09 65 00.pdf

PDF 39 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification for resilient flooring installation at Tinker Air Force Base, Oklahoma, dated April 2019.

The specification establishes requirements for multiple types of resilient flooring products and installation methods. Required flooring products include vinyl composition tile (ASTM F1066, 12-inch square, 1/8-inch thick, asbestos-free), sheet vinyl flooring (ASTM F1303, Type II Grade 1, minimum 0.080-inch wear layer and overall thickness, minimum 6 feet wide), rubber tile (ASTM F1344, 18-inch square, 0.125-inch thickness with raised studs), rubber sheet flooring (ASTM F1859, 0.100-inch thickness with embossed surface), luxury vinyl tile (ASTM F1700, 12 by 24 inches, 0.030-inch minimum wear layer, 0.118-inch overall thickness), and solid vinyl tile (ASTM F1700, 18-inch square, 0.125-inch thickness). Additional requirements include wall base conforming to ASTM F1861 (thermoset rubber with coved design), stair treads and risers conforming to ASTM F2169 with tactile strips for visually impaired, and integral cove base extending 4 inches up the wall. All flooring in corridors and exits must achieve a critical radiant flux of not less than 0.22 watts per square centimeter (Class 2) per ASTM E648 or NFPA 253. Installation must comply with manufacturer specifications, include moisture and alkalinity testing per ASTM F1869 or F2170, maintain environmental conditions of 68-85 degrees Fahrenheit during installation, and require surface preparation to achieve flatness within 3/16 inch in 10 feet. The contractor must provide manufacturer warranties extending beyond one year and supply extra materials at 10 tiles per 1000 tiles and 10 square feet per 1000 square feet, plus 20 linear feet of wall base in matching types and colors.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
00 71 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 09 65 00

RESI LI ENT FLOORI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM D4078 ( 2002; R 2015) Wat er Emul si on Fl oor Pol i sh

ASTM D5603 ( 2001; R 2008) Rubber Compoundi ng Mat er i al s - Recycl ed Vul cani zat e Par t i cul at e Rubber

ASTM E2129 ( 2010) St andar d Pr act i ce f or Dat a Col l ect i on f or Sust ai nabi l i t y Assessment of Bui l di ng Pr oduct s

ASTM E648 ( 2014c) St andar d Test Met hod f or Cr i t i cal Radi ant Fl ux of Fl oor - Cover i ng Syst ems Usi ng a Radi ant Heat Ener gy Sour ce

ASTM F1066 ( 2004; R 2014; E 2014) St andar d Speci f i cat i on f or Vi nyl Composi t i on Fl oor Tile

ASTM F1303 ( 2004; R 2014) Sheet Vi nyl Fl oor Cover i ng wi t h Backi ng

ASTM F1344 ( 2015) Rubber Fl oor Ti l e

ASTM F1482 ( 2015) I nst al l at i on and Pr epar at i on of Panel Type Under l ayment s t o Recei ve Resi l i ent Fl oor i ng

ASTM F1700 ( 2013a) Sol i d Vi nyl Fl oor Ti l e

ASTM F1859 ( 2014; E 2016) St andar d Speci f i cat i on f or Rubber Sheet Fl oor Cover i ng Wi t hout Backi ng

ASTM F1860 ( 2014; E 2016) St andar d Speci f i cat i on f or Rubber Sheet Fl oor Cover i ng Wi t h Backi ng

ASTM F1861 ( 2016) St andar d Speci f i cat i on f or Resi l i ent Wal l Base

ASTM F1869 ( 2016) St andar d Test Met hod f or Measur i ng Moi st ur e Vapor Emi ssi on Rat e of Concr et e Subf l oor Usi ng Anhydr ous Cal ci um Chl or i de

Apr i l 2019 Page 1 SECTI ON 09 65 00

ASTM F1913 ( 2004; R 2014) Vi nyl Sheet Fl oor Cover i ng Wi t hout Backi ng

ASTM F2034 ( 2008; R 2013) Sheet Li nol eum Fl oor Covering

ASTM F2169 ( 2015; E 2016) St andar d Speci f i cat i on f or Resi l i ent St ai r Tr eads

