DRAFT IDIQ and TO 01 PWS_Q and A_August 2024.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Solid State Phased Array Radar System (SSPARS) Reacquisition - FY26
Solicitation number
FA251823R0021_2
Issued by

About this file

This document contains a Request for Proposal (RFP) Instructions DRAFT for a Missile Warning, Missile Defense and Space Domain Awareness IDIQ and a DRAFT Solid State Phased Array Radar System (SSPARS) Operations & Maintenance PWS (Task Order 01).

The key details are: This IDIQ contract will support six geographic locations - Pituffik SB, Greenland; Beale AFB, CA; Clear SFS, AK; Cape Cod SFS, MA; Cheyenne Mountain SFS, CO; and RAF Fylingdales, UK. Task Orders will be issued off the IDIQ for work within scope, with both FFP and CR CLINs. Government plans to host a pre-proposal conference prior to formal solicitation release. The Government anticipates issuing the pre-solicitation draft on or about 9/9/2024. The PWS provides detailed requirements for radar operations, maintenance, and support services. Offerors should review the Q&A for additional information on qualifications, government furnished items, surge support, and other key areas.

View the file

Other files

File Type Posted
Attachment 05 - Section_M.docx DOCX document
Attachment 04 - Section_L.docx DOCX document
Attachment 13 - PIEE Solicitation Module.pdf PDF
Attachment 10 - Pricing Workbook.xlsx XLSX spreadsheet
Attachment 03 - DD Form 254.pdf PDF
Attachment 12 - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment 06 - Past Performance Information Citation.docx DOCX document
Attachment 09 - Labor Categorization Tool.xlsx XLSX spreadsheet
Attachment 01 - MW_MD_SDA IDIQ PWS.pdf PDF
Attachment 07 - Transmittal Letter.docx DOCX document
Attachment 02 - SSPARS TO 01 PWS.pdf PDF
Attachment 11 - Subcontractor Teaming Partner Consent Form.docx DOCX document
Attachment 08 - Past Performance Questionnaire.docx DOCX document
Attachment 14 - Posting Offer in Solicitation Module.pdf PDF
Updated Post_18 Sep 2024_SAM.gov.pdf PDF
Attachment 03_DD Form 254.pdf PDF
Attachment 01_IDIQ PWS.pdf PDF
Attachment 11_Pricing Workbook.xlsx XLSX spreadsheet
Attachment 02_TO 01 PWS.pdf PDF
Updated Post_29 Aug 2024_SAM.gov.pdf PDF
Attachment 07_Transmittal Letter.docx DOCX document
Attachment 04_Section_L.docx DOCX document
Attachment 13_Small Business Participation Commitment Document (SBPCD).docx DOCX document
Attachment 05_Section_M.docx DOCX document
Attachment 06_Past Performance Information Citation.docx DOCX document
Attachment 12_Subcontractor Teaming Partner Consent Form.docx DOCX document
Attachment 09_Client Authorization Letter.docx DOCX document
Attachment 10_PWS Labor Categorization Tool.xlsx XLSX spreadsheet
Attachment 14_PIEE Solicitation Module.pdf PDF
Attachment 15_Posting Offer in Solicitation Module.pdf PDF
Attachment 08_Past Performance Questionnaire.docx DOCX document
SF33 Solicitation_FA251824R0040.pdf PDF
FA251823R00212 - SSPARS Reacquisition - Draft PWS Questions_InDyne.xlsx XLSX spreadsheet
MW_MD and SDA_IDIQ PWS_DRAFT.pdf PDF
SSPARS TO PWS_DRAFT.pdf PDF
Attachment 2 - CSFS Mission Brief.pdf PDF
SSPARS Announcement_05July2024.pdf PDF
Attachment 5 - Summary Events Attendee List.xlsx XLSX spreadsheet
Attachment 3 -SF 312_Classified Information NDA.pdf PDF
Attachment 4 - Schedule Classified Documents and One-on-One Meeting.xlsx XLSX spreadsheet
Attachment 1 - Q and A Post CSFS Site Visit.xlsx XLSX spreadsheet
SSPARS Industry Day Briefing_06Mar2024.pdf PDF
Industry Day Event Q and A Matrix.pdf PDF
Attachment 1 - RFI 4_Worksheet for Vendor Responses.xlsx XLSX spreadsheet
Attachment 4 - RFI 4_SAIO-ProPricer Instructions to Contractor (DRAFT).docx DOCX document
Attachment 3 - RFI 4_SSPARS PWS (DRAFT).docx DOCX document
Attachment 1 - RFI 4_Worksheet for Vendor Responses.xlsx XLSX spreadsheet
Attachment 2 - RFI 4_Historical Clear Dining Facility Variance.pdf PDF
RFI_4_SSPARS Reacquisition - FY26.pdf PDF
Vendor Questions and Gov Responses_RFI 2_SSPARS Reacq FY26.docx DOCX document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Instructions DRAFT Missile Warning, Missile Defense and Space Domain Awareness IDIQ PWS and DRAFT Solid State Phased Array Radar System (SSPARS) O&M PWS (Task Order 01) GOVERNMENT RESPONSE

