07 12 00.pdf

PDF 42 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

SECTION 07 12 00: BUILT-UP BITUMINOUS WATERPROOFING

This is a technical specification document for built-up bituminous waterproofing systems at Tinker Air Force Base, Oklahoma, dated April 2019. The specification establishes requirements for materials, installation procedures, testing, and quality control for waterproofing applications on foundation walls, floors, shower pans, and other building envelope components. Materials must comply with ASTM International standards, including asphalt (ASTM D449/D449M Type I), bituminous plastic cement (ASTM D4586/D4586M Type I), and various membrane fabrics such as glass felt (ASTM D2178/D2178M Type III), cellulose fiber felt (ASTM D226/D226M), reinforcing glass fabric (ASTM D1668/D1668M REV A Type I), cotton fabric (ASTM D173/D173M), and woven burlap fabric (ASTM D1327/D1327M). Protection board materials must meet ASTM D517, ASTM C208, or ASTM C726 specifications. The specification also allows for prefabricated laminated asphalt waterproofing with minimum 0.40 lbs. per square foot weight and 75 percent bituminous content, and prefabricated copper fabric shower pans with 5 ounces per square foot copper sheet.

Installation requirements mandate ambient temperatures above 40 degrees Fahrenheit, surface preparation including cleaning and priming at a rate of not less than one gallon per 100 square feet, and application of bitumen at not less than 20 pounds per 100 square feet between plies and as top coating. Below-grade wall waterproofing requires a 3-ply hot-applied asphalt membrane system with minimum 24-inch overlap staggering; floor waterproofing requires fabric extension of 6 inches on slabs and 8 inches on walls at wall-slab intersections. All asphalt must be heated to flow freely but not exceed 375 degrees Fahrenheit, and flame-heated kettles must be located no closer than 25 feet from buildings with two approved fire extinguishers maintained nearby. Prior to concealment, horizontal membrane waterproofing must pass a 24-hour ponded water test with 3 inches of water. Contractors must submit product data, test reports, certificates, and manufacturer's instructions for government approval, provide VOC and recycled content certifications, and notify the Contracting Officer five working days before asphalt delivery to arrange sampling and independent laboratory testing.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
00 71 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 07 12 00

BUI LT- UP BI TUMI NOUS WATERPROOFI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM C208 ( 2012) Cel l ul osi c Fi ber I nsul at i ng Boar d

ASTM C726 ( 2012) Mi ner al Fi ber Roof I nsul at i on Boar d

ASTM D1327/ D1327M ( 2004e1; R 2012) St andar d Speci f i cat i on f or Bi t umen- Sat ur at ed Woven Bur l ap Fabr i cs Used i n Roof i ng and Wat er pr oof i ng

ASTM D1668/ D1668M ( 1997a; R 2014; E 2014) Gl ass Fabr i cs ( Woven and Tr eat ed) f or Roof i ng and Waterproofing

ASTM D173/ D173M ( 2003; R 2011; E 2012) Bi t umen- Sat ur at ed Cot t on Fabr i cs Used i n Roof i ng and Waterproofing

ASTM D2178/ D2178M ( 2015a) Asphal t Gl ass Fel t Used i n Roof i ng and Wat er pr oof i ng

ASTM D226/ D226M ( 2009) St andar d Speci f i cat i on f or Asphal t - Sat ur at ed Or gani c Fel t Used i n Roof i ng and Wat er pr oof i ng

ASTM D41/ D41M ( 2011) Asphal t Pr i mer Used i n Roof i ng, Damppr oof i ng, and Wat er pr oof i ng

ASTM D449/ D449M ( 2003; R 2014; E 2014) Asphal t Used i n Damppr oof i ng and Wat er pr oof i ng

ASTM D4586/ D4586M ( 2007; E 2012; R 2012) Asphal t Roof Cement , Asbest os- Fr ee

