This is a Question and Answer document for a federal contract solicitation. It clarifies a compliance requirement in the Request for Proposal (RFP) 80GSFC26R0028 for the Sounder for Microwave-Based Applications (SMBA) project issued by the National Aeronautics and Space Administration's Goddard Space Flight Center (NASA GSFC).

The Q&A addresses Section L, Mission Suitability requirements, subsection A.2, which requires offerors to provide an assessment of their proposed end-to-end SMBA instrument's compliance with requirements listed in the Performance Requirements Document (PRD). The government confirms that detailed system budgets and analysis with margins and contingency identified separately for all design elements spanning beginning-of-life through end-of-life timeframes are considered part of the PRD Requirements Compliance Matrix and are therefore exempt from the RFP's page count limitations specified in the table on page L-10 of the solicitation.

View the file

Other files

File Type Posted
RFP - 80GSFC26R0028 SMBA - Question and Answer 13-14.pdf PDF
Amnt 3 - RFP - 80GSFC26R0028 SMBA.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 12.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 10.pdf PDF
Amnt 2 - RFP - 80GSFC26R0028 SMBA.pdf PDF
Amnt 2 - Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
RFP - 80GSFC26R0028 SMBA - Questions and Answers 1-9.pdf PDF
Amnt 1 - RFP - 80GSFC26R0028 SMBA.pdf PDF
Amnt 1 - Attachment O - Milestone Payment Schedule_20260408.pdf PDF
Amnt 1 - DRD 6 - SCV Reporting.pdf PDF
Amnt 1 - Attachment C - Non-Technical Contract Data Requirements List_20260408.pdf PDF
RFP Cover Letter - 80GSFC26R0028 SMBA.pdf PDF
NS1-SMBA-SOW-0002D_NS1 SOW_03162026.pdf PDF
DRD 4 - CITAR DRD.pdf PDF
Attachment D - OCI Plan.pdf PDF
NS1-SMBA-REQ-0001E_NS1 SMBA PRD_03112026.pdf PDF
Enclosure 5 - CWBS.pdf PDF
RFP - 80GSFC26R0028 SMBA.pdf PDF
DRD 1 - OCI Plan.pdf PDF
DRD 5 - CAIRIA DRD.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Attachment N - Applicable Documents List.pdf PDF
Attachment O - Milestone Payment Schedule.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources DRD w C-SCRM requirements.pdf PDF
DRD 3 - CPIC DRD.pdf PDF
Attachment E - CSCRM Plan.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
Attachment K - TM Rate Matrices.pdf PDF
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Near Earth Orbit Network’s

Sounder for Microwave-Based Applications

Request for Proposal 80GSFC26R0028

Question and Answer 11

Below is a question and answer related to the Sounder for Microwave-Based Applications (SMBA) Request for Proposal (RFP) 80GSFC26R0028. In the event of any discrepancy, the RFP provisions and contract terms (including all amendments) will take precedence.

11. Section L, Mission Suitability requirements, A.2, states “The Offeror shall provide an assessment of its proposed end-to-end SMBA instrument’s compliance to the requirements (including performance and interface requirements) listed in the Performance Requirements Document (PRD) (i.e., PRD Requirements Compliance Matrix). The assessment shall include detailed system budgets and analysis with margins/contingency identified separately for all design elements spanning the beginning of life through the end-of-life timeframes.”

Question: Please confirm that the “detailed system budgets and analysis” above can be included as part of the Compliance Matrices excluded from the page count in the Table on page L-10.

Government Response: The Government confirms that the “detailed system budgets and analysis” quoted in the sentence above is part of the PRD Requirements Compliance Matrix and exempt from the page count.