Amnt 1 - RFP - 80GSFC26R0028 SMBA.pdf
PDF 522 KB Posted
- Solicitation number
- 80GSFC26R0028
About this file
This is Amendment 0001 to solicitation 80GSFC26R0028 issued by NASA/Goddard Space Flight Center (GSFC) on April 8, 2026. The amendment adds Supply Chain Visibility (SCV) Reporting requirements and corrects payment schedule percentages in Attachment O.
The contract pertains to the Near Earth Orbit Network Sounder for Microwave-Based Applications (NEON) program and involves multiple Contract Line Item Numbers (CLINs) for spacecraft development and support. CLIN 0001 covers general services and deliverables per the Statement of Work with delivery by July 1, 2032. CLIN 0002 includes Sounder for Microwave-Based Applications (SMBA) Flight Model 1 with July 1, 2032 delivery, SMBA Flight Model 2 with July 1, 2033 delivery, and SMBA Flight Model 3 with July 1, 2034 delivery. CLIN 0003 addresses post-commissioning and post-launch task support requirements extending 18 months beyond each flight model launch. Additional deliverables include documentation per Attachment N, special studies, task plans, reports of work, financial management reports, material inspection and receiving reports, foreign travel documentation, government property requests, safety and health plans, subcontracting plan reporting, security requirements for IT systems, and FASCSA reporting. The amendment formally adds Item 29, Supply Chain Visibility (SCV) Reporting, referenced in Section J and Attachment C, Data Requirements Description Item 6. Attachment O (Performance-Based Payment Schedule and Event Closure Criteria) is updated to version dated April 8, 2026 to reflect corrected percentages. All other terms and conditions remain unchanged and in full force and effect.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
GSFC
The purpose of this amendment is to 1: Add Supply Chain Visibility Reporting; and 2. Correct the percentages in Attachment O - Milestone Payment Schedule.
Accordingly, GSFC
NASA/Goddard Space Flight Center Procurement Operations Division Greenbelt MD 20771
NASA/Goddard Space Flight Center Procurement Operations Division Greenbelt MD 20771
80GSFC26R0028
NEON
1 11
04/08/2026
80GSFC26R0028
Amendment 0001
Attachment A, SOW
5 CLIN 0003 – SMBA
Flight Model 2 Post- Bench Acceptance Test at the Spacecraft/Mission Elements Contractor’s Facility task support requirements
As Defined in Individual Task Orders Issued Against
CLIN 0003
Through last SMBA Flight Model Launch + 18 months
As specified by individual task orders issued against CLIN
6 CLIN 0002 – SMBA
Flight Model 3
As Defined in Section J, Attachment A, SOW
Delivery Date of July 1, 2034
As Defined in Attachment A, SOW
7 CLIN 0003 – SMBA
Flight Model 3 Post- Bench Acceptance Test at the Spacecraft/Mission Elements Contractor’s Facility task support requirements
As Defined in Individual Task Orders Issued Against
CLIN 0003
Through last SMBA Flight Model Launch + 18 months
As specified by individual task orders issued against CLIN
8 Documentation in accordance with Attachment N Applicable Documents Tables, Contract Data Requirements List
Section J
Attachment N, Applicable Documents Tables, Contract Data Requirements List
As required by Attachment N, Applicable Documents Tables, Contract Data Requirements List
As required by Attachment N, Applicable Documents Tables, Contract Data Requirements List
9 Special Studies in accordance with Task Orders Issued
As Defined in Individual Task Orders
As Specified in Individual Task Orders Issued Against CLIN 0003
As Specified in Individual Task Orders Issued Against CLIN
Issued Against
CLIN 0003
10 Task Plans Section B
Supplemental Task Ordering Procedures
Section I
NFS 1852.216-
As Required in Clause NFS 1852.216-80
As Specified in Individual Task Orders Issued Against CLIN
11 Reports of Work Section H
NFS 1852.235-
As Required in Clauses NFS 1852.235-73
As specified in clauses
12 NASA Financial Management Reports (CLIN 0001 only)
Section G
GSFC 52.242-
NFS 1852.242-
Section J
Attachment B
Monthly and Quarterly in accordance with Attachment B
Electronic Format/
Contracting Officer (CO), Contracting Officer’s Representative (COR), Resource Analyst (RA), Regional Finance Office
13 Material Inspection and Receiving Reports (MIRR)
(DD Form 250)
Section E
NFS 1852.246-
GSFC 52.246-
At Time of Delivery Hard Copy/CO, COR, and Receiving & Inspection
14 Foreign Travel Requests and Foreign Travel Reports
Section G
NFS 1852.225-
Section J
Foreign Travel Requests–30 days in Advance of Travel
Foreign Travel Reports–Due within 10 business days of
As specified in CO’s travel approval
Attachment H the completion of travel.
