32 01 16.pdf

PDF 12 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a Technical Specification document for cold milling and asphaltic concrete work at Tinker Air Force Base, Oklahoma, dated April 2019.

The specification covers the removal of existing bituminous pavement surfaces through cold milling to depths and limits designated on project drawings or by the Contracting Officer, including loading, stockpiling, or disposal of milled material. Work is measured and paid by the square yard to the nearest unit, with no payment for milling outside the specified work area. The cold-milling machine must be self-propelled and capable of milling to specified depth and smoothness while maintaining effective control of transverse slope and dust production, without causing damage to pavement structures that are to remain. The contractor must provide all necessary cleaning equipment suitable for removing loose material and all required traffic controls during operations. Prior to milling, pavement surfaces must be cleaned of excessive dirt, clay, and foreign material. The contractor is responsible for collecting, removing, hauling, and disposing of all asphalt millings off-site in accordance with local regulations. Finished mill surfaces must conform to indicated lines, grades, and cross sections, with surfaces at junctures matching abutting pavements. Any damaged items such as manholes, valve boxes, utility lines, or torn, gouged, broken, or undercut pavement must be repaired or replaced as directed by the Contracting Officer. Milled material shall be removed to a stockpile area designated by the contracting officer or disposed of off-base in accordance with all local, state, and federal regulations.

View the file

Other files

File Type Posted
190023 Reno Restrooms B117 Pre Bid RFI Follow Up_COR_Signed.pdf PDF
Solicitation Amendment FA813726R00300001 SF 30.pdf PDF
23 08 00.pdf PDF
23 35 00.pdf PDF
07 60 00.pdf PDF
03 39 00.00 10.pdf PDF
32 01 14.pdf PDF
32 12 15.pdf PDF
07 42 13.pdf PDF
26 51 00.pdf PDF
33 11 00.pdf PDF
26 00 00.00 20.pdf PDF
10 21 13.pdf PDF
23 82 16.00 40.pdf PDF
32 13 14.pdf PDF
09 51 00.pdf PDF
08 41 13.pdf PDF
32 12 10.1.pdf PDF
07 14 00.pdf PDF
23 52 00.pdf PDF
08 34 19.10 20.pdf PDF
08 51 23.pdf PDF
07 41 13.pdf PDF
07 24 00.pdf PDF
05 50 13.pdf PDF
26 20 00.pdf PDF
26 23 00.pdf PDF
23 05 15.pdf PDF
23 64 26.pdf PDF
23 00 00.pdf PDF
07 61 14.00 20.pdf PDF
03 62 16.pdf PDF
32 92 23.pdf PDF
10 14 00.10.pdf PDF
09 90 00.pdf PDF
06 41 16.00 10.pdf PDF
23 31 13.00 40.pdf PDF
26 41 00.pdf PDF
09 72 00.pdf PDF
05 40 00.pdf PDF
000_TABLE OF CONTENTS Technical.pdf PDF
10 44 16.pdf PDF
32 11 23.pdf PDF
08 11 13.pdf PDF
07 31 13.pdf PDF
03 20 00.00 10.pdf PDF
09 29 00.pdf PDF
08 34 01.pdf PDF
08 52 00.pdf PDF
23 70 03.pdf PDF
Show 40 more

Latest 50 of 184 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 1 Section 32 01 16

SECTION 32 01 16

COLD MILLING; ASPHALTIC CONCRETE

Part 1 General

This specification covers the removal of the existing bituminous surface by cold milling to the depths and limits shown on the drawings or as established by the Contracting Officer. It also includes the loading and stockpiling or disposal of the milled material.

1.1 Unit Prices

1.1.1 Measurement

The unit of measurement for milling shall be square yards.

1.1.2 Payment

Payment will be to the nearest square yard. No payment will be made for milling outside of the specified area of work.

1.2 Equipment, Tools, and Machines

All equipment, tools and machine used in the performance of the work shall be maintained in a satisfactory working condition.

1.2.1 Cold-Milling Machine

1.2.1.1 The cold-milling machine shall be a self-propelled machine capable of milling the pavement to a specified depth and smoothness.

1.2.1.2 The milling machine shall have effective means of

controlling transverse slope.

1.2.1.3 The milling machine shall have an effective means of

controlling dust produced during the pavement milling operation.

1.2.1.4 The milling machine shall not cause damage to any part of the pavement structure that is not to be removed.

1.2.2 Cleaning Equipment

1.2.2.1 All cleaning equipment shall be suitable for removing and cleaning loose material from the pavement surface.

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 2 Section 32 01 16

1.3 Quality Assurance

1.3.1 Grade

1.3.1.1 The finished mill surfaces shall conform to the lines, grades, and cross sections indicated on the drawings.

1.3.1.2 Finished surfaces at a juncture with other pavements shall coincide with the finished surfaces of the abutting pavements.

1.3.2 Traffic Control

1.3.2.1 Provide all necessary traffic controls during the milling operation.

PART 2 PRODUCTS – Not Used

PART 3 EXECUTION

3.1 Preparation of Surface

3.1.1 The pavement surface shall be cleaned of excessive dirt, clay, or other foreign material immediately prior to milling the pavement.

3.2 Milling Operation

3.2.1 Sufficient passes shall be made so that the designated area is milled to the grades and cross sections indicated on the drawings.

3.2.2 The Contractor shall collect, remove, haul, and dispose of all asphalt millings off site in accordance with all applicable local regulations.

3.2.3 Any items, such as manholes, valve boxes, and utility

lines, damaged or any pavement that is torn, gouged, broken, or undercut shall be repaired or replaced as directed by the Contracting Officer.

3.3 Removal of Material

3.3.1 Milled material shall be removed from the project site to a stockpile area designated by the contracting officer or shall be disposed of, off base, in accordance with all local, state and federal regulations.

- End of Section -