07 51 13.pdf

PDF 95 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This is a technical specification document for built-up asphalt roofing systems at Tinker Air Force Base, Oklahoma. The specification details a three-ply fiberglass felt membrane with granule-surfaced modified bitumen cap sheet construction. Key materials include ASTM D4897/D4897M Type II venting base sheet, ASTM D4601/D4601M Type II fiberglass felt base sheet, ASTM D2178/D2178M Type IV ply felt, ASTM D312/D312M Type III or IV asphalt, ASTM D6164/D6164M Type II Grade G modified bitumen cap sheet minimum 120 mils thick at selvage, ASTM D41/D41M primer, ASTM D4586/D4586M asphalt roof cement, perlite cant strips per ASTM C728, and corrosion-resistant fasteners complying with FM 4470 requirements. The specification mandates recycled content materials constituting at least 10 percent of total materials cost per EPA Comprehensive Procurement Guidelines.

Quality assurance requirements include Class A fire rating per ASTM E108 or FM 4470, wind uplift resistance rated for 90 mph design wind speed per ASCE 7 and validated through FM testing, and a preroofing conference with the contractor, Contracting Officer, roof manufacturer representatives, and other participating trades. The roofing applicator must be approved by the manufacturer with minimum three years' experience and capability to provide specified warranty. The specification requires a 20-year no-dollar-limit roof system materials and workmanship warranty from the membrane manufacturer written directly to the Government, and a two-year installation warranty from the installer. Manufacturer technical representatives must conduct minimum three site inspections during installation: during first 20 squares, at mid-point, and at substantial completion prior to surfacing. Environmental conditions restrict application to temperatures above 40°F without precipitation, fog, ice, frost, or visible moisture on the roof deck. Asphalt heating and application procedures specify equiviscous temperature (EVT) ranges and prohibit heating between 500-525°F for longer than four consecutive hours or exceeding flash point temperatures.

View the file

Other files

File Type Posted
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
07 19 00.pdf PDF
07 21 16.pdf PDF
07 22 00.pdf PDF
07 31 13.pdf PDF
07 52 00.pdf PDF
07 72 20.pdf PDF
08 34 01.pdf PDF
08 34 19.10 20.pdf PDF
08 52 00.pdf PDF
09 29 00.pdf PDF
10 21 13.pdf PDF
10 22 13.pdf PDF
13 34 19.pdf PDF
21 13 13.pdf PDF
23 03 00.pdf PDF
23 05 48.00 40.pdf PDF
23 07 00.pdf PDF
23 09 23.01.pdf PDF
23 34 23.00 40.pdf PDF
23 52 00.pdf PDF
23 65 00.pdf PDF
23 70 03.pdf PDF
26 00 00.00 20.pdf PDF
26 05 48.00 10.pdf PDF
26 29 23.pdf PDF
26 32 14.00 10.pdf PDF
31 23 15.pdf PDF
31 23 16.pdf PDF
32 01 13.pdf PDF
32 11 11.pdf PDF
32 11 29.pdf PDF
32 12 10.1.pdf PDF
32 12 10.2.pdf PDF
32 13 14.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 07 51 13

BUI LT- UP ASPHALT ROOFI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)

ASCE 7 ( 2010; Er r at a 2011; Supp 1 2013) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her Structures

ASTM I NTERNATI ONAL ( ASTM)

ASTM C1153 ( 2010) St andar d Pr act i ce f or Locat i on of Wet I nsul at i on i n Roof i ng Syst ems Usi ng I nf r ar ed I magi ng

ASTM C208 ( 2012) Cel l ul osi c Fi ber I nsul at i ng Boar d

ASTM C728 ( 2016) Per l i t e Ther mal I nsul at i on Boar d

ASTM D1863/ D1863M ( 2005; R 2011; E 2012) Mi ner al Aggr egat e Used on Bui l t - Up Roof s

ASTM D1864/ D1864M ( 1989; E 2009; R 2009) Moi st ur e i n Mi ner al Aggr egat e Used on Bui l t - Up Roof s

ASTM D1970/ D1970M ( 2015a) Sel f - Adher i ng Pol ymer Modi f i ed Bi t umi nous Sheet Mat er i al s Used as St eep Roof i ng Under l ayment f or I ce Dam Pr ot ect i on

ASTM D2170/ D2170M ( 2010) Ki nemat i c Vi scosi t y of Asphal t s (Bitumens)

ASTM D2178/ D2178M ( 2015a) Asphal t Gl ass Fel t Used i n Roof i ng and Wat er pr oof i ng

ASTM D312/ D312M ( 2016) St andar d Speci f i cat i on f or Asphal t Used i n Roof i ng

ASTM D3617 ( 2007; R 2015; E 2015) Sampl i ng and Anal ysi s of New Bui l t - Up Roof Membr anes

ASTM D41/ D41M ( 2011) Asphal t Pr i mer Used i n Roof i ng, Damppr oof i ng, and Wat er pr oof i ng

ASTM D4263 ( 1983; R 2012) I ndi cat i ng Moi st ur e i n Concr et e by t he Pl ast i c Sheet Met hod

ASTM D4402/ D4402M ( 2015) Vi scosi t y Det er mi nat i on of Asphal t

Apr i l 2019 Page 1 SECTI ON 07 51 13 at El evat ed Temper at ur es Usi ng a Rot at i onal Vi scomet er

ASTM D448 ( 2012) Si zes of Aggr egat e f or Road and Br i dge Const r uct i on

ASTM D4586/ D4586M ( 2007; E 2012; R 2012) Asphal t Roof Cement , Asbest os- Fr ee

ASTM D4601/ D4601M ( 2004; R 2012) Asphal t - Coat ed Gl ass Fi ber Base Sheet Used i n Roof i ng

ASTM D4637/ D4637M ( 2015) EPDM Sheet Used i n Si ngl e- Pl y Roof Membrane

ASTM D4869/ D4869M ( 2016) St andar d Speci f i cat i on f or Asphal t - Sat ur at ed Or gani c Fel t Under l ayment Used i n St eep Sl ope Roof i ng

ASTM D4897/ D4897M ( 2001; R 2009) St andar d Speci f i cat i on f or Asphal t - Coat ed Gl ass- Fi ber Vent i ng Base Sheet Used i n Roof i ng

ASTM D517 ( 1998; R 2008) Asphal t Pl ank

ASTM D6162/ D6162M ( 2000a; R 2015; E 2015) St andar d Speci f i cat i on f or St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng a Combi nat i on of Pol yest er and Gl ass Fi ber Rei nf or cement s

ASTM D6163/ D6163M ( 2000; R 2015; E 2015) St andar d Speci f i cat i on f or St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng Gl ass Fi ber Rei nf or cement s

ASTM D6164/ D6164M ( 2011) St yr ene But adi ene St yr ene ( SBS) Modi f i ed Bi t umi nous Sheet Mat er i al s Usi ng Pol yest er Rei nf or cement s

ASTM D6757/ D6757M ( 2016) St andar d Speci f i cat i on f or Under l ayment Fel t Cont ai ni ng I nor gani c Fi ber s Used i n St eep- Sl ope Roof i ng

ASTM E108 ( 2011) Fi r e Test s of Roof Cover i ngs

FM GLOBAL ( FM)

FM 4470 ( 2010) Si ngl e- Pl y, Pol ymer - Modi f i ed Bi t umen Sheet , Bui l t - up Roof ( BUR) , and Li qui d Appl i ed Roof Assembl i es f or Use i n Cl ass 1 and Noncombust i bl e Roof Deck Construction

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/

Apr i l 2019 Page 2 SECTI ON 07 51 13

NATI ONAL ROOFI NG CONTRACTORS ASSOCI ATI ON ( NRCA)

NRCA Roof Man ( 2011 t hr u 2014) The NRCA Roof i ng Manual

SI NGLE PLY ROOFI NG I NDUSTRY ( SPRI )

