26 29 23.pdf

PDF 42 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for Variable Frequency Drive (VFD) systems under 600 volts at Tinker Air Force Base, Oklahoma, dated April 2019 (Section 26 29 23).

The specification establishes comprehensive requirements for VFD equipment, enclosures, wiring, and associated components. Key VFD requirements include: input circuit breaker with 10,000 amps symmetrical interrupting capacity; full-wave bridge converter design with diode rectifiers (SCR devices prohibited); sine-coded pulse width modulated inverter stage for NEMA design B motors; capability to supply 120 percent rated current for one minute; operation from 480 volt, three-phase, 60 Hz supply with ±10 percent tolerance; independently adjustable acceleration and deceleration from one to 60 seconds; output frequency range of 3 Hz to 60 Hz without low-speed cogging; minimum 96 percent efficiency; solid-state motor overload protection; slip compensation for speed regulation within ±0.5 percent; and critical speed lockout functionality with minimum three user-selectable bandwidths. The VFD must include front-panel operator controls (manual speed potentiometer, Hand-Off-Auto switch, power indicators, and local display) and properly sized NEMA-rated bypass and isolation contactors with mechanical and electrical interlocks. The specification requires power line and sensor/control wiring surge protection per IEEE standards, electromagnetic interference suppression per 47 CFR 15 and MIL-STD-461 for Class A computing devices, and comprehensive safety compliance with NEMA, IEEE, NFPA, and UL standards. Contractors must submit shop drawings, product data, factory test plans and results, manufacturer instructions, and operation and maintenance documentation. The complete system carries a one-year manufacturer warranty, with on-site maintenance support available at 36-hour response time during the warranty period. Field quality control includes performance verification testing, 192-hour endurance testing at 0.9998 effectiveness level, and training for operations and engineering personnel.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
00 71 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 26 29 23

VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS

04/17

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

I EEE 519 ( 2014) Recommended Pr act i ces and Requi r ement s f or Har moni c Cont r ol i n El ect r i cal Power Syst ems

I EEE C62. 41. 1 ( 2002; R 2008) Gui de on t he Sur ges Envi r onment i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s

I EEE C62. 41. 2 ( 2002) Recommended Pr act i ce on Char act er i zat i on of Sur ges i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

NEMA 250 ( 2014) Encl osur es f or El ect r i cal Equi pment ( 1000 Vol t s Maxi mum)

NEMA I CS 1 ( 2000; R 2015) St andar d f or I ndust r i al Cont r ol and Syst ems: Gener al Requi r ement s

NEMA I CS 3. 1 ( 2009; R 2014) Gui de f or t he Appl i cat i on, Handl i ng, St or age, I nst al l at i on and Mai nt enance of Medi um- Vol t age AC Cont act or s, Cont r ol l er s and Cont r ol Cent er s

NEMA I CS 6 ( 1993; R 2011) Encl osur es

NEMA I CS 7 ( 2014) Adj ust abl e- Speed Dr i ves

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 70 ( 2014; AMD 1 2013; Er r at a 1 2013; AMD 2 2013; Er r at a 2 2013; AMD 3 2014; Er r at a 3- 4 2014; AMD 4- 6 2014) Nat i onal El ect r i cal Code

U. S. DEPARTMENT OF DEFENSE ( DOD)

MIL-STD-461 ( 2015; Rev G) Requi r ement s f or t he Cont r ol of El ect r omagnet i c I nt er f er ence Char act er i st i cs of Subsyst ems and Equi pment

Apr i l 2019 Page 1 SECTI ON 26 29 23

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

47 CFR 15 Radi o Fr equency Devi ces

UNDERWRI TERS LABORATORI ES ( UL)

UL 489 ( 2013; Repr i nt Mar 2014) Mol ded- Case Ci r cui t Br eaker s, Mol ded- Case Swi t ches, and Ci r cui t - Br eaker Encl osur es

UL 508C ( 2002; Repr i nt Nov 2010) Power Conver si on Equipment

1. 2 RELATED REQUI REMENTS

Sect i on 26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS, and Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM appl y t o t hi s sect i on wi t h addi t i ons and modi f i cat i ons speci f i ed her ei n.

