Attachment 2 - CSFS Mission Brief.pdf
PDF 3 MB Posted
- Solicitation number
- FA251823R0021_2
About this file
This document is a mission brief for the Clear Space Force Station (Clear SFS) located in Denali, Alaska. It provides an overview of the station's history, leadership structure, missions, and assets. The key details are:
The Clear SFS is the oldest missile warning site in North America, tracing its origins back to the 1957 launch of Sputnik. It is home to the 13th Space Warning Squadron (13 SWS) and the 213th Space Warning Squadron (213 SWS) of the Alaska Air National Guard, as well as the 268th Security Forces Squadron (268 SFS). The station's primary missions are missile warning, missile defense, and space domain awareness, supported by assets such as the Upgraded Early Warning Radar (UEWR) and the Long Range Discrimination Radar (LRDR). The document outlines the station's infrastructure requirements, including water, power, HVAC, and structural upgrades. It also highlights several active and planned civil engineering projects valued at over $970 million.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clear Space Force Station Mission Brief
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Clear Space Force Station Mission Brief
Lt Col Stephanie Flowers 13th Space Warning Squadron
Lt Col Jody Schweickart 213th Space Warning Squadron
268th Security Forces Squadron
CUI
Overview
CUI
• Clear SFS History
• Clear’s Manpower
• Leadership Structure
• Missions
• Assets
• Missile Warning/Missile Defense
• Space Domain Awareness
• Clear Installation Overview
History
CUI
1957 Launch of Sputnik 1958 Construction of BMEWS began 1961 Activation of Det 1, 71 Missile Wing 1976 Cobra Dane operational 1983 Reorganized under AFSPC 1992 Re-designated 13 SWS, 21 SW 1998 Relocation of SSPARS from El Dorado, TX 2001 SSPARS operational – BMEWS deactivated 2006 Federal recognition & activation of 213 SWS 2014 COBRA DANE Radar aligned under 13 SWS 2016 BMEWS Demolition began 2017 LRDR Construction began 2017 Activation of 268 SFS 2019 UEWR & EPS operational 2019 BMEWS Demolition complete 2020 Buckley SFB Partnership, DEL4/SBD2 2021 Air Force Station to Space Force Station
Oldest missile warning site in North America
Team Clear
CUI
27 Active Duty 96 Air National Guard (213th and 268th) 2 Royal Canadian Air Force 38 DoD Civilians
Active Duty, RCAF, ANG, DoD Civilians + Contractors = TEAM CLEAR
Command Relationships
CUI
Alaska Air National Guard (AKANG) The Force Provider
USSPACECOM
General Whiting
USSF
General Saltzman
S4S Lt Gen Schiess
SpOC Lt Gen Miller
CSpOC Col Verroco
DEL 4
Col Schmitt
13 SWS
Lt Col Flowers
AK TAG
Lt Gen Saxe
Assistant AK TAG – Air Brig Gen Kile
168 WG
Col Griesbaum
168 OG
Col Oliver
168 MSG
Col Saldivar
213 SWS
Lt Col
Schweickart
268 SFS
Lt Col Odgers
13th SWS (USSF) Owns the mission & installation
Missions
CUI
Missile Warning
MW
Missile Defense
MD
Space Domain Awareness
SDA
ITW/AA
MDS
(Space Surveillance Network)
SSN
(Missile Defense System)
(Integrated Tactical Warning/ Attack Assessment)
Missile Warning & Space Domain Awareness Assets
CUI
CUI
Upgraded Early Warning Radar
(UEWR)
Long Range Discrimination Radar
(LRDR)
Overhead View
CUI
UEWR & EPS
Old Power Plant
Nenana River
Lake Sansing
Composite Area
Denali
LRDR
Old Camp
Old Cooling Ponds
Installation Overview
CUI
Denali
- 11,500 acres
- 78 miles south of Fairbanks
- 285 miles north of Anchorage
- 52 facilities
- Average age is 49 years old
Civil Engineer Projects
CUI
Denali
- 12 active projects valued at $971M
- 13 SWS Projects
- 84 Personnel Dorm – $68M, Dec 2025
- Repair Water/Wastewater - $13.5M, Apr 2024
- F. 800 Water Filter System Install – $640K, Apr 2024
- B230 Catwalk/FO Relief Valves – $300K, Apr 2024
- F. 800 Well Pump: $240K, July 2024
- Power Resiliency – $5.5M, Aug 2024
- Ambulance Bay - $2.2M, Jan 2025
- Tenant Organizations Projects
- LRDR Equipment Shelter, $869M, May 2024
- Enhanced Polar System-Recapitalization (EPS-R)- $5M, May 2024
- Project Snowball Facility– $1.5M, Apr 2024
- Project Snowball Fire Water Well House - $3.2M, Sep 2024
- Demobilization of the Temporary Work Camp - $2.4M, Sep 2024
- Planned Projects
- Clear Main Utilidor Piping Upgrades - $19M, FY24 Design, FY25 Award
- Clear Main Water Well - $6.4M, FY25 Award
- Consolidated Civil Engineer/Security Forces Complex - $78M, FY28
- Clear Main Gate - $8.4M, FY27 Design
- Repair Overhead Power - $1.4M
- Repair Fire Suppression Deficiencies - $350K
- Repair Railroad Crossing - $1.2M
Infrastructure Requirements
CUI
Denali
- Water
- Main water well replacement
- Power
- Upgrade from 4160V to 12470V
- Backup generator for the steam plant
- HVAC
- Repair cooling equipment in UEWR
- Repair exhaust in the motor pool
- Structural
- Renovate the dorms
- Heavy
- Fire break maintenance
Wildfire Threat
Denali
Comments
Questions
| Clear Space Force Station�Mission Brief |
| Clear Space Force Station�Mission Brief |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
File details come from the government source that posted it. Updated .