ASTM F2170 ( 2016a) St andar d Test Met hod f or Det er mi ni ng Rel at i ve Humi di t y i n Concr et e Fl oor Sl abs i n s i t u Pr obes

ASTM F710 ( 2011) St andar d Pr act i ce f or Pr epar i ng Concr et e Fl oor s t o Recei ve Resi l i ent Flooring

GREEN SEAL ( GS)

GS-36 ( 2011) Commer ci al Adhesi ves

I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)

I SO 3813 ( 2004) Resi l i ent Fl oor Cover i ngs - Cor k Fl oor Ti l es

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 253 ( 2011) St andar d Met hod of Test f or Cr i t i cal Radi ant Fl ux of Fl oor Cover i ng Syst ems Usi ng a Radi ant Heat Ener gy Sour ce

SOUTH COAST AI R QUALI TY MANAGEMENT DI STRI CT ( SCAQMD)

SCAQMD Rul e 1168 ( 1989; R 2005) Adhesi ve and Seal ant Applications

U. S. GREEN BUI LDI NG COUNCI L ( USGBC)

LEED BD+C ( 2009; R 2010) Leader shi p i n Ener gy and Envi r onment al Desi gn( t m) Bui l di ng Desi gn and Const r uct i on ( LEED- NC)

1. 2 SYSTEM DESCRI PTI ON

1. 2. 1 Fi r e Resi st ance Requi r ement s

Pr ovi de a cr i t i cal r adi ant f l ux of not l ess t han 0. 22 wat t s per squar e cent i met er ( Cl ass 2) f or f l oor i ng i n cor r i dor s and exi t s when t est ed i n accor dance wi t h ASTM E648 or NFPA 253.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

Apr i l 2019 Page 2 SECTI ON 09 65 00

SD- 02 Shop Dr awi ngs

Resi l i ent Fl oor i ng and Accessor i es; G

SD- 03 Pr oduct Dat a

Resi l i ent Fl oor i ng and Accessor i es; G Adhesives

SD- 04 Sampl es

Resi l i ent Fl oor i ng and Accessor i es; G

SD- 06 Test Repor t s

Moi st ur e, Al kal i ni t y and Bond Test s; G

SD- 08 Manuf act ur er ' s I nst r uct i ons

Sur f ace Pr epar at i on; G I nst al l at i on; G

SD- 10 Oper at i on and Mai nt enance Dat a

Resi l i ent Fl oor i ng and Accessor i es; G

1. 4 DELI VERY, STORAGE, AND HANDLI NG

Del i ver mat er i al s t o t he bui l di ng s i t e i n or i gi nal unopened cont ai ner s bear i ng t he manuf act ur er ' s name, st y l e name, pat t er n col or name and number , pr oduct i on r un, pr oj ect i dent i f i cat i on, and handl i ng i nst r uct i ons. St or e mat er i al s i n a c l ean, dr y, secur e, and wel l - vent i l at ed ar ea wi t h ambi ent ai r t emper at ur e mai nt ai ned above 68 degr ees F and bel ow 85 degr ees F, st acked accor di ng t o manuf act ur er ' s r ecommendat i ons. Pr ot ect mat er i al s f r om t he di r ect f l ow of heat f r om hot - ai r r egi st er s, r adi at or s and ot her heat i ng f i x t ur es and appl i ances.

Obser ve vent i l at i on and saf et y pr ocedur es speci f i ed i n t he MSDS.

1. 5 ENVI RONMENTAL REQUI REMENTS

Mai nt ai n ar eas t o r ecei ve r esi l i ent f l oor i ng at a t emper at ur e above 68 degr ees F and bel ow 85 degr ees F f or 3 days bef or e appl i cat i on, dur i ng appl i cat i on and 2 days af t er appl i cat i on, unl ess ot her wi se di r ect ed by t he f l oor i ng manuf act ur er f or t he f l oor i ng bei ng i nst al l ed. Mai nt ai n a mi ni mum t emper at ur e of 55 degr ees F t her eaf t er . Pr ovi de adequat e vent i l at i on t o r emove moi st ur e f r om ar ea and t o compl y wi t h r egul at i ons l i mi t i ng concent r at i ons of hazar dous vapor s.