ANSI / SPRI RD- 1 ( 2009) Per f or mance St andar d f or Ret r of i t Drains

UNDERWRI TERS LABORATORI ES ( UL)

UL 790 ( 2004; Repr i nt Jul 2014) St andar d Test Met hods f or Fi r e Test s of Roof Cover i ngs

UL RMSD ( 2012) Roof i ng Mat er i al s and Syst ems Directory

1. 2 DESCRI PTI ON OF ROOF MEMBRANE SYSTEM

Asphal t appl i ed, t hr ee- pl y f el t wi t h gr anul e- sur f aced modi f i ed bi t umen cap sheet bui l t - up r oof membr ane syst em.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Wi nd Upl i f t Cal cul at i ons; G

Asphalt

Fel t s, i ncl udi ng pl y f el t , base sheet and vent i l at i ng f el t as appl i cabl e; G

Gr anul e Sur f ace Modi f i ed Bi t umen Cap Sheet ; G

FLASHI NG MEMBRANE; G

Fasteners

Primer

Asphal t Roof Cement

Wal kpad Mat er i al sCant St r i ps

Cer t i f i cat e at t est i ng t hat t he f i ber boar d f ur ni shed f or t he pr oj ect cont ai ns r ecover ed mat er i al , and showi ng an est i mat ed per cent of such r ecover ed mat er i al .

Pr e- Manuf act ur ed Accessor i es t o be i ncor por at ed i n t he syst em i nst al l at i on; G

Roof Wal kways

Apr i l 2019 Page 3 SECTI ON 07 51 13

Sampl e War r ant i es cer t i f i cat es; G

Submi t al l dat a r equi r ed wi t h r equi r ement s of t hi s sect i on.

I ncl ude i n Dat a wr i t t en accept ance by t he r oof membr ane manuf act ur er of t he pr oduct s and accessor i es pr ovi ded. Li st pr oduct s i n t he appl i cabl e wi nd upl i f t and f i r e r at i ng c l assi f i cat i on l i s t i ngs, unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer .

SD- 06 Test Repor t s

Sampl es of Bui l t - Up Roof i ng

Submi t t est r esul t s on r oof i ng f i el d sampl es as r equi r ed, ver i f y i ng composi t i on of sampl e. Submi t s i x copi es of l abor at or y anal ysi s wi t hi n 30 cal endar days af t er sampl es ar e t aken. Submi t r epor t s i n accor dance wi t h ASTM D3617.

SD- 07 Cer t i f i cat es

Bi l l of Ladi ng

Submi t when l abel s of asphal t cont ai ner s do not i ndi cat e t he f i ni shed bl owi ng t emper at ur e, f l ash poi nt and equi v i scous temperature.

Qual i f i cat i ons of Appl i cat or

Submi t evi dence of t he r oof i ng syst em manuf act ur er ' s appr oval .

SD- 08 Manuf act ur er ' s I nst r uct i ons

Fel t s; G

Fl ashi ngs; G

Modi f i ed Bi t umen Cap Sheet ; G

Base Sheet at t achment , i ncl udi ng pat t er n and f r equency of mechani cal at t achment s r equi r ed i n f i el d of r oof , cor ner s, and per i met er s t o pr ovi de f or t he speci f i ed wi nd r esi st ance.

Asphalt

Primer

Roof Cement

Fasteners

Col d Weat her Condi t i ons i nst al l at i on; G

I ncl ude det ai l ed appl i cat i on i nst r uct i ons and st andar d manuf act ur er dr awi ngs al t er ed as r equi r ed by t hese speci f i cat i ons.

Expl i c i t l y i dent i f y i n wr i t i ng, di f f er ences bet ween manuf act ur er ' s i nst r uct i ons and t he speci f i ed r equi r ement s.

SD- 11 Cl oseout Submi t t al s

Apr i l 2019 Page 4 SECTI ON 07 51 13

WARRANTY

I NFORMATI ON CARD

1. 4 QUALI TY ASSURANCE

1. 4. 1 Qual i f i cat i ons of Appl i cat or

The r oof i ng syst em appl i cat or must be appr oved, aut hor i zed, or l i censed i n wr i t i ng by t he r oof i ng syst em manuf act ur er and must have a mi ni mum of 3 year s exper i ence as an appr oved, aut hor i zed, or l i censed appl i cat or wi t h t he manuf act ur er and be appr oved at a l evel capabl e of pr ovi di ng t he speci f i ed war r ant y.

1. 4. 2 Fi r e Resi st ance

Compl et e r oof cover i ng assembl y must :

a. Be Cl ass A r at ed i n accor dance wi t h ASTM E108 , FM 4470, or UL 790; and

b. Be l i s t ed as par t of Fi r e- Cl assi f i ed r oof deck const r uct i on i n UL RMSD, or Cl ass I r oof deck const r uct i on i n FM APP GUI DE.

1. 4. 3 Wi nd Upl i f t Resi st ance

The compl et e r oof syst em assembl y shal l be r at ed and i nst al l ed t o r esi st wi nd l oads cal cul at ed i n accor dance wi t h ASCE 7 and val i dat ed by upl i f t r esi st ance t est i ng i n accor dance wi t h Fact or y Mut ual ( FM) t est pr ocedur es. Do not i nst al l non- r at ed syst ems except as appr oved by t he Cont r act i ng Of f i cer . Submi t l i censed engi neer ' s wi nd upl i f t cal cul at i ons and subst ant i at i ng dat a t o val i dat e any non- r at ed r oof syst em. Base wi nd upl i f t measur ement s on a desi gn wi nd speed of 90 mph i n accor dance wi t h

ASCE 7

and/ or ot her appl i cabl e bui l di ng code r equi r ement s.

1. 4. 4 Pr er oof i ng Conf er ence

Af t er appr oval of submi t t al s and bef or e per f or mi ng r oof i ng syst em i nst al l at i on wor k, hol d a pr er oof i ng conf er ence t o r evi ew t he f ol l owi ng:

a. Dr awi ngs and speci f i cat i ons and submi t t al s r el at ed t o t he r oof wor k;

b. Roof syst em component s i nst al l at i on;

c. Pr ocedur e f or t he r oof manuf act ur er ' s t echni cal r epr esent at i ve' s onsi t e i nspect i on and accept ance of t he r oof i ng subst r at e, t he name of t he manuf act ur er ' s t echni cal r epr esent at i ves, t he f r equency of t he onsi t e v i s i t s, di st r i but i on of copi es of t he i nspect i on r epor t s f r om t he manuf act ur er ' s t echni cal r epr esent at i ves t o r oof manuf act ur er ;

d. Cont r act or ' s pl an f or coor di nat i on of t he wor k of t he var i ous t r ades i nvol ved i n pr ovi di ng t he r oof i ng syst em and ot her component s secur ed t o t he r oof i ng; and

e. Qual i t y cont r ol pl an f or t he r oof syst em i nst al l at i on;

f . Saf et y r equi r ement s.

Coor di nat e pr er oof i ng conf er ence schedul i ng wi t h t he Cont r act i ng Of f i cer .

Apr i l 2019 Page 5 SECTI ON 07 51 13

The conf er ence must be at t ended by t he Cont r act or , t he Cont r act i ng Of f i cer ' s desi gnat ed per sonnel , and per sonnel di r ect l y r esponsi bl e f or t he i nst al l at i on of r oof i ng and i nsul at i on, f l ashi ng and sheet met al wor k, mechani cal and el ect r i cal wor k, ot her t r ades i nt er f aci ng wi t h t he r oof wor k, and r epr esent at i ve of t he r oof i ng mat er i al s manuf act ur er . Bef or e begi nni ng r oof i ng wor k, pr ovi de a copy of meet i ng not es and act i on i t ems t o al l at t endi ng par t i es. Not e act i on i t ems r equi r i ng r esol ut i on pr i or t o st ar t of r oof wor k.