Question #Question / Comment - 21 Aug 2024
1Requirement: “Radar operations are performed by military members assigned to the four GSUs”, however it appears that contractor personnel operate the LRDR radar. 1.2 states that “LRDR operator support is executed remotely from LRDR Sector Operations Center (SOC) – Beale (SOC-B) (Primary), and SOC – Cheyenne Mountain (SOC-CM) (Alternate). Each LRDR Space Crew will consist of, at minimum, two (2) qualified Missile Defense Radar Operators (MDROs) per shift at SOC-B and at SOC-CM on a 24-hours-a-day, 7-days-a-week (24/7) basis.”
Question(s): What are the qualifications for the MDROs? Is a MDRO training course currently available, and will the course material be provided to the contractor?PWS 17.4 and its sub-paragraphs identify the training and qualifications for MDROs. MDRO Training Courses are available for current MDROs and the MDRO course material is available in the Bidders Library.
2Will any data be provided in the bidders’ library regarding the current vehicle fleet maintained by the incumbent contractor?Data regarding the requirement's current Government Vehicle Fleet will be available within the Bidders Library. No data will be provided pertaining to vehicles (if any) the incumbent contractor utilizes in performance of the Government's requirements.
3What is a reasonable number of visits/tours to anticipate annually?This workload data is provided in the Bidders Library
4Is Exercise support that may impact contractor staffing and/or overtime pay an example of the type of “labor surge” that is billable?IAW PWS 2.5.1 Firm Fixed Price Contract Line-Item Numbers, "Surge support outside of risk of life, limb, or mission failure must be approved by the CO in advance.". Such surge support is contingent and must be reviewed on a case-by-case basis.
5For workload planning purposes can the government provide any insight to the number and type of projects currently underway at Clear SFS? If not, could the government provide any information regarding projects completed in the past on an annual basis?A Project list has been provided to the sites (where applicable), which show all the previous projects completed from start of the current contract.
6Will a draft list of GFP, GFE, and Government-Furnished Material (GFM) be available prior to the release of the final RFP?The Government intends to provide access to the entire Bidders Library in advance of the formal solicitation.
7For planning purposes, can the government provide the estimated costs for the US Government to medically evacuate US contractor personnel out of Pituffik SB (to include airlift support and associated costs), in the unlikely event that is necessary?The Government does not have the costs a contractor could anticipate paying to medically evacuate a US contractor out of Pituffik.
8Please clarify if system analysis is only performed for anomalous behaviors, as needed. If more frequently, is system analysis centralized (one group/person performs the analysis for all sites) or decentralized (each site performs their own)?
System analysis is performed as needed by Space Delta 4, usually as a result of anomalous behaviors. If more frequent, system analysis is decentralized and if the anomalous behavior is occurring at more than one site, analysis is gathered and reviewed for each site affected.
9The contractor is required to “Develop initial technical and cost proposals for Government review and approval at the request of the CO.” Are contractor costs to prepare these proposals allowable costs? If so, will these costs be covered by a cost-reimbursable CLIN w/no fee, a CPFF CLIN, or a FFP CLIN?The Government will not have a separate CLIN for a contractor to invoice the preparation efforts for technical or other cost proposals resulting from individual projects or other requirements. It will be up to the contractor to manage and consider such in developing its proposals.
10For workload planning purposes, can the government provide any historical data regarding the actual numbers of projects requiring T&E support that have been accomplished at the four UEWR sites annually?The Government does not have historical annual Training & Evaluation (T&E) workload data for the UEWR sites to provide.