ASTM D517 ( 1998; R 2008) Asphal t Pl ank

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Apr i l 2019 Page 1 SECTI ON 07 12 00

Manuf act ur er ' s St andar d Det ai l s; G

Pr ot ect i on Boar d; G

Pr ef abr i cat ed Lami nat ed Asphal t Wat er pr oof i ng; G

Pr ef abr i cat ed Copper Fabr i c; G

Membr ane Fabr i c; G

Rei nf or ci ng Fabr i c; G

SD- 06 Test Repor t s

Bul k Li qui d Asphal t Cer t i f i ed Labor at or y Repor t s; G

SD- 07 Cer t i f i cat es

Membr ane Fabr i c; G

Rei nf or ci ng Fabr i c; G

Pr ot ect i on Boar d; G

Pr ef abr i cat ed Lami nat ed Asphal t Wat er pr oof i ng; G

Pr ef abr i cat ed Copper Fabr i c; G

Cer t i f i cat es of Compl i ance; G

SD- 08 Manuf act ur er ' s I nst r uct i ons

I nst al l at i on I nst r uct i ons

SD- 11 Cl oseout Submi t t al s

Asphal t Shi pment Recor ds

Cer t i f i cat es of Compl i ance; S

Vol at i l e Or gani c Compounds ( VOC) Cont ent s; S

Recycl ed Cont ent ; S

1. 3 MANUFACTURER' S DETAI L

Submi t manuf act ur er ' s st andar d det ai l s i ndi cat i ng met hods of at t achment and spaci ng, t r ansi t i on and t er mi nat i on condi t i ons, i nst al l at i on det ai l s.

1. 4 ENVI RONMENTAL CONDI TI ONS

Appl y t he pr i mer s and wat er pr oof i ng speci f i ed her ei n when t he ambi ent t emper at ur e i s above 40 degr ees F.

Apr i l 2019 Page 2 SECTI ON 07 12 00

1. 5 DELI VERY AND STORAGE

1. 5. 1 Mat er i al s Packagi ng

Del i ver mat er i al s i n bundl es, r ol l s , and seal ed cont ai ner s i n accor dance wi t h manuf act ur er ' s pr i nt ed handl i ng i nst r uct i ons and bear i ng manuf act ur er ' s or i gi nal l abel s. Mat er i al l abel s i ndi cat e dat es f or use or shel f l i f e; r emove out dat ed mat er i al , damaged, and det er i or at ed mat er i al f r om t he j obsi t e. Keep mat er i al s wr apped and separ at ed f r om of f - gassi ng mat er i al s ( such as dr yi ng pai nt s and adhesi ves) . Do not use mat er i al s t hat have vi s i bl e moi st ur e or bi ol ogi cal gr owt h.

1. 5. 2 Mat er i al s St or age

1. 5. 2. 1 Asphalt

Pr ot ect asphal t f r om f r eezi ng. St or e asphal t i n a weat her t i ght encl osur e, f r ee f r om cont act wi t h soi l . St or e and mai nt ai n at not l ess t han 50 degr ees F f or at l east 24 hour s bef or e use.

1. 5. 2. 2 Rei nf or cement Fabr i cs

Handl e and st or e r ei nf or cement f abr i cs i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst r uct i ons. Pr ot ect f abr i cs f r om moi st ur e damage and absor pt i on i n a weat her t i ght encl osur e or of f t he gr ound on pal l et s, and cover ed on t op and al l s i des wi t h br eat habl e- t ype canvas t ar paul i ns. Pl ast i c sheet s cause condensat i on bui l dup t her ef or e do not use t hem t o cover wat er pr oof i ng mat er i al s.