1. 6 SCHEDULING

Schedul e r esi l i ent f l oor i ng appl i cat i on af t er t he compl et i on of ot her wor k whi ch woul d damage t he f i ni shed sur f ace of t he f l oor i ng.

1. 7 WARRANTY

Pr ovi de manuf act ur er ' s st andar d per f or mance guar ant ees or war r ant i es t hat ext end beyond a one year per i od.

Apr i l 2019 Page 3 SECTI ON 09 65 00

1. 8 EXTRA MATERI ALS

Pr ovi de ext r a f l oor i ng mat er i al of each col or and pat t er n at t he r at e of 10 t i l es f or each 1000 t i l esand 10 squar e f eet f or each 1000 squar e f eet of sheet f l oor i ng i nst al l ed. Pr ovi de ext r a wal l base mat er i al composed of 20 l i near f eet of each t ype, col or and pat t er n. Package al l ext r a mat er i al s i n or i gi nal pr oper l y mar ked cont ai ner s bear i ng t he manuf act ur er ' s name, br and name, pat t er n col or name and number , pr oduct i on r un, and handl i ng i nst r uct i ons. Pr ovi de ext r a mat er i al s f r om t he same l ot as t hose i nst al l ed. Leave ext r a st ock at t he s i t e i n l ocat i on assi gned by Cont r act i ng Of f i cer .

PART 2 PRODUCTS

2. 1 VI NYL COMPOSI TI ON TI LE

Conf or m t o ASTM F1066 Cl ass 2, ( t hr ough pat t er n t i l e) , Composi t i on 1, asbest os- f r ee, 12 i nch squar e and 1/ 8 i nch t hi ck. Pr ovi de col or and pat t er n uni f or ml y di st r i but ed t hr oughout t he t hi ckness of t he t i l e.

2. 2 SHEET VI NYL FLOORI NG

Conf or m t o ASTM F1303, Type I I , Gr ade 1, wi t hout backi ng ( mi ni mum wear l ayer t hi ckness 0. 080 i nch and mi ni mum over al l t hi ckness 0. 080 i nch) , and a mi ni mum 6 f eet wi de. Ext end col or and pat t er n t hr ough t he t ot al t hi ckness of t he mat er i al . As r equi r ed, pr ovi de wel di ng r ods as r ecommended by t he manuf act ur er f or heat wel di ng of j oi nt s.

2. 3 RUBBER TI LE

Conf or m t o ASTM F1344 Cl ass 1 homogeneous , Type A ( sol i d col or ) 18 i nch squar e. Pr ovi de r ai sed r ound sur f ace st uds wi t h chamf er ed edges. Pr ovi de l ow st ud pr of i l e. Pr ovi de 0. 125 i nch over al l t hi ckness.

2. 4 RUBBER SHEET FLOORI NG

Conf or m t o ASTM F1859 ( f l oor i ng wi t hout backi ng) , Type I homogeneous Pr ovi deembossed sur f ace. Pr ovi de 0. 100 i nch over al l t hi ckness.

2. 5 LUXURY VI NYL TI LE

Conf or m t o ASTM F1700 Cl ass I I I pr i nt ed f i l m wi t h a mi ni mum wear l ayer t hi ckness 0. 030 i nch ( 30 mi l ) mi ni mum over al l t hi ckness 0. 118 i nch, Type B ( embossed) . Pr ovi de 12 by 24 i nch t i l e. Pr ovi de t i l e wi t h a f act or y pr ot ect i ve f i ni sh t hat enhances cl eani bi l i t y and dur abi l i t y .

2. 6 SOLI D VI NYL TI LE

Conf or m t o ASTM F1700 Cl ass I monol i t hi c ( mi ni mum wear l ayer t hi ckness

0. 125 i nch and mi ni mum over al l t hi ckness 0. 125 i nch, Type A ( smoot h) .

Pr ovi de18 i nch squar e t i l e.

2. 7 WALL BASE

Conf or m t o ASTM F1861, Type TS ( vul cani zed t her moset r ubber St yl e B ( coved

- i nst al l ed wi t h r esi l i ent f l oor i ng) Pr ovi de pr ef or med cor ner s i n mat chi ng hei ght , shape, and col or .

