02 41 00.pdf

PDF 56 KB Posted

Attached to
TINKER AFB MAC BOA WWYK190023 Renovate Restrooms B117
Solicitation number
FA813726R0030
Issued by

About this file

This document is a Technical Specifications section for demolition and deconstruction work at Tinker Air Force Base in Oklahoma, effective April 2019.

The specification establishes comprehensive requirements for the systematic removal of structures, utilities, and materials from the installation. Prior to commencing work, contractors must submit a Demolition Plan and Deconstruction Plan for Contracting Officer approval, detailing salvage procedures, material disposition, utility disconnection schedules, equipment methods, and operation sequences. Work must comply with EM 385-1-1 safety requirements and ASSE/SAFE A10.6 standards. Contractors are required to remove rubbish and debris daily from Government property and maintain protective measures against dust and dirt migration. Key execution requirements include: systematic demolition from top to ground level, disconnection and capping of utilities before work begins, protection of designated items to remain in place, prevention of structural overloading, and weather protection for remaining building portions. Burning of materials is prohibited. Trees designated to remain must be protected with six-foot fencing positioned at least five feet from trunks.

Material disposition requirements specify that title to removed materials vests in the Contractor upon approval of demolition procedures and authorization to begin work. Salvageable items designated for Government reuse must be removed without damage, properly packed, crated, and delivered to designated storage sites. Class I ozone-depleting substance refrigerants must be recovered in accordance with the Clean Air Act Amendment of 1990. Historical items including cornerstones and document boxes must be preserved and delivered to the Government. All unsalvageable materials must be transported off-site in compliance with federal, state, and local regulations. Fill material used for backfilling must conform to AASHTO M 145 soil classification standards and be sampled and tested by approved laboratories per AASHTO T 180 methods. Contractors must submit existing condition surveys, notification of commencement, and final receipts as closeout submittals.

View the file

Other files

File Type Posted
03 39 00.00 10.pdf PDF
03 62 16.pdf PDF
04 20 00.pdf PDF
05 21 00.pdf PDF
06 20 00.pdf PDF
06 61 16.pdf PDF
07 60 00.pdf PDF
07 61 14.00 20.pdf PDF
07 84 00.pdf PDF
07 92 00.pdf PDF
08 11 16.pdf PDF
08 36 13.pdf PDF
08 71 00.pdf PDF
09 68 00.pdf PDF
10 28 13.pdf PDF
13 48 00.pdf PDF
21 13 17.pdf PDF
22 00 00.pdf PDF
23 00 00.pdf PDF
23 08 00.pdf PDF
23 11 25.pdf PDF
23 35 00.pdf PDF
23 64 26.pdf PDF
23 82 16.00 40.pdf PDF
23 82 43.00 40.pdf PDF
26 56 00.pdf PDF
31 23 06.pdf PDF
32 01 14.pdf PDF
32 13 74.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
03 30 00.pdf PDF
07 14 00.pdf PDF
190023 Renovate Restrooms B117 RFIs_FINAL_COR_Signed.pdf PDF
TAFB_Tech_Reqs (Div 02-48).zip ZIP file
Model.zip ZIP file
00 71 00.pdf PDF
01 78 23.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 32 16.00 20.pdf PDF
01 33 16.00 10.pdf PDF
01 42 00.pdf PDF
01 78 00.pdf PDF
Tinker General Requirements Specifications_Nov 2022_Change Log.pdf PDF
Initial Site Visit WWYK190023.pdf PDF
Solicitation - FA813726R0030.pdf PDF
Att10_190023_SOW.pdf PDF
EAL List - BLANK to Contractors WWYK190023.xlsx XLSX spreadsheet
Att12_190023_Drawings_Final.pdf PDF
Section L - Instructions to Offerors.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 02 41 00

DEMOLI TI ON AND DECONSTRUCTI ON

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AI R- CONDI TI ONI NG, HEATI NG AND REFRI GERATI ON I NSTI TUTE ( AHRI )

AHRI Gui del i ne K ( 2009) Gui del i ne f or Cont ai ner s f or Recover ed Non- Fl ammabl e Fl uor ocar bon Refrigerants

AMERI CAN ASSOCI ATI ON OF STATE HI GHWAY AND TRANSPORTATI ON OFFI CI ALS

(AASHTO)

AASHTO M 145 ( 1991; R 2012) St andar d Speci f i cat i on f or Cl assi f i cat i on of Soi l s and Soi l - Aggr egat e Mi xt ur es f or Hi ghway Const r uct i on Pur poses

AASHTO T 180 ( 2015) St andar d Met hod of Test f or Moi st ur e- Densi t y Rel at i ons of Soi l s Usi ng a 4. 54- kg ( 10- l b) Rammer and a 457- mm ( 18- i n. ) Dr op

AMERI CAN SOCI ETY OF SAFETY ENGI NEERS ( ASSE/ SAFE)

ASSE/ SAFE A10. 6 ( 2006) Saf et y Requi r ement s f or Demol i t i on Operations

CARPET AND RUG I NSTI TUTE ( CRI )

CRI CI S ( 2011) Car pet I nst al l at i on St andar d

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

U. S. DEFENSE LOGI STI CS AGENCY ( DLA)

DLA 4145. 25 ( Jun 2000; Reaf f i r med Oct 2010) St or age and Handl i ng of Li quef i ed and Gaseous Compr essed Gases and Thei r Ful l and Empt y Cylinders http://www.aviation.dla.mil/UserWeb/aviationengineering/HazInfo/

U. S. DEPARTMENT OF DEFENSE ( DOD)

DOD 4000. 25- 1- M ( 2006) MI LSTRI P - Mi l i t ar y St andar d Requi si t i oni ng and I ssue Pr ocedur es

