VIPSAM Question Resolution Matrix for Industry Quest 31-42 dated 25 Mar 10.pdf

PDF 103 KB Posted

Attached to
VIPSAM at Andrews AFB-Aicraft Maintenance, Transient Alert, Fuels, Supply, Munitions
Solicitation number
FA7014-09-R-0032
Issued by

About this file

Attached is the question resolution matrix for questions 31-42 from Industry. It is up to date with the most current responses from the Government as of 25 Mar 10.

View the file

Other files

File Type Posted
Amendment 4 FA7014-09-R-0032-0004.doc DOC document
CDRLs Library - A055-A075.pdf PDF
CDRLS Library - A032 - A054.pdf PDF
VIPSAM RFP Question Resolution Matrix 14 jul 10 FBOr.doc DOC document
CDRLS Library - A001 - A031.pdf PDF
Amendment 3 FA7014-09-R-0032-0003.doc DOC document
TE-4a(2) Isochronal Inspection History VIPSAM Fleet.pdf PDF
CDRL Library PT 1 of 2.pdf PDF
VIPSAM PWS 10 July 10 Revised 13 Jul 2010.doc DOC document
CDRL Library PT 2 of 2.pdf PDF
VIPSAM RFP Question Resolution Matrix 9 jul 10 FBO.doc DOC document
Amendment 2 FA7014-09-R-0032-0002.doc DOC document
VIPSAM RFP Question Resolution Matrix 28 Jun 10 FBO.doc DOC document
VIPSAM PWS 29 June 10.doc DOC document
01 VIPSAM RFP 28 May 10.doc DOC document
Vipsam Question - Responses 20-25.docx DOCX document
Amendment 1 FA7014-09-R-0032-0001.pdf PDF
VIPSAM PWS 9 Jun 10.pdf PDF
TE-4h Heli Workload.pdf PDF
VIPSAM RFP Question Resolution Matrix —
VIPSAM RFP Question Resolution Matrix —
VIPSAM RFP Question Resolution Matrix —
Attachment 7 - Draft VGSA Template.doc DOC document
Attachment 10 - DoL WD for Trend Western Tech Corp CBA.pdf PDF
Attachment 6 - Draft DD254.pdf PDF
Attachment 2 - Pricing Matrix.xlsx XLSX spreadsheet
Attachment 9 - DynCorp CBA 1 Oct 2008.pdf PDF
Attachment 4 - Past Performance Questionnaire Cover Ltr.pdf PDF
Attachment 11 - Trend Western CBA 1 OF 2 —
Attachment 12 - Trend Western CBA 2 OF 2 —
01VIPSAM RFP 28 May 10.pdf PDF
Exhibit 1 - Technical Exhibit Library.pdf PDF
Attachment 13 - DoL WD 05-2103 Rev 8 Non-CBA Employees.pdf PDF
Attachment 5 - Past Performance Questionnaire.doc DOC document
Attachment 8 - DoL WD for DynCorp CBA —
Attachment 3 - Performance Plan 25 Mar 10.pdf PDF
Attachment 1 - VIPSAM PWS 27 May 10.pdf PDF
Presolicitation Notice.docx DOCX document
VIPSAM Question Resolution Matrix--Questions 191-214.pdf PDF
VIPSAM Draft PWS 26 Mar 2010 FA7014-09-R-0032.pdf PDF
VIPSAM Question Resolution Matrix--Questions 179-190.pdf PDF
VIPSAM Question Resolution Matrix--Revised Answers to Questions 1 24 and 49 dated 23 Mar 10.pdf PDF
VIPSAM Question Resolution Matrix for Industry--Quest 41 58 62 66 80 169 171 173 dated 23 Mar 10.pdf PDF
VIPSAM Question Resolution Matrix for Industry Quest 43-178 dated 17 Mar 10.pdf PDF
Draft RFP 17 March 10.doc DOC document
03-89 MXG Mission Brief - 1 March.pptx PPTX presentation
05-316 LRS Brief-8 Feb 10.pptx PPTX presentation
04-Industry Day Heli TA Brief.pptx PPTX presentation
06-PWS overview slides-Final.pptx PPTX presentation
07-Contracting way ahead.pptx PPTX presentation
Show 40 more

Latest 50 of 82 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA7014-09-R-0032

VIPSAM Question Resolution Matrix

Questions 31-42

Question Government Response

31 Is the USAF considering “breaking up” the upcoming requirement’s task areas into multiple contracts and setting them aside for SDVOSB, Small Business, and 8(a)?

No, although the Government does specify target goals for supporting small business.

