Contract Att09 - CDRL D001 - WTMD - CEIA Decommission Checklist_05.19.2025.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
Screening Equipment Deployment Services (SEDS) - Checkpoint (CP)
Solicitation number
70T04026R7672N005
Issued by

About this file

This is a Contractor Data Requirements List (CDRL) decommission checklist for CEIA Walkthrough Metal Detector (WTMD) systems being returned as part of the TSA's Screening Equipment Deployment Services (SEDS) contract. The checklist is a standardized template used to verify and document the condition of WTMD units prior to decommissioning and return, ensuring accountability and proper asset management throughout the equipment lifecycle.

The checklist requires comprehensive inspection and documentation across multiple categories: inventory verification of system components (including CEIA 02PN20 or 02PN20EZ WTMD systems, power supplies, control units, antennas, crosspieces, and shipping materials); operational testing of detection lights and audio functionality; detailed condition assessment for exterior and interior damage; and photographic documentation from six specific angles (operational, front, sides, back, master electronic unit, and power supply) plus serial number and barcode verification. The form requires completion and sign-off by the subcontractor performing decommissioning, system integrator review to confirm damage documentation and component accountability, and federal employee witness verification. A comments section throughout allows for notation of damage, missing components, or operational test kit returns. This checklist serves as a contractual deliverable ensuring TSA has complete visibility into equipment condition and status upon decommissioning.

View the file

Other files

File Type Posted
SEDS CP RFP Questions and Answers.4.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
SEDS CP RFP - Amendment 3 SF30.pdf PDF
SEDS CP RFP 70T04026R7672N005 Amendment 3 track changes.docx DOCX document
SEDS CP RFP 70T04026R7672N005 Amendment 3 clean.docx DOCX document
SEDS CP RFP Questions and Answers.3.pdf PDF
SEDS CP RFP Questions and Answers.2.pdf PDF
SEDS CP RFP - Amendment 2 SF30.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_amendment 2.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 track changes.docx DOCX document
RFP Att2 - CP SEDS Pricing Sheet_amendment 1.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 clean.docx DOCX document
SEDS CP RFP Questions and Answers.pdf PDF
SEDS CP RFP - Amendment 1 SF30.pdf PDF
RFP Att3 - CP SEDS II Program Management Amendment 1.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att4 -DHS Subcontracting Plan Review Checklist.pdf PDF
Contract Att08 - CDRL D001 - ETD - QSB220 De-Install - Install Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att01 - CDRL D001 - AIT-1 and AIT-2 - Leidos Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att17 - ITAR_Terms-ConditionsTemplate_11.17.2025.docx DOCX document
Contract Att06 - CDRL D001 - CT De-install Decommission Checklist_05.28.2025.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_04.06.2026.xlsx XLSX spreadsheet
Contract Att03- CDRL D001 - AT Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att05 - CDRL D001 - BLS - Smiths Responder Decomm Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att13 - CDRL B006 - Closeout Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att11 - CDRL A004 - Weekly Status Report (WSR)_08.11.2025.xlsx XLSX spreadsheet
Contract Att10 - CDRL B002 - PSP Site Survey_08.11.2025.xlsx XLSX spreadsheet
Contract Att15 - Checkpoint Deployment IMS_Example_01.26.2026.pdf PDF
Contract Att12 - CDRL B001- Daily Site Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att02 - CDRLD001 - AIT - RS Decommission Checklist _08.18.2025.xlsx XLSX spreadsheet
Contract Att16 - DSD Acronym List 03-11-26.docx DOCX document
Contract Att07 - CDRL D001 - ETD - 500DT Install - De-Installation Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att04 - CDRL D001 - BLS - CEIA EMA-MS Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005.pdf PDF
RFP Att1 - SEDS CP SF-1449.pdf PDF
Questions on SEDS CP RFP.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CDRL D001

Decommission Checklist For the CEIA Walkthrough Metal Detector (WTMD)

WTMD S/N: TSA Bar Code Number:

Airport Code: Terminal/Checkpoint/Lane: Date of Test:

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition
SectionEvaluation CriteriaYesNoComments/Concerns
Electrical power available on-site to initiate the decommission process?
InventoryCEIA 02PN20 WTMD System?
CEIA 02PN20EZ WTMD System?
Power Supply - Security Plug Adapter?

(Confirm power supply has a twist lock plug) Power Supply - Security Plug Adapter?

(Confirm power supply has a three prong plug)

Unit Keys?
Panel A (Transmitter)/Panel B (Receiver)?
720mm Crosspiece?
TX/RX Antennas with Power Supply Module?
Single Control Unit with Connection Cables?
Master/Slave Control Unit with Connection Cables?
Hardware Package (4 Panels/4 Control Screws)?
Shipping Box/Package?
TestingDetection Lights are Operational?
Detection Audio is Operational?
Unit ConditionDoes the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

Visible hardware is tightened and secured?
Panels are flush and fit satisfactory?

Visual Verification Take a photo of the unit while OPERATIONAL and document any damage or concerns. (screen included) Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the MASTER ELECTRONIC UNIT on the unit and document any damage or concerns.
Take a photo of the power supply and document any damage or concerns.
Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.
Unit PackagingTake photo of the unit PACKAGED for shipping and document any damage or concerns.
Is the labeling correct on the packaging?
Subcontractor Contact Information and Verification
Sign and date this Decommission Checklist and leave a copy with the unit.
Performed By:
Printed NameEmail AddressPhone Number
Company NameSignatureDate
System Integrator Section (This section should be filled in by the System Integrator ONLY)
Evaluation CriteriaYesNoComments/Concerns
Has all damage been documented? If NO, please specify in the comments section.
Are there any components missing? If YES, please specify in the comments section.
Is an Operational Test Kit being returned with this unit? If YES, please note it in the comments section.

Systems Integrator Additional Comments

Systems Integrator Contact Information and Verification
Sign and date this Decommission Checklist and leave a copy with the unit prior to packaging.
Reviewed By:
Printed NameEmail AddressPhone Number
Company NameSignatureDate

Federal Employee Comments/Concerns

Federal Employee Verification
As a witness, sign and date this Decommission Checklist to confirm the document was completed on-site.
Confirmed By:
Printed NameSignatureDate