32 92 23.pdf
PDF 26 KB Posted
- Solicitation number
- FA813726R0030
About this file
This is a Technical Specification document for sodding work at Tinker Air Force Base, Oklahoma, dated April 2019.
The specification establishes comprehensive requirements for grass sodding operations, including site preparation, material standards, installation procedures, and post-installation maintenance. Sod must be nursery-grade cultivated grass with a fibrous root system, cut into pieces not exceeding one square yard with soil thickness between three-fourths and one inch, and be 95 percent free from noxious weeds. Fertilizer materials must contain 10% nitrogen, 20% phosphoric acid, and 10% potash. Soil amendments are required but vermiculite is explicitly prohibited. Sod delivery must include vendor certification of botanical and common names with purity percentages, and fertilizer must include manufacturer certificates of inspection and analysis. The contractor is responsible for providing non-toxic water unless otherwise specified. Installation must follow Turfgrass Producers International standards with sod laid at right angles to slopes, starting at slope bottoms, with anchoring required on slopes steeper than 3-horizontal-to-1-vertical. Immediate post-installation watering to saturate the upper four inches of soil is mandatory, followed by rolling with equipment weighing between 150 and 250 pounds. Establishment care includes maintaining minimum one inch of absorbed water weekly, mowing to one and one-half inches when grass reaches three inches height, and applying fertilizer one week after sodding. The contractor must maintain sodded areas until project acceptance, including weed and pest control, erosion protection, and repair of any damage occurring prior to final acceptance. All submittals require government approval, and the Contracting Officer reserves the right to suspend operations during unsuitable weather conditions.
View the file
Other files
Show 40 more
Latest 50 of 184 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tinker AFB, OK TAFB Technical Specifications 2019
April 2019 Page 1 Section 32 92 23
SECTION 32 92 23
SODDING
PART 1 GENERAL
Areas shall be sodded as specified in this section.
Sodding shall not be performed until final grading is inspected and approved.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. Unless specifically noted, the current edition of the reference will be used.
TURFGRASS PRODUCERS INTERNATIONAL (TPI)
TPI GSS Guideline Specifications to Turfgrass
Sodding.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 602 Agricultural Liming Materials
ASTM D 4972 pH of Soils
ASTM D 5268 Topsoil Used for Landscaping Purposes
ASTM D 5883 Standard Guide for Use of Rotary Kiln Produced Expanded Shale, Clay or Slate (ESCS) as a Mineral Amendment in Topsoil Used for Landscaping and Related Purposes
OKLAHOMA STATE UNIVERSITY (OSU); Cooperative Extension Service
HLA-6418 Selecting a Lawn Grass for Oklahoma
HLA-6419 Establishing a Lawn in Oklahoma
April 2019 Page 2 Section 32 92 23
1.2 SUBMITTALS
Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00; SUBMITTAL
PROCEDURES:
SD-07 Certificates
Sod, Fertilizer
Prior to the delivery of materials, submit certificates of compliance attesting that materials meet the specified requirements. Certified copies of the material certificates shall include the following:
1.2.1 Sod. A sod vendor's certified statement shall be submitted for each sod type stating the botanical and common name for the sod and its percentage of purity.
1.2.2 Fertilizer. Certificates of inspection and manufacturer's or vendor's certified analyses for fertilizer materials shall be submitted.
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.1.1 Packaged materials shall be delivered in containers showing the weight, analysis and name of manufacturer.
1.3.1.2 Sod shall be protected from deterioration, drying and contamination during delivery.
1.3.1.3 Soil Amendments
Soil amendments shall be delivered to the site in the original, unopened containers bearing the manufacturer's chemical analysis. In lieu of containers, soil amendments may be furnished in bulk. A chemical analysis shall be provided for bulk deliveries.
1.3.1.4 Inspection
a) Sod shall be inspected upon arrival at the job site for conformity to species and quality. Sod that is unacceptable shall be removed from the jobsite immediately.
b) Other materials shall be inspected for compliance with specified requirements. The following shall be rejected:
open soil amendment containers or wet soil amendments.
April 2019 Page 3 Section 32 92 23
Unacceptable materials shall be removed from the job site.
1.3.2 Storage
Materials shall be stored in designated areas.
1.3.2.1 Sod shall be sprinkled with water and covered with moist burlap, straw or another approved covering and protected from exposure to wind and direct sunlight. Covering shall be such that air can circulate and heat will not be confined.
1.3.2.2 Fertilizer shall be stored in cool, dry location away from contaminants.
1.3.2.3 Chemical treatment materials shall be stored according to the manufacturer's instructions and not with sodding operation materials.
1.3.3 Handling
Except for bulk deliveries of rock, sand or soil, materials shall not be dropped or dumped from vehicles.
PART 2 PRODUCTS
2.1 SOD
Sod shall be nursery grade cultivated grass sod to match existing fibrous root system and shall be free from stones and burned or bare spots and shall be 95 percent free from noxious weeds.
2.1.1 Sod Cutting
Cut sod using an approved method in accordance with Turfgrass Producers International standards. Cut sod in pieces not exceeding one square yard with a soil portion thickness a minimum of three fourths of an inch and a maximum of one inch.
2.2 SOIL AMENDMENTS
Soil amendments shall consist of fertilizer, organic material and soil conditioners. Vermiculite shall not be used.
April 2019 Page 4 Section 32 92 23
2.2.1 Fertilizer
Fertilizer materials shall contain the following percentage of components by weight:
10% Nitrogen 20% Phosphoric Acid 10% Potash
2.3 WATER
Water shall be the responsibility of the Contractor, unless otherwise noted. Water shall not contain elements toxic to plant life.