1. 5 DELI VERY, STORAGE, AND HANDLI NG

1. 5. 1 Delivery

Del i ver mat er i al s i n manuf act ur er s ' or i gi nal unopened cont ai ner s and r ol l s wi t h manuf act ur er ' s l abel s i nt act and l egi bl e. Mar k and r emove wet or damaged mat er i al s f r om si t e. Wher e mat er i al s ar e cover ed by a r ef er enced speci f i cat i on, cont ai ner must bear speci f i cat i on number , t ype, and cl ass, as appl i cabl e. I ndi cat e on l abel s or bi l l of l adi ng f or r oof i ng asphal t t he asphal t t ype, f i ni shed bl owi ng t emper at ur e ( FBT) , f l ash poi nt ( FP) , and equi v i scous t emper at ur e ( EVT) , t hat i s , t he t emper at ur e at whi ch t he vi scosi t y i s ei t her 125 cent i st okes when t est ed i n accor dance wi t h ASTM D2170/ D2170M or 75 cent i poi se when t est ed i n accor dance wi t h ASTM D4402/ D4402M. Del i ver mat er i al s i n suf f i c i ent quant i t y t o al l ow wor k t o pr oceed wi t hout i nt er r upt i on.

1. 5. 2 Storage

Pr ot ect mat er i al s agai nst moi st ur e absor pt i on, cont ami nat i on, or ot her damage. Avoi d cr ushi ng or cr i nkl i ng of r ol l mat er i al s. St or e r ol l mat er i al s on end on cl ean r ai sed pl at f or ms i n dr y l ocat i ons i n encl osed bui l di ngs or t r ai l er s wi t h adequat e vent i l at i on. Do not st or e r ol l mat er i al s i n bui l di ngs under const r uct i on unt i l concr et e, mor t ar , and pl ast er wor k ar e f i ni shed and dr y. Do not st or e mat er i al s out door s unl ess appr oved by t he Cont r act i ng Of f i cer . Compl et el y cover f el t s st or ed out door s, on and of f r oof , wi t h wat er pr oof canvas pr ot ect i ve cover i ng. Do not use pol yet hyl ene sheet as a cover i ng. Ti e cover i ng secur el y t o pal l et s t o make compl et el y weat her pr oof and yet pr ovi de suf f i c i ent vent i l at i on t o pr event condensat i on. Mai nt ai n r ol l mat er i al s at t emper at ur e above 50 degr ees F f or a 24- hour per i od i mmedi at el y pr i or t o appl i cat i on. Keep aggr egat e dr y as def i ned by ASTM D1863/ D1863M. Pl ace onl y t hose mat er i al s t o be used dur i ng one day' s wor k on t he r oof at one t i me. Remove unused mat er i al s f r om t he r oof at t he end of each day' s wor k. I mmedi at el y r emove wet , cont ami nat ed or ot her wi se damaged or unsui t abl e mat er i al s f r om t he si t e. Damaged mat er i al s may be mar ked by t he Cont r act i ng Of f i cer .

1. 5. 3 Handling

Pr event damage t o edges and ends of r ol l mat er i al s. Do not i nst al l damaged mat er i al s i n t he wor k. Sel ect and oper at e mat er i al handl i ng equi pment so as not t o damage mat er i al s or appl i ed r oof i ng.

1. 6 ENVI RONMENTAL CONDI TI ONS

Do not i nst al l r oof i ng dur i ng pr eci pi t at i on, or f og, or when ai r t emper at ur e i s bel ow 40 degr ees F, or when t her e i s i ce, f r ost , moi st ur e or v i s i bl e dampness on r oof deck. Rest r i ct i on on appl i cat i on of r oof i ng mat er i al s bel ow 40 degr ees F may be wai ved i f Cont r act or devi ses a means, sat i sf act or y t o Cont r act i ng Of f i cer , of : ( 1) mai nt ai ni ng sur r oundi ng

Apr i l 2019 Page 6 SECTI ON 07 51 13 t emper at ur e above 40 degr ees F; ( 2) mai nt ai ni ng appl i cat i on t emper at ur e of heat ed mat er i al s wi t hout exceedi ng maxi mum speci f i ed heat i ng t emper at ur e;

and f ol l ows ot her r ecommendat i ons of t he membr ane manuf act ur er f or appl i cat i on i n col d weat her condi t i ons.

1. 7 SEQUENCING

Coor di nat e t he wor k wi t h ot her t r ades t o ensur e t hat component s whi ch ar e t o be secur ed t o or st r i pped i nt o t he r oof i ng syst em ar e avai l abl e and t hat per manent f l ashi ng and count er f l ashi ng ar e i nst al l ed as t he wor k pr ogr esses. Ensur e t empor ar y pr ot ect i on measur es ar e i n pl ace t o pr ecl ude moi st ur e i nt r usi on or damage t o i nst al l ed mat er i al s. Appl i cat i on of r oof i ng must i mmedi at el y f ol l ow appl i cat i on of i nsul at i on as a cont i nuous oper at i on. Coor di nat e r oof i ng oper at i ons wi t h i nsul at i on wor k so t hat al l r oof i nsul at i on appl i ed each day i s cover ed wi t h compl et e f el t pl y i nst al l at i on t he same day and i s wat er t i ght .

1. 8 WARRANTY

Pr ovi de r oof syst em mat er i al and wor kmanshi p war r ant i es meet i ng speci f i ed r equi r ement s. Pr ovi de r evi s i on or amendment t o st andar d membr ane manuf act ur er war r ant y t o compl y wi t h t he speci f i ed r equi r ement s. Mi ni mum manuf act ur er war r ant y shal l have no dol l ar l i mi t , cover f ul l syst em wat er - t i ght ness, and shal l have a mi ni mum dur at i on of 20 year s.

1. 8. 1 Roof Membr ane Manuf act ur er War r ant y

Fur ni sh t he r oof membr ane manuf act ur er ' s 20- year no dol l ar l i mi t r oof syst em mat er i al s and i nst al l at i on wor kmanshi p war r ant y, i ncl udi ng f l ashi ng, i nsul at i on, and accessor i es necessar y f or a wat er t i ght r oof syst em const r uct i on. Wr i t e t he war r ant y di r ect l y t o t he Gover nment commenci ng at t he t i me of Gover nment ' s accept ance of t he r oof wor k.

Pr ovi de t he f ol l owi ng st at ement f or such war r ant y:

a. I f wi t hi n t he war r ant y per i od t he r oof syst em, as i nst al l ed f or i t s i nt ended use i n t he nor mal c l i mat i c and envi r onment al condi t i ons of t he f aci l i t y , becomes non- wat er t i ght , shows evi dence of moi st ur e i nt r usi on wi t hi n t he assembl y, bl i s t er s, spl i t s, t ear s, del ami nat es, separ at es at t he seams, or shows evi dence of excessi ve weat her i ng due t o def ect i ve mat er i al s or i nst al l at i on wor kmanshi p, t he r epai r or r epl acement of t he def ect i ve and damaged mat er i al s of t he r oof syst em assembl y and cor r ect i on of def ect i ve wor kmanshi p ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er . Al l cost s associ at ed wi t h t he r epai r or r epl acement wor k ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er .

b. The war r ant y must r emai n i n f ul l f or ce and ef f ect , i ncl udi ng emer gency t empor ar y r epai r s per f or med by ot her s, when t he manuf act ur er or hi s appr oved appl i cat or f ai l t o per f or m t he r epai r s wi t hi n 72 hour s of notification.

1. 8. 2 Roof i ng Syst em I nst al l er War r ant y

The r oof syst em i nst al l er must war r ant f or a mi ni mum per i od of t wo year s t hat t he r oof syst em, as i nst al l ed, i s f r ee f r om def ect s i n i nst al l at i on wor kmanshi p, t o i ncl ude t he r oof membr ane, f l ashi ng, i nsul at i on, accessor i es, at t achment s, and sheet met al i nst al l at i on i nt egr al t o a compl et e wat er t i ght r oof syst em assembl y. Wr i t e t he war r ant y di r ect l y t o t he Gover nment . The r oof syst em i nst al l er i s r esponsi bl e f or cor r ect i on

Apr i l 2019 Page 7 SECTI ON 07 51 13 of def ect i ve wor kmanshi p and r epl acement of damaged or af f ect ed mat er i al s. The r oof syst em i nst al l er i s r esponsi bl e f or al l cost s associ at ed wi t h t he r epai r or r epl acement wor k.