Apr i l 2019 Page 4 SECTI ON 09 65 00

2. 8 I NTEGRAL COVE BASE

Ext end i nt egr al coved base f or sheet v i nyl f l oor i ng up t he wal l 4 i nches.

Pr ovi de a v i nyl or r ubber cap st r i p and vi nyl , r ubber , or wood f i l l et st r i p wi t h a mi ni mum r adi us of 3/ 4 i nch f or i nt egr al coved bases at per i met er and f i xed ver t i cal i nt er r upt i ons t o f l oor i ng . Pr ovi de i nt egr al cove of t he same mat er i al as f l oor i ng.

2. 9 STAI R TREADS, RI SERS AND STRI NGERS

Conf or m t o ASTM F2169, Type TS ( vul cani zed t her moset r ubber ) . Conf or m t o ASTM F2169 f or sur f ace of t r eads Cl ass 2 r ai sed r ound and have Gr oup 2 st r i p f or v i sual l y i mpai r ed of cont r ast i ng col or of abr asi ve mat er i al .

Pr ovi de squar e nosi ng. Pr ovi de ei t her a one pi ece nosi ng/ t r ead/ r i ser or a t wo pi ece nosi ng/ t r ead desi gn wi t h a mat chi ng coved r i ser .

2. 10 MOULDING

Pr ovi de t aper ed moul di ngs of v i nyl or r ubber and t ypes as r ecommended by f l oor i ng manuf act ur er f or bot h edges and t r ansi t i ons of f l oor i ng mat er i al s speci f i ed. Pr ovi de ver t i cal l i p on moul di ng of maxi mum 1/ 4 i nch. Pr ovi de bevel change i n l evel bet ween 1/ 4 and 1/ 2 i nch wi t h a s l ope no gr eat er t han 1: 2.

2. 11 ADHESIVES

Pr ovi de adhesi ves f or f l oor i ng, base and accessor i es as r ecommended by t he manuf act ur er and compl y wi t h l ocal i ndoor ai r qual i t y st andar ds. Submi t manuf act ur er ' s descr i pt i ve dat a, document at i on st at i ng physi cal char act er i st i cs, and mi l dew and ger mi ci dal char act er i st i cs.

2. 12 SURFACE PREPARATI ON MATERI ALS

Pr ovi de sur f ace pr epar at i on mat er i al s, such as panel t ype under l ayment , l i ni ng f el t , and f l oor cr ack f i l l er s as r ecommended by t he f l oor i ng manuf act ur er f or t he subf l oor condi t i ons. Compl y wi t h ASTM F1482 f or panel t ype under l ayment pr oduct s.

2. 13 POLISH/FINISH

Pr ovi de pol i sh f i ni sh as r ecommended by t he manuf act ur er and conf or m t o ASTM D4078 f or pol i sh.

2. 14 CAULKI NG AND SEALANTS

Pr ovi de caul k i ng and seal ant s i n accor dance wi t h Sect i on 07 92 00 JOI NT

SEALANTS.

2. 15 MANUFACTURER' S COLOR, PATTERN AND TEXTURE

Pr ovi de col or , pat t er n and t ext ur e f or r esi l i ent f l oor i ng and accessor i es i n accor dance wi t h Sect i on 09 06 00 SCHEDULES FOR FI NI SHES as i ndi cat ed on t he dr awi ngs sel ect ed f r om manuf act ur er ' s st andar d col or s. Col or l i s t ed i s not i nt ended t o l i mi t t he sel ect i on of equal col or s f r om ot her manuf act ur er s. Pr ovi de f l oor pat t er ns as speci f i ed on t he dr awi ngs.

Pr ovi de f l oor i ng i n any one cont i nuous ar ea or r epl acement of damaged f l oor i ng i n cont i nuous ar ea f r om same pr oduct i on r un wi t h same shade and pat t er n. Submi t scal ed dr awi ngs i ndi cat i ng pat t er ns ( i ncl udi ng l ocat i on of pat t er ns and col or s) and di mensi ons. Submi t manuf act ur er ' s descr i pt i ve

Apr i l 2019 Page 5 SECTI ON 09 65 00 dat a and t hr ee sampl es of each i ndi cat ed col or and t ype of f l oor i ng, base, moul di ngs, and accessor i es s i zed a mi ni mum 2- 1/ 2 by 4 i nch. Submi t Dat a Package 1 i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE

DATA.