PART 3 EXECUTION
3.1 PLANTING SEASON AND WEATHER RESTRICTIONS
3.1.1 Perform sodding during the planting season.
3.1.2 The Contractor may perform sodding during a non-planting season if the Contractor submits a written letter guaranteeing growth at the beginning of the next planting season and the guarantee is accepted by the CO.
3.1.3 If a non-planting season interrupts the placement of sod, resume work at the beginning of the next planting season.
3.1.4 If a non-planting season interrupts the placement of sod required for erosion control, then the Contractor shall install temporary sod on the areas.
3.1.5 The CO reserves the right to suspend sodding operations during periods of excessively cold, hot, wet or dry conditions.
3.2 PREPARATION OF SUBGRADE FOR SOD
3.2.1 Fine grade sub-grade, eliminating uneven areas and low
spots. Maintain lines, levels, profiles, and contours. Make changes in grade gradual. Blend slopes into level areas.
3.2.2 Remove foreign materials, undesirable plants and their
roots, stones and debris. Do not bury foreign material beneath areas to be sodded. Remove sub-soil which has been contaminated with petroleum products.
April 2019 Page 5 Section 32 92 23
3.3 LAYING SOD
3.3.1 Sodding shall be accomplished in accordance with the TPI
Guideline Specifications for Sodding. Sod shall always be laid at right angles to slopes or the flow of water. On slope areas, sodding shall be started at the bottom of the slope. Sod sections shall be anchored on slopes steeper than 3-horizonal-to-1-vertical. Anchoring may be required when surface weight or pressure upon placed sod sections is anticipated to cause lateral movement. Sod anchors shall be placed a minimum 2 feet on caters with a minimum 2 anchors per sod section.
3.3.2 Lay sod as soon as possible after delivery to prevent
deterioration.
3.3.3 Lay sod closely knit together with no open joints visible, and pieces not overlapped. Lay smooth and flush with adjoining grass areas and paving. Frayed edges shall be trimmed, and holes or missing corners shall be patched.
3.3.4 Water sodded areas immediately after installation. Apply sufficient water to saturate the new sod and the upper 4 inches of soil.
3.3.5 After the sod and soil have dried sufficiently to prevent damage, roll sodded areas to ensure good bond between sod and soil and to remove minor depressions and irregularities. Ensure rolling equipment weight is not over 250 pounds or less than 150 pounds.
3.4 ESTABLISHMENT OF TURF
3.4.1 The Contractor shall care for the sodded areas after
installation until the acceptance of the entire project.
3.4.2 Establishment of turf shall include watering, mowing, and protection of embankments and ditches from erosion.
3.4.3 Watering
Newly sodded areas shall be watered frequently to maintain an adequate supply of moisture within the root zone, but not less than one inch of absorbed water per week shall be furnished.
April 2019 Page 6 Section 32 92 23
3.4.4 Mowing
Sodded areas shall be mowed to a height of one and one-half inches whenever the average height of grass becomes three inches.
3.4.5 Fertilizing
An application of fertilizer (10-20-10) shall be made one week after sodding at the rate of 1.8 lb. of nitrogen per 1,000 square feet.
3.4.5.1 Fertilizer shall not be applied without prior written notice as to the quantity and area to be covered.
Fertilizer to be used shall be stored on the site and not used until it is inspected and approved by the Contracting Officer as to its conformance to quality requirements. Any fertilizer applied without prior knowledge or observation by the Contracting Officer will be at contractor's expense and considered as not applied.
3.4.6 Maintenance During Establishment
3.4.6.1 Maintenance of the sodded areas shall include eradicating weeds, insects, and diseases; protecting embankments and ditches from surface erosion; maintaining erosion control materials;
protecting installed areas from traffic; mowing; watering; and post-fertilization.
3.5 SURFACE EROSION CONTROL
3.5.1 Surface Erosion Control Material
3.5.1.1 Where indicated or as directed, surface erosion control material shall be installed in accordance with manufacturer's instructions. Placement of the material shall be accomplished without damage to installed material or without deviation to finished grade.
3.6 QUANTITY CHECK
For materials provided in bags, the empty bags shall be retained for recording the amount used. For materials provided in bulk, the weight certificates shall be retained as a record of the amount used. The amount of material used shall be compared with the total area covered to determine the rate of application used. Differences between the quantity applied and the quantity specified shall be adjusted as directed.
April 2019 Page 7 Section 32 92 23
3.7 RESTORATION AND CLEAN UP
3.7.1 Restoration
Existing turf areas, pavements, and facilities that have been damaged from the sodding operation shall be restored to original condition at Contractor's expense.
3.7.2 Clean Up
Excess and waste material shall be removed from the sodded areas and shall be disposed offsite. Adjacent paved areas shall be cleaned.
3.8 PROTECTION OF SODDED AREAS
Sodded areas shall be protected from damage or disturbance after planting operations are complete.
Damage resulting from erosion, gullies, washouts, or other causes, shall be repaired by filling with topsoil, tamping, and re-sodding by the Contractor at his expense, if such damage occurs prior to acceptance of the project.
- End of Section -
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.3.1 Delivery |
| 1.3.1.3 Soil Amendments |
| 1.3.1.4 Inspection |
| 1.3.2 Storage |
| 1.3.3 Handling |
| PART 2 PRODUCTS |
| 2.1 SOD |
| 2.1.1 Sod Cutting |
| 2.2 SOIL AMENDMENTS |
| 2.2.1 Fertilizer |
2.3 WATER
| PART 3 EXECUTION |
| 3.2 PREPARATION OF SUBGRADE FOR SOD |
| 3.3 LAYING SOD |
| 3.4 ESTABLISHMENT OF TURF |
| 3.4.3 Watering |
| 3.4.4 Mowing |
| 3.4.5 Fertilizing |
File details come from the government source that posted it. Updated .