Contract Att10 - CDRL B002 - PSP Site Survey_08.11.2025.xlsx
XLSX spreadsheet 221 KB Posted
- Solicitation number
- 70T04026R7672N005
About this file
This is a site survey checklist and reporting template (CDRL B002) for the Passenger Screening Program (PSP), designed to document comprehensive assessment data during checkpoint deployment activities at airports. The document serves as a standardized data collection instrument for Checkpoint Deployment Contractors (CDCs) to evaluate existing infrastructure, identify required modifications, and plan for installation of Transportation Security Administration (TSA) screening equipment at passenger checkpoint locations.
The survey template captures critical information across multiple infrastructure and operational categories: checkpoint deployment team contact information and site details; scope of work including Transportation Screening Equipment (TSE) installations and site preparation requirements; badging and security clearance procedures; permitting requirements and timelines; certificate of insurance and performance bond specifications; vendor and contractor licensing requirements; checkpoint operational hours and equipment access procedures; electrical infrastructure assessment including panel locations, capacity analysis, conduit routing, and required upgrades; information technology connectivity including switch specifications, cable distances, and data outlet locations; floor and ceiling specifications including material composition, weight capacity, slope measurement, and height clearance for screening equipment (noting specific height requirements for R&S AIT 8'7", SES AIT 9', Analogic CT 7'7"); structural and seismic considerations; queue area configuration and signage; existing equipment inventory with serial numbers and TSA barcodes; ancillary materials and furnishings; and duress/covert alarm system specifications including transmitter locations, receiver placement, repeater requirements, and monitoring procedures. The template also includes sections for documenting design issues, photos, and recommendations for infrastructure modifications required to accommodate TSA checkpoint equipment deployment.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
CDRL B002
Passenger Screening Program (PSP) Site Survey Report
| Site Survey Checklist Cover Page | |
| Checkpoint Deployment Contractor (CDC): | |
| Checkpoint Deployment Contractor POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
| Title | Name | Phone | |
| CDC Task Order Manager | |||
| CDC Site Survey Lead | |||
| CDC Architectural Designer | |||
| CDC Electrical Engineer | |||
| TSA Federal Security Director (FSD) | |||
| TSA Assistant Federal Security Director (AFSD) | |||
| TSA Project Lead/Primary POC | |||
| TSA Project Assistant | |||
| IT POC | |||
| Airport Authority Representative | |||
| Airport Facilities | |||
| Airport Electrical |
| Checkpoints/Overview | |||
| Terminal/Checkpoint Name or ID | Number of Lanes | Comments | |
| 0 | |||
| Scope of Work | |||
| Please provide list of TSE to be installed/removed. Confirm if site prep and site restoration will be needed and list any potential risk. |
| Shipping Address | ||||
| 0 | ||||
| Drawing Set Used for Validation | ||||
| Title and TSA Approval Status | Date | Source | ||
| 0 |
Sign-in Sheet
| Passenger Screening Program (PSP) Site Survey Report | |
| Site Survey Attendees Sign-in Sheet | |
| Checkpoint Deployment Contractor (CDC): | |
| Checkpoint Deployment Contractor POC: | |
| Airport Name: | |
| Airport Code: | Survey Date: |
Name Organization Phone Number Email
Badging
| Passenger Screening Program (PSP) Site Survey Report | |||
| Badging Requirements | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| BADGING | ||||
| The following documents the badging requirements. | ||||
| Will local Airport Security Personnel provide escort? | 0 | |||
| Is contractor badging required? | 0 | |||
| Is a badging class required? | 0 | |||
| What is the schedule for the badging class? | 0 | |||
| Badging Authority | POC | Contact Information | Hours of Operation |
Time To Obtain Cost Associated Valid For Escorting Privileges (Y/N)
| Documents Accepted | Notes: | |
| Driver's License | 0 | |
| Birth Certificate | 0 | |
| Social Security Card | 0 | |
| Passport | 0 | |
| # of Docs Required | 0 |
Office of Security Capabilities Passenger Screening Program
YES
YES
YES
YES
NO
NO
NO
NO
Permitting
| Passenger Screening Program (PSP) Site Survey Report | |||||
| Permitting Requirements | |||||
| Checkpoint Deployment Contractor (CDC): | 0 | ||||
| Checkpoint Deployment Contractor POC: | 0 | ||||
| Airport Name: | 0 | ||||
| Airport Code: | 0 | Survey Date: | 0 | ||
| PERMIT GENERAL DOCUMENTATION REQUIREMENTS | |||||
| Is permitting required? If no, skip lines 10-18 | 0 | ||||