32 DRFP Section B. Will there be CLINS for

Transition Phase-In and Transition Phase-out?

Transition Phase-In requirements will be included in CLINS 0001 through

0011; there will not be a separate Phase-In CLIN.

Additionally, as Phase-Out costs are contingent on future planning these costs will need to be negotiated at a later date and, if necessary, a new

CLIN may be established.

33 DRFP Section B, CLIN xx03. Suggest the

Government consider eliminating CLIN xx03, UH-1N Functional Check Flight Operations, by rolling this requirement into CLIN xx02.

These CLINS will remain separate.

34 DRFP Section B, CLIN xx05 should be labeled

OPTIONAL CLIN like CLINxx06 per the in-sourcing discussion on page 2.

Section B, page 2 of the RFP, was revised and the reference to the possible in-source of Munitions has been removed as it is no longer being considered. Accordingly this CLIN is no longer Optional.

35 DRFP TE-4e. Does this fuel data include both

USAF and USN requirements?

Yes. Fuels supports all JBANW customers and tenants.

36 DRFP - USN Transient Alert (TA) Workload

Data. When will the Government provide USN

TA workload data? USN data was in the previous draft but is missing in the latest DRFP.

The PWS has been revised and the Navy TA requirements have been removed.

37 DRFP TE-6c – Will any US Navy technical manuals be added to this tab?

No. The PWS has been revised and the Navy TA requirements have been removed.

38 DRFP. Do TEs-9a, 9b, 9c, 9d, 9e(1), 9e(2), 9e(3), 9e(4), 9f, 9h, 9i, 9j include the USN TA GFE that was listed in TE-10k of the previous draft? If not, when will the USN GFP/GFE list be provided?

No. The PWS has been revised and the Navy TA requirements have been removed.

39 DRFP, Section H-012. This paragraph states that

“… the contractor shall be fully liable as an insurer for any loss or damage to such equipment or property while in contractor care, custody or control arising from any cause whatsoever and contractor agrees to reimburse the Government in full.” This statement appears to assign contractor liability for situations that may be beyond the control of the contractor such as acts of God, damage that may be caused when Government personnel use GFE as required in PWS 11.3.2.1 or damage or lost may be caused when

Government personnel check out tools from the contractor. Please clarify the Government’s intent.

a. Is it the intent of the Government to increase the cost of the contract to the Government by not sharing in the cost of losses of GP and have the contractor bear the full cost of all losses as declared in Section H, Clause H-012?

b.Is it the intent of the Government to negate the contractor’s limited liability provided for by

DFARS Clause 252.228-7001 Ground and Flight

Risk cited in Section I?

c. Is it the intent of the Government to negate the contractor’s limited liability for provided for by

This local clause has been removed.

FARS Clause 52.246-25 Limitation of Liability

Services cited in Section I?

d. Is it the intent of the Government to only include Government Property and exclude

Government Furnished Property (GFP) in H-012?

FAR Clause 52.245-1, titled Government

Property, as cited in Section I, limits the liability of the contractor for GFP.

40 PWS 2.2.3. Significant workload changes are defined as variations greater than +/- 20%. The

+/-20% variation is large and likely to cause higher pricing to cover the associated risk on a

Firm Fixed Price CLIN. Suggest the Government reduce the variation to perhaps +/- 10%.

The Government has revised this variation to +/- 10%.

41 PWS 2.31.1. Please identify which publication defines the USAF standards for vehicle appearance and uniformity.

PWS 2.31 has been revised as follows and identifies the appropriate AFI that applies:

2.31 Vehicle Requirements. The contractor shall furnish all vehicles to meet the requirements of this PWS, not included in TE-9, as required.

The contractor shall maintain files of approved vehicle operators and shall ensure that all vehicles, Government or Contractor provided, are maintained and cleaned IAW AFI 23-302 Para 3.13 and meet appearance requirements as outlined in TE-12. Additionally, all vehicles shall have a conservative uniformed appearance.

PWS 2.4 Contractor Personnel Requirements.

Please clarify all Key Personnel requirements, the associated minimum experience levels and qualifications, and which positions require resumes.

Paragraph 2.4.3 has been revised as follows: “Identification and

Replacement Personnel. The contractor shall identify key personnel to the CO at time of proposal submission. Any changes or additions to key personnel will require a resume(s) to be submitted to the CO for acceptance prior to allowing the proposed individual to begin work on the contract.”

Para 2.4.3 defines Key Personnel as “project manager and management, responsible for overseeing the daily operations of the functional areas covered in this PWS”