ESBD_535245_1783451228039_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf

PDF 112 KB Posted

Attached to
Ellington HVAC Replacement Projects
Solicitation number
TMD26-ANG-WJ-25269002
Issued by
Harris County, Texas

About this file

This document is an attachment to a contract specification for Ellington Field in Houston, Texas, establishing safety policies and procedures required of contractors performing work at the installation. The specification mandates that contractors submit qualifications documentation including a Statement of Qualification for a land surveyor or civil engineer, a contractor health and safety plan, a construction hazard plan, and a temporary utility plan. All work must comply with OSHA 1926 regulations (29 CFR 1926). Contractors must designate a qualified, OSHA-trained safety representative who remains on-site during all work activities and is responsible for overall accident prevention supervision and jobsite safety inspections. The contractor must develop a Job Hazard Analysis and Job Safety and Health Plan for presentation at the preconstruction conference.

The Health and Safety Plan must meet specific minimum requirements including written hazard analysis for each task, employee training documentation with weekly safety briefing records, personal protective equipment specifications, medical surveillance provisions, air and environmental monitoring procedures, site control coordination with the installation, decontamination procedures for chemical materials, emergency response procedures, confined space entry protocols, spill containment provisions, and accident notification and reporting procedures. A safety and health supervisor meeting 29 CFR 1926 supervisor training requirements must verify adherence to the plan in writing. Contractors must also submit a Temporary Utility Plan addressing electrical, water, sanitary facilities, and other utilities, all requiring Project Manager approval and coordination. Monthly safety meetings with all personnel and subcontractors are mandatory, with meeting minutes and attendance rolls submitted to the Project Manager at each progress meeting. Any discovered hazards such as transite pipe or contaminated soils must be addressed through an Emergency Response Plan, and Safety Data Sheets for all materials must be maintained on-site.

View the file

Other files

File Type Posted
ESBD_535245_1783451200196_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_535245_1783451141821_Attachment G.4 - Mandatory Pricing Sheet.xlsx XLSX spreadsheet
ESBD_535245_1783451274676_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_535245_1783451625900_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_535245_1783451641521_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_535245_1783451577202_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_535245_1783451132036_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_535245_1783451287242_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_535245_1783451462644_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_535245_1783451100102_TMD26-ANG-WJ-25269002 - Solicitation.pdf PDF
ESBD_535245_1783451238797_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_535245_1783451344370_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_535245_1783451325745_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_535245_1783451508643_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_535245_1783451258158_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_535245_1783451524511_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_535245_1783451599549_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_535245_1783451651616_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_535245_1783451121206_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_535245_1783451432778_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_535245_1783451478101_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_535245_1783451177632_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_535245_1783451111748_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_535245_1783451612312_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_535245_1783451216328_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_535245_1783451540073_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_535245_1783451158210_Attachment G.5 - HUB HSP.pdf PDF
ESBD_535245_1783451490513_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_535245_1783451446516_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf PDF
ESBD_535245_1783451304801_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_535245_1783451189009_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.E - ELLINGTON AFB (EF) SAFETY POLICIES AND

PROCEDURES

PART 1 – GENERAL

1. SECTION INCLUDES

A. Statement of Qualification (SOQ) for land surveyor or civil engineer.

B. Contractor required health and safety plan.

C. Contractor required construction hazard plan.

D. Contractor required temporary utility plan.

2. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract apply to this section.

B. The publication listed below is a part of this specification to the extent referenced.

The publication is referred to in text by the basic designation only.

a. OSHA 1926 R.E.G. – 29 CFR, OSHA, 1926.

3. SUBMITTALS

A. Submittals the following items for KO approval:

a. Designation of safety representative: the contractor shall submit in writing a qualified employee OSHA trained in 29 CFR 1926 (1926 | Occupational

Safety and Health Administration (osha.gov)) responsible for the overall supervision of all accident prevention activities. Duties shall include ensuring applicable safety requirements are incorporated into work methods and inspecting the jobsite to ensure that safety measures and instruction are being applied. The person shall be always on site that work is in progress.

b. The contractor shall be trained/certified in 29 CFR 1926 procedures. All employees performing work will meet 29 CFR 1926 training requirements for their job capacity.

c. Records shall be kept of all weekly safety briefings and who was in attendance.