| Permitting Authority and Address: | |||||
| Describe the Process Required by Permitting Agencies: | 0 | ||||
| Describe the Permitting Requirements: | 0 | ||||
| Describe Permitting Lead Time: | 0 | ||||
| # Raised/Signed & Sealed Drawings and Specifications Required: | 0 | ||||
| # D Sized Drawings Required: | 0 | ||||
| # of 11x17-Size Copies Req'd: | 0 | ||||
| Address to Send Signed & Sealed Copies: | 0 | ||||
| Cost of Obtaining Permits: | 0 | ||||
| PERMIT TYPE APPLICABILITY FOR THIS PROJECT | 0 | ||||
| Type of Permit | Describe the Type of Work Effort that Requires Each Type of Permit | Airport POC and Contact Info (Phone, E-Mail) | |||
| Construction Permit | 0 | ||||
| Building Permit | 0 | 0 | |||
| Electrical Permit | 0 | 0 | |||
| Electrical Load Study | 0 | 0 | |||
| Seismic Analysis | 0 | 0 | |||
| Structural Analysis | 0 | 0 | |||
| HVAC Analysis | 0 | 0 | |||
| Asbestos Study | 0 | 0 | |||
| Waste Removal Plan | 0 | 0 | |||
| Spill Response Plan | 0 | 0 | |||
| Other (e.g., Tenant Improvement Plan): | 0 | 0 |
Cert of Insurance
| Passenger Screening Program (PSP) Site Survey Report | |||
| Certificate of Insurance Requirements | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Certificate of Insurance | |
| The following documents any Certificate of Insurance requirements. Include additional attachments or documentation as necessary. | |
| Is a Certificate of Insurance required? | Minimum Insurance Requirements |
| General Liability | |
| Additional Insured | Automobile Liability |
| Name | Umbrella Liability |
| Address | Worker's Compensation |
| Bodily Injury | |
| City, State, ZIP | Property Damage |
| Submit to | Notes |
| Name | |
| Fax | |
| Performance/Payment Bond | |
| Is a Performance and/or Payment Bond required? | Additional Bond Requirements |
| Special Bond Form Required? | |
| Obligee/Customer | # of Copies Required |
| Name | Notes |
| Address |
| City, State, ZIP |
| Submit to |
| Name |
| Fax |
Office of Security Capabilities Passenger Screening Program
Vendors
| Passenger Screening Program (PSP) Site Survey Report | |||
| Current List of Permitted/Badged Airport Service Contractors | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? 0
| Type Contractor | Electrical/Data | Type Contractor | Electrical/Data |
| Name | Name | ||
| Address | Address | ||
| City | City | ||
| State | State | ||
| Zip Code | Zip Code | ||
| Point of Contact | Point of Contact | ||
| Phone Office | Phone Office | ||
| Phone Cell | Phone Cell | ||
| E-Mail Address | E-Mail Address | ||
| Badged? | Badged? |
Office of Security Capabilities Passenger Screening Program
Hours of Operation
| Passenger Screening Program (PSP) Site Survey Report | |||
| Hours of Operation/Equipment Summary | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Checkpoint Operational Hours | |
| Weekdays | 0 |
| Weekends | 0 |
| Available Installation Hours | |
| Checkpoint must be turned over | 0 |
| Electrical room access | 0 |
| Basement access | 0 |
| Hours available for site survey | 0 |
| Hours available for site preparation | 0 |
| Notifications to be made when arriving on site | 0 |
Elec Panel
| Passenger Screening Program (PSP) Site Survey Report | |||
| Electrical Panel(s) | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Describe required procedure to obtain access to power panel | |
| 0 | |
| Describe required conduit route from electrical room to checkpoint; noting any restricted areas, space characteristics (public, utilities, etc.), special conditions, floor wall penetrations, or other potential cost considerations. | |
| 0 |
| Are panels located in locked rooms or areas? (Y/N) | 0 | Are panels located in locked rooms or areas? (Y/N) |
| Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet) | 0 | Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet) |
| Is there a Customs Area in the Conduit Route? (nearest point of checkpoint) | ||
| Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.) | 0 | Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.) |
| New panels required? | ||
| New transformer required? | ||
| Other New Equipment Required? | ||
| Number of Open/Vacant Breaker Slots | ||
| Pictures of panels feeding Checkpoint equipment. Include panel ID/label, rating, main breaker, branch circuit breakers, schedule, etc. |
Pictures of appropriate sub-panel, if needed. Panel label, rating, panel capacity, and type of panel showing
**Pictures of conduit routes, if possible.**
Office of Security Capabilities Passenger Screening Program
Elec Existing
| Passenger Screening Program (PSP) Site Survey Report | |||
| Existing Electrical | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Answer noted questions with relevant pictures and descriptions. |
| Describe mounting of existing electrical devices. |
Floor-mounted or power pole?