1. 6 Fl ame Heat ed Equi pment

1. 6. 1 Fi r e Pr ot ect i on

Locat e mel t ket t l es no cl oser t han 25 f eet f r om bui l di ngs or combust i bl e mat er i al s. Pr ovi de and mai nt ai n t wo appr oved 4- A: 40- B: C f i r e ext i ngui sher s wi t hi n 25 f eet of each oper at i ng ket t l e. Fi r e ext i ngui sher s, oper at i ons and l ocat i ons must compl y wi t h NFPA 1 Sect i on Tar Ket t l es. Equi p asphal t ( t ar ) ket t l es wi t h t i ght f i t t i ng l i ds.

1. 6. 2 Oper at i onal Requi r ement s

Equi p ket t l es wi t h aut omat i c t her most at i c cont r ol capabl e of mai nt ai ni ng asphal t t emper at ur e. Cal i br at e and mai nt ai n cont r ol s i n wor ki ng or der f or t he dur at i on of t he wor k. Equi p ket t l es wi t h means of agi t at i on and ensur e t hey ar e oper at i ng as necessar y t o pr oduce a cont r ol l ed uni f or m t emper at ur e t hr oughout ket t l e cont ent s t o pr event spot heat i ng. Do not heat cont ent s above f l ash poi nt . Do not pl ace f l ame heat ed equi pment on t he r oof .

1. 6. 3 Dr i ppage of Bi t umen

Seal j oi nt s i n and at edges as necessar y t o pr event dr i ppage of asphal t i nt o t he bui l di ng or ont o adj acent sur f aces.

PART 2 PRODUCTS

2. 1 PRODUCT SUSTAI NABI LI TY CRI TERI A

Wher e al l owed by per f or mance cr i t er i a:

Apr i l 2019 Page 3 SECTI ON 07 12 00

2. 1. 1 Reduce Vol at i l e Or gani c Compounds ( VOC) Cont ent s

Pr ovi de pr oduct s wi t h r educed VOC cont ent and pr ovi de cer t i f i cat es of compl i ance i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG par agr aph REDUCE VOLATI LE ORGANI C COMPOUNDS.

2. 1. 2 Recycl ed Cont ent

Pr ovi de pr oduct s wi t h r ecycl ed cont ent and pr ovi de cer t i f i cat es of compl i ance i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG par agr aph RECYCLED CONTENT.

2. 2 BITUMEN

Asphalt; ASTM D449/ D449M, Type I .

2. 3 BI TUMI NOUS PLASTI C CEMENT

ASTM D4586/ D4586M, Type I f or asphal t .

2. 4 MEMBRANE FABRI C

The f ol l owi ng r equi r ement s appl y:

Fel t or Fabr i c Mat er i al Sat ur ant or I mpr egnant Specification

Gl ass ( f el t ) mat Asphalt ASTM D2178/ D2178M, Type I I I

Cel l ul ose f i ber mat - based ( or gani c) f el t

Asphalt ASTM D226/ D226M

Rei nf or ci ng gl ass f abr i c Asphalt ASTM D1668/ D1668M REV A, Type I

Rei nf or ci ng cot t on f abr i c Asphalt ASTM D173/ D173M

Rei nf or ci ng woven bur l ap fabric

Asphalt ASTM D1327/ D1327M

2. 4. 1 Cot t on Fabr i cs

Pr ovi de cot t on f abr i cs woven ent i r el y of cot t on i n accor dance wi t h ASTM D173/ D173M and t hor oughl y and uni f or ml y sat ur at ed wi t h asphal t .

2. 4. 2 Woven Bur l ap Fabr i cs

Pr ovi de woven bur l ap f abr i cs i n accor dance wi t h ASTM D1327/ D1327M composed of 100 per cent j ut e f i ber and t wo cot t on t hr eads at each sel vage, and t hor oughl y and uni f or ml y sat ur at ed wi t h asphal t . Fabr i c cannot be compl et el y c l osed or seal ed by t he pr ocess of sat ur at i on and i s t o have suf f i c i ent por osi t y t o al l ow successi ve moppi ngs of pl y i ng asphal t t o seep t hr ough. Fabr i c sur f ace cannot be coat ed or cover ed wi t h t al c or any ot her subst ance t hat i nt er f er es wi t h t he adhesi on bet ween f abr i c and pl y i ng asphal t . Pr ovi de f abr i c sur f ace uni f or ml y smoot h and f r ee of i r r egul ar i t i es, f ol ds, knot s, r agged or unt r ue edges, br eaks, cr acks, and ot her v i s i bl e def ect s.

