ESBD_535245_1783451446516_ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template.pdf

PDF 215 KB Posted

Attached to
Ellington HVAC Replacement Projects
Solicitation number
TMD26-ANG-WJ-25269002
Issued by
Harris County, Texas

About this file

This is a Final Asbestos Abatement Report Template for Ellington Field Joint Reserve Base, prepared in accordance with Texas Department of State Health Services (TDSHS) regulations and federal Environmental Protection Agency (EPA) standards. The template outlines the documentation requirements for asbestos abatement projects conducted at the facility located at 14657 Sneider Street, Houston, Texas 77034. The report serves as a completion document summarizing project duration, work performed, air monitoring results, and regulatory compliance. The asbestos abatement scope includes removal of approximately 1,350 square feet of asbestos-containing floor tile and mastic. All work must comply with Texas Health and Human Services regulations under Texas Administrative Code Title 25, Part 1, Chapter 296, and federal Code of Regulations Title 40, Chapter 1, Part 61 (NESHAP standards).

The template requires submission of comprehensive documentation including TDSHS notifications submitted at least ten days prior to abatement commencement, Phase Contrast Microscopy (PCM) air samples analyzed according to NIOSH Method 7400, chain of custody forms, air monitoring field forms, daily project notes, TDSHS certifications and licenses for prime and subcontractors, before and after photographs, and signed waste manifests. Air monitoring must demonstrate that all area samples collected outside the work area remain at or below 0.01 fibers per cubic centimeter and that all personal samples remain below OSHA Permissible Exposure Limits (PEL of 0.1 f/cc TWA and 1.0 f/cc STEL). Waste materials must be manifested and transported by licensed waste transporters to approved landfills, with the military base designated as the generator. A TDSHS-licensed Asbestos Air Monitoring Technician must conduct continuous monitoring, final visual inspection for cleanliness, and daily air sampling throughout the project duration.