B. Submittal for information only: The following items shall be contractor certified:

a. Job Hazard Analysis: Contractor shall develop a job hazard analysis for presentation at the preconstruction conference. The Contractor’s job hazard analysis shall list potential hazards that could arise during the work.

b. Job Safety and Health Plan:

i. The Contractor shall develop a Job Safety and Health Plan for presentation at the preconstruction conference. The Contractor’s

Safety Plan shall make whatever provision are necessary to conduct his work in accordance with current OSHA standards.

c. The following are minimum requirements for the Health and Safety Plan:

i. Safety Plans: Safety Plans will be the responsibility of the Contractor for construction areas identified by the installation and /or TXANG as areas of known hazards only. These plans are required by 29 CFR

1926 and are the responsibility of the Contractor. This requirement shall be coordinated with the Health and Safety Program of the

Military installation by the Contractor.

https://osha-safety-training.net/product/1926-osha-construction-industry-regulations-2024-edition/?utm_term=&utm_campaign=Sales-Performance+Max-New-Best-Performers&utm_source=adwords&utm_medium=ppc&hsa_acc=8236925820&hsa_cam=20512594485&hsa_grp=&hsa_ad=&hsa_src=x&hsa_tgt=&hsa_kw=&hsa_mt=&hsa_net=adwords&hsa_ver=3&gad_source=1&gclid=CjwKCAjw65-zBhBkEiwAjrqRMP7E8ru73uFwonCkyc5WuI5maWCG8keup2kQJj8Q05xzvLRcYu3vkBoCbSUQAvD_BwE

ELLINGTON FIELD, HOUSTON, TX 21 May 2024

ii. Minimum requirements for the Health and Safety Plan are as follows:

1. Must be kept on site and must be written.

2. Will contain a hazard analysis (safety and health risk) for each site task and operation.

3. Will include employee training and weekly safety update briefings (record kept on each employee and subcontractor)

4. Will include personal protective equipment to be used by employees for each of the site tasks and operations.

5. Will include provisions for medical surveillance.

6. Will include frequency and type of air monitoring, personal monitoring, environmental sampling instruments being used if required.

7. Will include a site control program to be coordinated with the installation.

8. Will include a decontamination procedure for the anticipated types of chemical materials to be used in the project

9. Will include an emergency response plan.

10. Will include a confines space entry procedure and pre-entry briefings.

11. Will include provisions for spill containment, to be coordinated with installation.

12. Will include telephone notifications for accidents and follow-on procedures for written reports of the accidents.

13. Written verification of adherence to the Plan by a safety and health supervisor is required (the supervisor must meet 29 CFR

1926 training requirements for supervisors).

14. Deficiencies will be corrected immediately upon discovery and after consultation with the Project Manager, KO as required.

d. Hazard Response Plan: The plan unplanned or non-predicted discovery of such hazards as transite pipe, contaminated soils, and other possible hazards will be addressed within an Emergency Response Plan (EMR) by all contractors. This requirement will be coordinated through the Health and

Safety Program of the Project Manager by the Contractor. Safety Data Sheets

(SDS) shall be maintained at the site for all materials in use.

e. Temporary Utility Plan: The Contractor shall submit a temporary utility hook up plan to be coordinated and approved by the Project Manager. The plan shall describe electrical, water, sanitary facilities, telephone/fax and/or gas.

4. MONTHLY SAFETY MEETINGS

A. The Contractor shall schedule subsequent safety meetings with all personnel, employees and subcontractor personnel on a monthly basis or as required by the

Project Manager. Minutes of the safety meetings shall be prepared and signed by the

Contractor. The meeting notes shall have a roll signed by all members present. This document shall be submitted to the Project Manager at each progress meeting and be a part of the itinerary.