1. 3 SYSTEM DESCRI PTI ON

1. 3. 1 Per f or mance Requi r ement s

1. 3. 1. 1 El ect r omagnet i c I nt er f er ence Suppr essi on

Comput i ng devi ces, as def i ned by 47 CFR 15, MIL-STD-461 r ul es and r egul at i ons, shal l be cer t i f i ed t o compl y wi t h t he r equi r ement s f or c l ass A comput i ng devi ces and l abel ed as set f or t h i n par t 15.

1. 3. 1. 2 El ect r omechani cal and El ect r i cal Component s

El ect r i cal and el ect r omechani cal component s of t he Var i abl e Fr equency Dr i ve ( VFD) shal l not cause el ect r omagnet i c i nt er f er ence t o adj acent el ect r i cal or el ect r omechani cal equi pment whi l e i n oper at i on.

1. 3. 2 El ect r i cal Requi r ement s

1. 3. 2. 1 Power Li ne Sur ge Pr ot ect i on

I EEE C62. 41. 1 and I EEE C62. 41. 2, I EEE 519 Cont r ol panel shal l have sur ge pr ot ect i on, i ncl uded wi t hi n t he panel t o pr ot ect t he uni t f r om damagi ng t r ansi ent vol t age sur ges. Sur ge ar r est or shal l be mount ed near t he i ncomi ng power sour ce and pr oper l y wi r ed t o al l t hr ee phases and gr ound.

Fuses shal l not be used f or sur ge pr ot ect i on.

1. 3. 2. 2 Sensor and Cont r ol Wi r i ng Sur ge Pr ot ect i on

I / O f unct i ons as speci f i ed shal l be pr ot ect ed agai nst sur ges i nduced on cont r ol and sensor wi r i ng i nst al l ed out door s and as shown. The i nput s and out put s shal l be t est ed i n bot h nor mal mode and common mode usi ng t he f ol l owi ng t wo wavef or ms:

a. A 10 mi cr osecond by 1000 mi cr osecond wavef or m wi t h a peak vol t age of 1500 vol t s and a peak cur r ent of 60 amper es.

b. An 8 mi cr osecond by 20 mi cr osecond wavef or m wi t h a peak vol t age of 1000 vol t s and a peak cur r ent of 500 amper es.

Apr i l 2019 Page 2 SECTI ON 26 29 23

1. 4 SUBMITTALS

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Schemat i c di agr ams;

I nt er connect i ng di agr ams;

I nst al l at i on dr awi ngs;

Submi t dr awi ngs f or gover nment appr oval pr i or t o equi pment const r uct i on or i nt egr at i on. Modi f i cat i ons t o or i gi nal dr awi ngs made dur i ng i nst al l at i on shal l be i mmedi at el y r ecor ded f or i ncl usi on i nt o t he as- bui l t dr awi ngs.

SD- 03 Pr oduct Dat a

Var i abl e f r equency dr i ves;

Wi r es and cabl es

Equi pment schedul e

I ncl ude dat a i ndi cat i ng compat i bi l i t y wi t h mot or s bei ng dr i ven.

SD- 06 Test Repor t s

VFD Test

Per f or mance Ver i f i cat i on Test s

Endur ance Test

SD- 08 Manuf act ur er ' s I nst r uct i ons

I nst al l at i on i nst r uct i ons

SD- 09 Manuf act ur er ' s Fi el d Repor t s

VFD Fact or y Test Pl an;

Fact or y t est r esul t s

SD- 10 Oper at i on and Mai nt enance Dat a

Var i abl e f r equency dr i ves, Dat a Package 4

Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA. Pr ovi de ser vi ce and mai nt enance i nf or mat i on i ncl udi ng pr event i ve mai nt enance, assembl y, and di sassembl y pr ocedur es. I ncl ude el ect r i cal dr awi ngs f r om el ect r i cal gener al sect i ons. Submi t addi t i onal i nf or mat i on necessar y t o pr ovi de compl et e oper at i on, r epai r , and mai nt enance i nf or mat i on, det ai l ed t o t he smal l est r epl aceabl e uni t . I ncl ude copi es of as- bui l t submi t t al s. Pr ovi de r out i ne pr event at i ve mai nt enance i nst r uct i ons, and equi pment r equi r ed. Pr ovi de i nst r uct i ons on how

Apr i l 2019 Page 3 SECTI ON 26 29 23 t o modi f y pr ogr am set t i ngs, and modi f y t he cont r ol pr ogr am.