If floor, recessed (poke-thru) or surface?
| If floor, conduit entry core-drilled or surface run? | 0 | ||
| Does airport currently have back-up power/generator? | |||
| Other Notes: | 0 | ||
| Pictures of Electrical/Data Outlets - Labeled for Each TSE & Lane |
Elec Delta
| Passenger Screening Program (PSP) Site Survey Report | |||
| Electrical Changes | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| List tasks required to modify/upgrade infrastructure to accommodate required CAT units, starting from existing conditions. | |
| Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.) | Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.) |
| 0 | |
| 0 | |
| New Receptacles (quantity, location, etc.) | New Receptacles (quantity, location, etc.) |
| 0 | |
| 0 | |
| New Data Outlets | New Data Outlets |
| 0 | |
| 0 | |
| New Conduit (quantity, distance, location, routing, etc.) | New Conduit (quantity, distance, location, routing, etc.) |
| 0 | |
| 0 | |
| New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.) | New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.) |
| 0 | |
| 0 | |
| Panel Expansion/Extension, Sub-Panel (size, location, etc.) | Panel Expansion/Extension, Sub-Panel (size, location, etc.) |
| 0 | |
| 0 | |
| Other | Other |
| 0 | |
| 0 | |
| Discuss with facility electrical personnel potential location(s) and distribution source(s) for adding a new transformer and panel. |
Describe recommendations.
| Location and ID of distribution panel, switchgear, substation, or other potential power source. Provide photos of panel, breakers, and schedule below. |
| Potential location(s) space for transformer and/or panel. Provide photos and dimensions of space below. |
| Approximate conduit distance from source to proposed transformer and from proposed transformer to proposed panel. |
| Other relevant information. |
| Insert photos of electrical equipment, schedules, and space as described above. (Include pictures of conduit route, if possible.) |
IT
| Passenger Screening Program (PSP) Site Survey Report | |||
| Information Technology Connectivity | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
Make & Model of Switch(es) & Patch Panel(s) Total # of Ports # of Open Switch Ports or UnTerminated Patch Ports Location (room #) Is cable distance to TSE more than 295'? Category Cable
Is there room in existing rack for additional patch panels/switches? (Y/N) Is there space/power in existing room for an additional IT rack?
List any cables that exceed 295'.
Measure cable lengths on open ports in checkpoint using Fluke Meter. Record average lengths.
Describe required procedure to obtain access to IT rack(s).
Describe required routing for data cables and if conduit is required.
Any airport-provided IT connections? If yes, describe.
Pictures: Location/Patch Panel
Floors & Ceilings
| Passenger Screening Program (PSP) Site Survey Report | |||
| Floors and Ceilings | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
Terminal/Checkpoint Floor Material If Tile/Carpet, How Much Spare Stock Does Airport Have and Is It Allowed for Use? Manufacturer, Model Number, Vendor for Replacement Floor Material
| Confirm with airport that proposed location will support weight per CRPG guidelines: |
| Identify whether expansion joints are present in area where TSE will be installed: |
| Measure the slope of the floor in degrees where the TSE will be placed and record here. Any slope between 0.5 and 2.0 degrees will require OEM installation modification. |
Note: TOPM will notify the COR in writing if the checkpoint has a slope in excess of 2.0 degrees.
Is the checkpoint slab-on-grade? If Yes:
Is it acceptable to saw-cut and trench the floor, if necessary?
Confirm with airport authority.
Potential design issue.
Identify ceiling height within checkpoint:
If this is a design issue, address in the Design Issues tab.
Identify any ceiling protrusions (sprinkler heads, monitors, signage, etc.) that may be below the minimum height requirement.
• R&S AIT 8’7’ (103”)
• SES AIT1 9' (108") AIT2 8' (96”)
• Analogic CT 7’7” (91”) Identify the type of ceiling above checkpoint (ceiling finish, drop ceiling tile type, other). Describe it: drop ceiling tile size, finished ceiling, exposed ceiling with conduit, etc.? Provide photos.