PART 3 EXECUTI ON

3. 1 EXAMINATION

Exami ne and ver i f y t hat s i t e condi t i ons ar e i n agr eement wi t h t he desi gn package. Repor t al l condi t i ons t hat wi l l pr event a pr oper i nst al l at i on.

Do not t ake any cor r ect i ve act i on wi t hout wr i t t en per mi ssi on f r om t he Gover nment . Wor k wi l l pr oceed onl y when condi t i ons have been cor r ect ed and accept ed by t he i nst al l er . Submi t manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons f or al l f l oor i ng mat er i al s and accessor i es, i ncl udi ng pr epar at i on of subst r at e, seami ng t echni ques, and r ecommended adhesi ves.

3. 2 SURFACE PREPARATI ON

Pr ovi de a smoot h, t r ue, l evel pl ane f or sur f ace pr epar at i on of t he f l oor i ng, except wher e i ndi cat ed as s l oped. Fl oor t o be f l at t o wi t hi n 3/ 16 i nch i n 10 f eet . Pr epar e subf l oor i n accor dance wi t h f l oor i ng manuf act ur er ' s r ecommended i nst r uct i ons. Pr epar e t he sur f aces of l i ght wei ght concr et e s l abs ( as def i ned by t he f l oor i ng manuf act ur er ) as r ecommended by t he f l oor i ng manuf act ur er . Compl y wi t h ASTM F710 f or concr et e subf l oor pr epar at i on. Fl oor f i l l s or t oppi ngs may be r equi r ed as r ecommended by t he f l oor i ng manuf act ur er . I nst al l under l ayment s, when r equi r ed by t he f l oor i ng manuf act ur er , i n accor dance wi t h manuf act ur er ' s r ecommended pr i nt ed i nst al l at i on i nst r uct i ons. Compl y wi t h ASTM F1482 f or panel t ype under l ayment s. Bef or e any wor k under t hi s sect i on i s begun, cor r ect al l def ect s such as r ough or scal i ng concr et e, chal k and dust , cr acks, l ow spot s, hi gh spot s, and uneven sur f aces. Repai r al l damaged por t i ons of concr et e s l abs as r ecommended by t he f l oor i ng manuf act ur er .

Remove concr et e cur i ng and seal er compounds f r om t he sl abs, ot her t han t he t ype t hat does not adver sel y af f ect adhesi on. Remove pai nt , var ni sh, oi l s , r el ease agent s, seal er s, waxes, and adhesi ves, as r equi r ed by t he f l oor i ng pr oduct i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on instructions.

3. 3 MOI STURE, ALKALI NI TY AND BOND TESTS

Det er mi ne t he sui t abi l i t y of t he concr et e subf l oor f or r ecei v i ng t he r esi l i ent f l oor i ng wi t h r egar d t o moi st ur e cont ent and pH l evel by moi st ur e and al kal i ni t y t est s. Conduct moi st ur e t est i ng i n accor dance with ASTM F1869 or ASTM F2170, unl ess ot her wi se r ecommended by t he f l oor i ng manuf act ur er . Conduct al kal i ni t y t est i ng as r ecommended by t he f l oor i ng manuf act ur er . Det er mi ne t he compat i bi l i t y of t he r esi l i ent f l oor i ng adhesi ves t o t he concr et e f l oor s by a bond t est i n accor dance wi t h t he f l oor i ng manuf act ur er ' s r ecommendat i ons. Submi t copy of t est r epor t s f or moi st ur e and al kal i ni t y cont ent of concr et e s l ab, and bond t est st at i ng dat e of t est , per son conduct i ng t he t est , and t he ar ea t est ed.