1. 8. 3 Cont i nuance of War r ant y

Appr ove r epai r or r epl acement wor k t hat becomes necessar y wi t hi n t he war r ant y per i od and accompl i shed i n a manner so as t o r est or e t he i nt egr i t y of t he r oof syst em assembl y and val i di t y of t he r oof membr ane manuf act ur er war r ant y f or t he r emai nder of t he manuf act ur er war r ant y period.

1. 9 CONFORMANCE AND COMPATI BI LI TY

The ent i r e r oof i ng and f l ashi ng syst em must be i n accor dance wi t h speci f i ed and i ndi cat ed r equi r ement s, i ncl udi ng f i r e and wi nd r esi st ance r equi r ement s. Wor k not speci f i cal l y addr essed and any devi at i on f r om speci f i ed r equi r ement s must be i n gener al accor dance wi t h r ecommendat i ons of t he NRCA Roof Man, membr ane manuf act ur er publ i shed r ecommendat i ons and det ai l s, and compat i bl e wi t h sur r oundi ng component s and const r uct i on.

Submi t any devi at i on f r om speci f i ed or i ndi cat ed r equi r ement s t o t he Cont r act i ng Of f i cer f or appr oval pr i or t o i nst al l at i on.

1. 10 SUSTAI NABI LI TY REPORTI NG

1. 10. 1 Recycl ed Mat er i al s

Cont r act or shal l sel ect mat er i al s so t hat t he sum of post - consumer r ecycl ed cont ent val ue pl us one- hal f of post - i ndust r i al r ecycl ed cont ent val ue const i t ut es at l east 10 per cent of t he t ot al mat er i al s cost f or t he pr oj ect . EPA Compr ehensi ve Pr ocur ement Gui del i nes has a suppl i er dat abase: http://www.epa.gov/cpg/products/

PART 2 PRODUCTS

2. 1 GENERAL

Fur ni sh a combi nat i on of speci f i ed mat er i al s t hat compr i se t he membr ane manuf act ur er ' s st andar d syst em of t he number and t ype of pl i es speci f i ed.

Mat er i al s pr ovi ded must be appr oved by t he r oof membr ane manuf act ur er and sui t abl e f or t he ser vi ce and cl i mat i c condi t i ons of t he i nst al l at i on.

2. 2 FI BERGLASS FELT MATERI ALS

a. Vent i ng Base Sheet : ASTM D4897/ D4897M, Type I I , wi t hout per f or at i ons and as appr oved by t he r oof membr ane manuf act ur er .

b. Fi ber gl ass Fel t Base Sheet : ASTM D4601/ D4601M, Type I I , wi t hout and as appr oved by t he r oof membr ane manuf act ur er .

c. Pl y Fel t : ASTM D2178/ D2178M, Type I V .

2. 3 BASE FLASHI NG MEMBRANE

ASTM D6163/ D6163M. Membr ane manuf act ur er ' s st andar d, mi ni mum t wo- pl y modi f i ed bi t umen membr ane f l ashi ng syst em compat i bl e wi t h t he bui l t - up r oof membr ane and as r ecommended i n membr ane manuf act ur er ' s publ i shed l i t er at ur e. Pr ovi de a mi ni mum base pl y of f l ashi ng membr ane of 70 mi l s t hi ck. Pr ovi de a mi ni mum gr anul e sur f ace modi f i ed bi t umen f l ashi ng cap

Apr i l 2019 Page 8 SECTI ON 07 51 13 sheet of 120 mi l s t hi ck on t he sel vage edge.

2. 4 ASPHALT

ASTM D312/ D312M, Type I I I , or I V, i n accor dance wi t h membr ane manuf act ur er r equi r ement s and compat i bl e wi t h t he s l ope condi t i ons of t he i nst al l at i on.

2. 5 SURFACI NG MATERI AL

2. 5. 1 Gr anul e Sur f ace Modi f i ed Bi t umen Cap Sheet

ASTM D6164/ D6164M; Type I I , Gr ade G, mi ni mum 3 mm ( 120 mi l s) t hi ck at sel vage edge, and as r equi r ed t o pr ovi de speci f i ed f i r e saf et y r at i ng.

2. 6 PRIMER

ASTM D41/ D41M f or asphal t r oof i ng syst ems and as appr oved by t he membr ane manufacturer.

2. 7 ASPHALT ROOF CEMENT

ASTM D4586/ D4586M f or use wi t h asphal t r oof i ng syst ems, Type I I f or ver t i cal sur f aces and bui l t - up bi t umi nous f l ashi ngs; Type I f or hor i zont al sur f aces and as r ecommended by t he membr ane manuf act ur er .

2. 8 CANT STRI PS

St andar d cant st r i ps must be of per l i t e conf or mi ng t o ASTM C728 t r eat ed wi t h bi t umi nous i mpr egnat i on, s i z i ng, or waxi ng and f abr i cat ed t o pr ovi de maxi mum 45 degr ee change i n di r ect i on of membr ane. Pr ovi de mi ni mum 1- 1/ 2 i nch t hi ck cant st r i ps and pr ovi de f or mi ni mum 5 i nch f ace and 3- 1/ 2 i nch ver t i cal hei ght when i nst al l ed at 45 degr ee f ace angl e, except wher e c l ear ance r est r i ct s hei ght t o l esser di mensi on.

2. 9 UNSATURATED FELT OR ROSI N- SI ZED BUI LDI NG PAPER

Pr ovi de r osi n- si zed sheat hi ng paper wei ghi ng mi ni mum 5 pounds per 100 squar e f eet or unsat ur at ed f el t wei ghi ng appr oxi mat el y 7- 1/ 2 pounds per 100 squar e f eet .

2. 10 FASTENERS AND PLATES

Coat ed, cor r osi on r esi st ant f ast ener s compat i bl e wi t h component s bei ng at t ached and cont act sur f aces. Conf or m t o FM 4470 f or f ast ener s f or at t achment t o deck subst r at e of Cl ass I r oof deck const r uct i on and FM APP GUI DE f or t he wi nd r esi st ance speci f i ed. Use har d copper f ast ener s i n cont act wi t h copper ; al umi num or st ai nl ess st eel f ast ener s i n cont act wi t h al umi num; and st ai nl ess st eel f ast ener s i n cont act wi t h st ai nl ess st eel . For f ast eni ng onl y r oof i ng f el t s, use f ast ener s dr i ven t hr ough met al di scs, or one- pi ece composi t e f ast ener s wi t h heads not l ess t han 1 i nch i n di amet er or 1 i nch squar e wi t h r ounded or 45- degr ee t aper ed corners.

2. 10. 1 Wood Subst r at es and Nai l er s

Pr ovi de 11 gage annul ar t hr eaded shank nai l s wi t h 7/ 16 t o 5/ 8 i nch di amet er heads; or one- pi ece composi t e nai l s wi t h annul ar t hr eaded shanks not l ess t han 11 gage f or secur i ng f el t s and met al i t ems. Pr ovi de f ast ener s l ong enough t o penet r at e mi ni mum 1 i nch i nt o or mi ni mum 1/ 4 i nch

Apr i l 2019 Page 9 SECTI ON 07 51 13 t hr ough wood subst r at e mat er i al s. Do not penet r at e wood decki ng exposed t o v i ew on t he under si de.

2. 10. 2 Masonr y or Concr et e Wal l s and Ver t i cal Sur f aces

Pr ovi de har dened st eel nai l s or scr ews wi t h f l at heads, di amond shaped poi nt s, and mechani cal l y def or med shanks not l ess t han 1 i nch l ong f or secur i ng f el t s, met al i t ems, and accessor i es. Use power - dr i ven f ast ener s onl y when appr oved i n wr i t i ng by Cont r act i ng Of f i cer .