If this is a design issue, address in the Design Issues tab.
Photos
Design Issues
| Passenger Screening Program (PSP) Site Survey Report | |||
| Design Issues | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
Terminal/Checkpoint Lane Drawing/Design Issue Additional Comments to include Pending/Planned/In-progress Construction
Structural & Seismic
| Passenger Screening Program (PSP) Site Survey Report | |||
| Structural & Seismic | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Is the airport in a seismic zone and confirmed to require seismic anchoring? |
| Are existing AITs anchored? |
Provide photos.
Are existing CTs anchored?
Provide photos.
| Architect already in possession of structural record drawings? (i.e. from previous project) |
| If not, have structural record drawings been requested from the airport and/or AHJ or Local POC? |
| Is a current soils report available? If no, use default site soil data in ASCE tool for determination. (https://ascehazardtool.org/) |
| Have structural concerns been observed? (brief description of concern, such as checkpoint has a raised, grid flooring system requiring product/engineering data) |
| Is the checkpoint Slab on Grade? |
| Are there utility tunnels? |
| Is the suspended slab with occupiable spaces below? |
| Is there a raised floor system installed in the checkpoint? |
If so, who is the manufacturer and model (cut sheets available)?
If the floor is a raised floor in the checkpoint, are the WTMD’s and CT’s sitting on concrete pads for support?
Any vibration damping issues?
Do structural concerns require onsite presence of a structural engineer for assessment? (Structural Engineer determination)
| Is a separate permit required for structural scope or seismic anchoring? (i.e. Building permit vs. Electrical permit) |
| What is the length of the permit review cycle? |
| Does the Building Permit have specific fees and submittal/approval days? |
| What are the inspection requirements for seismic and/or structural scope? (i.e. CA requires onsite presence of EOR and sign-off confirming work was done to spec and drawings) |
| Unless slab-on-grade, has a visual inspection been completed of the space below the checkpoint? (Prioritize taking photos of floor below checkpoint) |
| In the event that thru-bolting is required, is the area accessible? |
Provide photos of spaces below the checkpoint.
If visual inspection is needed, are there any anomalies, including conveyors, cable trays, HVAC and plumbing, airport systems, etc.?
Coordinate with the airport to get photos above ceiling where accessible.
Will shut down request(s) be needed for installation of new conduit and cabling?
If so what is the timeline and procedure to schedule and request a shut down?
| Are there any or has there been any issues or interference with WTMD ghost alarming due to below floor vibrations and or frequency changes? This is also very important for slab on grade checkpoints. |
| Photos |
Queue Area Validation
| Passenger Screening Program (PSP) Site Survey Report | |||
| Queue Area Validation | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Checkpoint/Terminal | Dimensions of Queue Area | Number of TDCs | Number of Stanchions | Additional Comments | |||||
| 0 | 0 | ||||||||
| Identify if an Employee/Known Crew Members (KCM) lane is being used? | |||||||||
| Is the Employee/KCM lane identified with signage? | Identify if an Employee/Known Crew Members (KCM) lane is being used? | ||||||||
| Is the Employee/KCM lane identified with signage? | 0 | ||||||||
| Identify if a PreCheck lane is being used? | |||||||||
| Is the PreCheck lane identified with signage? | Identify if a PreCheck lane is being used? | ||||||||
| Is the PreCheck lane identified with signage? | 0 | ||||||||
| How many lanes are established for passenger use? | How many lanes are established for passenger use? | 0 | |||||||
| Are there any other lanes/queues established for other use? If so, please identify their usage. | Are there any other lanes/queues established for other use? If so, please identify their usage. | 0 | |||||||
| Pictures of Queue Area Surveyed, Including Proposed CT Testing Area |
Existing Equip Summary
| Passenger Screening Program (PSP) Site Survey Report | |||
| Existing Equipment Summary | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Existing Equipment Summary (TSA Standard Equipment Only) | ||
| TSE Type | TSE Quantity | TSE OEM |
Existing Equipment Detail Passenger Screening Program (PSP) Site Survey Report
| Existing Equipment Detail | |||||
| Checkpoint Deployment Contractor (CDC): | 0 | ||||
| Checkpoint Deployment Contractor POC: | 0 | ||||
| Airport Name: | 0 | ||||
| Airport Code: | 0 | Survey Date: | 0 | ||
| Terminal / Checkpoint | Lane | Equipment Type | OEM / Model | Configuration | |
| (RH/LH AT/CT; Standard/Opposite for AIT) | Serial Number | TSA Barcode | If X-Ray, Number and Size of Rollers | Picture or Serial/Barcode Missing: |
Reason and Corrective Action *
Photos of TSE/Serial Numbers/TSA Barcodes
&F - &A Page &P of &N
Ancillary Material
Passenger Screening Program (PSP) Site Survey Report
| Existing Ancillary Material | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| *NOTE* Two rows per Checkpoint are required--one for reusable equipment and a second for equipment that will be disposed of. |
For equipment located between lanes, express its location as (Lane A/Lane B). Example: a gate between Lanes 3 and 4 would be listed as "3/4".