Apr i l 2019 Page 4 SECTI ON 07 12 00

2. 5 NAILS

Pr ovi de gal vani zed r oof i ng nai l s or nai l s i n accor dance wi t h f abr i c and pr ot ect i on boar d manuf act ur er ' s wr i t t en r ecommendat i ons. I f f abr i c cont ai ns met al , pr ovi de nai l s as necessar y t o avoi d el ect r ol yt i c act i on due t o pr oxi mi t y of di ssi mi l ar met al s.

2. 6 PRIMER

ASTM D41/ D41M f or asphal t .

2. 7 PROTECTI ON BOARD

ASTM D517, pl ai n, asphal t pl ank; ASTM C208, const r uct i on gr ade bui l di ng boar d, 1/ 2 i nch t hi ck, asphal t sat ur at ed or coat ed; ASTM C726, 7/ 16 i nch t hi ck, cover ed on one si de wi t h wat er pr oof paper or asphal t - sat ur at ed f el t .

2. 8 PREFABRI CATED LAMI NATED ASPHALT WATERPROOFI NG

Pr ovi de pr ef abr i cat ed l ami nat ed const r uct i on consi st i ng of pl i es of kr af t paper bonded by l ayer s of bi t umen r ei nf or ced wi t h l ayer s of f i br ous gl ass and one l ayer of pol yet hyl ene f aci ng. MPr ovi de mat er i al and wei ght as follows:

a. One l ayer pol yet hyl ene f aci ng, 30 l bs. r eam wei ght ; seven i nt er medi at e l ayer s of bi t umi nous- sat ur at ed kr af t paper .

b. Seven l ayer s of bi t umen.

c. Thr ee l ayer s of 20. 20 f i br ous gl ass mesh.

d. Bot t om " cushi on" sheet of cr epe kr af t paper .

e. Tot al mi ni mum wei ght of mat er i al s of 0. 40 l bs. per squar e f oot .

f . Mi ni mum bi t umi nous cont ent of 75 per cent by wei ght .

g. Per manent l y pl i abl e and i mper vi ous t o mi l dew and ot her or gani c at t ack, i ncl udi ng t er mi t es and r odent s.

h. Punct ur e r esi st ant and sel f seal i ng.

2. 9 PREFABRI CATED COPPER FABRI C SHOWER PANS

A f act or y f abr i cat ed sheet of copper bonded t o and bet ween t wo l ayer s of asphal t i mpr egnat ed f i ber gl ass or cot t on f abr i c. Copper sheet t o wei gh 5 ounces per squar e f oot .

2. 10 WOOD NAI LERS

Speci f i ed i n Sect i on 06 10 00 ROUGH CARPENTRY.

PART 3 EXECUTI ON

3. 1 I NSPECTI ON OF SURFACES

Bef or e st ar t i ng t he wor k, i nspect al l sur f aces t hat must be wat er pr oof ed t o det er mi ne i f i n sat i sf act or y condi t i on. Check t he l ocat i on and set t i ng of al l embedded i t ems. Pl ace backi ng and bl ocki ng and per i met er f r ami ng

Apr i l 2019 Page 5 SECTI ON 07 12 00 f or r ecessed i t ems as r equi r ed by t he var i ous t r ades on t he pr oj ect .

Compl et e condui t , pi pi ng, and ot her r equi r ed r ough- i n. Not i f y t he Cont r act i ng Of f i cer of ser i ous def ect s or condi t i ons t hat pr event sat i sf act or y appl i cat i on. St ar t appl i cat i on af t er such def ect s and condi t i ons have been cor r ect ed.