15 Requests for Government Property
Section G
NFS 1852.245-
30 Days Prior to Acquire Date
Electronic Format/CO
16 Financial Report of NASA Property in the Custody of Contractors (NF 1018)
Section G
NFS 1852.245-
Annual Report by October 15th and Final Report
NF 1018 Electronic Submission System
(NESS)
17 Supplemental Financial Report of NASA Property in the Custody of Contractors
Section G
GSFC 52.245-
Monthly By the 21st of each Month and Final Report
Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov
18 Physical Inventory of Capital Personal Property Reporting
Section G
NFS 1852.245-
Within 10 Days of Annual Physical Inventory
Property Administrator
19 Reporting of Inventions
Section G
NFS 1852.227-
NFS 1852.227-
Section I
FAR 52.227-11
Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion
Electronic or Hard Copy Format/New Technology Representative or Patent Representative
20 Small Business Subcontracting Plan Reporting
Section H
GSFC 52.219-
Section I
ISR–Semi-Annual
(April 30th and October 30th) and Final
SSR–Annual
Electronic Format/ Electronic Subcontract Reporting System (eSRS) http://www.esrs.gov
NFS 1852.219-
(October 30th)
21 Safety & Health Plan Section H
FAR 52.236-
13-- Alternate I as modified by
NFS
1826.7001
30 Days After Contract Award
Electronic Format/CO
22 Safety & Health Reporting
Section H
NFS 1852.226-
NFS 1852.226-
GSFC 52.223-
Monthly/Quarterly Reports and As Required
NASA Mishap Information System
(NMIS)
23 Personal Identity Verification (PIV) Documentation and Reporting
Section H
GSFC 52.204-
Section I
FAR 52.204-9
10th Day of the Month and As Required
Electronic Format and Hard Copy/COR & Code 240
24 Certificate of Insurance
Section I
FAR 52.228-7
NFS 1852.228-
As Specified by FAR 52.228-7
Electronic Format/CO
25 Subcontract Notification
Section I
FAR 52.244-2
30 Days Prior to Subcontract Award Date
Electronic or Hard Copy Format/CO
26 Security Requirements for Unclassified IT
Section I
1852.240-76
Section J
As specified by 1852.240-76 and Attachment C, DRD
As specified in the clause and DRD
Resources and other IT Reports and Plans
Attachment C, DRD 2, DRD
3, DRD 4, and
DRD 5
2, DRD 3, DRD 4,
and DRD 5
27 FASCSA Reporting Section I
FAR 52.240-
As specified by FAR 52.240-91
As specified by FAR 52.240-91
28 Time and Materials Orders Summary Reports
Section H
Time and Materials (T&M) Orders Summary Reporting
As specified by Time and Materials (T&M) Orders Summary Reporting clause
As specified by Time and Materials (T&M) Orders Summary Reporting clause
29 Supply Chain Visibility (SCV) Reporting
Section J
Attachment C, DRD 6
In accordance with Attachment C, DRD
As specified in the
DRD
NOTE: All hardware items developed under the Development CLIN(s) that are not listed in this clause, nor accepted in accordance with clause GSFC 52.246-93 ACCEPTANCE -- LOCATION(S), shall remain subject to contractor risk of loss and correction responsibility until the end of the contract.
NOTE: Unless otherwise specified, “day” means “calendar day”.