| Location | Existing Barriers | ADA Gate | Existing Tables | Other FF&E | ||||||||
| 12" | 24" | 36" | 48" | Left or Right | 4' | 5' | 6' | Composure Benches | Podiums | ETD Tables | ETD Cabinets |
&F - &A Page &P of &N
Duress Alarms Integrated
| Passenger Screening Program (PSP) Site Survey Report | |||
| Duress/Covert Alarms | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Existing Equipment Summary | ||
| Terminal / Checkpoint: | ||
| Current Duress Alarm Systems & Hardware | ||
| Transmitters | ||
| (i.e., EN1233 S/D; EN1235S/D) | "As Labeled" |
Location Coded Name (i.e., XRAY5) Physical Location Installed (Lane 1, 2, 3 etc.)
(i.e., TDC, XRAY, Exit, KCM, EDS, STSO) Notes:
See point status instructions below
Equipment Make/Model/Quantity Terminal Checkpoint Specific Location (i.e., on wall next to Room 123 in terminal)
| Existing Power, Ethernet, and POTS (telephone jack) Locations | |||
| Connection type | |||
| (i.e., Ethernet, POTS) | Terminal | Checkpoint | Locations Installed |
(i.e., Supervisor podium, TDC, X-Ray)
| 0 | ||||||
| TSA | Airport | TSA | ||||
| Terminates (location where monitored) i.e., where duress | ||||||
| alarm is received | 0 | |||||
| TSA Maintenance Contractor | Name: |
Telephone:
Address:
| Email: | 0 | ||
| Airport Maintenance Contractor (preferred) | Name: |
Telephone:
Address:
| Email: | 0 | |
| Who is the main POC for identifying/confirming alarm naming? |
(primary decision-maker; power to confirm local AP response preferences) How far is the furthest alarm in this area from the monitoring panel (Receivers)?
Direct length; provide in feet Are the duress alarm buttons easily removable/transferable (document below with photos)?
Discuss duress alarm mobility during IPT calls if they are not easily moved/removed.
Is a repeater(s) required to amplify the signal between the duress alarm buttons and the monitoring panel? (Receiver) Repeater required if distance is more than 400-feet; max total distance of 1200' How many repeaters are required?
Ex: 900' = (3) repeaters [1 repeater for every 400'] See Notes for point status instructions.
Where will the repeater(s) be installed?
Non-public space; preferably TSA controlled; work with AP maintenance/operations Is there available power (120v outlet) for the repeater(s)?
Repeaters can be hardwired or plugged into a power source; repeaters/receivers have 24-hour backup battery Are additional modifications required?
Note additional efforts required to support installation (i.e. electrical modifications for power, or low voltage wiring from receivers to monitoring panels) Describe the additional modifications?
Provide detail to include any additional permitting requirements, etc.
Photos
| Point Status Instructions (Captures current I/O availability) |
| The point status menu allows you to view detailed alarm and fault |
information. Point status information is available without entering a password.
To access the point status menu:
1. From the EN4232MR start screen, press the enter button to access the receiver’s three main menus. “Point Status” displays.
2. Press the enter to display point status details.
3. Use the up/down buttons to scroll through the points; press the enter button again to view the outputs the displayed conditions are mapped to.
• Point status flags are defined as follows: A = Alarm (transmitter only);
T = Tamper; B = Low Battery; L = AC loss (repeater only); I = Inactive.