View the file

Other files

File Type Posted
ESBD_535245_1783451200196_ATTACHMENT G.C - Ellington AFB (EF) Project Coordination.pdf PDF
ESBD_535245_1783451141821_Attachment G.4 - Mandatory Pricing Sheet.xlsx XLSX spreadsheet
ESBD_535245_1783451228039_ATTACHMENT G.E - Ellington Field (EF) Safety Policies And Procedures.pdf PDF
ESBD_535245_1783451274676_ATTACHMENT G.F.2 - Ellington AFB (EF) Contractor Hazardous Material Identification Form Close-Out Procedures.pdf PDF
ESBD_535245_1783451625900_ATTACHMENT G.V - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Unmarked Burials.pdf PDF
ESBD_535245_1783451641521_ATTACHMENT G.W - Ellington AFB (EF) AF103_REV.pdf PDF
ESBD_535245_1783451577202_ATTACHMENT G.S - Ellington AFB (EF) Substitutions Request Form.pdf PDF
ESBD_535245_1783451132036_ATTACHMENT G.3 Texas Military Department Standard Terms and Conditions Revision 6.pdf PDF
ESBD_535245_1783451287242_ATTACHMENT G.G - Ellington AFB (EF) Quality Control.pdf PDF
ESBD_535245_1783451462644_ATTACHMENT G.M - Ellington AFB (EF) Material Equipment.pdf PDF
ESBD_535245_1783451100102_TMD26-ANG-WJ-25269002 - Solicitation.pdf PDF
ESBD_535245_1783451238797_ATTACHMENT G.F - Ellington Field (EF) EMS Hazardous Material Procedures.pdf PDF
ESBD_535245_1783451344370_ATTACHMENT G.J - Ellington Field (EF) Operation And Maintenance Data.pdf PDF
ESBD_535245_1783451325745_ATTACHMENT G.I - Ellington Field (EF) Houston Texas Standard Operating Procedure (Sop) For Inadvertent Discovery Of Cultural Materials.pdf PDF
ESBD_535245_1783451508643_ATTACHMENT G.P - Ellington Field (EF) Contract Closeout.pdf PDF
ESBD_535245_1783451258158_ATTACHMENT G.F.1 - Ellington AFB (EF) Contractor Hazardous Material Usage Data.pdf PDF
ESBD_535245_1783451524511_ATTACHMENT G.Q - Ellington AFB (EF) Cutting And Patching.pdf PDF
ESBD_535245_1783451599549_ATTACHMENT G.T - Ellington Field (EF) Post Award Submittals.pdf PDF
ESBD_535245_1783451651616_ATTACHMENT G.X - Ellington AFB (EF) AF3000.pdf PDF
ESBD_535245_1783451121206_ATTACHMENT G.2 Application for Texas Identification Number AP-152.pdf PDF
ESBD_535245_1783451432778_ATTACHMENT G.K - Ellington AFB (EF) Construction Facilities And Temporary Controls.pdf PDF
ESBD_535245_1783451478101_ATTACHMENT G.N - Ellington Field (EF) Manufacturers’ Services.pdf PDF
ESBD_535245_1783451177632_ATTACHMENT G.A - Ellington Field (EF) General Requirements.pdf PDF
ESBD_535245_1783451111748_ATTACHMENT G.1 Direct Deposit Authorization Form 74-176 (Rev.9-2121).pdf PDF
ESBD_535245_1783451612312_ATTACHMENT G.U - Ellington Field (EF) Sustainable Design Requirements.pdf PDF
ESBD_535245_1783451216328_ATTACHMENT G.D - Ellington AFB (EF) Field Engineering.pdf PDF
ESBD_535245_1783451540073_ATTACHMENT G.R - Ellington Field (EF) EMS Construction Waste Management And Disposal Part 1 - General.pdf PDF
ESBD_535245_1783451158210_Attachment G.5 - HUB HSP.pdf PDF
ESBD_535245_1783451490513_ATTACHMENT G.O - Ellington Field (EF) Starting Of Systems.pdf PDF
ESBD_535245_1783451304801_ATTACHMENT G.H - Ellington Field (EF) EMS Environmental Protection.pdf PDF
ESBD_535245_1783451189009_ATTACHMENT G.B - Ellington Field (EF) Coordination And Meetings.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G.L - Ellington Field JRB Final Asbestos Abatement Report Template

ELLINGTON FIELD JOINT RESERVE BASE

FINAL ASBESTOS ABATEMENT REPORT

FOR WORK PERFORMED AT:

PROJECT NUMBER:

PREPARED FOR:

Ellington Field JRB

14657 Sneider Street Houston, Texas 77034

REPORT DATE:

14657 Sneider Street

Houston, Texas 77034 281-929-2013

Project Number: Date:

FINAL ASBESTOS ABATEMENT REPORT

Date

Address of Company

Ellington Field JRB Project Number:

Prepared by: ____________________________________________

Project Manager

Reviewed by: ____________________________________________

TDSHS Asbestos Consultant, License #

Company Logo

Company Address

Table of Contents

PROJECT INFORMATION _______________________________________________ 1

ASBESTOS ABATEMENT COMPLETION REPORT 1

Project Location

PROJECT SUMMARY 1

APPENDICES _________________________________________________________ 3

Appendix 1: TDSHS Notifications

Appendix 2: Summary of Air Samples

Air Sample Results

Appendix 3: Chain of Custody Forms

Appendix 4: Summary of Monitoring

Air Monitoring Field Forms

Appendix 5: Daily Project Notes & Additional Field Forms

Appendix 6: TDSHS Certifications and Licenses

Prime and Subcontractors

Appendix 7: Pictures- (Before and After)……………………………………………………………3

Appendix 8: Signed Copies of All Waste Manifests…………………………………….3

Project Information

ELLINGTON FIELD PROJECT NUMBER:

ASBESTOS ABATEMENT COMPLETION REPORT

This report represents a summary of the asbestos abatement, project duration, and air monitoring results for the abatement project conducted on Date:

Project Location

All of the work described within this report was conducted at the following location:

Location:

Owner/Generator: Ellington Field Joint Reserve Base Environmental Manager Mr. Mark A. Garcia

Project Type: Asbestos abatement of ???????????.