Pr ovi de i nst r uct i ons on dr i ve adj ust ment , t r oubl e- shoot i ng, and conf i gur at i on. Pr ovi de i nst r uct i ons on pr ocess t uni ng and syst em calibration.

1. 5 QUALI TY ASSURANCE

1. 5. 1 Schemat i c Di agr ams

Show ci r cui t s and devi ce el ement s f or each r epl aceabl e modul e. Schemat i c di agr ams of pr i nt ed ci r cui t boar ds ar e per mi t t ed t o gr oup f unct i onal assembl i es as devi ces, pr ovi ded t hat suf f i c i ent i nf or mat i on i s pr ovi ded f or gover nment mai nt enance per sonnel t o ver i f y pr oper oper at i on of t he f unct i onal assembl i es.

1. 5. 2 I nt er connect i ng Di agr ams

Show i nt er connect i ons bet ween equi pment assembl i es, and ext er nal i nt er f aces, i ncl udi ng power and si gnal conduct or s. I ncl ude f or encl osur es and ext er nal devi ces.

1. 5. 3 I nst al l at i on Dr awi ngs

Show f l oor pl an of each si t e, wi t h V. F. D. ' s and mot or s i ndi cat ed.

I ndi cat e vent i l at i on r equi r ement s, adequat e c l ear ances, and cabl e r out es.

1. 5. 4 Equi pment Schedul e

Pr ovi de schedul e of equi pment suppl i ed. Schedul e shal l pr ovi de a cr oss r ef er ence bet ween manuf act ur er dat a and i dent i f i er s i ndi cat ed i n shop dr awi ngs. Schedul e shal l i ncl ude t he t ot al quant i t y of each i t em of equi pment suppl i ed. For compl et e assembl i es, such as VFD' s, pr ovi de t he ser i al number s of each assembl y, and a sub- schedul e of component s wi t hi n t he assembl y. Pr ovi de r ecommended spar e par t s l i s t i ng f or each assembl y or component .

1. 5. 5 I nst al l at i on i nst r uct i ons

Pr ovi de i nst al l at i on i nst r uct i ons i ssued by t he manuf act ur er of t he equi pment , i ncl udi ng not es and r ecommendat i ons, pr i or t o shi pment t o t he s i t e. Pr ovi de oper at i on i nst r uct i ons pr i or t o accept ance t est i ng.

1. 5. 6 Fact or y Test Resul t s

Document t est r esul t s and submi t t o gover nment wi t hi n 7 wor ki ng days af t er compl et i on of t est .

1. 6 DELI VERY AND STORAGE

Equi pment del i ver ed and pl aced i n st or age shal l be st or ed wi t h pr ot ect i on f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s.

1. 7 WARRANTY

The compl et e syst em shal l be war r ant ed by t he manuf act ur er f or a per i od of one year , or t he cont r act ed per i od of any ext ended war r ant ee agr eed upon by t he cont r act or and t he Gover nment , af t er successf ul compl et i on of t he accept ance t est . Any component f ai l i ng t o per f or m i t s f unct i on as

Apr i l 2019 Page 4 SECTI ON 26 29 23 speci f i ed and document ed shal l be r epai r ed or r epl aced by t he cont r act or at no addi t i onal cost t o t he Gover nment . I t ems r epai r ed or r epl aced shal l be war r ant ed f or an addi t i onal per i od of at l east one year f r om t he dat e t hat i t becomes f unct i onal agai n, as speci f i ed i n t he FAR CLAUSE 52. 246- 21.

1. 8 MAINTENANCE

1. 8. 1 Spar e Par t s

Manuf act ur er s pr ovi de spar e par t s i n accor dance wi t h r ecommended spar e par t s l i s t .

1. 8. 2 Mai nt enance Suppor t

Dur i ng t he war r ant y per i od, t he Cont r act or shal l pr ovi de on- si t e, on- cal l mai nt enance ser vi ces by Cont r act or ' s per sonnel on t he f ol l owi ng basi s:

The ser vi ce shal l be on a per - cal l basi s wi t h 36 hour r esponse.

Cont r act or shal l suppor t t he mai nt enance of al l har dwar e and sof t war e of t he syst em. Var i ous per sonnel of di f f er ent exper t i se shal l be sent on- si t e dependi ng on t he nat ur e of t he mai nt enance ser vi ce r equi r ed.

