This is a Quality Control specification attachment for a construction project at Ellington Air Force Base (EF) in Houston, Texas, dated May 21, 2024. The document establishes quality assurance and control requirements for installation work, including compliance with manufacturers' instructions, adherence to specified tolerances, and compliance with referenced standards and codes. The specification requires the contractor to perform work by qualified personnel and to secure products with appropriate anchorage devices. The document references related attachments covering post-award submittals, material equipment specifications, and system start-up procedures, indicating this is part of a larger construction or renovation project with multiple specification sections.

The specification mandates that contractors employ and pay for independent testing and inspecting laboratory services, with the independent firm subject to Project Manager approval prior to use. Test reports must be submitted within three working days of completion, and the contractor is responsible for all testing costs, including retesting for non-conformance items. When specified in individual sections, manufacturers must provide qualified personnel to observe site conditions, installation quality, equipment start-up, and testing activities, with observer qualifications submitted 30 days in advance for approval. The specification clarifies that inspecting and testing do not relieve the contractor of responsibility for performing work to contract requirements, and all costs associated with quality control, testing, and manufacturer field services remain the contractor's responsibility.

View the file

Other files

File Type Posted
ESBD_535245_1783451200196_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_535245_1783451141821_Attachment G.4 - Mandatory Pricing Sheet.xlsx XLSX spreadsheet
ESBD_535245_1783451228039_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_535245_1783451274676_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_535245_1783451625900_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_535245_1783451641521_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_535245_1783451577202_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_535245_1783451132036_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_535245_1783451462644_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_535245_1783451100102_TMD26-ANG-WJ-25269002 - Solicitation.pdf PDF
ESBD_535245_1783451238797_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_535245_1783451344370_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_535245_1783451325745_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_535245_1783451508643_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_535245_1783451258158_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_535245_1783451524511_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_535245_1783451599549_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_535245_1783451651616_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_535245_1783451121206_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_535245_1783451432778_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_535245_1783451478101_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_535245_1783451177632_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_535245_1783451111748_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_535245_1783451612312_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_535245_1783451216328_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_535245_1783451540073_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_535245_1783451158210_Attachment G.5 - HUB HSP.pdf PDF
ESBD_535245_1783451490513_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_535245_1783451446516_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_535245_1783451304801_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_535245_1783451189009_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.G - ELLINGTON AFB (EF) QUALITY CONTROL

PART 1 – GENERAL

1. SUMMARY

A. This Section includes:

a. Quality assurance – control of installation.

b. Tolerances.

c. References.

d. Mockup.

e. Inspecting and testing laboratory services.

f. Manufacturers’ field services and reports.

2. RELATED SECTIONS

A. Attachment G.T - Ellington AFB (EF) Post Award Submittals: Submission of manufacturers’ instructions and certificates.

B. Attachment G.M - Ellington AFB (EF) Material Equipment.

C. Attachment G.O - Ellington AFB (EF) Starting Of Systems.

3. QUALITY ASSURANCE – CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step-in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from the Project Manager before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform work by persons qualified to produce workmanship of specified quality.

F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

4. TOLERANCES

A. Monitor tolerance control of installed Products to produce acceptable Work. Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from the Project Manager before proceeding.

C. Adjust Products to appropriate dimensions; position before securing Products in place.

5. REFERENCES

A. For Products or workmanship specified by association, trade, or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard by date of issue current on date of Contract

Documents, except where a specific date is established by code.

C. Obtain copies of standards where required by product specification sections.

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

D. The contractual relationship, duties, and responsibilities of the parties in Contract nor those of the Architect or the Project Manager shall not be altered from the Contract

Documents by mention or inference otherwise in any reference document.

6. INSPECTING AND TESTING LABORATORY SERVICES

A. Contractor shall employ and pay for specified services of an independent firm to perform inspecting and testing. The independent lab shall be approved by the Project

Manager prior to use and should be submitted in sufficient time to eliminate delay.

B. The independent firm will perform inspections, tests, and other services specified in individual specification sections and as required by the Project Manager. Test reports are required to be submitted within 3 working days of each test performed.

C. Inspecting, testing, and source quality control may occur on or off the project site.

Perform off-site inspecting or testing as required by the Project Manager.

D. Reports will be submitted by the independent firm to the Project Manager and the

Contractor, in duplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents.

E. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.

F. Notify the Project Manager and independent firm in writing 24 hours prior to expected time for operations requiring services.

G. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.

H. Testing or inspecting does not relieve Contractor to perform Work to contract requirements.

I. Retesting required because of non-conformance to specified requirements shall be performed by the same independent firm on instructions by the Project Manager.

Payment for all testing services (including re-testing) will be the responsibility of the

Contractor.

7. MANUFACTURERS’ FIELD SERVICES AND REPORTS

A. When specified in individual specification sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment as applicable, and to initiate instructions when necessary.

B. Submit qualifications of observer to the Project Manager 30 days in advance of required observations. Observer subject to approval of the Project Manager.

C. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

D. Submit report in duplicate within 30 days of observation to Architect for information if applicable.

File details come from the government source that posted it. Updated .