3. 4 PLACI NG VI NYL COMPOSI TI ON, LI NOLEUM AND SOLI D VI NYL TI LES

I nst al l t i l e f l oor i ng and accessor i es i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s di r ect i ons. Keep t i l e l i nes and j oi nt s squar e, symmet r i cal , t i ght , and even. Keep each f l oor i n t r ue, l evel pl ane, except wher e s l ope i s i ndi cat ed. Var y edge wi dt h as necessar y t o

Apr i l 2019 Page 6 SECTI ON 09 65 00 mai nt ai n f ul l - s i ze t i l es i n t he f i el d, no edge t i l e t o be l ess t han one- hal f t he f i el d t i l e s i ze, except wher e i r r egul ar shaped r ooms make i t i mpossi bl e. Cut f l oor i ng t o f i t ar ound al l per manent f i x t ur es, bui l t - i n f ur ni t ur e and cabi net s, pi pes, and out l et s. Cut , f i t , and scr i be edge t i l e t o wal l s and par t i t i ons af t er f i el d f l oor i ng has been appl i ed.

3. 5 PLACI NG LUXURY VI NYL TI LES

I nst al l l uxur y v i nyl t i l e f l oor i ng usi ng gl ue down i nst al l at i on. I nst al l f l oor i ng and accessor i es i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s di r ect i ons f or i nst al l at i on met hod speci f i ed. Keep t i l e l i nes and j oi nt s squar e, symmet r i cal , t i ght , and even. Keep each f l oor i n t r ue, l evel pl ane, except wher e s l ope i s i ndi cat ed. Var y edge wi dt h as necessar y t o mai nt ai n f ul l - s i ze t i l es i n t he f i el d, no edge t i l e t o be l ess t han one- hal f t he f i el d t i l e s i ze, except wher e i r r egul ar shaped r ooms make i t i mpossi bl e. Cut f l oor i ng t o f i t ar ound al l per manent f i x t ur es, bui l t - i n f ur ni t ur e and cabi net s, pi pes, and out l et s. Cut , f i t , and scr i be edge t i l e t o wal l s and par t i t i ons af t er f i el d f l oor i ng has been applied.

3. 6 PLACI NG SHEET VI NYL FLOORI NG

I nst al l sheet v i nyl f l oor i ng and accessor i es i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons. Pr ovi de squar e, symmet r i cal , t i ght , and even f l oor i ng l i nes and j oi nt s. Keep each f l oor i n t r ue, l evel pl ane, except wher e s l ope i s i ndi cat ed. Cut f l oor i ng t o f i t ar ound al l per manent f i x t ur es, bui l t - i n f ur ni t ur e and cabi net s, pi pes, and out l et s. Lay out sheet s t o mi ni mi ze wast e. Cut , f i t , and scr i be f l oor i ng t o wal l s and par t i t i ons af t er f i el d f l oor i ng has been appl i ed. Pr ovi de heat wel ded seams and edges i n accor dance wi t h t he manuf act ur er ' s wr i t t en i nst al l at i on i nst r uct i ons. Fi ni sh j oi nt s f l ush, f r ee f r om voi ds, r ecesses, and r ai sed ar eas. I nst al l f l oor i ng wi t h an i nt egr al coved base.

3. 7 PLACI NG RUBBER TI LE

I nst al l r ubber t i l e and accessor i es i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons. Pr ovi de squar e, symmet r i cal , t i ght , and even f l oor i ng l i nes and j oi nt s. Keep each f l oor i n t r ue, l evel pl ane, except wher e s l ope i s i ndi cat ed. Var y wi dt h of edge t i l es as necessar y t o mai nt ai n f ul l - s i ze t i l es, except wher e i r r egul ar - shaped r ooms makes i t i mpossi bl e. Cut f l oor i ng t o f i t ar ound, al l per manent f i x t ur es, bui l t - i n f ur ni t ur e and cabi net s, pi pes, and out l et s. Cut , f i t , and scr i be f l oor i ng t o wal l s and par t i t i ons af t er f i el d f l oor i ng has been appl i ed.