Cost s shal l i ncl ude t r avel , l ocal t r anspor t at i on, l i v i ng expenses, and l abor r at es of t he ser vi ce per sonnel whi l e r espondi ng t o t he ser vi ce r equest . The pr ovi s i ons of t hi s Sect i on ar e not i n l i eu of , nor r el i eve t he Cont r act or of , war r ant y r esponsi bi l i t i es cover ed i n t hi s speci f i cat i on. Shoul d t he r esul t of t he ser vi ce r equest be t he uncover i ng of a syst em def ect cover ed under t he war r ant y pr ovi s i ons, al l cost s f or t he cal l , i ncl udi ng t he l abor necessar y t o i dent i f y t he def ect , shal l be bor ne by t he Cont r act or .

PART 2 PRODUCTS

2. 1 VARI ABLE FREQUENCY DRI VES ( VFD)

Pr ovi de f r equency dr i ve t o cont r ol t he speed of i nduct i on mot or ( s) . The VFD shal l i ncl ude t he f ol l owi ng mi ni mum f unct i ons, f eat ur es and r at i ngs.

a. I nput c i r cui t br eaker per UL 489 wi t h a mi ni mum of 10, 000 amps symmet r i cal i nt er r upt i ng capaci t y and door i nt er l ocked ext er nal operator.

b. A conver t er st age per UL 508C shal l change f i xed vol t age, f i xed f r equency, ac l i ne power t o a f i xed dc vol t age. The conver t er shal l ut i l i ze a f ul l wave br i dge desi gn i ncor por at i ng di ode r ect i f i er s.

Si l i con Cont r ol l ed Rect i f i er s ( SCR) ar e not accept abl e. The conver t er shal l be i nsensi t i ve t o t hr ee phase r ot at i on of t he ac l i ne and shal l not cause di spl acement power f act or of l ess t han . 95 l aggi ng under any speed and l oad condi t i on.

c. An i nver t er st age shal l change f i xed dc vol t age t o var i abl e f r equency, var i abl e vol t age, ac f or appl i cat i on t o a st andar d NEMA desi gn B squi r r el cage mot or . The i nver t er shal l be swi t ched i n a manner t o pr oduce a s i ne coded pul se wi dt h modul at ed ( PWM) out put wavef or m.

d. The VFD shal l be capabl e of suppl y i ng 120 per cent of r at ed f ul l l oad cur r ent f or one mi nut e at maxi mum ambi ent t emper at ur e.

e. The VFD shal l be desi gned t o oper at e f r om a 480 vol t , pl us or mi nus 10 per cent , t hr ee phase, 60 Hz suppl y, and cont r ol mot or s wi t h a cor r espondi ng vol t age r at i ng.

Apr i l 2019 Page 5 SECTI ON 26 29 23 f . Accel er at i on and decel er at i on t i me shal l be i ndependent l y adj ust abl e f r om one second t o 60 seconds.

g. Adj ust abl e f ul l - t i me cur r ent l i mi t i ng shal l l i mi t t he cur r ent t o a pr eset val ue whi ch shal l not exceed 120 per cent of t he cont r ol l er r at ed cur r ent . The cur r ent l i mi t i ng act i on shal l mai nt ai n t he V/ Hz r at i o const ant so t hat var i abl e t or que can be mai nt ai ned. Shor t t i me st ar t i ng over r i de shal l al l ow st ar t i ng cur r ent t o r each 175 per cent of cont r ol l er r at ed cur r ent t o maxi mum st ar t i ng t or que.

h. The cont r ol l er s shal l be capabl e of pr oduci ng an out put f r equency over t he r ange of 3 Hz t o 60 Hz ( 20 t o one speed r ange) , wi t hout l ow speed coggi ng. Over f r equency pr ot ect i on shal l be i ncl uded such t hat a f ai l ur e i n t he cont r ol l er el ect r oni c c i r cui t r y shal l not cause f r equency t o exceed 110 per cent of t he maxi mum cont r ol l er out put f r equency sel ect ed.

i . Mi ni mum and maxi mum out put f r equency shal l be adj ust abl e over t he f ol l owi ng r anges: 1) Mi ni mum f r equency 3 Hz t o 50 per cent of maxi mum sel ect ed f r equency; 2) Maxi mum f r equency 40 Hz t o 60 Hz.

