RFP - 80GSFC26R0028 SMBA - Question and Answer 12.pdf

PDF 79 KB Posted

Attached to
Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
80GSFC26R0028
Issued by

About this file

This is a Question and Answer document clarifying contract requirements for the Sounder for Microwave-Based Applications (SMBA) Request for Proposal 80GSFC26R0028, issued by NASA's Goddard Space Flight Center.

The document addresses contractor responsibilities regarding SI traceability and calibration maintenance of a Government Furnished Property Black Body Calibration Target. The government clarified that offerors are not required to develop hardware, methodology, or capabilities to achieve SI traceability. Instead, contractors must assume the blackbody characteristics provided by the Contracting Officer when addressing calibration or intercalibration activities. NASA assumes full responsibility for periodic calibration and maintenance of the calibration standard through NIST, and contractors bear no responsibility for NIST calibration efforts. The document notes that in any discrepancy between this Q&A and RFP provisions or contract terms, the RFP and contract terms take precedence.

View the file

Other files

File Type Posted
RFP - 80GSFC26R0028 SMBA - Question and Answer 13-14.pdf PDF
Amnt 3 - RFP - 80GSFC26R0028 SMBA.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 10.pdf PDF
RFP - 80GSFC26R0028 SMBA - Question and Answer 11.pdf PDF
Amnt 2 - Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
RFP - 80GSFC26R0028 SMBA - Questions and Answers 1-9.pdf PDF
Amnt 2 - RFP - 80GSFC26R0028 SMBA.pdf PDF
Amnt 1 - RFP - 80GSFC26R0028 SMBA.pdf PDF
Amnt 1 - Attachment O - Milestone Payment Schedule_20260408.pdf PDF
Amnt 1 - Attachment C - Non-Technical Contract Data Requirements List_20260408.pdf PDF
Amnt 1 - DRD 6 - SCV Reporting.pdf PDF
Attachment O - Milestone Payment Schedule.pdf PDF
NS1-SMBA-SOW-0002D_NS1 SOW_03162026.pdf PDF
Enclosure 2 - Cost Exhibits 1- 8.xlsx XLSX spreadsheet
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment E - CSCRM Plan.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
RFP Cover Letter - 80GSFC26R0028 SMBA.pdf PDF
Enclosure 5 - CWBS.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources DRD w C-SCRM requirements.pdf PDF
NS1-SMBA-REQ-0001E_NS1 SMBA PRD_03112026.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
DRD 4 - CITAR DRD.pdf PDF
DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Attachment K - TM Rate Matrices.pdf PDF
DRD 3 - CPIC DRD.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
Attachment D - OCI Plan.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
DRD 5 - CAIRIA DRD.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
RFP - 80GSFC26R0028 SMBA.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Near Earth Orbit Network’s

Sounder for Microwave-Based Applications

Request for Proposal 80GSFC26R0028

Question and Answer 12 Below is a question and answer related to the Sounder for Microwave-Based Applications (SMBA) Request for Proposal (RFP) 80GSFC26R0028. In the event of any discrepancy, the RFP provisions and contract terms (including all amendments) will take precedence.

12. Within SMBA Final RFP, Attachment I, Government Furnished Property List, there is a note indicating “the design of the Black Body Calibration Target is available upon request from the Contracting Officer.” Can the government please provide information related to SI traceable calibration and maintenance of this standard? Will the contractor be responsible for the periodic calibration of the target through NIST, or will NASA perform and manage this calibration standard? If periodic calibration is required of the contractor, are there guidelines for the frequency of this effort to be performed with

NIST?

Government Response: Offerors are not required to develop hardware, methodology, and/or capabilities to achieve SI traceability. However, Offerors should assume the Government Furnished Property Blackbody characteristics provided by the Contracting Officer when addressing related calibration or intercalibration.

Will the contractor be responsible for the periodic calibration of the target through NIST?

No.

Will NASA perform and manage this calibration standard? Yes.