3. 2 PREPARATI ON OF SURFACES

Ensur e sur f aces t o r ecei ve t r eat ment ar e c l ean and dr y, smoot h and f r ee f r om del et er i ous and excess mat er i al s and pr oj ect i ons. Ensur e masonr y sur f aces ar e f r ee of oi l , gr ease, di r t , l ai t ance, l oose and br oken mat er i al , f r ost , debr i s and ot her cont ami nant s. Ensur e concr et e sur f aces ar e pr oper l y cur ed, f r ee of r el ease agent s, oi l , gr ease, di r t , l ai t ance, l oose mat er i al , f r ost , debr i s and ot her cont ami nant s. Thor oughl y wet hol es, j oi nt s, cr acks, and voi ds i n concr et e wi t h wat er , t hen f i l l wi t h Por t l and cement mor t ar , st r i ke f l ush, and per mi t t o dr y. Cut of f or gr i nd hi gh spot s smoot h. Ensur e mor t ar j oi nt s i n masonr y wal l s ar e f l ush and f r ee of ext r aneous mor t ar . Ensur e met al sur f aces ar e dr y and f r ee of r ust , scal e, l oose pai nt , oi l , gr ease, di r t , f r ost and debr i s. Coat sur f aces t o r ecei ve asphal t membr ane wat er pr oof i ng wi t h a pr i mi ng coat of asphal t pr i mer . Appl y pr i mi ng coat at a r at e of not l ess t han one gal l on per 100 squar e f eet , cover i ng t he ent i r e wat er pr oof edsur f ace. Al l ow pr i mer t o dr y per manuf act ur er ' s pr i nt ed i nst r uct i ons bef or e appl y i ng wat er pr oof i ng.

3. 3 APPLICATION

3. 3. 1 Bui l di ng Envel ope Requi r ement s

Pr ovi de a cont i nuous wat er pr oof i ng syst em at al l mat er i al and bui l di ng t r ansi t i ons. Lap, wr ap, f ast en and seal pr oduct s i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst r uct i ons. Locat e wat er pr oof i ng component s wi t hi n envel ope assembl i es i n l ocat i ons i ndi cat ed on t he Dr awi ngs.

Envel ope assembl y var i at i ons ar e not per mi t t ed wi t hout wr i t t en appr oval f r om t he Cont r act i ng Of f i cer ' s Repr esent at i ve.

3. 3. 2 Gener al I nst al l at i on Requi r ement s

Pr ovi de wat er pr oof i ng wher e i ndi cat ed. At t he Cont r act or ' s opt i on, shower pans of pr ef abr i cat ed l ami nat ed asphal t wat er pr oof i ng or pr ef abr i cat ed copper f abr i c shower pan, as speci f i ed her ei n, may be used i nst ead of bi t umi nous membr ane wat er pr oof i ng. Pr ovi de vent i l at i on f or encl osed spaces when usi ng bi t umi nous membr ane wat er pr oof i ng.

3. 3. 3 Pr ef abr i cat ed Pan

Pr ovi de pr ef abr i cat ed l ami nat ed asphal t wat er pr oof i ngor pr ef abr i cat ed copper f abr i c shower pan. For m each shower pan f r om a si ngl e pi ece of t he l ami nat ed mat er i al wi t hout j oi nt s and wi t h no openi ng except f or shower dr ai n. Pr ovi de pan i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst r uct i ons.