Apr i l 2019 Page 1 SECTI ON 02 41 00

MIL-STD-129 ( 2014; Rev R) Mi l i t ar y Mar ki ng f or Shi pment and St or age

U. S. FEDERAL AVI ATI ON ADMI NI STRATI ON ( FAA)

FAA AC 70/ 7460- 1 ( 2015; Rev L) Obst r uct i on Mar ki ng and Lighting

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

40 CFR 61 Nat i onal Emi ssi on St andar ds f or Hazar dous Ai r Pol l ut ant s

40 CFR 82 Pr ot ect i on of St r at ospher i c Ozone

49 CFR 173. 301 Shi pment of Compr essed Gases i n Cyl i nder s and Spher i cal Pr essur e Vessel s

1. 2 PROJECT DESCRI PTI ON

1. 2. 1 Demol i t i on/ Deconst r uct i on Pl an

Pr epar e a Demol i t i on Pl an and Deconst r uct i on Pl an and submi t pr oposed sal vage, demol i t i on, deconst r uct i on, and r emoval pr ocedur es f or appr oval bef or e wor k i s st ar t ed. I ncl ude i n t he pl an pr ocedur es f or car ef ul r emoval and di sposi t i on of mat er i al s speci f i ed t o be sal vaged, coor di nat i on wi t h ot her wor k i n pr ogr ess, a di sconnect i on schedul e of ut i l i t y ser vi ces, a det ai l ed descr i pt i on of met hods and equi pment t o be used f or each oper at i on and of t he sequence of oper at i ons. Coor di nat e wi t h Wast e Management Pl an. Pr ovi de pr ocedur es f or saf e conduct of t he wor k i n accor dance wi t h EM 385- 1- 1. Pl an shal l be appr oved by Cont r act i ng Of f i cer pr i or t o wor k begi nni ng.

1. 2. 2 Gener al Requi r ement s

Do not begi n demol i t i on or deconst r uct i on unt i l aut hor i zat i on i s r ecei ved f r om t he Cont r act i ng Of f i cer . Remove r ubbi sh and debr i s f r om t he pr oj ect s i t e; do not al l ow accumul at i ons i nsi de or out si de t he bui l di ng( s) or on ai r f i el d pavement s. The wor k i ncl udes demol i t i on, deconst r uct i on, sal vage of i dent i f i ed i t ems and mat er i al s, and r emoval of r esul t i ng r ubbi sh and debr i s. Remove r ubbi sh and debr i s f r om Gover nment pr oper t y dai l y, unl ess ot her wi se di r ect ed. St or e mat er i al s t hat cannot be r emoved dai l y i n ar eas speci f i ed by t he Cont r act i ng Of f i cer . I n t he i nt er est of occupat i onal saf et y and heal t h, per f or m t he wor k i n accor dance wi t h EM 385- 1- 1, Sect i on 23, Demol i t i on, and ot her appl i cabl e Sect i ons.

1. 3 I TEMS TO REMAI N I N PLACE

Take necessar y pr ecaut i ons t o avoi d damage t o exi st i ng i t ems t o r emai n i n pl ace, t o be r eused, or t o r emai n t he pr oper t y of t he Gover nment . Repai r or r epl ace damaged i t ems as appr oved by t he Cont r act i ng Of f i cer .

Coor di nat e t he wor k of t hi s sect i on wi t h al l ot her wor k i ndi cat ed.

Const r uct and mai nt ai n shor i ng, br aci ng, and suppor t s as r equi r ed. Ensur e t hat st r uct ur al el ement s ar e not over l oaded. I ncr ease st r uct ur al suppor t s or add new suppor t s as may be r equi r ed as a r esul t of any cut t i ng, r emoval , deconst r uct i on, or demol i t i on wor k per f or med under t hi s cont r act . Do not over l oad st r uct ur al el ement s. Pr ovi de new suppor t s and r ei nf or cement f or exi st i ng const r uct i on weakened by demol i t i on, Apr i l 2019 Page 2 SECTI ON 02 41 00 deconst r uct i on, or r emoval wor k. Repai r s, r ei nf or cement , or st r uct ur al r epl acement r equi r e appr oval by t he Cont r act i ng Of f i cer pr i or t o per f or mi ng such wor k.

1. 3. 1 Exi st i ng Const r uct i on Li mi t s and Pr ot ect i on

Do not di st ur b exi st i ng const r uct i on beyond t he ext ent i ndi cat ed or necessar y f or i nst al l at i on of new const r uct i on. Pr ovi de t empor ar y shor i ng and br aci ng f or suppor t of bui l di ng component s t o pr event set t l ement or ot her movement . Pr ovi de pr ot ect i ve measur es t o cont r ol accumul at i on and mi gr at i on of dust and di r t i n al l wor k ar eas. Remove dust , di r t , and debr i s f r om wor k ar eas dai l y.

1. 3. 2 Weat her Pr ot ect i on

For por t i ons of t he bui l di ng t o r emai n, pr ot ect bui l di ng i nt er i or and mat er i al s and equi pment f r om t he weat her at al l t i mes. Wher e r emoval of exi st i ng r oof i ng i s necessar y t o accompl i sh wor k, have mat er i al s and wor kmen r eady t o pr ovi de adequat e and t empor ar y cover i ng of exposed ar eas.

1. 3. 3 Trees

Pr ot ect t r ees wi t hi n t he pr oj ect s i t e whi ch mi ght be damaged dur i ng demol i t i on or deconst r uct i on, and whi ch ar e i ndi cat ed t o be l ef t i n pl ace, by a 6 f oot hi gh f ence. Er ect and secur e f ence a mi ni mum of 5 f eet f r om t he t r unk of i ndi v i dual t r ees or f ol l ow t he out er per i met er of br anches or c l umps of t r ees. Repl ace any t r ee desi gnat ed t o r emai n t hat i s damaged dur i ng t he wor k under t hi s cont r act wi t h l i ke- ki nd or as appr oved by t he Cont r act i ng Of f i cer .

