32 13 14.pdf

PDF 13 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

Tinker AFB Technical Specifications for Non-Airfield Pavement (Section 32 13 14)

This document is a technical specification section establishing standards for non-airfield pavement construction at Tinker Air Force Base, Oklahoma, effective April 2019. The specification adopts the Oklahoma Department of Transportation (ODOT) Standard Specifications for Highway Construction as the baseline standard for all non-airfield paving work, including grading, drainage, roads, streets, parking facilities, storage areas, sidewalks, driveways, bridges, and associated signage, markings, lighting, and signalization. The applicable ODOT edition is determined by the date of the Notice to Proceed with design. The specification incorporates referenced standards from the Department of Defense Unified Facilities Criteria (UFC 1-200-01 General Building Requirements and UFC 3-201-01 Civil Engineering).

Key modifications to ODOT standards include: concrete strength specifications for roads, streets, and parking areas must be flexural with a minimum strength of 650 psi; pavements exceeding 8 inches in cumulative thickness require both drainage and separation layers (with fabric acceptable for separation); all curbs and gutters must be concrete and monolithic, installed separately from pavement; subgrade preparation must remove all plant materials and roots, with unsuitable material replaced or stabilized; and proof rolling of subgrades is mandatory with visual inspection for pumping, regardless of compaction test results. All materials must be sourced from the ODOT Approved Material Suppliers List and be ODOT-approved for their intended use. Contract-specific revisions and amendments appear in the special conditions, while pay quantities for IDIQ contracts are specified in line items rather than ODOT standards.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
00 71 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 1 Section 32 13 14

SECTION 32 13 14

PAVEMENT; NON-AIRFIELD

Part 1 GENERAL

1.1 SCOPE

The Standard Specifications for Highway Construction, as published by the Oklahoma Department of Transportation (ODOT), are adopted as the Tinker Air Force Base Standard Specifications for all non-airfield paving. Non-airfield paving includes, but is not limited to, grading, drainage, drainage structures, roads, streets, parking facilities, storage areas, sidewalks, driveways, bridges and all associated signage, markings, lighting and signalization. The edition shall be the edition current on the date of the Notice to Proceed (NTP) with design.

1.2 DEFINITIONS

Certain terms included in the ODOT Standard Specifications shall incorporate the following substitutions in their use:

a. For Commission substitute Base Civil Engineer and Contracting

Officer

b. For Department substitute Tinker Air Force Base

c. For Director substitute Base Civil Engineer

d. For Resident Engineer substitute Contracting Officer

e. For Engineer substitute 72 ABW/CE

f. For Materials Division substitute 72 ABW/CE

These substitutions do not in any way alter the requirement that all project correspondence be channelled through the Contracting Officer.

1.3 REFERENCES

UNITED STATES DEPARTMENT OF DEFENSE; UNIFIED FACILITIES CRITERIA

UFC 1-200-01 General Building Requirements

UFC 3-201-01 Civil Engineering

OKLAHOMA DEPARTMENT OF TRANSPORTATION (ODOT)

ODOT SSHC Standard Specifications for Highway Construction

Tinker AFB, OK TAFB Technical Specifications 2019

April 2019 Page 2 Section 32 13 14

Part 2 PROCEDURE

2.1 REVISIONS, AMENDMENTS AND CLARIFICATIONS

2.1.1 Contract specific revisions, amendments and clarifications to the ODOT SSHC shall be included in the special conditions of the Contract.

2.1.2 General revisions, amendments and clarifications to the

ODOT SSHC are as follows:

2.1.2.1 Pay quantities and units shall be as specified in the line items of the IDIQ Contract. For non IDIQ contracts the pay quantities and units shall be as specified in the ODOT SSHC.

2.1.2.2 Concrete strength for roads, streets and parking areas shall be specified as flexural and shall have a minimum strength of 650 psi.

2.1.2.3 All pavements with a thickness (the cumulative total of all layers above the subgrade)of greater than 8 inches shall require a drainage layer and a separation layer. The separation layer may be fabric.

2.1.2.4 All curbs and gutters shall be concrete and monolithic. They shall be placed separate from pavement.

2.1.2.5 When preparing the subgrade, all plant materials and roots shall be removed and the excavation filled with select fill.

2.1.2.6 When working the subgrade, all soft, yielding or other unsuitable material shall be removed and replaced or modified in place until stable.

2.1.2.7 When preparing subgrades, the subgrade shall be proof rolled with a large roller or loaded scraper and visually checked for pumping even if it meets compaction requirements. Pumping subgrade material shall be removed or treated until it is stable.

2.2 MATERIALS

2.2.1 All materials shall be from a source listed on the ODOT

Approved Material Supppiers List.

2.2.2 All materials shall be ODOT approved for the use intended.

-- End of Section --