About this file
This is a Scope of Work attachment for field engineering services at Ellington Air Force Base (EF) in Houston, Texas, under contract with the Air National Guard. The contractor is required to provide comprehensive field engineering services, including survey work, civil and structural engineering, and construction method documentation. Key deliverables include maintaining survey control points and temporary benchmarks throughout the project, establishing lines and levels for site improvements and utility installations, and verifying layouts during construction. The contractor must retain a registered Texas surveyor to lay out the work and maintain surveys during construction, with the contractor bearing full responsibility for proper work location and preservation of all stakes and marks. Upon contract closeout, the contractor shall submit a comprehensive survey of roadways, drainage, site grading, buried utilities, and manholes at the same scale as construction documents, with elevations and stationing marked at 100-foot increments.
The contractor is also responsible for preparing geospatial data in compliance with ANG ETL 19-12 standards, delivering a GIS electronic map with GPS-based geospatial data that integrates into the 147 CES Common Installation Picture. Final deliverables must include precise location data for all constructed elements, including building corners, valves, manholes, handholes, light poles, fire hydrants, and parking lot outlines to provide complete situational awareness of all project installations. All documentation and record drawings showing pipe and structure locations must be submitted to the Project Manager upon request, with complete and accurate control and survey logs maintained throughout the project duration.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G.D - ELLINGTON AFB (EF) FIELD ENGINEERING
PART 1 – GENERAL
1. REQUIREMENTS INCLUDED
A. The Contractor shall provide and pay for field engineering services for:
a. Survey work required in execution of work.
b. Civil, structural, or other professional engineering services specified or required to execute the Contractor’s construction method.
B. The method of field staking for the construction of the work shall be at the option of the Contractor.
C. The accuracy of any method of staking shall be responsibility of the Contractor. All engineering for vertical and horizontal control shall be the responsibility of the
Contractor.
a. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are carelessly or willfully disturbed by the
Contractor, the Contractor shall not proceed with any work until he has re-established such points, marks, lines, and elevations as may be necessary for the prosecution of the work.
b. The Contractor shall retain the services of a competent surveyor, registered in the State of Texas, to lay out the work and maintain a survey during construction. The Contractor shall be solely responsible for proper location of the work.
2. SURVEY REFERENCE POINTS
A. Locate and protect control points prior to starting site work and preserve all permanent reference points during construction.
a. Make no changes or relocations without prior written notice to the Project
Manager.
b. Report to the Project Manager when any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations.
3. PROTECT SURVEY REQUIREMENTS
A. Establish temporary benchmarks as needed, referenced to data established by survey control points. Record locations with horizontal and vertical data, on Record
Drawings.
B. Establish lines and levels, and locate and lay out, by instrumentation and similar appropriate means:
a. Site improvements, including utility slopes and invert elevations.
b. Batter boards for structures.
c. From time to time, verify layouts by same methods.
4. RECORDS
A. Maintain a complete, accurate log of al control and survey work as it progresses.
B. At Contract closeout, submit a survey of installation of roadways, drainage, site grading, buried utilities, and manholes at the same scale as the Construction
Documents indicating elevations and stationing at 100-foot increments.
ELLINGTON FIELD, HOUSTON, TX 21 May 2024
5. SUBMITTALS
A. On request of the Project Manager, submit documentation to verify accuracy of field engineering work.
B. Submit Drawings showing locations of all pipes and structures constructed. This
Drawing shall be included with the Record Drawings.
6. GEOSPATIAL DATA STANDARD
A. Prepare and furnish geographical Information System (GIS) electronic map of the site and site utilities that integrates into the 147 CES Common Installation Picture (CIP) using Geographical Positioning System (GPS) Geospatial Electronic data per ANG
ETL 19-12, Geographic Information System (GIS) Data Format Specifications Dated
18 November 2019.
B. At the end of the project all data points will need to be provided by the contractor.
Provide all final locations of the corners (outline) of building, valves, manholes, handholes, light poles, fire hydrants, outline of parking lots and other items to provide a complete picture of what has been built and installed. Provide enough data to enable the government to have the location of everything on the project.