1. 3. 4 Ut i l i t y Ser vi ce

Mai nt ai n exi st i ng ut i l i t i es i ndi cat ed t o st ay i n ser vi ce and pr ot ect agai nst damage dur i ng demol i t i on and deconst r uct i on oper at i ons. Pr i or t o st ar t of wor k, t he Gover nment wi l l di sconnect and seal ut i l i t i es ser vi ng each ar ea of al t er at i on or r emoval upon wr i t t en r equest f r om t he Cont r act or .

1. 3. 5 Facilities

Pr ot ect el ect r i cal and mechani cal ser vi ces and ut i l i t i es. Wher e r emoval of exi st i ng ut i l i t i es and pavement i s speci f i ed or i ndi cat ed, pr ovi de appr oved bar r i cades, t empor ar y cover i ng of exposed ar eas, and t empor ar y ser vi ces or connect i ons f or el ect r i cal and mechani cal ut i l i t i es. Fl oor s, r oof s, wal l s, col umns, pi l ast er s, and ot her st r uct ur al component s t hat ar e desi gned and const r uct ed t o st and wi t hout l at er al suppor t or shor i ng, and ar e det er mi ned t o be i n st abl e condi t i on, must r emai n st andi ng wi t hout addi t i onal br aci ng, shor i ng, or l at er al suppor t unt i l demol i shed or deconst r uct ed, unl ess di r ect ed ot her wi se by t he Cont r act i ng Of f i cer .

Ensur e t hat no el ement s det er mi ned t o be unst abl e ar e l ef t unsuppor t ed and pl ace and secur e br aci ng, shor i ng, or l at er al suppor t s as may be r equi r ed as a r esul t of any cut t i ng, r emoval , deconst r uct i on, or demol i t i on wor k per f or med under t hi s cont r act .

1. 4 BURNING

The use of bur ni ng at t he pr oj ect s i t e f or t he di sposal of r ef use and debr i s wi l l not be per mi t t ed.

Apr i l 2019 Page 3 SECTI ON 02 41 00

1. 5 AVAI LABI LI TY OF WORK AREAS

Ar eas i n whi ch t he wor k i s t o be accompl i shed wi l l be avai l abl e accor di ng t o t he schedul e pr ovi ded by t he Cont r act i ng Of f i cer .

1. 6 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Demol i t i on Pl an; G Deconst r uct i on Pl an; G Exi st i ng Condi t i ons

SD- 07 Cer t i f i cat es

Not i f i cat i on; G

SD- 11 Cl oseout Submi t t al s

Receipts

1. 7 QUALI TY ASSURANCE

Submi t t i mel y not i f i cat i on of demol i t i on and deconst r uct i on pr oj ect s t o Feder al , St at e, r egi onal , and l ocal aut hor i t i es i n accor dance wi t h 40 CFR 61, Subpar t M. Not i f y t he St at e' s envi r onment al pr ot ect i on agency and t he Cont r act i ng Of f i cer i n wr i t i ng 10 wor ki ng days pr i or t o t he commencement of wor k i n accor dance wi t h 40 CFR 61, Subpar t M. Compl y wi t h f eder al , st at e, and l ocal haul i ng and di sposal r egul at i ons. I n addi t i on t o t he r equi r ement s of t he " Cont r act Cl auses, " conf or m t o t he saf et y r equi r ement s cont ai ned i n ASSE/ SAFE A10. 6. Compl y wi t h t he Envi r onment al Pr ot ect i on Agency r equi r ement s speci f i ed. Use of expl osi ves wi l l not be permitted.

1. 7. 1 Dust and Debr i s Cont r ol

Pr event t he spr ead of dust and debr i s t o occupi ed por t i ons of t he bui l di ng and avoi d t he cr eat i on of a nui sance or hazar d i n t he sur r oundi ng ar ea.

Do not use wat er i f i t r esul t s i n hazar dous or obj ect i onabl e condi t i ons such as, but not l i mi t ed t o, i ce, f l oodi ng, or pol l ut i on.

1. 8 PROTECTION

1. 8. 1 Tr af f i c Cont r ol Si gns

a. Wher e pedest r i an and dr i ver saf et y i s endanger ed i n t he ar ea of r emoval wor k, use t r af f i c bar r i cades wi t h f l ashi ng l i ght s. Not i f y t he Cont r act i ng Of f i cer pr i or t o begi nni ng such wor k.

1. 8. 2 Pr ot ect i on of Per sonnel

Bef or e, dur i ng and af t er t he demol i t i on and deconst r uct i on wor k cont i nuousl y eval uat e t he condi t i on of t he st r uct ur e bei ng demol i shed or

Apr i l 2019 Page 4 SECTI ON 02 41 00 deconst r uct ed and t ake i mmedi at e act i on t o pr ot ect al l per sonnel wor ki ng i n and ar ound t he pr oj ect s i t e. No ar ea, sect i on, or component of f l oor s, r oof s, wal l s, col umns, pi l ast er s, or ot her st r uct ur al el ement wi l l be al l owed t o be l ef t st andi ng wi t hout suf f i c i ent br aci ng, shor i ng, or l at er al suppor t t o pr event col l apse or f ai l ur e whi l e wor kmen r emove debr i s or per f or m ot her wor k i n t he i mmedi at e ar ea.

1. 9 RELOCATIONS

Per f or m t he r emoval and r ei nst al l at i on of r el ocat ed i t ems as i ndi cat ed wi t h wor kmen ski l l ed i n t he t r ades i nvol ved. Repai r or r epl ace i t ems t o be r el ocat ed whi ch ar e damaged by t he Cont r act or wi t h new undamaged i t ems as appr oved by t he Cont r act i ng Of f i cer .