j . The cont r ol l er ef f i c i ency at any speed shal l not be l ess t han 96 percent.

k. The cont r ol l er s shal l be capabl e of bei ng r est ar t ed i nt o a mot or coast i ng i n t he f or war d di r ect i on wi t hout t r i ppi ng.

l . Pr ot ect i on of power semi conduct or component s shal l be accompl i shed wi t hout t he use of f ast act i ng semi conduct or out put f uses. Subj ect i ng t he cont r ol l er s t o any of t he f ol l owi ng condi t i ons shal l not r esul t i n component f ai l ur e or t he need f or f use r epl acement :

1. Shor t c i r cui t at cont r ol l er out put

2. Gr ound f aul t at cont r ol l er out put

3. Open ci r cui t at cont r ol l er out put

4. I nput under vol t age

5. I nput over vol t age

6. Loss of i nput phase

7. AC l i ne swi t chi ng t r ansi ent s

8. I nst ant aneous over l oad

9. Sust ai ned over l oad exceedi ng 115 per cent of cont r ol l er r at ed current

10. Over t emper at ur e

11. Phase r ever sal

m. Sol i d st at e mot or over l oad pr ot ect i on shal l be i ncl uded such t hat cur r ent exceedi ng an adj ust abl e t hr eshol d shal l act i vat e a 60 second t i mi ng ci r cui t . Shoul d cur r ent r emai n above t he t hr eshol d

Apr i l 2019 Page 6 SECTI ON 26 29 23 cont i nuousl y f or t he t i mi ng per i od, t he cont r ol l er wi l l aut omat i cal l y shut down.

n. A s l i p compensat i on c i r cui t shal l be i ncl uded whi ch wi l l sense changi ng mot or l oad condi t i ons and adj ust out put f r equency t o pr ovi de speed r egul at i on of NEMA B mot or s t o wi t hi n pl us or mi nus 0. 5 per cent of maxi mum speed wi t hout t he necessi t y of a t achomet er gener at or .

o. The VFD shal l be f act or y set f or manual r est ar t af t er t he f i r st pr ot ect i ve c i r cui t t r i p f or mal f unct i on ( over cur r ent , under vol t age, over vol t age or over t emper at ur e) or an i nt er r upt i on of power . The VFD shal l be capabl e of bei ng set f or aut omat i c r est ar t af t er a sel ect ed t i me del ay. I f t he dr i ve f aul t s agai n wi t hi n a speci f i ed t i me per i od ( adj ust abl e 0- 60 seconds) , a manual r est ar t wi l l be r equi r ed.

p. The VFD shal l i ncl ude ext er nal f aul t r eset capabi l i t y . Al l t he necessar y l ogi c t o accept an ext er nal f aul t r eset cont act shal l be included.

q. Pr ovi de cr i t i cal speed l ockout c i r cui t r y t o pr event oper at i ng at f r equenci es wi t h cr i t i cal har moni cs t hat cause r esonant v i br at i ons.

The VFD shal l have a mi ni mum of t hr ee user sel ect abl e bandwi dt hs.

r . Pr ovi de t he f ol l owi ng oper at or cont r ol and moni t or i ng devi ces mount ed on t he f r ont panel of t he VFD:

1. Manual speed pot ent i omet er .

2. Hand- Of f - Aut o ( HOA ) swi t ch.

3. Power on l i ght .

4. Dr i ve r un power l i ght .

5. Local di spl ay.

s. Pr ovi de pr oper l y s i zed NEMA r at ed by- pass and i sol at i on cont act or s t o enabl e oper at i on of mot or i n t he event of VFD f ai l ur e. Mechani cal and el ect r i cal i nt er l ocks shal l be i nst al l ed bet ween t he by- pass and i sol at i on cont act or s. Pr ovi de a sel ect or swi t ch and t r ansf er del ay timer.

2. 2 ENCLOSURES

Pr ovi de equi pment encl osur es conf or mi ng t o NEMA 250, NEMA I CS 7, NEMA I CS 6.

2. 3 WI RES AND CABLES

Al l wi r es and cabl es shal l conf or m t o NEMA 250, NEMA I CS 7, NFPA 70.

2. 4 NAMEPLATES

Namepl at es ext er nal t o NEMA encl osur es shal l conf or m wi t h t he r equi r ement s of Sect i on 26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS.