11Are there Government required/specified software tools or environments (e.g., Gov cloud) for documents, software CM, inventory, etc.? Windchill, ALCS, JIRA, Azure, etc.OneDrive for Gov Cloud service, IDSS for SCFs, JDRS for DRs, and IMDS for maintenance actions.
12Will the government define minimum qualifications for the ISSO positions in the final PWS?ISSO appointees must be intermediate proficiency level qualified IAW DoD Manual 8140.03. Reference PWS paragraph 4.3.1 & 17.3
13Would the government consider it reasonable to have a single ISSO per site, cross-trained to maintain network, JWICS, FAB-T, and computer security?PWS specifies providing a primary and alternate for specific sites. The ISSOs can provide the support necessary for multiple systems.
14The reference to Appendix F for Appendix F looks like Rev 4 not 5 – Rev 5 has newer CCI families (e.g., Supply Chain) is this reference correct?Updated Appendix F to reflect the current family names according to NIST SP 800-53 Rev 5
15Are there existing processes for installing patches and upgrades (we assume updates are vetted before being provided in an integration lab, for example)PWS paragraph 3.7 provides information regarding patches and upgrades.
16When are current ATOs due?Would you please clarify what specifically from the ATO is due that is being asked?
17Requirement: Contractor Controlled Availability (ACC) allow ~ 26 hours of downtime/year.
Question: How is the ACC formula calculated? Is scheduled maintenance part of this calculation? Are there redundant systems that allow for any maint to be done while operational. Are external interfaces (power, comm, etc.) included in the calculation?The definition for ACC and how it is calculated is listed in Appendix B
18Requirement: Maintain an inventory of all warehouse supplies and materials. Include both GFM (provided at contract start) and contractor procured items.
Question: Will the Government provide inventory schedules of all warehouse locations?The Bidders Library will provide a list of the warehouse inventory. A specific schedule is indicative of 'Burn Rates' which is controlled at the contractor level. The Government does not manage inventory schedules.
19Would the government provide the number, locations, tank sizes and type of POL stored in each Aboveground Storage Tanks?This information is provided in the Bidders Library - 'Supplemental Lists'
20How is the contractor reimbursed for the immediate work performed under Emergency Repair Requests? Is this typically done on a cost-plus fixed fee basis?No, this is covered under the FFP structure.
21Are there any natural gas aboveground storage tanks supplying any site/building(s)? If so, will the Government please provide the number of tanks, tank sizes, and historical usage data for each location where natural gas is required ?Clear SFS doesn't utilize natural gas on the installation.
22Can the Government provide the number, locations, manufacturer, model, output wattage, fuel type and fuel capacity for each generator portable and fixed?This information is provided in the Bidders Library - 'Supplemental Lists' for Cape Cod, Beale, and Clear.
23Would the government provide warehouse building numbers, square footage of each and the types of materials stored within each warehouse location?Bldgs 250 and 906 are our only warehouses. 250 is 40,181 sq ft and is the main warehouse for items being shipped in and out of Clear. It has a range of materials in it that support the installation i.e appliances for the dorms, office fu and UEWR operations. 906 is 10,696 sq ft. It contains all LRDR maintenance items (i.e. Filters, belts, spare motors)
24PWS states the contractor must “Purchase all food from a DoD approved source”, will the Government provide a list of approved sources?PWS Section 16.1.1.4 - Subsistence and Material Handling specifies sourcing of food from Government-approved sources. The following URLs are Government-approved sources for the purchase of these items: https://www.fsis.usda.gov/inspection/fsis-inspected-establishments https://www.fsis.usda.gov/inspection/establishments/meat-poultry-and-egg-product-inspection-directory