1. 10 EXI STI NG CONDI TI ONS

Bef or e begi nni ng any demol i t i on or deconst r uct i on wor k, sur vey t he si t e and exami ne t he dr awi ngs and speci f i cat i ons t o det er mi ne t he ext ent of t he wor k. Recor d exi st i ng condi t i ons i n t he pr esence of t he Cont r act i ng Of f i cer showi ng t he condi t i on of st r uct ur es and ot her f aci l i t i es adj acent t o ar eas of al t er at i on or r emoval . Phot ogr aphs si zed 4 i nch wi l l be accept abl e as a r ecor d of exi st i ng condi t i ons. I ncl ude i n t he r ecor d t he el evat i on of t he t op of f oundat i on wal l s, f i ni sh f l oor el evat i ons, possi bl e conf l i c t i ng el ect r i cal condui t s, pl umbi ng l i nes, al ar ms syst ems, t he l ocat i on and ext ent of exi st i ng cr acks and ot her damage and descr i pt i on of sur f ace condi t i ons t hat exi st pr i or t o bef or e st ar t i ng wor k. I t i s t he Cont r act or ' s r esponsi bi l i t y t o ver i f y and document al l r equi r ed out ages whi ch wi l l be r equi r ed dur i ng t he cour se of wor k, and t o not e t hese out ages on t he r ecor d document . Submi t sur vey r esul t s.

PART 2 PRODUCTS

2. 1 FI LL MATERI AL

a. Compl y wi t h excavat i ng, backf i l l i ng, and compact i ng pr ocedur es f or soi l s used as backf i l l mat er i al t o f i l l basement s, voi ds, depr essi ons or excavat i ons r esul t i ng f r om demol i t i on or deconst r uct i on of structures.

b. Fi l l mat er i al shal l conf or m t o t he def i ni t i on of sat i sf act or y soi l mat er i al as def i ned i n AASHTO M 145, Soi l Cl assi f i cat i on Gr oups A- 1, A- 2- 4, A- 2- 5 and A- 3. I n addi t i on, f i l l mat er i al shal l be f r ee f r om r oot s and ot her or gani c mat t er , t r ash, debr i s, f r ozen mat er i al s, and st ones l ar ger t han 2 i nches i n any di mensi on.

c. Pr oposed f i l l mat er i al must be sampl ed and t est ed by an appr oved soi l t est i ng l abor at or y, as f ol l ows:

Soi l c l assi f i cat i on AASHTO M 145

Moi st ur e- densi t y r el at i ons AASHTO T 180, Met hod B or D

PART 3 EXECUTI ON

3. 1 EXI STI NG FACI LI TI ES TO BE REMOVED

I nspect and eval uat e exi st i ng st r uct ur es onsi t e f or r euse. Exi st i ng

Apr i l 2019 Page 5 SECTI ON 02 41 00 const r uct i on schedul ed t o be r emoved f or r euse shal l be di sassembl ed.

Di smant l ed and r emoved mat er i al s ar e t o be separ at ed, set asi de, and pr epar ed as speci f i ed, and st or ed or del i ver ed t o a col l ect i on poi nt f or r euse, r emanuf act ur e, r ecycl i ng, or ot her di sposal , as speci f i ed.

Mat er i al s shal l be desi gnat ed f or r euse onsi t e whenever possi bl e.

3. 1. 1 Structures

a. Remove exi st i ng st r uct ur es i ndi cat ed t o be r emoved t o t he ext ent i ndi cat ed on t he dr awi ngs. Remove si dewal ks, cur bs, gut t er s and st r eet l i ght bases as i ndi cat ed.

b. Demol i sh st r uct ur es i n a syst emat i c manner f r om t he t op of t he st r uct ur e t o t he gr ound. Compl et e demol i t i on wor k above each t i er or f l oor bef or e t he suppor t i ng member s on t he l ower l evel ar e di st ur bed.

Demol i sh concr et e and masonr y wal l s i n smal l sect i ons. Remove st r uct ur al f r ami ng member s and l ower t o gr ound by means of der r i cks, pl at f or ms hoi st s, or ot her sui t abl e met hods as appr oved by t he Cont r act i ng Of f i cer .

c. Locat e demol i t i on and deconst r uct i on equi pment t hr oughout t he st r uct ur e and r emove mat er i al s so as t o not i mpose excessi ve l oads t o suppor t i ng wal l s, f l oor s, or f r ami ng.

3. 1. 2 Ut i l i t i es and Rel at ed Equi pment

3. 1. 2. 1 Gener al Requi r ement s

Do not i nt er r upt exi st i ng ut i l i t i es ser vi ng occupi ed or used f aci l i t i es, except when aut hor i zed i n wr i t i ng by t he Cont r act i ng Of f i cer . Do not i nt er r upt exi st i ng ut i l i t i es ser vi ng f aci l i t i es occupi ed and used by t he Gover nment except when appr oved i n wr i t i ng and t hen onl y af t er t empor ar y ut i l i t y ser vi ces have been appr oved and pr ovi ded. Do not begi n demol i t i on or deconst r uct i on wor k unt i l al l ut i l i t y di sconnect i ons have been made.

Shut of f and cap ut i l i t i es f or f ut ur e use, as i ndi cat ed.

