FA7014-09-R-0032
VIPSAM Question Resolution Matrix
Master List
| Document & Para # |
| Type |
(A/S/C)
| Question |
| Government Response |
| 55 |
| Sec L 7.3.4.1 |
1. Amendment 0002, new para 7.3.4.1 states "The percentages are based on total subcontracting dollars and first, second and third tier subcontracting dollars can be counted towards meeting your small business participation goals." Previous answers to questions stated that the small business requirement was to be based on total contract value vice subcontracted dollars.
Q: Please clarify the actual requirement.
Correct. An amendment will be posted to restate that SB percentages goals are based on total contract dollars.
| 56 |
| PWS 5.33.1 and 5.33.2 |
2. Amendment 0002, PWS paras 5.33.1 and 5.33.2 now show an increase in time to perform inspection yet there is no change to the TE-4h workload data.
Q: Will the Govt provide an updated TE-4h?
TE-4h is not affected by the changes in paragraph 5.33.1 and 5.33.2.
| 57 |
| PWS 5.23 and 5.46 |
1. Amendment 0002, PWS paras 5.23 and 5.46 number 18 have been changed to reflect a new requirement of at least 80% FMC helicopter availability. Historically, there is always one helicopter in Phase, one helicopter awaiting FCF, and one often in depot repair. 80% of 19 aircraft equals 15.2 which we assume would be rounded up to 16 aircraft. 80% of 18 aircraft equals 14.4 which we assume would be rounded up to 15 aircraft. Assuming one aircraft in phase, one awaiting FCF and one in depot, the contractor is already at the limit without taking into account the impact of daily flight operations. Every time any of the remaining aircraft returns from a flight in a Code 3 status the contractor will fail the 80% requirement.
Additionally, it is our understanding is that PMAI aircraft do not include aircraft under depot repair yet PWS para 5.11.8 states "the contractor shall not expect relief from the daily aircraft requirement for TDY, depot, AOG or off-station aircraft.”
We expect that the 80 percent will be rounded down. (Ex: 18 will equal 14, 19 will equal 15 and so on if we get additional airframes.) This requirement was established by the 316OG/CD.
Document & Para #: Enter the specific, complete paragraph number. Enter “Gen” for general comments on the document not specific to any single paragraph.
Type (G, A, S, C): Type of comment (G=General; A = Administrative; S = Substantive; C = Critical)
· CRITICAL – Label a comment “Critical” if you believe success of the program depends on a revision to the area commented on.
· SUBSTANTIVE - Substantive comments are provided because sections in the document appear to be or are potentially unnecessary, incorrect, incomplete, misleading, confusing, or inconsistent with other sections.
· ADMINISTRATIVE - Administrative comments correct what appear to be typographical or grammatical errors.
· GENERAL – General Comments require a simple explanation/clarification and does not necessarily result in a change to a document
Question: Self-explanatory Government Response: Self-explanatory