workday.
3.2 PREPARATION OF SEALANT
3.2.1 Hot-Poured
Hot-poured sealing materials shall not be heated in excess of the same heating temperature recommended by the manufacturer as shown on sealant containers. Sealant that has been overheated or subjected to heating for over 3 hours or that has remained in the applicator at the end of the day’s operation shall be wasted at the contractor’s expense.
3.2.2 Cold-Applied
Sealant components and containers shall be inspected prior to use, and materials that contain water, hard caking of any separated constituents, nonreversible jell, or are otherwise unsatisfactory shall be rejected. Settlement of constituents in a soft mass that can be readily and uniformly remixed in the field with simple tools will not be cause for rejection. Prior to transfer of components from the shipping containers to the appropriate reservoirs of the application equipment, the materials in the shipping containers shall be thoroughly mixed to insure homogeneity of the components and incorporation of constituents at the time of transfer. When necessary for remixing prior to transfer to the application-equipment reservoirs, components of the sealants shall be warmed to a temperature not exceeding 90 degrees F by placing the components in heated storage or by other approved methods, but in no case shall the components be heated by direct flame or in single-walled, nonoil-bath heating kettles.
April 2019 Page 6 Section 32 13 73
3.3 INSTALLATION OF SEALANTS
3.3.1 Time of Application
Joints shall be sealed immediately following the concrete-curing period or as soon thereafter as weather conditions permit.
Concrete walls of the joint shall be surface dry, and the atmospheric and pavement temperatures shall be above 50 degrees F at the time of application of the sealant. Open joints that cannot be sealed under the conditions specified herein shall be provided with an approved temporary seal to prevent infiltration of foreign particles. Wet joints shall be dried prior to installing sealants.
3.3.2 Sealing Joints
No joint sealant shall be installed until the cleaned joints have been inspected and approved. The joints shall be filled from the bottom up to within 1/4 inch of the pavement surface, plus or/minus 1/8 inch, using equipment specified in Paragraph 1.3, EQUIPMENT for the type of sealing material to be installed.
Excess or spilled sealant shall be removed from the pavement and discarded. Traffic shall not be permitted over newly sealed pavement until authorized by the Contracting Officer. In no case shall sealant be installed using the gravity method and pouring pots. When a primer is supplied by the manufacturer, it shall be applied evenly to the joint faces in accordance with the manufacturer’s recommendations. When cold-applied sealant is used, proportioning of the equipment shall be checked at the beginning of each day’s operation and every 4 hours, to determine that the preset volume output for each component is being maintained. Material used for these checks may be returned to the proper component reservoir. Joints shall be checked frequently to insure that the newly installed sealant is cured to a tack-free condition within 3 hours.
3.4 INSPECTIONS
3.4.1 Joint Inspection
Joints shall be inspected during cleaning to correct improper equipment and cleaning techniques that damage the concrete.
Cleaned joints will be approved prior to installing joint sealant.
3.4.2 Sealing Operations
Application equipment shall be inspected to assure conformance to temperature requirements, proper proportioning and mixing (if two-component type sealant), and installation. Evidences of improper installation shall be cause to suspend operations until causes of deficiencies are determined and corrected.
April 2019 Page 7 Section 32 13 73
3.4.3 Sealant Inspection
Sealant shall be inspected for proper rate of cure and set, bonding to concrete surfaces of joint walls, cohesive separation within the sealant, reversion to liquid, entrapped air, and voids. Sealants exhibiting any deficiencies will be rejected.
Sealants may be rejected at any time prior to final acceptance of the project. Sealant which is rejected shall be removed from the joint, wasted, and replaced at no additional cost to the government.
- End of Section -
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EQUIPMENT |
| 1.3.1 Joint-Cleaning Equipment |
| 1.3.1.1 Sandblasting Equipment |
| 1.3.1.2 Concrete Saw |
| 1.3.2 Sealing Equipment |
| 1.3.2.1 Hot-Poured Sealant Equipment |
| 1.3.2.2 Cold-Applied Sealant Equipment |
| 1.4 SAMPLING AND TESTING |
| 1.5 DELIVERY AND STORAGE |
| 1.6 MEASUREMENT |
| PART 2 PRODUCTS |
| 2.1 SEALANTS |
| 2.2 PRIMERS |
| 2.3 SEPARATING AND BLOCKING MEDIUM |
| PART 3 EXECUTION |
| 3.1 PREPARATION OF JOINTS |
| 3.1.1 Sawing |
| 3.1.2 Sandblast Cleaning |
| 3.1.3 Separating and Blocking Media |
| 3.1.4 Installing Tape |
| 3.1.5 Rate of Progress |
| 3.2 PREPARATION OF SEALANT |
| 3.2.1 Hot-Poured |
| 3.2.2 Cold-Applied |
| 3.3 INSTALLATION OF SEALANTS |
| 3.3.1 Time of Application |
| 3.3.2 Sealing Joints |
| 3.4 INSPECTIONS |
| 3.4.1 Joint Inspection |
| 3.4.2 Sealing Operations |
| 3.4.3 Sealant Inspection |