3. 1. 2. 2 Di sconnect i ng Exi st i ng Ut i l i t i es

Remove exi st i ng ut i l i t i es as i ndi cat ed and t er mi nat e i n a manner conf or mi ng t o t he nat i onal l y r ecogni zed code cover i ng t he speci f i c ut i l i t y and appr oved by t he Cont r act i ng Of f i cer . When ut i l i t y l i nes ar e encount er ed but ar e not i ndi cat ed on t he dr awi ngs, not i f y t he Cont r act i ng Of f i cer pr i or t o f ur t her wor k i n t hat ar ea. Remove met er s and r el at ed equi pment and del i ver t o a l ocat i on on base i n accor dance wi t h i nst r uct i ons of t he Cont r act i ng Of f i cer .

3. 1. 3 Chai n Li nk Fenci ng

Remove chai n l i nk f enci ng, gat es and ot her r el at ed sal vaged i t ems schedul ed f or r emoval and t r anspor t t o desi gnat ed ar eas. Remove gat es as whol e uni t s. Cut chai n l i nk f abr i c t o 25 f oot l engt hs and st or e i n r ol l s of f t he gr ound.

3. 1. 4 Pavi ng and Sl abs

Remove concr et e and asphal t i c concr et e pavi ng and sl abs i ncl udi ng aggr egat e base as i ndi cat ed. Pr ovi de neat sawcut s at l i mi t s of pavement r emoval as i ndi cat ed. Pavement and sl abs desi gnat ed t o be r ecycl ed and ut i l i zed i n t hi s pr oj ect shal l be moved, gr ound and st or ed as di r ect ed by

Apr i l 2019 Page 6 SECTI ON 02 41 00 t he Cont r act i ng Of f i cer . Pavement and sl abs not t o be used i n t hi s pr oj ect shal l be r emoved f r om t he I nst al l at i on at Cont r act or ' s expense.

3. 1. 5 Roofing

Remove exi st i ng r oof syst em and associ at ed component s i n t hei r ent i r et y down t o exi st i ng r oof deck. Remove r oof i ng t o ef f ect t he connect i ons wi t h new f l ashi ng or r oof i ng. Sequence wor k t o mi ni mi ze bui l di ng exposur e bet ween demol i t i on or deconst r uct i on and new r oof mat er i al s i nst al l at i on.

3. 1. 5. 1 Tempor ar y Roof i ng

I nst al l t empor ar y r oof i ng and f l ashi ng as necessar y t o mai nt ai n a wat er t i ght condi t i on t hr oughout t he cour se of t he wor k. Remove t empor ar y wor k pr i or t o i nst al l at i on of per manent r oof syst em mat er i al s unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer .

3. 1. 5. 2 Reroofing

When r emovi ng t he exi st i ng r oof i ng syst em f r om t he r oof deck, r emove onl y as much r oof i ng as can be r ecover ed by t he end of t he wor k day, unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Do not at t empt t o open t he r oof cover i ng syst em i n t hr eat eni ng weat her . Reseal al l openi ngs pr i or t o suspensi on of wor k t he same day.

3. 1. 6 Masonry

Sawcut and r emove masonr y so as t o pr event damage t o sur f aces t o r emai n.

Wher e new masonr y adj oi ns exi st i ng, t he new wor k shal l abut or t i e i nt o t he exi st i ng const r uct i on as i ndi cat ed. Pr ovi de squar e, st r ai ght edges and cor ner s wher e exi st i ng masonr y adj oi ns new wor k and ot her l ocat i ons.

Masonr y r emoved i n pi eces shal l be cr ushed.

3. 1. 7 Concrete

Saw concr et e al ong st r ai ght l i nes t o a dept h of a mi ni mum 2 i nch. Make each cut i n wal l s per pendi cul ar t o t he f ace and i n al i gnment wi t h t he cut i n t he opposi t e f ace. Br eak out t he r emai nder of t he concr et e pr ovi ded t hat t he br oken ar ea i s conceal ed i n t he f i ni shed wor k, and t he r emai ni ng concr et e i s sound. At l ocat i ons wher e t he br oken f ace cannot be conceal ed, gr i nd smoot h or saw cut ent i r el y t hr ough t he concr et e.

3. 1. 8 St r uct ur al St eel

Di smant l e st r uct ur al st eel at f i el d connect i ons and i n a manner t hat wi l l pr event bendi ng or damage. Sal vage f or r ecycl e st r uct ur al st eel , st eel j oi st s, gi r der s, angl es, pl at es, col umns and shapes. Fl ame- cut t i ng t or ches ar e per mi t t ed onl y when ot her met hods of di smant l i ng ar e not pr act i cal . Tr anspor t st eel j oi st s and gi r der s as whol e uni t s and not di smant l ed. Tr anspor t st r uct ur al st eel shapes t o a desi gnat ed r ecycl i ng f aci l i t y , st acked accor di ng t o s i ze, t ype of member and l engt h, and st or ed of f t he gr ound, pr ot ect ed f r om t he weat her .

3. 1. 9 Mi scel l aneous Met al

Sal vage shop- f abr i cat ed i t ems such as access door s and f r ames, st eel gr at i ngs, met al l adder s, wi r e mesh par t i t i ons, met al r ai l i ngs, met al wi ndows and si mi l ar i t ems as whol e uni t s. Sal vage l i ght - gage and col d- f or med met al f r ami ng, such as st eel st uds, st eel t r usses, met al

Apr i l 2019 Page 7 SECTI ON 02 41 00 gut t er s, r oof i ng and si di ng, met al t oi l et par t i t i ons, t oi l et accessor i es and si mi l ar i t ems. Recycl e scr ap met al as par t of demol i t i on and deconst r uct i on oper at i ons. Pr ovi de separ at e cont ai ner s t o col l ect scr ap met al and t r anspor t t o a scr ap met al col l ect i on or r ecycl i ng f aci l i t y , i n accor dance wi t h t he Wast e Management Pl an.

