03 39 00.00 10.pdf

PDF 11 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for concrete curing at Tinker Air Force Base, Oklahoma, dated April 2019 (Section 03 39 00.00 10).

The specification establishes requirements for concrete curing materials and procedures. Contractors must provide curing materials in accordance with ACI 301 Sections 5 and ACI 308.1 Section 2, and submit product data and manufacturer's instructions for concrete curing compounds. Water used for curing must be fresh, clean, potable, and free of injurious amounts of oil, acid, salt, or alkali; non-potable water is acceptable if it meets ASTM C1602/C1602M standards. Concrete must be cured and protected in accordance with ACI 301 Section 5. The specification requires submittals with government approval designation "G" for curing materials product data, testing and inspection reports for Contractor Quality Control, and curing compound manufacturer's instructions. Materials must be stored to prevent contamination and deterioration while maintaining accurate identification after opening.

The specification mandates extensive testing and inspection for quality control compliance. Contractors must conduct moist curing inspections at least once per shift and twice daily on both workdays and non-workdays, recording surface moisture conditions. Membrane curing inspections require verification that curing compound is properly mixed before application and measurement of coverage rates in square feet per gallon, with re-spraying required if coverage is less than specified or non-uniform. Sheet curing inspections must occur at least once per shift and once daily on non-workdays, documenting covering condition and lap/tape tightness. Any deficiencies identified in daily inspection reports require immediate corrective action and a one-day extension to the required curing period for affected areas.

View the file

Other files

File Type Posted
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
000_TABLE OF CONTENTS Technical.pdf PDF
05 05 23.16.pdf PDF
05 12 00.pdf PDF
05 30 00.pdf PDF
05 40 00.pdf PDF
05 50 13.pdf PDF
06 41 16.00 10.pdf PDF
07 24 00.pdf PDF
07 41 13.pdf PDF
07 51 13.pdf PDF
00 71 00.pdf PDF
01 78 23.pdf PDF
00 70 00.pdf PDF
00 80 05.pdf PDF
01 33 00.pdf PDF
01 45 00.00 10.pdf PDF
01 50 00.pdf PDF
WWYK20190023_REV02_19MAY2026.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Section M - Evaluation Factors for Award.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 03 39 00. 00 10

CONCRETE CURI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE I NTERNATI ONAL ( ACI )

ACI 301 ( 2010; ERTA 2015) Speci f i cat i ons f or St r uct ur al Concr et e

ACI 301M ( 2010; ERTA 2015) Met r i c Speci f i cat i ons f or St r uct ur al Concr et e

ACI 308. 1 ( 2011) Speci f i cat i on f or Cur i ng Concr et e

ASTM I NTERNATI ONAL ( ASTM)

ASTM C1602/ C1602M ( 2012) St andar d Speci f i cat i on f or Mi xi ng Wat er Used i n Pr oduct i on of Hydr aul i c Cement Concr et e

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Cur i ng Mat er i al s

SD- 06 Test Repor t s

Test i ng and I nspect i on f or CQC

SD- 08 Manuf act ur er ' s I nst r uct i ons

Cur i ng Compound

1. 3 DELI VERY, STORAGE, AND HANDLI NG

St or e mat er i al s i n such a manner as t o avoi d cont ami nat i on and det er i or at i on. Mat er i al s must be capabl e of bei ng accur at el y i dent i f i ed af t er bundl es or cont ai ner s ar e opened.

Apr i l 2019 Page 1 SECTI ON 03 39 00. 00 10

PART 2 PRODUCTS

2. 1 CURI NG MATERI ALS

Pr ovi de cur i ng mat er i al s i n accor dance wi t h ACI 301 Sect i ons 5 and ACI 308. 1 Sect i on 2. Submi t pr oduct dat a and manuf act ur er ' s i nst r uct i ons f or concr et e cur i ng compound.

2. 2 WATER

Pr ovi de wat er f or cur i ng t hat i s f r esh, c l ean, pot abl e, and f r ee of i nj ur i ous amount s of oi l , aci d, sal t , or al kal i , except t hat non- pot abl e wat er may be used i f i t meet s t he r equi r ement s of ASTM C1602/ C1602M.

PART 3 EXECUTI ON

3. 1 CURI NG AND PROTECTI ON

Cur e and pr ot ect concr et e i n accor dance wi t h ACI 301 Sect i on 5.

3. 2 TESTI NG AND I NSPECTI ON FOR CQC

Per f or m t he i nspect i on and t est s descr i bed bel ow and, based upon t he r esul t s of t hese i nspect i ons and t est s, t ake t he act i on r equi r ed. Submi t cer t i f i ed copi es of l abor at or y t est r epor t s, i ncl udi ng cur i ng compound pr oposed f or use on t hi s pr oj ect .

3. 2. 1 Moi st Cur i ng I nspect i ons

At l east once each shi f t , and not l ess t han t wi ce per day on bot h wor k and non- wor k days, i nspect al l ar eas subj ect t o moi st cur i ng. Not e and r ecor d t he sur f ace moi st ur e condi t i on.

3. 2. 2 Moi st Cur i ng Cor r ect i ve Act i one

When a dai l y i nspect i on r epor t l i s t s an ar ea of i nadequat e cur i ng, t ake i mmedi at e cor r ect i ve act i on, and ext end t he r equi r ed cur i ng per i od f or t hose ar eas by 1 day.

3. 2. 3 Membr ane Cur i ng I nspect i on

Appl y no cur i ng compound unt i l t he Cont r act or has ver i f i ed t hat t he compound i s pr oper l y mi xed and r eady f or spr ayi ng. At t he end of each oper at i on, est i mat e t he quant i t y of compound used by measur ement of t he cont ai ner and t he ar ea of concr et e sur f ace cover ed, comput e t he r at e of cover age i n squar e f eet / gal l on, and not e whet her or not cover age i s uniform.

3. 2. 4 Membr ane Cur i ng Cor r ect i ve Act i on

When t he cover age r at e of t he cur i ng compound i s l ess t han t hat speci f i ed or when t he cover age i s not uni f or m, spr ay t he ent i r e sur f ace agai n.

3. 2. 5 Sheet Cur i ng I nspect i on

At l east once each shi f t and once per day on non- wor k days, i nspect i on al l ar eas bei ng cur ed usi ng i mper vi ous sheet s. Not e and r ecor d t he condi t i on of t he cover i ng and t he t i ght ness of t he l aps and t apes.

Apr i l 2019 Page 2 SECTI ON 03 39 00. 00 10

3. 2. 6 Sheet Cur i ng Cor r ect i ve Act i on

When a dai l y i nspect i on r epor t l i s t s any t ear s, hol es, or l aps or j oi nt s t hat ar e not compl et el y c l osed, pr ompt l y r epai r t he t ear s and hol es or r epl ace t he sheet s, c l ose t he j oi nt s, and ext end t he r equi r ed cur i ng per i od f or t hose ar eas by 1 day.

- - End of Sect i on - -

Apr i l 2019 Page 3 SECTI ON 03 39 00. 00 10

File details come from the government source that posted it. Updated .