https://www.ecfr.gov/current/title-21 https://www.fda.gov/food/federalstate-food-programs/interstate-milk-shippers-list https://www.fda.gov/food/federalstate-food-programs/interstate-certified-shellfish-shippers-list https://publicdashboards.dl.usda.gov/t/MRP_PUB/views/AMSLPQADPlantBook/MapofPlants?%3Aembed=y&%3AisGuestRedirectFromVizportal=y https://apps.ams.usda.gov/dairy/ApprovedPlantList/ (US Foods, Sysco Food Brands are worldwide authorized)

25Clear Dining Facility: What variance ceiling threshold would you recommend establishing to drive contractor performance in managing the Clear Space Force Station Dining Facility?The PWS has been further updated. For the requirements specified in D178 - Dining Services Report, the last sentence of the stated requirement, "Identify the variance for amount of food purchased versus the amount collected from the patrons." has been removed. A variance is no longer required as the Government will implement an 'a la carte' model within the new contract.
26Clear Dining Facility: Which means and measures would you implement to ensure the established variance ceiling threshold is met or improved?The PWS has been further updated. For the requirements specified in D178 - Dining Services Report, the last sentence of the stated requirement, "Identify the variance for amount of food purchased versus the amount collected from the patrons." has been removed. A variance is no longer required as the Government will implement an 'a la carte' model within the new contract.
27Clear Dining Facility: How should non-performance be addressed if the variance amount / percentage exceeds the established variance ceiling threshold?The PWS has been further updated. For the requirements specified in D178 - Dining Services Report, the last sentence of the stated requirement, "Identify the variance for amount of food purchased versus the amount collected from the patrons." has been removed. A variance is no longer required as the Government will implement an 'a la carte' model within the new contract.
28Clear Dining Facility: Would the Government consider making this an area of the PWS for which an incentive could be considered? Please define and clarify.The PWS has been further updated. For the requirements specified in D178 - Dining Services Report, the last sentence of the stated requirement, "Identify the variance for amount of food purchased versus the amount collected from the patrons." has been removed. A variance is no longer required as the Government will implement an 'a la carte' model within the new contract.
29Would the government confirm that they will require use of a Staffing Matrix, format provided by the Government, including labor category descriptions, position title, relevant experience, education, certifications/licensing, applicable security clearances and responsibilities necessary to meet or exceed PWS Requirements?The Government does not plan to utilize a Staffing Matrix as a requirement for an offer to assemble the Technical portion of its proposal.
30Will the Government provide all available workload history data with, or prior to, the release of the Draft RFP documents? This data is key to non-incumbents being able to accurately define Level of Effort (LOE) and propose acceptable staffing/organization structures.The Government intends to provide access to the entire Bidders Library in advance of the formal solicitation.
31Will the Government provide any/all MOA's, MOU's, and Grievances that have been filed and/or executed post the ratification of the current CBA's? This information is key as any of the aforementioned items that have been executed need to be understood by all offerors since they will responsible for meeting the outcomes of those efforts, in addition to the mandates of the CBAs.The Government intends to provide access to the entire Bidders Library in advance of the formal solicitation. The CBAs and MOUs will be available within the Bidders Library.
32Will the Government provide plug numbers for ODC's such as travel, material, sparing, etc. so that there is a level playing field for non-incumbents with regards to those types of costs/pricing?The Government has plug numbers within the CR CLIN. Reference PWS paragraph 2.5.2 that speaks to the Cost Reimbursable CLIN.
33Will the Government define the SB goal/requirements as a total percentage of "labor dollars"? By doing so the SB's will recognize workshare based on services they are eligible to perform, as opposed to a percentage of "total contract value" that might include ODC's that only the Prime contractor will propose and/or execute.The contract will include a 25% Minimum Quantitative Requirement of the Total Contract Value for Small Business Participation Commitment.
34Task Order #1 PWS 2.3.8 Associate Contractor Agreements states "Submit completed ACA(s) to the CO no later than 30 days after award."
Will the Government consider extending this requirement to 60 days? This will allow offerors the needed time to identify POCs and then finalize the agreement with the company and their legal/contract teams.Government will amend this requirement from 30 days to 60 days.