3. 1. 10 Carpentry

Sal vage f or r euse or r ecycl e l umber , mi l l wor k i t ems, and f i ni shed boar ds, and sor t by t ype and si ze. Chi p or shr ed and r ecycl e sal vaged wood unf i t f or r euse, except st ai ned, pai nt ed, or t r eat ed wood. Remove wi ndows, door s, f r ames, and cabi net s, and si mi l ar i t ems as whol e uni t s, compl et e wi t h t r i m and accessor i es. Do not r emove har dwar e at t ached t o uni t s, except f or door c l oser s. Br ace t he open end of door f r ames t o pr event damage.

3. 1. 11 Carpet

Remove exi st i ng car pet f or r ecl amat i on i n accor dance wi t h manuf act ur er r ecommendat i ons and as f ol l ows. Remove used car pet i n l ar ge pi eces, r ol l t i ght l y, and pack neat l y i n a cont ai ner . Remove adhesi ve accor di ng t o r ecommendat i ons of t he Car pet and Rug I nst i t ut e ( CRI ) . Adhesi ve r emoval sol vent s shal l compl y wi t h CRI CI S. Recycl e r emoved car pet cushi on.

3. 1. 12 Acoust i c Cei l i ng Ti l e

Remove, neat l y st ack, and r ecycl e acoust i c cei l i ng t i l es. Recycl i ng may be avai l abl e wi t h manuf act ur er . Ot her wi se, pr i or i t y shal l be gi ven t o a l ocal r ecycl i ng or gani zat i on. Recycl i ng i s not r equi r ed i f t he t i l es cont ai n or may have been exposed t o asbest os mat er i al .

3. 1. 13 Patching

Wher e r emoval s l eave hol es and damaged sur f aces exposed i n t he f i ni shed wor k, pat ch and r epai r t hese hol es and damaged sur f aces t o mat ch adj acent f i ni shed sur f aces, usi ng on- si t e mat er i al s when avai l abl e. Wher e new wor k i s t o be appl i ed t o exi st i ng sur f aces, per f or m r emoval s and pat chi ng i n a manner t o pr oduce sur f aces sui t abl e f or r ecei v i ng new wor k. Fi ni shed sur f aces of pat ched ar ea shal l be f l ush wi t h t he adj acent exi st i ng sur f ace and shal l mat ch t he exi st i ng adj acent sur f ace as c l osel y as possi bl e as t o t ext ur e and f i ni sh. Pat chi ng shal l be as speci f i ed and i ndi cat ed, and shal l i ncl ude:

a. Concr et e and Masonr y: Compl et el y f i l l hol es and depr essi ons, l ef t as a r esul t of r emoval s i n exi st i ng masonr y wal l s t o r emai n, wi t h an appr oved masonr y pat chi ng mat er i al , appl i ed i n accor dance wi t h t he manuf act ur er ' s pr i nt ed i nst r uct i ons.

b. Wher e exi st i ng par t i t i ons have been r emoved l eavi ng damaged or mi ssi ng r esi l i ent t i l e f l oor i ng, pat ch t o mat ch t he exi st i ng f l oor t i l e.

c. Pat ch acoust i c l ay- i n cei l i ng wher e par t i t i ons have been r emoved. The t r ansi t i on bet ween t he di f f er ent cei l i ng hei ght s shal l be ef f ect ed by cont i nui ng t he hi gher cei l i ng l evel over t o t he f i r st r unner on t he l ower cei l i ng and cl osi ng t he ver t i cal openi ng wi t h a pai nt ed sheet met al st r i p.

Apr i l 2019 Page 8 SECTI ON 02 41 00

3. 1. 14 Ai r Condi t i oni ng Equi pment

Remove ai r condi t i oni ng, r ef r i ger at i on, and ot her equi pment cont ai ni ng r ef r i ger ant s wi t hout r el easi ng chl or of l uor ocar bon r ef r i ger ant s t o t he at mospher e i n accor dance wi t h t he Cl ean Ai r Act Amendment of 1990. Recover al l r ef r i ger ant s pr i or t o r emovi ng ai r condi t i oni ng, r ef r i ger at i on, and ot her equi pment cont ai ni ng r ef r i ger ant s and di spose of i n accor dance wi t h t he par agr aph ent i t l ed " Di sposal of Ozone Depl et i ng Subst ance ( ODS) . " Tur n i n sal vaged Cl ass I ODS r ef r i ger ant s as speci f i ed i n par agr aph, " Sal vaged Mat er i al s and Equi pment . "

3. 1. 15 Cyl i nder s and Cani st er s

Remove al l f i r e suppr essi on syst em cyl i nder s and cani st er s and di spose of i n accor dance wi t h t he par agr aph ent i t l ed " Di sposal of Ozone Depl et i ng Subst ance ( ODS) . "

3. 1. 16 Lockset s on Swi ngi ng Door s

Remove al l l ockset s f r om al l swi ngi ng door s i ndi cat ed t o be r emoved and di sposed of . Del i ver t he l ockset s and r el at ed i t ems t o a desi gnat ed l ocat i on f or r ecei pt by t he Cont r act i ng Of f i cer af t er r emoval .

3. 1. 17 Mechani cal Equi pment and Fi xt ur es

Di sconnect mechani cal har dwar e at t he near est connect i on t o exi st i ng ser vi ces t o r emai n, unl ess ot her wi se not ed. Di sconnect mechani cal equi pment and f i xt ur es at f i t t i ngs. Remove ser vi ce val ves at t ached t o t he uni t . Sal vage each i t em of equi pment and f i xt ur es as a whol e uni t ;

l i s t ed, i ndexed, t agged, and st or ed. Sal vage each uni t wi t h i t s nor mal oper at i ng auxi l i ar y equi pment . Tr anspor t sal vaged equi pment and f i xt ur es, i ncl udi ng mot or s and machi nes, t o a desi gnat ed on base st or age ar ea as di r ect ed by t he Cont r act i ng Of f i cer . Do not r emove equi pment unt i l appr oved. Do not of f er l ow- ef f i c i ency equi pment f or r euse; pr ovi de t o r ecycl i ng ser vi ce f or di sassembl y and r ecycl i ng of par t s.