Duress Alarms Stand Alone
| Passenger Screening Program (PSP) Site Survey Report | |||
| Duress/Covert Alarms | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Duress Equipment Detail |
| Total number of all new DA buttons (for all CP) |
| Are the duress alarm buttons easily removable/transferable (document below with photos)? |
Discuss duress alarm mobility during IPT calls if they are not easily moved/removed.
| Total number of all new receivers (for all CP) | ||
| Total number of all new repeaters (for all CP) | ||
| Who is the main POC for the central monitoring location? | ||
| (primary decision-maker; power to confirm local AP response preferences) | Name: |
Address:
Telephone:
Email:
Where is the central monitoring location?
(room number, occupant/owner, description) (NON-TSA; on-site monitoring during operational hours) Name:
Address:
Telephone:
Email:
Are there restrictions for accessing the central monitoring location? (badge, key, hours of operation, etc.)
(notifications, escorting needs, availability to access area) Are there any construction materials/obstructions that may affect a wireless signal?
(ex: shielded rooms, in-wall obstructions, mechanical systems, etc.)
How many receivers are required?
Up to (30) alarm inputs per receiver (ex: 36 alarms are needed = Receivers must be installed) Are duress buttons installed by zone, or is 1-1 monitoring preferred?
If zone, how will the alarms will be grouped? i.e., TDC 1-4, X-ray 1-5 Each alarm is programmed to display exact location on panel If 1-1, how many alarms/messages are required? i.e., TDC 1, X-ray 1, PSR 1
| Alarms located closely together display same location on panel | 0 | |
| Where do monitoring personnel prefer the receiver to be installed (wall, desk, etc.)? Provide description and/or photo | ||
| Specifications: 8.75" x 7" x 1.63", <2 lbs. | 0 | |
| Is power (120V outlet) available for each Receiver? | ||
| Dedicated circuit NOT required, (1) outlet per monitoring panel | 0 | |
| How far is the outlet/power source from the receiver location? | ||
| 30' maximum allowable distance | 0 | |
| Is the outlet/power in this area on emergency or generator power? | ||
| If not, we must provide a UPS for backup power. | 0 | |
| How should the system be reset (toggle, latching, momentary)? If momentary, how long to reset? |
> Toggle: panel displays alarm when button is activated; only resets by pressing alarm again (not recommended) > Latching: panel displays alarm when button is activated; remains on until panel is reset > Momentary: panel displays alarm when button is activated; remains on for period of time (2.0 to 99.5 seconds)
>See notes below for existing conditions What type of alarm enunciation is preferred, either audible alarm OR flashing light?
the audible alarm is adjustable (80-110 dB); the flashing light is similar to a strobe light, and or flashing light.
| Data Requirements for Auto-Dialer |
| When a Duress Alarm is activated, what is the pre-recorded message that is sent? |
| Sequential order or Continuous order when notifying authorities of an alarm? |
| How many times should the Auto-Dialer attempt to make contact with each phone number before moving on to the next phone number? |
| How many times should the pre-recorded voice message repeat? |
| What should the "outgoing message" say? |
| Photos |
Equipment Access
Passenger Screening Program (PSP) Site Survey Report
| Equipment Access / Rigging Path | |||
| Checkpoint Deployment Contractor (CDC): | 0 | ||
| Checkpoint Deployment Contractor POC: | 0 | ||
| Airport Name: | 0 | ||
| Airport Code: | 0 | Survey Date: | 0 |
| Terminal ID | |||
| Delivery Description, Truck Route | |||
| Curbside Delivery | |||
| AOA Side Delivery | |||
| Loading DOCK Delivery | |||
| Notifications Needed? To whom? | |||
| Store Forklift On Site? (Yes/No) |
If Yes, storage location?
| Freight Elevator Access |
| Delivery Path Description |
Note: The TOPM will contact the COR in writing if the only rigging path options would require significant construction efforts or structural modifications potentially resulting in a "no fit" scenario.
Sherrie Tsen: List any restrictions such as truck size/type, Walk/drive the delivery route from the airport entrance, describe any low overhangs, under 15 feet, any tight turns, any obstacles, ballads etc., to hamper or restrict the delivery.
| Delivery Description, Inside the Terminal |
| Type Flooring |
| Doors Location |
Sherrie Tsen: Include all doors along the route
| Door ID |
| Door H / W |
| Elevators, Location & Size (Confirm elevator weight requirements) |
Sherrie Tsen: Make sure to include measurements to the elevator door, this will be the limiting factors take into account rails within the elevator Confirm elevator weight requirements.
| Inclines |
| Inside Delivery Path Description to include floor protection type, as required |
Photos
&F - &A Page &P of &N image1.png
File details come from the government source that posted it. Updated .