2. 10. 3 Met al Pl at es

Fl at cor r osi on- r esi st ant r ound st r ess pl at es as r ecommended by t he modi f i ed bi t umen sheet manuf act ur er ' s pr i nt ed i nst r uct i ons and meet i ng t he r equi r ement s of FM 4470; mi ni mum 2 i nch i n di amet er . For m di scs t o pr event di shi ng or cuppi ng.

2. 11 PRE- MANUFACTURED ACCESSORI ES

Pr e- manuf act ur ed accessor i es must be manuf act ur er ' s st andar d f or i nt ended pur pose, compl y wi t h appl i cabl e speci f i cat i on sect i on, compat i bl e wi t h t he membr ane r oof syst em and appr oved f or use by t he r oof membr ane manufacturer.

2. 11. 1 Pr e- f abr i cat ed Cur bs

Pr ovi de 18 gauge G90 gal vani zed cur bs wi t h mi ni mum 4 i nch f l ange f or at t achment t o r oof nai l er s. Pr ovi de mi ni mum hei ght of 10 i nch above t he f i ni shed r oof membr ane sur f ace.

2. 12 WALKPADS

Pr ovi de pol yest er r ei nf or ced r oof wal kpads, gr anul e- sur f aced modi f i ed bi t umen membr ane mat er i al , ASTM D6162/ D6162M or ASTM D6164/ D6164M, mi ni mum 200 mi l s t hi ck, compat i bl e wi t h t he r oof membr ane and as r ecommended by t he r oof membr ane manuf act ur er . Do not exceed 4 f eet i n l engt h f or each panel . Ot her wal kpad mat er i al s r equi r e appr oval of t he Cont r act i ng Of f i cer pr i or t o i nst al l at i on.

2. 13 ROOF I NSULATI ON BELOW MEMBRANE SYSTEM

I nsul at i on must be compat i bl e wi t h t he r oof membr ane, appr oved by t he membr ane manuf act ur er .

2. 14 MEMBRANE LI NER

Sel f - adher i ng modi f i ed bi t umen under l ayment conf or mi ng t o ASTM D1970/ D1970M, EPDM membr ane l i ner conf or mi ng t o ASTM D4637/ D4637M, or ot her wat er pr oof membr ane l i ner mat er i al conf or mi ng t o ASTM D4869/ D4869M, or ASTM D6757/ D6757M, and as appr oved by t he Cont r act i ng Of f i cer .

PART 3 EXECUTI ON

3. 1 VERI FI CATI ON OF CONDI TI ONS

Bef or e appl y i ng r oof i ng mat er i al s, ensur e t hat t he f ol l owi ng exi st :

a. Dr ai ns, cur bs, cant s, cont r ol j oi nt s, expansi on j oi nt s, per i met er wal l s, r oof penet r at i ng component s, and equi pment suppor t s ar e i n

Apr i l 2019 Page 10 SECTI ON 07 51 13 place.

b. Sur f aces ar e r i gi d, c l ean, dr y, smoot h, and f r ee of cr acks, hol es, and shar p changes i n el evat i on. Joi nt s i n subst r at e ar e seal ed t o pr event dr i ppage of bi t umen i nt o bui l di ng or down ext er i or wal l s. I nspect sur f aces and appr ove i mmedi at el y bef or e appl i cat i on of r oof i ng and f l ashi ngs. Appl y t he r oof i ng and f l ashi ngs t o a smoot h and f i r m sur f ace f r ee f r om i ce, f r ost , v i s i bl e moi st ur e, di r t , pr oj ect i ons, and f or ei gn mat er i al s.

c. The pl ane of t he subst r at e does not var y mor e t han 1/ 4 i nch wi t hi n an ar ea 10 by 10 f eet when checked wi t h a 10 f oot st r ai ght edge pl aced anywher e on t he subst r at e.

d. Subst r at e i s s l oped as i ndi cat ed t o pr ovi de dr ai nage.

e. Wal l s and ver t i cal sur f aces ar e const r uct ed t o r ecei ve count er f l ashi ng and wi l l per mi t mechani cal f ast eni ng of t he base f l ashi ng mat er i al s.

f . Tr eat ed wood nai l er s ar e i n pl ace on non- nai l abl e sur f aces, t o per mi t nai l i ng of base f l ashi ng at mi ni mum hei ght of 8 i nch above f i ni shed r oof i ng sur f ace.

g. Tr eat ed wood nai l er s ar e f ast ened i n pl ace at eaves, gabl e ends, openi ngs, and i nt er sect i ons wi t h ver t i cal sur f aces f or secur i ng of f el t s, edgi ng st r i ps, at t achment f l anges of sheet met al , and r oof f i x t ur es. Sur f ace- appl i ed nai l er s ar e same t hi ckness as r oof insulation.

h. Cant s ar e secur el y f ast ened i n pl ace i n t he angl es f or med by wal l s and ot her ver t i cal sur f aces. The angl e of t he cant i s appr oxi mat el y 45 degr ees and t he hei ght of t he ver t i cal l eg i s not l ess t han nomi nal 3- 1/ 2 i nch. Lay cant s i n a sol i d asphal t moppi ng or coat of asphal t cement j ust pr i or t o l ayi ng t he r oof i ng pl i es.

i . Vent i ng i s pr ovi ded i n accor dance wi t h t he f ol l owi ng:

( 1) Edge Vent i ng: Per i met er nai l er s ar e ker f ed acr oss wi dt h of t he nai l er s t o per mi t escape of gaseous pr essur e at r oof edges.

( 2) Under si de Vent i ng: Vent openi ngs ar e pr ovi ded i n st eel f or m decki ng f or cast - i n- pl ace concr et e subst r at e.

j . Exposed nai l heads i n wood subst r at es ar e pr oper l y set . War ped and spl i t boar ds and sheet s have been r epl aced. Ther e ar e no cr acks or end j oi nt s 1/ 4 i nch i n wi dt h or gr eat er . Knot hol es ar e cover ed wi t h sheet met al and nai l ed i n pl ace. Wood, Pl ywood decks ar e cover ed wi t h r osi n paper or unsat ur at ed f el t pr i or t o base sheet or r oof membr ane appl i cat i on. Joi nt s i n pl ywood subst r at es ar e t aped wi t h 2 i nch wi de maski ng t ape t o pr event ai r l eakage f r om t he under si de.

k. I nsul at i on boar ds ar e i nst al l ed smoot hl y and evenl y, and ar e not br oken, cr acked, or cur l ed. Ther e ar e no gaps i n i nsul at i on boar d j oi nt s exceedi ng 1/ 4 i nch i n wi dt h. I nsul at i on i s bei ng r oof ed over on t he same day t he i nsul at i on i s i nst al l ed.

l . Cast - i n- pl ace concr et e subst r at es have been al l owed t o cur e and t he sur f ace dr yness r equi r ement s speci f i ed under par agr aph ent i t l ed " Fi el d Qual i t y Cont r ol " have been met . No vi abl e moi st ur e pr esent when

Apr i l 2019 Page 11 SECTI ON 07 51 13 conducting ASTM D4263

m. Joi nt s bet ween pr ecast concr et e deck uni t s, i ncl udi ng wel d pl at es, ar e gr out ed, l evel ed, and cover ed wi t h 4 i nch wi de pl y f el t or ot her bi t umi nous st r i ppi ng membr ane set i n bi t umi nous cement pr i or t o appl y i ng ot her r oof i ng mat er i al s over t he ar ea. Pr i or t o appl i cat i on of pr i mer on pr ecast concr et e decks, cover j oi nt s wi t h a mi ni mum 4 i nch st r i p of f el t or bi t umi nous st r i ppi ng membr ane set i n bi t umi nous cement.

3. 2 PREPARATION

Ver i f y t hat wor k of ot her t r ades t hat penet r at es t he r oof deck or r equi r es men and equi pment t o t r aver se t he r oof deck i s compl et e.

