Example_Photography_of_Concrete_Debris.pdf

PDF 2 MB Posted

Attached to
Flagler County Beach Nourishment Project - Reach II FPN 429573-1-38-01
Solicitation number
25-ITB-078
Issued by
Glades County, Brownsville CDP, Florida

About this file

This is an example photography document supporting the Flagler County Beach Nourishment Project - Reach II (ITB #25-ITB-078) procurement in Flagler County, Florida. The document provides visual documentation of concrete debris requiring removal as part of the project scope. The photographs include images of exposed concrete debris near Varn Park captured on April 2, 2026, historical aerial imagery from November 2021 and December 2017 showing partially exposed seawall debris south of Varn Park, and multiple photographs of failed Camptown Seawall concrete debris dated October 21, 2025, and March 16, 2026. These images serve as reference materials demonstrating the existing site conditions and the extent of debris that contractors must address during project execution.

The document functions as a visual exhibit supporting the solicitation for competitive sealed bids to restore approximately 5.5 miles of eroded coastline by placing approximately 1.8 million cubic yards of beach-compatible sand. The project includes deliverables such as mobilization and demobilization, beach and dune fill placement, structure inspection and vibration monitoring, endangered species monitoring, sea turtle trawling services, sand fencing installation, vegetation dune planting of approximately 364,200 units, and environmental monitoring. Work must commence upon issuance of a Notice to Proceed and be completed within 240 calendar days, with a total contract performance period of 365 calendar days. The pre-bid meeting occurred on March 27, 2026 at 10:00 a.m., bidder questions were due April 3, 2026 at 2:00 p.m., and sealed bids were due April 16, 2026 at 2:00 p.m. The project is federally funded through the Federal Emergency Management Agency with $44,544,369.25 in state cost sharing from the Florida Department of Environmental Protection under Agreement No. 23FL2 (Amendment No. 2), with no local match requirement. The contractor must furnish 100 percent performance and payment bonds, comprehensive insurance coverage including worker's compensation and commercial general liability, and maintain a one-year warranty bond following project acceptance. Liquidated damages will apply at rates ranging from $904 to $10,224 per calendar day, and payment will be made under Florida's Local Government Prompt Payment Act with five percent retainage held until satisfactory completion.

View the file

Other files

File Type Posted
Flagler_County_Beach_Nourishment_Project_-_Reach_II_FPN_429573-1-38-01_(Addendum_#7_Revision).pdf PDF
Example_Photography_of_Concrete_Debris.pdf PDF
Contract_Form.pdf PDF
Contract_Form.pdf PDF
Federal_Requirements.pdf PDF
Federal_Requirements.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT26.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
23FL2_A2_Flagler_County_Hurricane_Recovery_Project.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
FLAGLER_INTERIM_TECH_REPORT_[OA]_25_NOV_2019.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
USACE_2015_Feasability_Study_-_AppendixD_Geotechnical.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
[Q]_20251014-SP_Proffered_Permit_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Warranty_Bond_Form.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
Example_Payment_and_Performance_Bond_Form_337_18_Version_May_6_2014_doc.pdf PDF
2025-03_BeachProfiles_NAVD88.CSV CSV file
2025-03_BeachProfiles_NAVD88.CSV CSV file
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
Attachment_23_Flagler_County_Physical_Monitoring_Plan_2025-01-13.pdf PDF
2019-05_BorrowArea_NAVD88.txt TXT text file
2019-05_BorrowArea_NAVD88.txt TXT text file
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
Flagler_County_Construction_Beach_Fill_Plans_2026-03-04_RevSHT25.pdf PDF
README.txt TXT text file
README.txt TXT text file
Project_Contract_Forms.pdf PDF
Project_Contract_Forms.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
2026-02-02_Flagler_Phase_2_Bid_Schedule_revised.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
Flagler_2020_Geotechnical_Investigation.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
[T]_20251016_PA_4673-01484_PN_714658_and_PA_4680-00153_PN_714659_DOCUMENT_SOU.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
Flagler_County_Permit_Mod_Attachment_16f_Sediment_QAQC_Plan.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[S]_Vessel_Strike_Avoidance_Measures.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
[R]_OCS_A_0572_BOEM_Lease_Flagler_Phase_II_Executed_8-21-2025.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
FO_Flagler_County_Beach_and_Dune_Restoration_Project_-_0379716-003-JM.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
2024-03_Flagler_Geotechnical_Investigation.pdf PDF
Flagler_Reach_2_Tech_Specs_Formatted.pdf PDF
24-PC-01778_Flagler_Final_Report_[July_2024].pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flagler County Beach Nourishment Project Reach II Foth 1

Example Photography of Concrete Debris to be Removed

25-ITB-078

Figure A: Exposed concrete debris located in the vicinity of Varn Park (Moffatt & Nichol, 4/2/2026).

Figure B: Exposed concrete debris located in the vicinity of Varn Park (Moffatt & Nichol, 4/2/2026).

Reach II Foth 2

Figure C: November 2021 historical imagery of partially exposed seawall debris south of Varn Park (Nearmap, 11/3/2021).

Figure D: December 2017 historical imagery of partially exposed seawall debris south of Varn Park (Nearmap, 12/26/2017).

Reach II Foth 3

Figure E: Failed Camptown Seawall and concrete debris (The Observer, 10/21/2025).

Figure F: Failed Camptown Seawall and concrete debris (Flagler County, 3/16/2026).

Reach II Foth 4

Figure G: Failed Camptown Seawall and concrete debris (Flagler County, 3/16/2026).

Figure H: Failed Camptown Seawall and concrete debris (Flagler County, 3/16/2026).

Reach II Foth 5

Figure I: Failed Camptown Seawall and concrete debris (Flagler County, 3/16/2026).