3. 3. 4 Pr ot ect i on of Sur r oundi ng Ar eas

Bef or e st ar t i ng wat er pr oof i ng wor k, pr ot ect sur r oundi ng ar eas and sur f aces f r om spi l l age and mi gr at i on of asphal t ont o ot her wor k. Pr ovi de non- combust i bl e pr ot ect i ve cover i ngs at sur f aces adj acent t o hoi st s and ket t l es. Lap pr ot ect i ve cover i ngs at l east 6 i nches, secur e agai nst wi nd, and vent t o pr event col l ect i on of moi st ur e on cover ed sur f aces. Keep pr ot ect i ve cover i ngs i n pl ace f or t he dur at i on of asphal t wor k. Pr ot ect dr ai ns and conduct or s f r om cl oggi ng wi t h asphal t .

Apr i l 2019 Page 6 SECTI ON 07 12 00

3. 3. 5 Heat i ng and Appl i cat i on of Bi t umen Coat i ngs

Heat sol i d bi t umen i n ket t l e equi pped wi t h an aut omat i c heat i ng devi ce or cont r ol uni t f or posi t i ve cont r ol of t he speci f i ed t emper at ur e. Pr ovi de an accur at e and cl ear l y r eadabl e t her momet er on al l ket t l es. Bul k l i qui d asphal t may be heat ed usi ng t he heat i ng equi pment i n t he t r anspor t t anker vehi c l e or t r ansf er r ed t o ket t l es and heat ed as speci f i ed f or sol i d bi t umen. Heat bi t umen t o f l ow f r eel y but not above 375 degr ees F. Appl y bi t umen over t he pr i mer , bet ween each pl y and as a t op coat i ng at t he r at e of not l ess t han 20 pounds of asphal t per 100 squar e f eet of sur f ace.

3. 3. 6 Membr ane Wat er pr oof i ng

3. 3. 6. 1 Bel ow Gr ade Wal l Wat er pr oof i ng

Pr ovi de 3- pl y hot - appl i ed asphal t membr ane syst em f or f oundat i on wal l s.

I nst al l f abr i cs i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst al l at i on i nst r uct i ons. Caul k j oi nt s bef or e appl y i ng pr i mer . Appl y pr i mer at a r at e of 1/ 2 gal l on per 100 squar e f eet . Over l ap f abr i cs at ends and st agger a mi ni mum of 24 i nch f or 3- pl y syst em. End- t o- end t api ng i s not accept abl e. Fi r ml y embed each f abr i c i n a sol i d uni f or m coat i ng of hot asphal t at a r at e of 20 l bs. per 100 squar e f eet . Al l ow asphal t t o penet r at e each f abr i c and t o pr ovi de r equi r ed adhesi on. Avoi d excessi ve appl i cat i ons of asphal t bet ween f abr i cs i n or der t o pr event s l i ppage.

Pr ovi de wat er pr oof i ng syst em consi st i ng of t wo or mor e f abr i cs wi t h f abr i c r ei nf or cement at cor ner s, angl es, over const r uct i on j oi nt s, and i n l ocat i ons wher e subj ect t o i ncr eased st r ess.

3. 3. 6. 2 Fl oor Wat er pr oof i ng

Appl y pr i mer at a r at e of 1/ 2 gal l on per 100 squar e f eet . Do not al l ow pr i mer t o puddl e. Conf i r m pr i mer i s dr y t o t he t ouch bef or e appl i cat i on of asphal t . Wher e sl ab abut s wal l s, ext end f i r st r ei nf or ci ng f abr i c a mi ni mum of 6 i nches on sl abs and 8 i nches on wal l s. At ver t i cal cor ner s, ext end f i r st f abr i c a mi ni mum of 5 i nches f r om cor ner s on each si de. Lap second f abr i c wi t h t he f i r st f abr i c a mi ni mum of 2 i nches. At f l oor dr ai ns, and el sewher e as i ndi cat ed, ext end f abr i c i nt o a c l ampi ng devi ce, set i n a heavy coat i ng of f l ashi ng cement , and secur el y c l amp.