Exami ne deck sur f aces f or i nadequat e anchor age, f or ei gn mat er i al , moi st ur e, and unevenness whi ch woul d pr event t he execut i on and qual i t y of application.

Pr oceed wi t h t he r oof i ng appl i cat i on onl y af t er def ect s have been corrected.

St ar t i ng wor k desi gnat es accept ance of t he sur f aces by t he Cont r act or .

3. 2. 1 Pr ot ect i on of Pr oper t y

3. 2. 1. 1 Pr ot ect i ve Cover i ngs

I nst al l pr ot ect i ve cover i ngs at pavi ng and bui l di ng wal l s adj acent t o hoi st s and ket t l es pr i or t o st ar t i ng t he wor k. Lap pr ot ect i ve cover i ngs not l ess t han si x i nch, secur e agai nst wi nd, and vent t o pr event col l ect i on of moi st ur e on cover ed sur f aces. Keep pr ot ect i ve cover i ngs i n pl ace f or t he dur at i on of t he r oof i ng wor k.

3. 2. 1. 2 Bi t umen St ops

Pr ovi de f el t bi t umen st ops or ot her means t o pr event bi t umen dr i ppage at r oof edges, openi ngs, and ver t i cal pr oj ect i ons bef or e hot mopped appl i cat i on of t he r oof i ng membr ane. For m f el t bi t umen st ops wi t h t wo 12 i nch wi de st r i ps of or gani c pl y f el t . Lami nat e wi t h and set st r i ps i nt o a coat i ng of asphal t r oof cement wi t h one- hal f of t he wi dt h over hangi ng t he edge of t he r oof or openi ng. Wher e nai l er s ar e pr ovi ded, nai l t he st r i ps wi t h r oof i ng nai l s spaced 12 i nch on cent er i n addi t i on t o embeddi ng i n asphal t r oof cement . Pr ot ect t he f r ee por t i on of each st r i p f r om damage t hr oughout t he r oof i ng per i od. Af t er t he pl i es of f el t ar e i n pl ace, f ol d f r ee por t i on of t he st r i ps back over t he r oof i ng membr ane and embed i n a cont i nuous coat i ng of asphal t r oof cement . Secur e wi t h r oof i ng nai l s spaced 3 i nch on cent er .

3. 2. 2 Equipment

3. 2. 2. 1 Mechani cal Appl i cat i on Devi ces

Pr ovi de and mai nt ai n mechani cal appl i cat i on devi ces wi t h pneumat i c t i r es t hat oper at e wi t hout damagi ng t he i nsul at i on, r oof i ng membr ane, or st r uct ur al component s.

Apr i l 2019 Page 12 SECTI ON 07 51 13

3. 2. 2. 2 Fl ame- Heat ed Equi pment

Do not pl ace f l ame- heat ed equi pment on r oof . Pr ovi de and mai nt ai n a f i r e ext i ngui sher adj acent t o f l ame- heat ed equi pment and on t he r oof .

3. 2. 2. 3 Open Fl ame Appl i cat i on Equi pment

Use onl y open f l ame equi pment r ecommended by t he r oof i ng mat er i al s manuf act ur er . Do not i gni t e open f l ame equi pment when l ef t unat t ended.

Pr ovi de and mai nt ai n a f i r e ext i ngui sher adj acent t o open f l ame equi pment on t he r oof .

3. 2. 3 Pr i mi ng of Sur f aces

Pr i me al l sur f aces t o be i n cont act wi t h adher ed membr ane mat er i al s.

Appl y pr i mer at t he r at e of 3 l i t er s per 0. 75 gal l on per 100 sq. f t . or as r ecommended by r oof membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons t o pr omot e adhesi on of membr ane mat er i al s. Al l ow pr i mer t o dr y pr i or t o appl i cat i on of membr ane mat er i al s t o pr i med sur f ace. Avoi d f l ammabl e pr i mer mat er i al condi t i ons i n t or ch appl i ed membr ane base f l ashi ng applications.

3. 2. 3. 1 Pr i mi ng of Concr et e and Masonr y Sur f aces

Af t er sur f ace dr yness r equi r ement s have been met , coat concr et e and masonr y sur f aces whi ch ar e t o r ecei ve r oof i ng and base f l ashi ng uni f or ml y wi t h pr i mer . Al l ow pr i mer t o dr y bef or e appl i cat i on of r oof i ng and f l ashi ng mat er i al s.

3. 2. 3. 2 Pr i mi ng of Met al Sur f aces

Pr i me f l anges of met al component s t o be embedded i nt o t he r oof i ng syst em pr i or t o set t i ng i n bi t umi nous mat er i al s or st r i ppi ng i nt o r oof i ng syst em.

3. 2. 4 Cover i ng of Wood Subst r at e

Cover wood subst r at e wi t h a l ayer of unsat ur at ed f el t or r osi n- si zed bui l di ng paper l apped 2 i nch at s i des and 4 i nch at ends. Nai l t o hol d i n pl ace pr i or t o appl i cat i on of r oof i ng syst em.

3. 2. 5 Heat i ng of Asphal t

Br eak up sol i d asphal t on a sur f ace f r ee of di r t and debr i s. Heat asphal t i n ket t l e desi gned t o pr event cont act of f l ame wi t h sur f aces i n cont act wi t h t he asphal t . Pr ovi de vi s i bl e wor ki ng t her momet er and t her most at i c cont r ol s set t o t he t emper at ur e l i mi t s. Keep cont r ol s i n wor ki ng or der and cal i br at ed. Use i mmer si on t her momet er , accur at e wi t hi n a t ol er ance of pl us or mi nus 2 degr ees F, t o check t emper at ur es of t he asphal t f r equent l y. When t emper at ur es exceed maxi mum speci f i ed, r emove asphal t f r om t he si t e. Do no per mi t cut t i ng back, adul t er at i ng, or f l uxi ng of asphalt.

3. 2. 5. 1 Temper at ur e Li mi t at i ons f or Asphal t

Heat and appl y asphal t at t he t emper at ur es speci f i ed bel ow unl ess speci f i ed ot her wi se by manuf act ur er ' s pr i nt ed appl i cat i on i nst r uct i ons.

Use t her momet er t o check t emper at ur e dur i ng heat i ng and appl i cat i on. Have ket t l e at t ended const ant l y dur i ng heat i ng pr ocess t o ensur e speci f i ed t emper at ur es ar e mai nt ai ned. Do not heat asphal t above i t s f i ni shed

Apr i l 2019 Page 13 SECTI ON 07 51 13 bl owi ng t emper at ur e ( FBT) . Do not heat asphal t bet ween 500 and 525 degr ees F f or l onger t han f our consecut i ve hour s. Do not heat asphal t t o t he f l ash poi nt ( FP) . Appl y asphal t and embed membr ane sheet s when t emper at ur e of asphal t i s wi t hi n pl us or mi nus 25 degr ees F of t he equi v i scous t emper at ur e ( EVT) . Bef or e heat i ng and appl i cat i on of asphal t r ef er t o t he asphal t manuf act ur er ' s l abel or bi l l of l adi ng f or FP, FBT, and EVT of t he asphal t used.

3. 3 APPLICATION

Appl y r oof i ng mat er i al s as speci f i ed unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Keep r oof i ng mat er i al s dr y bef or e and dur i ng appl i cat i on. Except f or aggr egat e sur f aci ng, compl et e appl i cat i on of r oof i ng i n a cont i nuous oper at i on. Begi n and appl y onl y as much r oof i ng i n one day as can be compl et ed t hat same day. Mai nt ai n speci f i ed t emper at ur e f or asphal t . Pr ovi de t empor ar y r oof i ng and f l ashi ng as speci f i ed her ei n pr i or t o appl i cat i on of per manent r oof i ng syst em. Do not appl y aggr egat e sur f aci ng unt i l t he ot her r oof i ng appl i cat i on pr ocedur es speci f i ed her ei n ar e compl et ed.