Ellington Project: #######

PROJECT SUMMARY (EXAMPLE TEXT SUBMISSION)

ACME Environmental submitted the Original Notification for abatement to the Texas Department of State Health Services (TDSHS) on November 14, 20?? (Attached) to precede the 10 day notification for the State. ACME Environmental submitted an amendment on December 1, 20??

If required. The project will comply with Texas Health and Human Services, Texas Laws and Regulations under Operational Codes Chapter 1954-Asbestos Health Protection, Texas Administrative Code, Title 25, Part 1, Chapter 296-Texas Asbestos Health Protection and Federal Code of Regulations, Title 40, Chapter1, Part 61-National Emission Standards for Hazardous Air Pollutants (NESHAP).

ACME Environmental, TDSHS License Number ##-####, conducted the asbestos abatement for the project listed above. ACME Environmental, TDSHS Waste Transporter License Number ##- #### and EPA ID Number ##-#####, provided waste transportation to ##### Landfill located in Houston, Texas.

The abatement project included the removal of approximately 1,350 square feet (sf) of asbestos-containing floor tile and mastic. The materials removed from the site were collected and manifested (Manifest Number #####) per regulations set forth by the Texas Commission on Environmental Quality (TCEQ). The manifest was properly signed by the Ellington Field Base Environmental Manager signifying the military base as the generator.

Mr. Bob Doe, TDSHS Asbestos Air Monitoring Technician License Number ##-####, continually monitored work performance and compliance with federal, state and local regulations, conducted the final visual inspection for cleanliness, and provided daily air monitoring during the abatement project. All licenses can be found in Appendix 6.

ACME SUBCONTRACTOR collected and analyzed Phase Contrast Microscopy (PCM) samples according to National Institute of Occupational Safety and Health (NIOSH) methods. ACME SUBCONTRACTOR is a participant in the NIOSH Proficiency and Analytical Testing Program (PAT) and performs fiber count analysis by the NIOSH Method 7400 Revision 3, Rule A. ACME SUBCONTRACTOR is a licensed asbestos laboratory with the TDSHS, Toxic Substance Control Division for analysis of airborne asbestos fibers.

Area air monitoring was conducted by ACME SUBCONTRACTOR in accordance with the Texas Asbestos Health Protection Rules (TAHPR). Area samples were collected on December 1-6, 20XX. All of the area air samples collected outside the work area were at or below the threshold value of 0.01 fibers / cubic centimeter (f/cc) or below the limit of detection (L.O.D.).

All of the personal samples were below the OSHA Permissible Exposure Limit (PEL) for the Short Term Exposure (STEL) of 1.0 f/cc and the Time Weighted Average (TWA) limit of 0.1 f/cc.

The contract was performed in general compliance with contract documents. All ACME SUBCONTRACTOR post-abatement submittals are attached. ACME Environmental post-abatement submittals will be sent under separate cover from the contractor.

Appendices

TECHNICAL DETAILS AND ATTACHMENTS

Appendix 1: TDSHS Notifications

Appendix 2: Air Sample Results

Appendix 3: Chain of Custody Forms

Appendix 4: Air Monitoring Field Forms

Appendix 5: Daily Project Notes & Additional Field Forms

Appendix 6: TDSHS Certifications and Licenses

Appendix 7: Pictures

Appendix 8: Signed Copies of All Waste Manifests

TDSHS Notifications

Air Sample Results

Chain of Custody Forms

Air Monitoring Field Forms

Daily Project Notes & Additional Field Forms

TDSHS Certifications and Licenses

PICTURES

Copies of All Signed Waste Manifests

File details come from the government source that posted it. Updated .