3. 3. 7 Fabr i c Membr ane Rei nf or cement

Pr ovi de f abr i c membr anes t o r ei nf or ce f el t s at i nt er sect i ons. Pr ovi de r ei nf or cement consi st i ng of t wo pl i es of f abr i c membr ane cement ed i n pl ace and t o each ot her wi t h bi t umi nous pl ast i c cement not l ess t han 1/ 16 i nch t hi ck f or each coat i ng. At t he i nt er sect i on of s l abs and ver t i cal sur f aces, ext end t he f i r st pl y at l east 6 i nches on t he sl ab and 4 i nches up t he ver t i cal sur f ace. At i nt er sect i ons of t wo ver t i cal sur f aces, ext end t he f i r st pl y at l east 10 i nches on each si de of t he i nt er sect i on.

Pl ace second pl y t o l ap t he f i r st by not l ess t han 2 i nches.

3. 3. 8 Keyed Joi nt Foot i ngs

Pr ovi de membr ane f l ashi ng, neat l y f or med, t o t he cont our s of keyed j oi nt s i n f oundat i on wal l f oot i ngs. Ext end f l ashi ng t o t he out si de edge of t he f oot i ng, and t ur n t he f l ashi ng down 4 i nches. Cont i nue t he f l ashi ng t hr ough t he j oi nt t o t he i nsi de of t he wal l s and l ap t he f l ashi ng i nt o t he wat er pr oof i ng membr ane under t he s l ab. Pr ot ect t he f l ashi ng unt i l i t i s l apped by t he wat er pr oof i ng membr anes f or t he subsur f ace f l oor s l abs and

Apr i l 2019 Page 7 SECTI ON 07 12 00 f oundat i on wal l s. Pr ovi de f l ashi ng membr ane made up of t he same number and t ype mat er i al s as t he wat er pr oof i ng membr ane or a t her mopl ast i c mat er i al compat i bl e wi t h t he wat er pr oof i ng mat er i al s, as r ecommended by t he manuf act ur er i n wr i t i ng.

3. 3. 9 Fl ashi ng Fl anges

Pr i me f l ashi ng f l anges of pi pe sl eeves and duct s penet r at i ng t he wat er pr oof i ng membr ane. Al l ow pr i mer t o dr y. Pr ovi de f l anges wi t h t wo f abr i c membr ane col l ar s cement ed i n pl ace and t o each ot her wi t h bi t umi nous pl ast i c cement . Ext end col l ar s 4 and 6 i nches, r espect i vel y, beyond t he edge of t he f l anges, cover t he f l anges, and f i t t he f l anges t i ght agai nst t he s l eeve. Ext end wat er pr oof i ng connect ed t o wor k exposed t o weat her t o t he back of t he adj oi ni ng wor k, or count er f l ash t o f or m a wat er t i ght connect i on.

3. 3. 10 Cl ampi ng Devi ces

At f l oor dr ai ns and el sewher e, as i ndi cat ed, ext end membr ane i nt o c l ampi ng devi ce set i n heavy coat i ng of bi t umi nous pl ast i c cement , and cl amp securely.

3. 3. 11 Reglets

I nst al l cont i nuous r egl et s t o r ecei ve t he exposed edges of membr ane wat er pr oof i ng. Af t er pl acement of wat er pr oof i ng, compl et el y f i l l r egl et s wi t h bi t umen.

3. 4 FI ELD TEST

3. 4. 1 Sampl i ng and Test i ng of Bul k Li qui d Asphal t

Not i f y t he Cont r act i ng Of f i cer 5 wor ki ng days pr i or t o t he del i ver y dat e of asphal t . Take a mi ni mum of one quar t sampl e of each shi pment of bul k l i qui d asphal t when t he shi pment ar r i ves at t he const r uct i on s i t e. Obt ai n sampl es i n t he pr esence of t he Cont r act i ng Of f i cer usi ng cl ean one quar t , f r i c t i on l i d cans. Label sampl es t o i ndi cat e pr oj ect cont r act number , l ocat i on wher e used on pr oj ect , and dat e and t i me of ar r i val of shi pment f r om whi ch sampl e i s t aken. Gi ve sampl es t o t he Cont r act i ng Of f i cer f or saf ekeepi ng unt i l pi cked up by t he t est i ng l abor at or y. Pay f or t he t est i ng of t he bul k l i qui d asphal t by an i ndependent t est i ng company.