Namepl at es i nt er nal t o encl osur es shal l be manuf act ur er ' s st andar d, wi t h t he except i on t hat t hey must be per manent .

Apr i l 2019 Page 7 SECTI ON 26 29 23

2. 5 SOURCE QUALI TY CONTROL

2. 5. 1 VFD Fact or y Test Pl an

To ensur e qual i t y, each VFD shal l be subj ect t o a ser i es of i n- pl ant qual i t y cont r ol i nspect i ons bef or e appr oval f or shi pment f r om t he manuf act ur er ' s f aci l i t i es. Pr ovi de t est pl ans and t est r epor t s.

PART 3 EXECUTI ON

3. 1 INSTALLATION

Per NEMA I CS 3. 1, i nst al l equi pment i n accor dance wi t h t he appr oved manuf act ur er ' s pr i nt ed i nst al l at i on dr awi ngs, i nst r uct i ons, wi r i ng di agr ams, and as i ndi cat ed on pr oj ect dr awi ngs and t he appr oved shop dr awi ngs. A f i el d r epr esent at i ve of t he dr i ve manuf act ur er shal l super vi se t he i nst al l at i on of al l equi pment , and wi r i ng.

3. 2 FI ELD QUALI TY CONTROL

Speci f i ed pr oduct s shal l be t est ed as a syst em f or conf or mance t o speci f i cat i on r equi r ement s pr i or t o schedul i ng t he accept ance t est s.

Cont r act or shal l conduct per f or mance ver i f i cat i on t est s i n t he pr esence of Gover nment r epr esent at i ve, obser vi ng and document i ng compl et e compl i ance of t he syst em t o t he speci f i cat i ons. Cont r act or shal l submi t a s i gned copy of t he t est r esul t s, cer t i f y i ng pr oper syst em oper at i on bef or e schedul i ng t est s.

3. 2. 1 VFD Test

A pr oposed t est pl an shal l be submi t t ed t o t he cont r act i ng of f i cer at l east 28 cal endar days pr i or t o pr oposed t est i ng f or appr oval . The t est s shal l conf or m t o NEMA I CS 1, NEMA I CS 7, and al l manuf act ur er ' s saf et y r egul at i ons. The Gover nment r eser ves t he r i ght t o wi t ness al l t est s and r evi ew any document at i on. The cont r act or shal l i nf or m t he Gover nment at l east 14 wor ki ng days pr i or t o t he dat es of t est i ng. Cont r act or shal l pr ovi de vi deo t apes, i f avai l abl e, of al l t r ai ni ng pr ovi ded t o t he Gover nment f or subsequent use i n t r ai ni ng new per sonnel . Al l t r ai ni ng ai ds, t ext s, and expendabl e suppor t mat er i al f or a sel f - suf f i c i ent pr esent at i on shal l be pr ovi ded, t he amount of whi ch t o be det er mi ned by t he cont r act i ng of f i cer .

3. 2. 2 Per f or mance Ver i f i cat i on Test s

" Per f or mance Ver i f i cat i on Test " pl an shal l pr ovi de t he st ep by st ep pr ocedur e r equi r ed t o est abl i sh f or mal ver i f i cat i on of t he per f or mance of t he VFD. Compl i ance wi t h t he speci f i cat i on r equi r ement s shal l be ver i f i ed by i nspect i ons, r evi ew of cr i t i cal dat a, demonst r at i ons, and t est s. The Gover nment r eser ves t he r i ght t o wi t ness al l t est s, r evi ew dat a, and r equest ot her such addi t i onal i nspect i ons and r epeat t est s as necessar y t o ensur e t hat t he syst em and pr ovi ded ser vi ces conf or m t o t he st at ed r equi r ement s. The cont r act or shal l i nf or m t he Gover nment 14 cal endar days pr i or t o t he dat e t he t est i s t o be conduct ed.

3. 2. 3 Endur ance Test

I mmedi at el y upon compl et i on of t he per f or mance ver i f i cat i on t est , t he endur ance t est shal l commence. The syst em shal l be oper at ed at var yi ng r at es f or not l ess t han 192 consecut i ve hour s, at an aver age ef f ect i veness

Apr i l 2019 Page 8 SECTI ON 26 29 23 l evel of . 9998, t o demonst r at e pr oper f unct i oni ng of t he compl et e PCS.