3. 3. 1 Phased Membr ane Const r uct i on

Phased appl i cat i on of membr ane pl i es i s pr ohi bi t ed. Any del ay i n modi f i ed bi t umen cap sheet i nst al l at i on wi l l r esul t i n t hor ough cl eani ng of t he appl i ed membr ane mat er i al sur f ace and dr yi ng i mmedi at el y pr i or t o cap sheet i nst al l at i on. Pr i mi ng of t he appl i ed membr ane sur f ace may be r equi r ed at t he di scr et i on of t he Cont r act i ng Of f i cer pr i or t o cap sheet installation.

3. 3. 2 Tempor ar y Roof i ng and Fl ashi ng

Pr ovi de wat er t i ght t empor ar y r oof i ng and f l ashi ng wher e consi der abl e wor k by ot her t r ades, such as i nst al l i ng cool i ng t ower s, ant ennas, pi pes, duct s, i s t o be per f or med on t he r oof or wher e const r uct i on schedul i ng or weat her condi t i ons r equi r e pr ot ect i on of bui l di ng i nt er i or bef or e per manent r oof i ng syst em can be i nst al l ed. Do not i nst al l t empor ar y r oof i ng over per manent l y i nst al l ed i nsul at i on. Pr ovi de r i gi d pads f or t r af f i c over t empor ar y r oof i ng.

3. 3. 2. 1 Removal

Compl et el y r emove t empor ar y r oof i ng and f l ashi ng bef or e cont i nui ng wi t h appl i cat i on of per manent r oof i ng syst em.

3. 3. 3 Base Sheet Appl i cat i on - Gener al

Ful l y adher e base sheet s i n accor dance wi t h membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons. Rol l and br oom i n t he base sheet t o ensur e f ul l cont r act wi t h t he hot asphal t appl i cat i on. On nai l abl e subst r at es, mechani cal l y f ast en base sheet i n conf or mance wi t h speci f i ed wi nd r esi st ance r equi r ement s and membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons, and t o i ncl ude i ncr eased f ast eni ng f r equency i n cor ner and per i met er ar eas. Dr i ve f ast ener s f l ush wi t h no di shi ng or cuppi ng of f ast ener pl at e. Wher e appl i cabl e, base sheet may be mechani cal l y f ast ened i n conj unct i on wi t h i nsul at i on t o t he subst r at e, i n accor dance wi t h membr ane manuf act ur er s pr i nt ed i nst r uct i ons. Appl y sheet s i n a cont i nuous oper at i on. Appl y sheet s wi t h s i de l aps at a mi ni mum of 2 i nch unl ess gr eat er s i de l ap i s r ecommended by t he manuf act ur er ' s st andar d wr i t t en appl i cat i on i nst r uct i ons. Pr ovi de end l aps of not l ess t han 6 i nch and

Apr i l 2019 Page 14 SECTI ON 07 51 13 st agger ed a mi ni mum of 36 i nch. Appl y sheet s at r i ght angl es t o t he r oof s l ope so t hat t he di r ect i on of wat er f l ow i s over and not agai nst t he l aps par al l el t o t he r oof s l ope . Ext end base sheet s appr oxi mat el y 2 i nch above t he t op of cant st r i ps at ver t i cal sur f aces and t o t he t op of cant st r i ps el sewher e. Tr i m base sheet t o a neat f i t ar ound vent pi pes, r oof dr ai ns, and ot her pr oj ect i ons t hr ough t he r oof . Ret r of i t r oof dr ai ns must conf or m t o ANSI / SPRI RD- 1. Appl i cat i on must be f r ee of r i dges, wr i nkl es, and buckl es.

3. 3. 3. 1 Vent i l at i ng Base Sheet s

Appl y vent i l at i ng base sheet mat er i al r ecommended by t he r oof membr ane manuf act ur er . Ext end sheet s over r oof cant s, up ver t i cal sur f aces, and t er mi nat e under cap f l ashi ng; at r oof edges t er mi nat e sheet s under out si de edge of per i met er edge nai l er s or under gr avel st op.

3. 3. 4 Pl y Fel t s

Ensur e pr oper al i gnment of f el t s pr i or t o i nst al l at i on. Appl y pl y f el t s shi ngl e f ashi on per pendi cul ar t o s l ope of r oof , i ncl udi ng appl i cat i on on ar eas of t aper ed i nsul at i on t hat change sl ope di r ect i on. Appl y pl y f el t s par al l el t o s l ope of r oof so t hat pl i es of f el t ext end f r om eave l i ne on one si de of bar r el - t ype r oof and 18 i nch over cent er l i ne of t he cr own of r oof . Appl y f el t s on ot her s i de i n same manner , r esul t i ng i n t wi ce nor mal amount of r oof i ng f el t s and asphal t at cr own. Bucki ng or backwat er l aps ar e pr ohi bi t ed. Appl y f el t s i n a cont i nuous oper at i on. Pr ovi de st ar t er sheet s of f el t t o mai nt ai n t he speci f i ed number of pl i es t hr oughout t he r oof i ng. Appl y f el t s wi t h s i de l aps i n accor dance wi t h t he mat er i al manuf act ur er ' s pr i nt ed i nst r uct i ons f or t he number of pl i es t o be i nst al l ed and i n uni f or m al i gnment . Lap ends not l ess t han 6 i nch and st agger 36 i nch mi ni mum. Pl ace t he f ul l wi dt h of each pl y i n hot bi t umen i mmedi at el y behi nd t he bi t umen appl i cat or . Pl i es must be l ai d f r ee of wr i nkl es, cr eases, r i dges, or f i shmout hs. Ext end f el t s appr oxi mat el y 2 i nch above t op of cant st r i ps at ver t i cal sur f aces and t o t op of cant st r i ps el sewher e. Tr i m f el t s t o a neat f i t ar ound vent pi pes, r oof dr ai ns, and ot her pr oj ect i ons. Avoi d t r af f i c on mopped sur f aces when t he bi t umen i s f l ui d and f or a mi ni mum of one hour af t er pl y appl i cat i on.

3. 3. 4. 1 Hot - Moppi ng of Pl y Fel t s

Bond pl i es t o each ot her and t o t he base sheet s subst r at e wi t h hot asphal t . Appl y f el t s i mmedi at el y f ol l owi ng appl i cat i on of asphal t . Do not wor k ahead wi t h asphal t . At t he i nst ant f el t s come i nt o cont act wi t h asphal t , asphal t must be compl et el y f l ui d, wi t h asphal t t emper at ur es wi t hi n speci f i ed EVT r ange. Appl y asphal t uni f or ml y i n a f ul l , cont i nuous moppi ng and f i r ml y bondi ng f i l m. Appl y asphal t at t he r at e of appr oxi mat el y 25 pounds per 100 sq. f eet pl us or mi nus 25 per cent .

Requi r e appl i cat i on r at e on t he hi gh end of t he appl i cat i on r ange when moppi ng di r ect l y t o absor pt i ve i nsul at i on subst r at es of per l i t e and woodf i ber . As f el t s ar e r ol l ed i nt o t he hot asphal t , i mmedi at el y squeegee, r ol l or br oom down t o el i mi nat e t r apped ai r and t o pr ovi de t i ght , smoot h l ami nat i ons wi t hout wr i nkl es, buckl es, k i nks, or f i sh mout hs. Bi t umen must be vi s i bl e beyond al l edges of each pl y as i t i s bei ng i nst al l ed. I ndi v i dual pl y i nst al l at i on and t he compl et ed r oof membr ane syst em must be f r ee of ai r pocket s, f el t del ami nat i ons, r i dges, cr eases, f i shmout hs, dr y l aps, or bl i st er s. Do not l ay f el t s dr y or t ur n back l aps f or moppi ng bet ween pl i es.