35Task Order #1 PWS 5.8 DIFM Assets states "Manage DIFM and maintain a current copy of the Repair Cycle Asset Management Listing. (D23). Accomplish DIFM reconciliation showing the correct status, locations and any noted discrepancies. Locate missing items and resolve discrepancies. Immediately research property found during the reconciliation which is not on the listing. Initiate found on base return procedures if property does not belong to the site. Ensure each DIFM asset has a completed AFTO Form 350 tag and the applicable condition tag."
Would the Government please confirm that Site Applicability includes RAF Fylingdales. The host base contractor at Fylingdales currently handles all supply requirements.This PWS paragraph's 'Site Applicability' was amended by removing 'RAF Fylindales'. This requirement is provided by Babcock, a UK contractor
36Task Order #1 PWS Section 5.12 Supply Assistance states "Submit ILS-S supply assistance requests. Notify Each Site Host LRS if response is unsatisfactory."
Would the Government please confirm that Site Applicability includes RAF Fylingdales. The host base contractor at Fylingdales currently handles all supply requirements.This PWS paragraph's 'Site Applicability' was amended by removing 'RAF Fylindales'. This requirement is provided by Babcock, a UK contractor
37Task Order #1 PWS Section 8.1.1.1 Emergency Repair Requests states "Material requirements for all emergency repair shall be ordered the same day the call is received."
Would the Government please extend the timeline for ordering material to allow contractors time to coordinate CR CLIN requests and obtain three quotes?The contractor is required to downgrade the emergency situation. Once that occurs, material ordering timelines can be used per the normal process. Three quotes are not required for emergency repairs, and the Govt will be responsive to any contractor CR CLIN requests as the situation dictates.
38Task Order #1 PWS Section 8.1.23 Landscaping and Grounds states "At Clear SFS, mow lawn weekly and clear and maintain all fire breaks annually. At Cape Cod SFS, maintain all fire breaks and clear zones annually."
Would the Government provide an official map of all Fire Breaks so that offerors can estimate the area?Fire Management Plans and overlays for Clear SFS and Cape Code SFS are available within the Bidders Library.
39Task Order #1 PWS Section 8.2 Custodial Services states "Provide custodial services for all occupied facilities. Coordinate with affected agencies to prevent disruption of mission. Clean and sanitize all publicly accessible restrooms daily."
Would the Government please provide site-specific custodial plans and a facility map of all occupied facilities that must receive custodial service, cleaning, and sanitization?Custodial Plans for Cape Code and Clear SFSs are included in the Bidders Library.
40Task Order #1 PWS Section 9.1.3 Elevated Network Privileges/Rights - would the Government please confirm that the Performance Standards must meet AFI 17-130 Chapter 3 - Cybersecurity Framework?Yes, Performance Standards must meet AFI 17-130, Chapter 3 - Cybersecurity Framework.
41Task Order #1 PWS Section 9.2.7.6 Secure Voice Program - Would the Government please clarify if this requirement applies only to Pituffik SB and CMSFS?Yes, the Government confirms that PWS Section 8.2.7.6 - Secure Voice Program only applies to Pituffik and CMSFS
42Task Order #1 PWS Section 2.3.4 contained a Conflict of Interest personnel requirement. Are there any OCI concerns regarding offerors developing and fielding software and/or hardware for UEWRs?There are no identified OCI issues at this time. However, offerors are reminded that there is a continuous obligation to identify potential OCIs throughout performance of the contract.
43Can the Government elaborate on how the IDIQ approach will be used and contract type?The IDIQ (Missile Warning, Missile Defense, and Space Domain Awareness) supports six (6) geographic locations: Pituffik SB, Greenland, Beale AFB, California, Clear SFS, Alaska, Cape Cod SFS, Massachusetts, Cheyenne Mountain SFS, Colorado, and RAF Fylingdales, United Kingdom. Task Orders will be issued off of the IDIQ for work within scope of the IDIQ for only these six (6) locations. Task Orders issued are planned to include FFP and CR CLINs.
44Can the Government provide an estimated schedule for when the DRFP will be released?The Government anticpates issuing the Pre-Solicitation DRAFT the Government's requirement on or about 9/9/2024
45Will the Government host a pre-proposal conference prior to the formal release of the formal solicitation?Yes, the Government will host a pre-proposal conference prior to the publishing of the Government's requirement. This pre-proposal conference will be facilitated through a Microsoft Teams teleconference platform to allow all interested vendors to participate. During this pre-proposal conference, the Government will review and demonstrate certain tools, functions, instructions of the Solicitation. The Government will also receive vendor questions.

File details come from the government source that posted it. Updated .