3. 8 PLACI NG RUBBER SHEET FLOORI NG

I nst al l r ubber sheet f l oor i ng and accessor i es i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons. Pr ovi de squar e, symmet r i cal , t i ght , and even f l oor i ng l i nes and j oi nt s. Keep each f l oor i n t r ue, l evel pl ane, except wher e s l ope i s i ndi cat ed. Cut seams by over l appi ng or under scr i bi ng as r ecommended by t he manuf act ur er . Lay out sheet s t o mi ni mi ze wast e. Cut f l oor i ng t o f i t ar ound al l per manent f i x t ur es, bui l t - i n f ur ni t ur e and cabi net s, pi pes, and out l et s. Cut , f i t , Apr i l 2019 Page 7 SECTI ON 09 65 00 and scr i be f l oor i ng t o wal l s and par t i t i ons af t er f i el d f l oor i ng has been applied.

3. 9 PLACI NG FEATURE STRI PS

I nst al l f eat ur e st r i ps i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons.

3. 10 PLACI NG MOULDI NG

Pr ovi de moul di ng wher e f l oor i ng t er mi nat i on i s hi gher t han t he adj acent f i ni shed f l oor i ng and at t r ansi t i ons bet ween di f f er ent f l oor i ng mat er i al s. When r equi r ed, l ocat e moul di ng under door cent er l i ne.

Moul di ng i s not r equi r ed at door ways wher e t hr eshol ds ar e pr ovi ded.

Secur e moul di ng wi t h adhesi ve as r ecommended by t he manuf act ur er . Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons.

3. 11 PLACI NG WALL BASE

I nst al l wal l base i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons. Ti ght en base j oi nt s and make even wi t h adj acent r esi l i ent f l oor i ng. Fi l l voi ds al ong t he t op edge of base at masonr y wal l s wi t h caul k. Rol l ent i r e ver t i cal sur f ace of base wi t h hand r ol l er , and pr ess t oe of base wi t h a st r ai ght pi ece of wood t o ensur e pr oper al i gnment . Avoi d excess adhesi ve i n cor ner s.

3. 12 PLACI NG STAI R TREADS, RI SERS, AND STRI NGERS

Secur e and i nst al l st ai r t r eads, r i ser s, and st r i nger s i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Cover t he sur f ace of t r eads and r i ser s t he f ul l wi dt h of t he st ai r s. Pr ovi de equal l engt h pi eces but t ed t oget her t o cover t he t r eads and r i ser s f or st ai r s wi der t han manuf act ur er ' s st andar d l engt hs. Pr ovi de st r i nger angl es on bot h t he wal l and bani st er s i des of t he st ai r s, and l andi ng t r i m.

3. 13 PLACI NG I NTEGRAL COVED BASE

I nst al l i nt egr al cove base i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Pr epar e and appl y adhesi ves i n accor dance wi t h manuf act ur er ' s pr i nt ed di r ect i ons. Shape i nt egr al coved base by ext endi ng t he f l oor i ng mat er i al 4 i nch ont o t he wal l sur f ace. Suppor t cove by a f i l l er . Pr ovi de a cap st r i p at t he t op of t he base. Fi l l voi ds al ong t he t op edge of base at masonr y wal l s wi t h caul k.

3. 14 CLEANING

I mmedi at el y upon compl et i on of i nst al l at i on of f l oor i ng i n a r oom or an ar ea, dr y/ c l ean t he f l oor i ng and adj acent sur f aces t o r emove al l sur pl us adhesi ve. Cl ean f l oor i ng as r ecommended i n accor dance wi t h manuf act ur er ' s pr i nt ed mai nt enance i nst r uct i ons and wi t hi n t he r ecommended t i me f r ame.

As r equi r ed by t he manuf act ur er , appl y t he r ecommended number of coat s and t ype of pol i sh and/ or f i ni sh i n accor dance wi t h manuf act ur er ' s wr i t t en instructions.

3. 15 PROTECTION

Fr om t he t i me of i nst al l at i on unt i l accept ance, pr ot ect f l oor i ng f r om

Apr i l 2019 Page 8 SECTI ON 09 65 00 damage as r ecommended by t he f l oor i ng manuf act ur er . Remove and r epl ace f l oor i ng whi ch becomes damaged, l oose, br oken, or cur l ed and wal l base whi ch i s not t i ght t o wal l or secur el y adher ed.

- - End of Sect i on - -

Apr i l 2019 Page 9 SECTI ON 09 65 00

File details come from the government source that posted it. Updated .