3. 1. 17. 1 Pr epar at i on f or St or age

Remove wat er , di r t , dust , and f or ei gn mat t er f r om uni t s; t anks, pi pi ng and f i xt ur es shal l be dr ai ned; i nt er i or s, i f pr evi ousl y used t o st or e f l ammabl e, expl osi ve, or ot her danger ous l i qui ds, shal l be st eam cl eaned.

Seal openi ngs wi t h caps, pl at es, or pl ugs. Secur e mot or s at t ached by f l exi bl e connect i ons t o t he uni t . Change l ubr i cat i ng syst ems wi t h t he pr oper oi l or gr ease.

3. 1. 17. 2 Piping

Di sconnect pi pi ng at uni ons, f l anges and val ves, and f i t t i ngs as r equi r ed t o r educe t he pi pe i nt o st r ai ght l engt hs f or pr act i cal st or age. St or e sal vaged pi pi ng accor di ng t o s i ze and t ype. I f t he pi pi ng t hat r emai ns can become pr essur i zed due t o upst r eam val ve f ai l ur e, end caps, bl i nd f l anges, or ot her t ypes of pl ugs or f i t t i ngs wi t h a pr essur e gage and bl eed val ve shal l be at t ached t o t he open end of t he pi pe t o ensur e posi t i ve l eak cont r ol . Car ef ul l y di smant l e pi pi ng t hat pr evi ousl y cont ai ned gas, gasol i ne, oi l , or ot her danger ous f l ui ds, wi t h pr ecaut i ons t aken t o pr event i nj ur y t o per sons and pr oper t y. St or e pi pi ng out door s unt i l al l f umes and r esi dues ar e r emoved. Box pr ef abr i cat ed suppor t s, hanger s, pl at es, val ves, and speci al t y i t ems accor di ng t o s i ze and t ype.

Wr ap spr i nkl er heads i ndi v i dual l y i n pl ast i c bags bef or e boxi ng. Cl assi f y

Apr i l 2019 Page 9 SECTI ON 02 41 00 pi pi ng not desi gnat ed f or sal vage, or not r eusabl e, as scr ap met al .

3. 1. 17. 3 Ducts

Cl assi f y r emoved duct wor k as scr ap met al .

3. 1. 17. 4 Fi xt ur es, Mot or s and Machi nes

Remove and sal vage f i xt ur es, mot or s and machi nes associ at ed wi t h pl umbi ng, heat i ng, ai r condi t i oni ng, r ef r i ger at i on, and ot her mechani cal syst em i nst al l at i ons. Sal vage, box and st or e auxi l i ar y uni t s and accessor i es wi t h t he mai n mot or and machi nes. Tag sal vaged i t ems f or i dent i f i cat i on, st or age, and pr ot ect i on f r om damage. Sal vage and cr ush por cel ai n pl umbi ng f i xt ur es unsui t abl e f or r euse.

3. 1. 18 El ect r i cal Equi pment and Fi xt ur es

Sal vage mot or s, mot or cont r ol l er s, and oper at i ng and cont r ol equi pment t hat ar e at t ached t o t he dr i ven equi pment . Sal vage wi r i ng syst ems and component s. Box l oose i t ems and t ag f or i dent i f i cat i on. Di sconnect pr i mar y, secondar y, cont r ol , communi cat i on, and si gnal c i r cui t s at t he poi nt of at t achment t o t hei r di st r i but i on syst em.

3. 1. 18. 1 Fixtures

Remove and sal vage el ect r i cal f i x t ur es. Sal vage unpr ot ect ed gl asswar e f r om t he f i xt ur e and sal vage separ at el y. Sal vage i ncandescent , mer cur y- vapor , and f l uor escent l amps and f l uor escent bal l ast s manuf act ur ed pr i or t o 1978, boxed and t agged f or i dent i f i cat i on, and pr ot ect ed f r om breakage.

3. 1. 18. 2 El ect r i cal Devi ces

Remove and sal vage swi t ches, swi t chgear , t r ansf or mer s, conduct or s i ncl udi ng wi r e and nonmet al l i c sheat hed and f l exi bl e ar mor ed cabl e, r egul at or s, met er s, i nst r ument s, pl at es, c i r cui t br eaker s, panel boar ds, out l et boxes, and si mi l ar i t ems. Box and t ag t hese i t ems f or i dent i f i cat i on accor di ng t o t ype and si ze.

3. 1. 18. 3 Wi r i ng Duct s or Tr oughs

Remove and sal vage wi r i ng duct s or t r oughs. Di smant l e pl ug- i n duct s and wi r i ng t r oughs i nt o uni t l engt hs. Remove pl ug- i n or di sconnect i ng devi ces f r om t he busway and st or e separ at el y.

3. 1. 18. 4 Condui t and Mi scel l aneous I t ems

Sal vage condui t except wher e embedded i n concr et e or masonr y. Consi der cor r oded, bent , or damaged condui t as scr ap met al . Sor t st r ai ght and undamaged l engt hs of condui t accor di ng t o s i ze and t ype. Cl assi f y suppor t s, knobs, t ubes, c l eat s, and st r aps as debr i s t o be r emoved and disposed.

3. 1. 19 El evat or s and Hoi st s

Remove el evat or s, hoi st s, and si mi l ar conveyi ng equi pment and sal vage as whol e uni t s, t o t he most pr act i cal ext ent . Remove and pr epar e i t ems f or sal vage wi t hout damage t o any of t he var i ous par t s. Sal vage and st or e r ai l s f or st r uct ur al st eel wi t h t he equi pment as an i nt egr al par t of t he

Apr i l 2019 Page 10 SECTI ON 02 41 00 unit.