Sampl es t est ed t hat ar e f ound not i n compl i ance wi t h speci f i ed r equi r ement s wi l l be r ej ect ed. Remove and r epl ace wi t h new mat er i al s al l wat er pr oof i ng component s i nst al l ed wi t h asphal t f r om whi ch t he noncompl i ant sampl es wer e t aken, at no cost t o t he Gover nment .

3. 4. 2 Test of Membr ane Wat er pr oof i ng

Pr i or t o conceal ment , pl ug t he dr ai n and cover membr ane wat er pr oof i ng on hor i zont al sur f aces over f i ni shed spaces wi t h 3 i nches of ponded wat er f or 24 hour s t o t est wat er t i ght ness. Make car ef ul measur ement of t he wat er l evel at t he begi nni ng and end of t he 24- hour per i od. I f wat er l evel f al l s , dr ai n t he wat er , and t hor oughl y dr y and i nspect t he wat er pr oof i ng membr ane. Make r epai r s or r epl acement , as di r ect ed, and r epeat t est . Do not pr oceed wi t h wor k t hat conceal s membr ane wat er pr oof i ng bef or e appr oval of t est r esul t s.

Apr i l 2019 Page 8 SECTI ON 07 12 00

3. 5 PROTECTI VE COVERI NG

3. 5. 1 Ver t i cal Sur f aces

Pr ot ect membr ane wat er pr oof i ng agai nst whi ch backf i l l must be pl aced by pr ovi di ng pr ot ect i ve cover i ng pr essed i nt o t he f i nal moppi ng whi l e t he moppi ng of bi t umen i s st i l l hot . But t edges of pr ot ect i on boar d agai nst adj acent edges of pr ot ect i on boar ds. Cover exposed sur f aces wi t h a coat i ng of bi t umen. Wher e sur f aced f i ber boar d or mi ner al f i ber boar d i s used, pl ace sur f ace si de f aci ng out war d. Fi t boar d ar ound pi pes and pr oj ect i ons so as t o cover t he ent i r e sur f ace of t he membr ane waterproofing.

3. 5. 2 Hor i zont al Sur f aces

Pl ace pr ot ect i ve cover i ng over membr ane i mmedi at el y af t er appl i cat i on has t hor oughl y dr i ed. Remove pr ot ect i ve cover i ng i mmedi at el y bef or e pr oceedi ng wi t h wor k t hat wi l l conceal t he membr ane wat er pr oof i ng.

3. 6 CLEAN UP

Use a c l eaner r ecommended by t he wat er pr oof i ng manuf act ur er t o c l ean ot her wor k sur f aces t hat ar e st ai ned wi t h wat er pr oof i ng mat er i al .

3. 7 SCHEDULE OF MATERI ALS

Some met r i c measur ement s i n t hi s sect i on ar e based on mat hemat i cal conver si on of i nch- pound measur ement , and not on met r i c measur ement commonl y agr eed t o by t he manuf act ur er s or ot her par t i es. The i nch- pound and met r i c measur ement s shown ar e as f ol l ows:

Products Inch-Pound Metric

Pr ot ect i on Boar d 1/ 2 i nch

7/ 16 i nch

Pol yet hyl ene Sheet 30 l bs.

Lami nat ed Sheet 0. 40 l bs. per sq. f t

Copper Sheet 3 oz/ sq f t

5 oz/ sq f t

7 oz/ sq f t

- - End of Sect i on - -

Apr i l 2019 Page 9 SECTI ON 07 12 00

File details come from the government source that posted it. Updated .