Cont i nue t he t est on a day- t o- day basi s unt i l per f or mance st andar d i s met . Dur i ng t he endur ance t est , t he cont r act or shal l not be al l owed i n t he bui l di ng. The syst em shal l r espond as desi gned.

3. 3 DEMONSTRATION

3. 3. 1 Training

Coor di nat e t r ai ni ng r equi r ement s wi t h t he Cont r act i ng Of f i cer .

3. 3. 1. 1 I nst r uct i ons t o Gover nment Per sonnel

Pr ovi de t he ser vi ces of compet ent i nst r uct or s who wi l l gi ve f ul l i nst r uct i on t o desi gnat ed per sonnel i n oper at i on, mai nt enance, cal i br at i on, conf i gur at i on, and pr ogr ammi ng of t he compl et e cont r ol syst em. Or i ent t he t r ai ni ng speci f i cal l y t o t he syst em i nst al l ed.

I nst r uct or s shal l be t hor oughl y f ami l i ar wi t h t he subj ect mat t er t hey ar e t o t each. The Gover nment per sonnel desi gnat ed t o at t end t he t r ai ni ng wi l l have a hi gh school educat i on or equi val ent . The number of t r ai ni ng days of i nst r uct i on f ur ni shed shal l be as speci f i ed. A t r ai ni ng day i s def i ned as ei ght hour s of i nst r uct i on, i ncl udi ng t wo 15- mi nut e br eaks and excl udi ng l unch t i me; Monday t hr ough Fr i day. Pr ovi de a t r ai ni ng manual f or each st udent at each t r ai ni ng phase whi ch descr i bes i n det ai l t he mat er i al i ncl uded i n each t r ai ni ng pr ogr am. Pr ovi de one addi t i onal copy f or ar chi v i ng. Pr ovi de equi pment and mat er i al s r equi r ed f or c l assr oom t r ai ni ng. Pr ovi de a l i s t of addi t i onal r el at ed cour ses, and of f er s, not i ng any cour ses r ecommended. Li st each t r ai ni ng cour se i ndi v i dual l y by name, i ncl udi ng dur at i on, appr oxi mat e cost per per son, and l ocat i on of cour se. Unused copi es of t r ai ni ng manual s shal l be t ur ned over t o t he Gover nment at t he end of l ast t r ai ni ng sessi on.

3. 3. 1. 2 Oper at i ng Per sonnel Tr ai ni ng Pr ogr am

Pr ovi de one 2 hour t r ai ni ng sessi on at t he s i t e at a t i me and pl ace mut ual l y agr eeabl e bet ween t he Cont r act or and t he Gover nment . Pr ovi de sessi on t o t r ai n 4 oper at i on per sonnel i n t he f unct i onal oper at i ons of t he syst em and t he pr ocedur es t hat per sonnel wi l l f ol l ow i n syst em oper at i on.

Thi s t r ai ni ng shal l i ncl ude:

a. Syst em over vi ew

b. Gener al t heor y of oper at i on

c. Syst em oper at i on

d. Al ar m f or mat s

e. Fai l ur e r ecover y pr ocedur es f . Tr oubl eshoot i ng

3. 3. 1. 3 Engi neer i ng/ Mai nt enance Per sonnel Tr ai ni ng

Accompl i sh t he t r ai ni ng pr ogr am as speci f i ed. Tr ai ni ng shal l be conduct ed on si t e at a l ocat i on desi gnat ed by t he Gover nment . Pr ovi de a one day t r ai ni ng sessi on t o t r ai n 4 engi neer i ng per sonnel i n t he f unct i onal oper at i ons of t he syst em. Thi s t r ai ni ng shal l i ncl ude:

Apr i l 2019 Page 9 SECTI ON 26 29 23

a. Syst em over vi ew

b. Gener al t heor y of oper at i on

c. Syst em oper at i on

d. Syst em conf i gur at i on

e. Al ar m f or mat s f . Fai l ur e r ecover y pr ocedur es

g. Tr oubl eshoot i ng and r epai r

h. Mai nt enance and cal i br at i on i . Syst em pr ogr ammi ng and conf i gur at i on

- - End of Sect i on - -

Apr i l 2019 Page 10 SECTI ON 26 29 23

File details come from the government source that posted it. Updated .