3. 2 CONCURRENT EARTH- MOVI NG OPERATI ONS

Do not begi n excavat i on, f i l l i ng, and ot her ear t h- movi ng oper at i ons t hat ar e sequent i al t o demol i t i on or deconst r uct i on wor k i n ar eas occupi ed by st r uct ur es t o be demol i shed or deconst r uct ed unt i l al l demol i t i on and deconst r uct i on i n t he ar ea has been compl et ed and debr i s r emoved. Fi l l hol es, open basement s and ot her hazar dous openi ngs.

3. 3 DI SPOSI TI ON OF MATERI AL

3. 3. 1 Ti t l e t o Mat er i al s

Except f or sal vaged i t ems speci f i ed i n r el at ed Sect i ons, and f or mat er i al s or equi pment schedul ed f or sal vage, al l mat er i al s and equi pment r emoved and not r eused or sal vaged, shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om Gover nment pr oper t y. Ti t l e t o mat er i al s r esul t i ng f r om demol i t i on and deconst r uct i on, and mat er i al s and equi pment t o be r emoved, i s vest ed i n t he Cont r act or upon appr oval by t he Cont r act i ng Of f i cer of t he Cont r act or ' s demol i t i on, deconst r uct i on, and r emoval pr ocedur es, and aut hor i zat i on by t he Cont r act i ng Of f i cer t o begi n demol i t i on and deconst r uct i on. The Gover nment wi l l not be r esponsi bl e f or t he condi t i on or l oss of , or damage t o, such pr oper t y af t er cont r act awar d. Showi ng f or sal e or sel l i ng mat er i al s and equi pment on si t e i s prohibited.

3. 3. 2 Sal vaged Mat er i al s and Equi pment

Remove mat er i al s and equi pment t hat ar e l i s t ed i n t he Demol i t i on/ Deconst r uct i on Pl an i ndi cat ed t o be r emoved by t he Cont r act or and t hat ar e t o r emai n t he pr oper t y of t he Gover nment , and del i ver t o a st or age si t e, as di r ect ed.

a. Sal vage i t ems and mat er i al t o t he maxi mum ext ent possi bl e.

b. St or e al l mat er i al s sal vaged f or t he Cont r act or as appr oved by t he Cont r act i ng Of f i cer and r emove f r om Gover nment pr oper t y bef or e compl et i on of t he cont r act . On si t e sal es of sal vaged mat er i al i s prohibited.

c. Remove sal vaged i t ems t o r emai n t he pr oper t y of t he Gover nment i n a manner t o pr event damage, and packed or cr at ed t o pr ot ect t he i t ems f r om damage whi l e i n st or age or dur i ng shi pment . I t ems damaged dur i ng r emoval or st or age must be r epai r ed or r epl aced t o mat ch exi st i ng i t ems. Pr oper l y i dent i f y t he cont ent s of cont ai ner s.

d. Remove t he f ol l owi ng i t ems r eser ved as pr oper t y of t he usi ng ser vi ce pr i or t o commencement of wor k per t he cont r act document s.

e. Remove hi st or i cal i t ems i n a manner t o pr event damage. Del i ver t he f ol l owi ng hi st or i cal i t ems t o t he Gover nment f or di sposi t i on: Cor ner st ones, cont ent s of cor ner st ones, and document boxes wher ever l ocat ed on t he si t e.

f . Remove and capt ur e al l Cl ass I ODS r ef r i ger ant s i n accor dance wi t h t he Cl ean Ai r Act Amendment of 1990.

Apr i l 2019 Page 11 SECTI ON 02 41 00

3. 3. 3 Unsal vageabl e and Non- Recycl abl e Mat er i al

Di spose of unsal vageabl e and non- r ecycl abl e combust i bl e mat er i al of f t he site.

3. 4 CLEANUP

Remove debr i s and r ubbi sh f r om basement and si mi l ar excavat i ons. Remove and t r anspor t t he debr i s i n a manner t hat pr event s spi l l age on st r eet s or adj acent ar eas. Appl y l ocal r egul at i ons r egar di ng haul i ng and di sposal .

3. 5 DI SPOSAL OF REMOVED MATERI ALS

3. 5. 1 Regul at i on of Removed Mat er i al s

Di spose of debr i s, r ubbi sh, scr ap, and ot her nonsal vageabl e mat er i al s r esul t i ng f r om r emoval oper at i ons wi t h al l appl i cabl e f eder al , st at e and l ocal r egul at i ons as cont r act ual l y speci f i ed i n t he Wast e Management Pl an.

3. 5. 2 Bur ni ng on Gover nment Pr oper t y

Bur ni ng of mat er i al s r emoved f r om demol i shed and deconst r uct ed st r uct ur es wi l l not be per mi t t ed on Gover nment pr oper t y.

3. 5. 3 Removal f r om Gover nment Pr oper t y

Tr anspor t wast e mat er i al s r emoved f r om demol i shed and deconst r uct ed st r uct ur es, except wast e soi l , f r om Gover nment pr oper t y f or l egal di sposal . Di spose of wast e soi l as di r ect ed.

3. 6 REUSE OF SALVAGED I TEMS

Recondi t i on sal vaged mat er i al s and equi pment desi gnat ed f or r euse bef or e i nst al l at i on. Repl ace i t ems damaged dur i ng r emoval and sal vage oper at i ons or r est or e t hem as necessar y t o usabl e condi t i on.

- - End of Sect i on - -

Apr i l 2019 Page 12 SECTI ON 02 41 00

File details come from the government source that posted it. Updated .