Enclosure 3 - Past Performance Questionnaire.pdf

PDF 143 KB Posted

Attached to
Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
80GSFC26R0028
Issued by

About this file

This document is a Past Performance Questionnaire template used by NASA Goddard Space Flight Center to evaluate contractor performance on reference contracts during source selection.

The questionnaire collects detailed information across six sections. Sections 1-3 gather contract identification data and evaluator information, including contract number, type, period of performance, total value, and the evaluator's name, title, agency, and role. Section 4 requires raters to assess the contractor's relevant experience across eleven Statement of Work (SOW) elements, including program management, systems engineering, mission assurance, software development, product development and integration, verification and validation, delivery, post-delivery support, subcontract management, and fabrication/assembly. Section 5 evaluates general performance across fourteen questions organized by quality, schedule, cost, and business/management categories, using a five-point scale (Very High, High, Moderate, Low, Very Low, or Not Rated). Raters assess factors such as quality of services, risk identification and mitigation, schedule adherence, cost control, personnel management, and government communication. Section 6 addresses contract financial performance, including initial and current contract values, total expenditures to date, annual cost calculations, cost overruns, award fee ratings if applicable, and an overall contract performance rating with explanatory comments. The completed questionnaire should be returned to Bruce Tsai at NASA Goddard Space Flight Center by a date to be determined (TBD). The form is designated as containing Source Selection Information per FAR 3.104.

View the file

Other files

File Type Posted
RFP - 80GSFC26R0028 SMBA - Question and Answer 13-14.pdf PDF
Amnt 3 - RFP - 80GSFC26R0028 SMBA.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 12.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 11.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 10.pdf PDF
Amnt 2 - Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
Amnt 2 - RFP - 80GSFC26R0028 SMBA.pdf PDF
RFP - 80GSFC26R0028 SMBA - Questions and Answers 1-9.pdf PDF
Amnt 1 - Attachment C - Non-Technical Contract Data Requirements List_20260408.pdf PDF
Amnt 1 - RFP - 80GSFC26R0028 SMBA.pdf PDF
Amnt 1 - Attachment O - Milestone Payment Schedule_20260408.pdf PDF
Amnt 1 - DRD 6 - SCV Reporting.pdf PDF
DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Attachment N - Applicable Documents List.pdf PDF
Attachment O - Milestone Payment Schedule.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
RFP Cover Letter - 80GSFC26R0028 SMBA.pdf PDF
NS1-SMBA-SOW-0002D_NS1 SOW_03162026.pdf PDF
DRD 4 - CITAR DRD.pdf PDF
Attachment D - OCI Plan.pdf PDF
NS1-SMBA-REQ-0001E_NS1 SMBA PRD_03112026.pdf PDF
Enclosure 5 - CWBS.pdf PDF
RFP - 80GSFC26R0028 SMBA.pdf PDF
DRD 1 - OCI Plan.pdf PDF
DRD 5 - CAIRIA DRD.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources DRD w C-SCRM requirements.pdf PDF
DRD 3 - CPIC DRD.pdf PDF
Attachment E - CSCRM Plan.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
Attachment K - TM Rate Matrices.pdf PDF
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center BY TBD. Attn: Bruce Tsai, Code 171.

Greenbelt, MD 20771 Phone: 240-684-0428 e-mail: Bruce.B.Tsai@nasa.gov

PAST PERFORMANCE QUESTIONNAIRE

1. Contract Information

A. Name of Company/Division Being Evaluated:_____________________

B. Address:_____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number:_______________________________________

E. Contract Type:_________________________________________

F. Period of Performance (including options): From:______ To:_______

G. Total Contract Value:_____________________________________

H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________

This form contains Source Selection Information when completed. See FAR 3.104. 3

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

Management necessary to meet instrument cost and schedule constraints including, Program Management, Financial Management, Risk Management, and Adequate Staffing

Systems Engineering necessary to meet system performance specifications including Requirements Analyses, Requirements Derivations, Requirements Allocations, Contamination Control, Design Engineering, Design Documentation, Analysis Documentation, and Verification Documentation

Mission Assurance especially a risk-informed application of mission assurance requirements which balance lower performance risk with greater reliance on non-Government processes

Software Development including establishment, maintenance, and implementation of a Software Management Program to implement software development processes and procedures, software tools, reviews, resources, schedules, and deliverables required for support of flight instrument integration, test and verification program, and on orbit operations

Product (including hardware and software) Development, Integration, Test, Operations, and Management of multiple (≥3) instrument flight models

Product (including hardware and software) Development, Integration, Test, Operations, and Management for long periods of time (≥10 years)

Verification and Validation including test documentation Delivery including packaging, handling, storage, and transportation Post-delivery support, including, post-delivery Ground Support Equipment (GSE) and instrument checkout, observatory integration and test support, launch site support, post-launch test support, and mission operations support (including post-launch anomaly support, continuous performance trending, and calibration updates)

Subcontract Management and Control System, providing technical direction and effective subcontract management utilizing schedule milestone controls.

Fabrication and Assembly including all necessary personnel, facilities, services, and materials to fabricate and assemble the instrument in accordance with its design specifications. “Fabrication” could also include procured items.

This form contains Source Selection Information when completed. See FAR 3.104. 4

5. General Performance Survey

NO PERFORMANCE QUESTIONS PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3. Ability to identify and correct performance deficiencies in a timely manner VH H M L VL N/R

4. Demonstrated understanding and compliance with mission safety requirements VH H M L VL N/R

5.

Ability of in-house processes, policies, procedures, and documentation to consistently deliver products that meet customer requirements

VH H M L VL N/R

Comment:

SCHEDULE

6. Timeliness, quality, and accuracy of schedule estimates and reporting VH H M L VL N/R

7. Ability to meet/exceed schedule milestones VH H M L VL N/R

COST

8. Ability to establish realistic cost estimates and adhere to estimated costs VH H M L VL N/R

9. Ability to anticipate, identify and control cost growth. VH H M L VL N/R

BUSINESS/MANAGEMENT

10. Communicating/interfacing with Government and overall responsiveness to Government requests VH H M L VL N/R

11. Ability to effectively manage the contract including subcontractor performance, if applicable VH H M L VL N/R

12.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

13. Adequacy of Contractor’s system(s) for processing task orders and/or changes. VH H M L VL N/R

14. Ability to meet Small Business Subcontracting Plan Goals VH H M L VL N/R

This form contains Source Selection Information when completed. See FAR 3.104. 5

Section 6:

What is the Contract Value:

Initial Value Current Value Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

This form contains Source Selection Information when completed. See FAR 3.104. 6

If less than Very High Performance Rating, please explain:

Please add any other comments you may feel are pertinent.

Rater’s Signature Date

File details come from the government source that posted it. Updated .