NOTE: Transportation Classification: The contractor shall comply with NASA Procedural Requirements (NPR) 6000.1H. Items 2, 4, and 6 shall be considered Class I. All other hardware items shall be considered Class II. The remaining deliverables, unless specified (electronic format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the Government.
(End of clause)
2. Within Section E, clause GSFC 52.246-93 ACCEPTANCE -- LOCATION(S) is revised as follows: Account for Item 29, Supply Chain Visibility (SCV) Reporting.
Therefore, clause GSFC 52.246-93 ACCEPTANCE -- LOCATION(S) is replaced in its entirety with the following:
GSFC 52.246-93 ACCEPTANCE -- LOCATION(S). (APR 2022)
The Contracting Officer or authorized representative will accomplish acceptance at the following location(s) upon successful completion of the associated Event/Milestone:
Deliverable Item No.
Location Event/Milestone Authorized Representative
1 As Defined in Attachment A, SOW
As Defined in Attachment A, SOW
Contracting Officer or Contracting Officer’s Representative
2 On-Orbit Post-Commissioning or Post-Launch + 6 months (whichever is later)
Contracting Officer or Contracting Officer’s Representative
4, 6 Spacecraft Contractor Facility
Post-Bench Acceptance Test at the Spacecraft/Mission Elements Contractor’s Facility
Contracting Officer or Contracting Officer’s Representative
3, 5, 7
As Defined in Attachment A, SOW and Individual Task Order
As Defined in Attachment A, SOW and Individual Task Order
Contracting Officer or Contracting Officer’s Representative
8 NASA Goddard Space Flight Center (GSFC)
As Defined in Attachment N, Applicable Documents
Contracting Officer or Contracting
Tables, Contract Data Requirements List
Officer’s Representative
9-29 NASA GSFC As required by each applicable Contract clause or Individual Task Order
Contracting Officer or Contracting Officer’s Representative
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
NOTE: All hardware items developed under the Development CLIN(s) that are not listed in clause GSFC 52.211-90, nor accepted in this clause, shall remain subject to contractor risk of loss and correction responsibility until the end of the contract.
3. Within Section J, clause GSFC 52.211-101 LIST OF ATTACHMENTS is revised as follows: 1. Update Attachment C to version dated April 8, 2026. This update will add the Contract Data Requirements List, Data Requirements Description, Item 6, Supply Chain Visibility (SCV) Reporting; and 2. Update Attachment O to version dated April 8, 2026.
Therefore, clause GSFC 52.211-101 LIST OF ATTACHMENTS is replaced in its entirety with the following:
GSFC 52.211-101 LIST OF ATTACHMENTS. (NOV 2022)
The following documents are attached hereto and made a part of this contract:
Attachment Description Date No. of Pages (including the cover page)
A Near Earth Orbit Network Sounder for Microwave-Based
March 16, 2026 53
Applications Statement of Work
(NS1-SMBA-SOW-0002),
Revision D
B Financial Management Reporting Requirements
June 2014 4
C Non-Technical Contract Data Requirements List (including Data Requirements Documents)
April 8, 2026 7
D Organizational Conflicts of Interest Plan
TBP TBP
E Cyber Supply Chain Risk Management (C-SCRM) Plan
TBS in accordance with Attachment C, DRD 2
TBS in accordance with Attachment C, DRD 2
F Safety and Health Plan TBS*** TBS***
G Small Business Subcontracting Plan
TBP TBP
H Requirements Statements List February 27, I List of Government Furnished Property
February 13, J Reserved
K Time and Materials Rates Matrices TBP** TBP**
L Contractor Proposed Enhancements
March 2015 TBP
M Reserved
N Applicable Documents Tables February 27, O CLIN 0002: Performance-Based Payment Schedule and Event Closure Criteria
April 8, 2026 6
TBS = To Be Submitted
TBP = To Be Proposed
*TBS within 30 days of the contract effective date
**TBS with proposal
***TBS within 30 days of contract award
4. All other terms and conditions remain unchanged and in full force and effect.
(End of Amendment 0001)
| 2026-04-08T15:50:31-0400 | |
| BRUCE TSAI |
File details come from the government source that posted it. Updated .