This document is a Substitutions Request Form for Ellington Air Force Base (EF), a federal military installation. The form provides a standardized process for contractors to request approval of substitute materials or equipment that differ from items specified in the contract documents. Contractors must identify the specified item by section, page, and paragraph number, describe the proposed substitution, and provide detailed supporting documentation. The form requires submission to the Project Manager and establishes a formal review mechanism for evaluating alternative products or services during project execution.

The form establishes seven mandatory certifications that the submitting contractor must affirm: that the substitution does not alter dimensional specifications on drawings, that the contractor will cover costs for any required government review or redesign services, that the contractor will coordinate installation and complete associated work at no additional cost to the government, that the substitution will not negatively impact other trades or the construction schedule, that maintenance and service parts remain locally available, that all attached supporting data complies with Section 01600 requirements with clearly identified applicable portions, and that contract document revisions required for proper installation are documented. The contractor must certify that the proposed substitution maintains equivalent or superior function, appearance, and quality compared to the originally specified item. The form requires signature, firm name, address, date, and telephone number from the submitting party, with space provided for listing all attached supporting documentation.

View the file

Other files

File Type Posted
ESBD_535245_1783451121206_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_535245_1783451228039_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_535245_1783451612312_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_535245_1783451432778_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_535245_1783451200196_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_535245_1783451524511_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_535245_1783451258158_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_535245_1783451189009_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
ESBD_535245_1783451304801_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_535245_1783451141821_Attachment G.4 - Mandatory Pricing Sheet.xlsx XLSX spreadsheet
ESBD_535245_1783451490513_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_535245_1783451216328_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_535245_1783451540073_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_535245_1783451446516_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_535245_1783451158210_Attachment G.5 - HUB HSP.pdf PDF
ESBD_535245_1783451111748_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_535245_1783451625900_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_535245_1783451132036_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_535245_1783451177632_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_535245_1783451641521_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_535245_1783451478101_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_535245_1783451508643_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_535245_1783451599549_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_535245_1783451651616_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_535245_1783451287242_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_535245_1783451325745_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_535245_1783451344370_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_535245_1783451462644_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_535245_1783451274676_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_535245_1783451100102_TMD26-ANG-WJ-25269002 - Solicitation.pdf PDF
ESBD_535245_1783451238797_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.S - ELLINGTON AFB (EF)

SUBSTITUTIONS REQUEST FORM

To: Project Manager

Specified Item:

Section Page Paragraph Description

The undersigned requests consideration of the following:

Proposed Substitution: ___________________________________________________

The undersigned certifies that the following paragraphs, unless modified or clarified by attachments, are correct:

1. The proposed substitution does not affect dimensions shown on the Drawings.

2. The undersigned will reimburse the Government for review or redesign services associated with re- approval by authorities.

3. The undersigned will coordinate installation and make changes to other Work which may be re- quired for the Work to be complete with no additional cost to

Owner.

4. The proposed substitution will have no adverse effect on other trades, the construction schedule, or specified warranty requirements.

5. Maintenance and service parts will be locally available for the proposed substitution.

6. Attached data includes support items listed in Section 01600, and applicable portions of the data are clearly identified.

7. Attached data also includes a description of any revisions to the Contract

Documents which the proposed substitution will require for its proper installation.

The undersigned further certifies that the function, appearance and quality of the proposed substitution are equivalent or superior to the specified item.

Submitted by:

Signature __________________________________________________________

Firm ______________________________________________________________

Address ____________________________________________________________

Date

Telephone

List of Attachments:

File details come from the government source that posted it. Updated .