RFP_Change_Matix.pdf

PDF 11 KB Posted

Attached to
Sheppard Trainer Maintenance Federal contract opportunity
Solicitation number
FA300214R0011
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

RFP Change Matrix - Changes made since draft RFP posting.

View the file

Other files for this federal contract opportunity

Other files attached to Sheppard Trainer Maintenance, newest first.
File Type Posted
FA3002-14-R-0011-0002.pdf PDF
Round_3_-_Q A_Final_RFP_(Posted_to_FBO_16_Dec_14).pdf PDF
Amendment_1_(FA3002-14-R-0011-0001) _Posted_to_FBO_9_Dec_14.pdf PDF
Round_2_-_Q A_Final_RFP.pdf PDF
Minutes_-_STM_Pre-Prop_Conf_ _Site_Visit_(3_Dec_14).pdf PDF
Round_1_-_Q A_Final_RFP.pdf PDF
Atch_10_-_Sample_Subcontractor_Letter_of_Consent.docx DOCX document
Atch_5_-_Wage_Determination_(WD)_-_FLORIDA_and_TEXAS.pdf PDF
PWS_Change_Matrix.pdf PDF
FA3002-14-R-0011.pdf PDF
Atch_6_Part_1_of_2_-_Current_Collective_Bargaining_Agreement_(CBA).pdf PDF
Atch_8_-_Past_Performance_Information_Sheet.docx DOCX document
Atch_6_Part_2_of_2_-_CBA_Job_Descriptions.pdf PDF
Atch_4_-_DD_Form_254.pdf PDF
338_SCONS_Subcontracting_Plan_Checklist.pdf PDF
Atch_2_-_Draft_Quality_Assurance_Surveillance_Plan_(QASP).pdf PDF
Atch_12_-_Solicitation_Question_and_Comment_Sheet.xlsx XLSX spreadsheet
Atch_1_-_Performance_Work_Statement_(PWS).pdf PDF
Atch_9_-_Past_Performance_Questionnaire_(PPQ).docx DOCX document
Atch_7_-_Shift_Summary_Matrix.xlsx XLSX spreadsheet
Atch_11_-_Sample_Client_Authorization_Letter.docx DOCX document
STM_Pre-Proposal_Conf_ _Site_Visit_(2nd_Posting).docx DOCX document
DRFP_Q As_(Posted_7_Nov_14).pdf PDF
STM_Pre-Proposal_Conf_ _Site_Visit.pdf PDF
Draft_RFP_Q As_(Posted_8_Oct_14).pdf PDF
Lifting_Devices.xlsx XLSX spreadsheet
Draft_PWS_posting_responses_(11-Sep-14)_rev1.pdf PDF
Draft_PWS_posting_responses_(11-Sep-14).pdf PDF
Atch_10_-_Sample_Subcontractor_Letter_of_Consent.docx DOCX document
Draft_RFP _FA3002-14-R-0011.doc DOC document
Atch_6_-_Current_Collective_Bargaining_Agreement_(CBA)_1.pdf PDF
Atch_1_-_Performance_Work_Statement_(PWS).pdf PDF
Atch_9_-_Past_Performance_Questionaire_(PPQ).docx DOCX document
PWS_Change_Matrix_Sheppard_TRM_Sep_2014.docx DOCX document
Atch_12_-_Solicitation_Question_and_Comment_Sheet.xlsx XLSX spreadsheet
Atch_8_-_Past_Performance_Information_Sheet.docx DOCX document
Atch_11_-_Sample_Client_Authorization_Letter.docx DOCX document
Atch_3_-_Incentive_Option-Period_(IOP)_Plan.docx DOCX document
Atch_2_-_Draft_Quality_Assurance_Surveillance_Plan_(QASP).pdf PDF
Atch_5_-_Wage_Determinations_(WD)_-_TEXAS_and_FLORIDA.pdf PDF
Atch_4_-_DD_Form_254.pdf PDF
Atch_7_-_Shift_Summary_Matrix.xlsx XLSX spreadsheet
Draft_PWS_posting_responses_(14_Aug_14).pdf PDF
DRAFT_Sheppard_Trainer_Maintenance_PWS.pdf PDF
STM_Draft_PWS_-_Q A_Form.doc DOC document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Section Change

B Multiple changes associated with Mobilization becoming the base period (i.e. CLIN numbering, moving of mobilization CLIN to 0001 for a one-month base period).

B Addition of CLIN X005.

B Added two new implementation instructions extracted from Section H.

B Revised language in "Government Directed Overtime", Implementation Instruction section.

E CLIN numbering changed.

F CLIN numbering and period of performance change.

H

Clauses H002-H010 were removed. Clauses H007-H009 were moved to Section B under

Implementation Instructions. H001 was revised to include the entire, revised, Incentive

Option-Period Plan.

I Added AFFARS 5352.201-9101, Ombudsman .

I Changed paragraph (c) language in clause 52.217-9 to increase the not to exceed amount by 1 month, from 7-years and 6-months to 7-years and 7-months.

I Added clause 52.222-99, Establishing a Minimum Wage for Contractors.

I Added Clause 52.245-1 Alt I.

I Clauses 52.252-3 and 52.252-4 were removed.

J SCA WDs have been replaced/updated.

J The Incentive Option-Period Plan was removed as attachment 3 and inserted into Section H as Clause "H001". Attachment 3 is now "Reserved".

J Atch 9, PPQ was edited in multiple areas.

K Clause 52.204-8, NAICS Size Std updated from $19M to $20.5M.

L Paragraph numbering in "L. INSTRUCTIONS TO OFFERORS" has been changed/updated.

L L. INSTRUCTIONS TO OFFERORS, paragraph L.1.2.1 was added.

L L. INSTRUCTIONS TO OFFERORS, paragraphs L.1.4, L.2.4.4, L.3.4.5, L.4.3.1, L.4.5.4, and

L.5.3 were revised.

L L. INSTRUCTIONS TO OFFERORS, second paragraph at L.3.1.1. was deleted and moved to Section M, M. EVALUATION CRITERIA, paragraph M.3.1.1.

L Number of Technical proposal volumes reduced from 1 original and 5 copies, to 1 original and 4 copies.

M M. EVALUATION CRITERIA, paragraphs M.1.1.1, M.3.1.1, M.5.1.1, M.5.1.2, and M.5.1.3 were revised.

SF33 Block 12 Changed "240" to "280" calendar days.

File details come from the government source that posted it. Updated .