Apr i l 2019 Page 15 SECTI ON 07 51 13

3. 3. 4. 2 Val l eys and Ri dges

Val l eys: Appl y r oof i ng at val l eys and wat er ways i n t he f ol l owi ng manner :

Cont i nue base sheet s acr oss val l eys and t er mi nat e 18 i nchf r om t he val l ey.

Cont i nue f el t pl i es acr oss val l eys and t er mi nat e 12 i nch f r om t he val l ey.

Ter mi nat e exposed l aps on a l i ne 12 i nch f r om, and par al l el t o, t he gut t er val l ey. Pr ovi de t wo pl i es of f el t , 9 and 12 i nch wi de, successi vel y mop i n over each f el t l i ne of t he t er mi nat i on.

I f t he appl i cat i on can be compl et ed wi t hout wr i nkl es, buckl es, or f i shmout hs and i f s i de l aps do not f ace t he di r ect i on of dr ai nage, r oof i ng f el t s and base sheet s may be l ai d cont i nuousl y acr oss or par al l el t o shal l ow val l eys such as t hose f or med by r ever se- sl ope r oof s. For t hi s appl i cat i on, r ei nf or ce val l eys wi t h one pl y of f el t , wi de, cent er on t he val l ey gut t er and l ay i n a sol i d moppi ng of asphal t over t he t op pl y of r oof i ng.

3. 3. 5 Membr ane Fl ashi ng

Pr ovi de t wo pl i es of modi f i ed bi t umen membr ane st r i p f l ashi ng and sheet f l ashi ng i n t he angl es f or med wher e t he r oof deck abut s wal l s, cur bs, vent i l at or s, pi pes, and ot her ver t i cal sur f aces, and wher e necessar y t o make t he wor k wat er t i ght . Top pl y of f l ashi ng must be gr anul e- sur f aced modi f i ed bi t umen membr ane. I nst al l f l ashi ng af t er pl i es of r oof membr ane f el t have been appl i ed but bef or e aggr egat e sur f aci ng i s appl i ed. Cut at a 45 degr ee angl e acr oss t er mi nat i ng end l ap ar ea of cap membr ane pr i or t o appl y i ng adj acent over l appi ng cap membr ane. Pr ess f l ashi ng i nt o pl ace t o ensur e f ul l adhesi on and avoi d br i dgi ng. Ensur e f ul l l ap seal i n al l l ap ar eas. Mechani cal l y f ast en t op edge of base f l ashi ng 6 i nch on cent er t hr ough mi ni mum 1 i nch di amet er t i n caps wi t h f ast ener s of suf f i c i ent l engt h t o embed mi ni mum 1 i nch i nt o at t achment subst r at e. Appl y mat chi ng gr anul es i n any ar eas of asphal t bl eed out whi l e t he asphal t i s st i l l hot .

Appl y membr ane l i ner over t op of exposed nai l er s and bl ocki ng and t o over l ap t op edge of base f l ashi ng i nst al l at i on at cur bs, par apet wal l s, expansi on j oi nt s and as ot her wi se i ndi cat ed t o ser ve as wat er pr oof l i ni ng under sheet met al f l ashi ng component s.

3. 3. 5. 1 St r i p Fl ashi ng

Set pr i med f l anges of sheet met al f l ashi ngs t o be i ncor por at ed i nt o r oof i ng syst em i n a uni f or m coat i ng of asphal t r oof cement not l ess t han 1/ 16 i nch t hi ck appl i ed over t he pl y f el t s. St r i p- i n wi t h one l ayer of smoot h sur f ace modi f i ed bi t umen membr ane and cap wi t h gr anul e- sur f aced modi f i ed bi t umen membr ane. Set st r i p f l ashi ng i n hot asphal t or cement t o t he t ops of t he f l anges, r oof i ng membr ane, and t o each ot her . Use coat i ngs of asphal t r oof cement not l ess t han 1/ 16 i nch t hi ck f or pl y f el t . Use hot asphal t or modi f i ed bi t umen cement f or modi f i ed bi t umen sheet s. Ext end f i r st st r i ppi ng pl y not l ess t han 4 i nch beyond out er edge of f l ange ont o r oof membr ane. Ext end each addi t i onal pl y 4 i nch beyond t he edge of t he pr evi ous pl y.

3. 3. 5. 2 Membr ane Fl ashi ng at Roof Dr ai n

Ext end r oof i ng pl i es t o edge of dr ai n bowl openi ng at r oof dr ai n deck f l ange. Neat l y f i t and pr ess pr i med r oof dr ai n f l ashi ng i nt o heavy coat of asphal t r oof cement appl i ed t o t op of r oof i ng pl i es. St r i p i n and compl et el y cover f l ashi ng wi t h t wo l ayer s of modi f i ed bi t umen sheet , Apr i l 2019 Page 16 SECTI ON 07 51 13 ext endi ng t he f i r st sheet 6 i nch on t he r oof i ng beyond t he edge of f l ashi ng. Ext end t he cap sheet 6 i nch beyond t he pr evi ous f l ashi ng pl y.

Bond t he t wo l ayer s t o t he met al f l ashi ng and t o each ot her wi t h hot asphal t . Secur el y c l amp membr ane, met al f l ashi ng, and st r i p f l ashi ng i n t he f l ashi ng cl ampi ng r i ng. Secur e c l amps so t hat st r i p f l ashi ng and met al f l ashi ng ar e f r ee f r om wr i nkl es and f ol ds. Tr i m membr ane, f l ashi ng, and st r i ppi ng f l ush wi t h i nsi de of c l ampi ng r i ng.

3. 3. 5. 3 Pr e- f abr i cat ed Cur bs

Anchor pr ef abr i cat ed cur bs secur el y t o nai l er or ot her base subst r at e as i ndi cat ed and f l ash wi t h modi f i ed bi t umen f l ashi ng membr ane.

3. 3. 5. 4 Set - On Accessor i es

Wher e pi pe or condui t bl ocki ng, suppor t s and si mi l ar r oof accessor i es ar e set on t he membr ane, adher e wal kpad mat er i al t o bot t om of accessor i es pr i or t o set t i ng on r oof i ng membr ane. Speci f i c met hod of i nst al l i ng set - on accessor i es must per mi t nor mal movement due t o expansi on, cont r act i on, v i br at i on, and si mi l ar occur r ences wi t hout damagi ng r oof i ng membr ane. Do not mechani cal l y secur e set - on accessor i es t hr ough r oof i ng membr ane i nt o r oof deck subst r at e.

3. 3. 5. 5 Li ght ni ng Pr ot ect i on

Fl ash or at t ach l i ght ni ng pr ot ect i on syst em component s t o t he r oof membr ane i n a manner accept abl e t o t he r oof membr ane manuf act ur er .

3. 3. 6 Roof Wal kpads

I nst al l wal kpads at r oof access poi nt s and wher e ot her wi se i ndi cat ed f or t r af f i c ar eas and f or access t o mechani cal equi pment , i n accor dance wi t h t he modi f i ed bi t umen sheet r oof i ng manuf act ur er ' s pr i nt ed i nst r uct i ons.

Pr ovi de mi ni mum 6 i nch separ at i on bet ween adj acent wal kpads t o accommodat e dr ai nage. Pr ovi de wal kpad or an addi t i onal l ayer of cap sheet under pr ecast concr et e paver bl ocks t o pr ot ect t he r oof i ng.

3. 3. 7 Gr anul e- Sur f aced Modi f i ed Bi t umen Cap Sheet

I nspect under l y i ng appl i ed membr ane and r epai r f r ee of damage, hol es, punct ur e, gouges, abr asi ons, and any ot her def ect s, and f r ee of moi st ur e, l oose mat er i al s, debr i s, sedi ment s, dust , and any ot her condi t i ons r equi r ed by t he membr ane manuf act ur er pr i or t o cap sheet i nst al l at i on.

Pr ovi de cl eani ng and ar t i f i c i al dr y i ng wi t h heat ed bl ower s or t or ches t o ensur e c l ean, dr y sur f ace pr i or t o cap sheet appl i cat i on.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .