This is a Technical Specification document for sodding work at Tinker Air Force Base, Oklahoma, dated April 2019.

The specification establishes comprehensive requirements for grass sodding operations, including site preparation, material standards, installation procedures, and post-installation maintenance. Sod must be nursery-grade cultivated grass with a fibrous root system, cut into pieces not exceeding one square yard with soil thickness between three-fourths and one inch, and be 95 percent free from noxious weeds. Fertilizer materials must contain 10% nitrogen, 20% phosphoric acid, and 10% potash. Soil amendments are required but vermiculite is explicitly prohibited. Sod delivery must include vendor certification of botanical and common names with purity percentages, and fertilizer must include manufacturer certificates of inspection and analysis. The contractor is responsible for providing non-toxic water unless otherwise specified. Installation must follow Turfgrass Producers International standards with sod laid at right angles to slopes, starting at slope bottoms, with anchoring required on slopes steeper than 3-horizontal-to-1-vertical. Immediate post-installation watering to saturate the upper four inches of soil is mandatory, followed by rolling with equipment weighing between 150 and 250 pounds. Establishment care includes maintaining minimum one inch of absorbed water weekly, mowing to one and one-half inches when grass reaches three inches height, and applying fertilizer one week after sodding. The contractor must maintain sodded areas until project acceptance, including weed and pest control, erosion protection, and repair of any damage occurring prior to final acceptance. All submittals require government approval, and the Contracting Officer reserves the right to suspend operations during unsuitable weather conditions.

View the file

Other files

File Type Posted
190023 Reno Restrooms B117 Pre Bid RFI Follow Up_COR_Signed.pdf PDF
Solicitation Amendment FA813726R00300001 SF 30.pdf PDF
23 08 00.pdf PDF
23 35 00.pdf PDF
07 60 00.pdf PDF
03 39 00.00 10.pdf PDF
32 01 14.pdf PDF
32 12 15.pdf PDF
07 42 13.pdf PDF
26 51 00.pdf PDF
33 11 00.pdf PDF
26 00 00.00 20.pdf PDF
10 21 13.pdf PDF
23 82 16.00 40.pdf PDF
32 13 14.pdf PDF
09 51 00.pdf PDF
08 41 13.pdf PDF
32 12 10.1.pdf PDF
07 14 00.pdf PDF
23 52 00.pdf PDF
08 34 19.10 20.pdf PDF
08 51 23.pdf PDF
07 41 13.pdf PDF
07 24 00.pdf PDF
05 50 13.pdf PDF
26 20 00.pdf PDF
26 23 00.pdf PDF
23 05 15.pdf PDF
23 64 26.pdf PDF
23 00 00.pdf PDF
07 61 14.00 20.pdf PDF
03 62 16.pdf PDF
10 14 00.10.pdf PDF
32 01 16.pdf PDF
09 90 00.pdf PDF
06 41 16.00 10.pdf PDF
23 31 13.00 40.pdf PDF
26 41 00.pdf PDF
09 72 00.pdf PDF
05 40 00.pdf PDF
000_TABLE OF CONTENTS Technical.pdf PDF
10 44 16.pdf PDF
32 11 23.pdf PDF
08 11 13.pdf PDF
07 31 13.pdf PDF
03 20 00.00 10.pdf PDF
09 29 00.pdf PDF
08 34 01.pdf PDF
08 52 00.pdf PDF
23 70 03.pdf PDF
Show 40 more

Latest 50 of 184 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 1 Section 32 92 23

SECTION 32 92 23

SODDING

PART 1 GENERAL

Areas shall be sodded as specified in this section.

Sodding shall not be performed until final grading is inspected and approved.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. Unless specifically noted, the current edition of the reference will be used.

TURFGRASS PRODUCERS INTERNATIONAL (TPI)

TPI GSS Guideline Specifications to Turfgrass

Sodding.

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM C 602 Agricultural Liming Materials

ASTM D 4972 pH of Soils

ASTM D 5268 Topsoil Used for Landscaping Purposes

ASTM D 5883 Standard Guide for Use of Rotary Kiln Produced Expanded Shale, Clay or Slate (ESCS) as a Mineral Amendment in Topsoil Used for Landscaping and Related Purposes

OKLAHOMA STATE UNIVERSITY (OSU); Cooperative Extension Service

HLA-6418 Selecting a Lawn Grass for Oklahoma

HLA-6419 Establishing a Lawn in Oklahoma

April 2019 Page 2 Section 32 92 23

1.2 SUBMITTALS

Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00; SUBMITTAL

PROCEDURES:

SD-07 Certificates

Sod, Fertilizer

Prior to the delivery of materials, submit certificates of compliance attesting that materials meet the specified requirements. Certified copies of the material certificates shall include the following:

1.2.1 Sod. A sod vendor's certified statement shall be submitted for each sod type stating the botanical and common name for the sod and its percentage of purity.

1.2.2 Fertilizer. Certificates of inspection and manufacturer's or vendor's certified analyses for fertilizer materials shall be submitted.

1.3 DELIVERY, STORAGE, AND HANDLING

1.3.1 Delivery

1.3.1.1 Packaged materials shall be delivered in containers showing the weight, analysis and name of manufacturer.

1.3.1.2 Sod shall be protected from deterioration, drying and contamination during delivery.

1.3.1.3 Soil Amendments

Soil amendments shall be delivered to the site in the original, unopened containers bearing the manufacturer's chemical analysis. In lieu of containers, soil amendments may be furnished in bulk. A chemical analysis shall be provided for bulk deliveries.

1.3.1.4 Inspection

a) Sod shall be inspected upon arrival at the job site for conformity to species and quality. Sod that is unacceptable shall be removed from the jobsite immediately.

b) Other materials shall be inspected for compliance with specified requirements. The following shall be rejected:

open soil amendment containers or wet soil amendments.

April 2019 Page 3 Section 32 92 23

Unacceptable materials shall be removed from the job site.

1.3.2 Storage

Materials shall be stored in designated areas.

1.3.2.1 Sod shall be sprinkled with water and covered with moist burlap, straw or another approved covering and protected from exposure to wind and direct sunlight. Covering shall be such that air can circulate and heat will not be confined.

1.3.2.2 Fertilizer shall be stored in cool, dry location away from contaminants.

1.3.2.3 Chemical treatment materials shall be stored according to the manufacturer's instructions and not with sodding operation materials.

1.3.3 Handling

Except for bulk deliveries of rock, sand or soil, materials shall not be dropped or dumped from vehicles.

PART 2 PRODUCTS

2.1 SOD

Sod shall be nursery grade cultivated grass sod to match existing fibrous root system and shall be free from stones and burned or bare spots and shall be 95 percent free from noxious weeds.

2.1.1 Sod Cutting

Cut sod using an approved method in accordance with Turfgrass Producers International standards. Cut sod in pieces not exceeding one square yard with a soil portion thickness a minimum of three fourths of an inch and a maximum of one inch.

2.2 SOIL AMENDMENTS

Soil amendments shall consist of fertilizer, organic material and soil conditioners. Vermiculite shall not be used.

April 2019 Page 4 Section 32 92 23

2.2.1 Fertilizer

Fertilizer materials shall contain the following percentage of components by weight:

10% Nitrogen 20% Phosphoric Acid 10% Potash

2.3 WATER

Water shall be the responsibility of the Contractor, unless otherwise noted. Water shall not contain elements toxic to plant life.

PART 3 EXECUTION

3.1 PLANTING SEASON AND WEATHER RESTRICTIONS

3.1.1 Perform sodding during the planting season.

3.1.2 The Contractor may perform sodding during a non-planting season if the Contractor submits a written letter guaranteeing growth at the beginning of the next planting season and the guarantee is accepted by the CO.

3.1.3 If a non-planting season interrupts the placement of sod, resume work at the beginning of the next planting season.

3.1.4 If a non-planting season interrupts the placement of sod required for erosion control, then the Contractor shall install temporary sod on the areas.

3.1.5 The CO reserves the right to suspend sodding operations during periods of excessively cold, hot, wet or dry conditions.

3.2 PREPARATION OF SUBGRADE FOR SOD

3.2.1 Fine grade sub-grade, eliminating uneven areas and low

spots. Maintain lines, levels, profiles, and contours. Make changes in grade gradual. Blend slopes into level areas.

3.2.2 Remove foreign materials, undesirable plants and their

roots, stones and debris. Do not bury foreign material beneath areas to be sodded. Remove sub-soil which has been contaminated with petroleum products.

April 2019 Page 5 Section 32 92 23

3.3 LAYING SOD

3.3.1 Sodding shall be accomplished in accordance with the TPI

Guideline Specifications for Sodding. Sod shall always be laid at right angles to slopes or the flow of water. On slope areas, sodding shall be started at the bottom of the slope. Sod sections shall be anchored on slopes steeper than 3-horizonal-to-1-vertical. Anchoring may be required when surface weight or pressure upon placed sod sections is anticipated to cause lateral movement. Sod anchors shall be placed a minimum 2 feet on caters with a minimum 2 anchors per sod section.

3.3.2 Lay sod as soon as possible after delivery to prevent

deterioration.

3.3.3 Lay sod closely knit together with no open joints visible, and pieces not overlapped. Lay smooth and flush with adjoining grass areas and paving. Frayed edges shall be trimmed, and holes or missing corners shall be patched.

3.3.4 Water sodded areas immediately after installation. Apply sufficient water to saturate the new sod and the upper 4 inches of soil.

3.3.5 After the sod and soil have dried sufficiently to prevent damage, roll sodded areas to ensure good bond between sod and soil and to remove minor depressions and irregularities. Ensure rolling equipment weight is not over 250 pounds or less than 150 pounds.

3.4 ESTABLISHMENT OF TURF

3.4.1 The Contractor shall care for the sodded areas after

installation until the acceptance of the entire project.

3.4.2 Establishment of turf shall include watering, mowing, and protection of embankments and ditches from erosion.

3.4.3 Watering

Newly sodded areas shall be watered frequently to maintain an adequate supply of moisture within the root zone, but not less than one inch of absorbed water per week shall be furnished.

April 2019 Page 6 Section 32 92 23

3.4.4 Mowing

Sodded areas shall be mowed to a height of one and one-half inches whenever the average height of grass becomes three inches.

3.4.5 Fertilizing

An application of fertilizer (10-20-10) shall be made one week after sodding at the rate of 1.8 lb. of nitrogen per 1,000 square feet.

3.4.5.1 Fertilizer shall not be applied without prior written notice as to the quantity and area to be covered.

Fertilizer to be used shall be stored on the site and not used until it is inspected and approved by the Contracting Officer as to its conformance to quality requirements. Any fertilizer applied without prior knowledge or observation by the Contracting Officer will be at contractor's expense and considered as not applied.

3.4.6 Maintenance During Establishment

3.4.6.1 Maintenance of the sodded areas shall include eradicating weeds, insects, and diseases; protecting embankments and ditches from surface erosion; maintaining erosion control materials;

protecting installed areas from traffic; mowing; watering; and post-fertilization.

3.5 SURFACE EROSION CONTROL

3.5.1 Surface Erosion Control Material

3.5.1.1 Where indicated or as directed, surface erosion control material shall be installed in accordance with manufacturer's instructions. Placement of the material shall be accomplished without damage to installed material or without deviation to finished grade.

3.6 QUANTITY CHECK

For materials provided in bags, the empty bags shall be retained for recording the amount used. For materials provided in bulk, the weight certificates shall be retained as a record of the amount used. The amount of material used shall be compared with the total area covered to determine the rate of application used. Differences between the quantity applied and the quantity specified shall be adjusted as directed.

April 2019 Page 7 Section 32 92 23

3.7 RESTORATION AND CLEAN UP

3.7.1 Restoration

Existing turf areas, pavements, and facilities that have been damaged from the sodding operation shall be restored to original condition at Contractor's expense.

3.7.2 Clean Up

Excess and waste material shall be removed from the sodded areas and shall be disposed offsite. Adjacent paved areas shall be cleaned.

3.8 PROTECTION OF SODDED AREAS

Sodded areas shall be protected from damage or disturbance after planting operations are complete.

Damage resulting from erosion, gullies, washouts, or other causes, shall be repaired by filling with topsoil, tamping, and re-sodding by the Contractor at his expense, if such damage occurs prior to acceptance of the project.

- End of Section -

PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.1.3 Soil Amendments
1.3.1.4 Inspection
1.3.2 Storage
1.3.3 Handling
PART 2 PRODUCTS
2.1 SOD
2.1.1 Sod Cutting
2.2 SOIL AMENDMENTS
2.2.1 Fertilizer

2.3 WATER

PART 3 EXECUTION
3.2 PREPARATION OF SUBGRADE FOR SOD
3.3 LAYING SOD
3.4 ESTABLISHMENT OF TURF
3.4.3 Watering
3.4.4 Mowing
3.4.5 Fertilizing

File details come from the government source that posted it. Updated .