Contract Att01 - CDRL D001 - AIT-1 and AIT-2 - Leidos Decommission Checklist_05.21.2025.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
Screening Equipment Deployment Services (SEDS) - Checkpoint (CP)
Solicitation number
70T04026R7672N005
Issued by

About this file

This is a Decommission Checklist template for the removal and return of Leidos Advanced Imaging Technology (AIT) screening equipment units from Transportation Security Administration (TSA) checkpoint locations. The checklist is a Contractor Deliverable Requirements List (CDRL) document designated as D001 and applies to AIT-1 and AIT-2 systems being decommissioned under the Screening Equipment Deployment Services (SEDS) contract.

The checklist establishes a systematic inspection and documentation process organized into five primary sections: Inventory verification (confirming presence of system components including power supplies, keys, operation test kits, and documentation); Operational Testing (validating functionality of warning lights, emergency stop, ceiling lights, ASCU fans, motors, brakes, and image quality); Unit Condition assessment (evaluating exterior/interior damage, panel fit, and hardware security); Visual Verification (requiring photographic documentation of the unit operational, front, sides, back, serial number, and barcode, along with packaged unit); and Unit Packaging verification (confirming correct shipping labels). The checklist requires sign-off by three parties: the subcontractor performing the decommission work, the System Integrator responsible for overall verification, and a Federal Employee witness confirming on-site completion. Field entries require Yes/No responses with detailed comments sections for documenting damage, missing components, or other concerns, including a requirement to note if an Operational Test Kit is being returned with the equipment.

View the file

Other files

File Type Posted
SEDS CP RFP Questions and Answers.4.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
SEDS CP RFP - Amendment 3 SF30.pdf PDF
SEDS CP RFP 70T04026R7672N005 Amendment 3 track changes.docx DOCX document
SEDS CP RFP 70T04026R7672N005 Amendment 3 clean.docx DOCX document
SEDS CP RFP Questions and Answers.3.pdf PDF
SEDS CP RFP Questions and Answers.2.pdf PDF
SEDS CP RFP - Amendment 2 SF30.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_amendment 2.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 track changes.docx DOCX document
RFP Att2 - CP SEDS Pricing Sheet_amendment 1.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 clean.docx DOCX document
SEDS CP RFP Questions and Answers.pdf PDF
SEDS CP RFP - Amendment 1 SF30.pdf PDF
RFP Att3 - CP SEDS II Program Management Amendment 1.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att4 -DHS Subcontracting Plan Review Checklist.pdf PDF
Contract Att09 - CDRL D001 - WTMD - CEIA Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att08 - CDRL D001 - ETD - QSB220 De-Install - Install Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att17 - ITAR_Terms-ConditionsTemplate_11.17.2025.docx DOCX document
Contract Att06 - CDRL D001 - CT De-install Decommission Checklist_05.28.2025.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_04.06.2026.xlsx XLSX spreadsheet
Contract Att03- CDRL D001 - AT Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att05 - CDRL D001 - BLS - Smiths Responder Decomm Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att13 - CDRL B006 - Closeout Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att11 - CDRL A004 - Weekly Status Report (WSR)_08.11.2025.xlsx XLSX spreadsheet
Contract Att10 - CDRL B002 - PSP Site Survey_08.11.2025.xlsx XLSX spreadsheet
Contract Att15 - Checkpoint Deployment IMS_Example_01.26.2026.pdf PDF
Contract Att12 - CDRL B001- Daily Site Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att02 - CDRLD001 - AIT - RS Decommission Checklist _08.18.2025.xlsx XLSX spreadsheet
Contract Att16 - DSD Acronym List 03-11-26.docx DOCX document
Contract Att07 - CDRL D001 - ETD - 500DT Install - De-Installation Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att04 - CDRL D001 - BLS - CEIA EMA-MS Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005.pdf PDF
RFP Att1 - SEDS CP SF-1449.pdf PDF
Questions on SEDS CP RFP.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CDRL D001

Decommission Checklist For the Leidos Advanced Imaging Technology (AIT) AIT S/N: TSA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition
SectionEvaluation CriteriaYesNoComments/Concerns
InventoryLeidos AIT Provision 2 System?
Power Supply?
System Keys?
Operation Test Kit (OTK)?
Inner Radomes free from scratches?
Outer Radomes free from scratches?
Metal components free from rust/scratches?
Floor and ramps in good condition?
Foot prints clearly visible?
UPS present?
AC Power Cord in good condition?
BlueMan Panel in good condition?
OCP in good condition?
Skins free from scratches?
Operators Manual included?
TestingSoftware is up to date?
Passed SAT/ORT?
FDRS Reports exported 30 days before decommission?
Warning lights illuminate?
E-stop functions correctly?
Ceiling lights all illuminate?
ASCU fans operate normally?
Motor/Gearbox operate normally?
Motor Brake Release functional?
Passed image quality test?
ASCU: record SW version and scan count
Unit ConditionDoes the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

Panels are flush and fit satisfactorily?
Visible hardware tightened and secured?

Visual Verification Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

Unit Packaging Take photo of the unit PACKAGED and document any damage or concerns.

Is the shipping label correct on the packaging?

Subcontractor Contact Information and Verification
Sign and date this Decommission Checklist and leave a copy with the unit.
Performed By:
Printed NameEmail AddressPhone Number
Company NameSignatureDate
System Integrator Section (This section should be filled in by the System Integrator ONLY)
Evaluation CriteriaYesNoComments/Concerns
Has all damage been documented? If NO, please specify in the comments section.
Are there any components missing? If YES, please specify in

the comments section, to include those items in the above inventory section.

Is an Operational Test Kit (OTK) being returned with this unit? If YES, please note it in the comments section.

Systems Integrator Additional Comments

Systems Integrator Contact Information and Verification
Sign and date this Decommission Checklist and leave a copy with the unit.
Reviewed By:
Printed NameEmail AddressPhone Number
Company NameSignatureDate

Federal Employee Comments/Concerns

Federal Employee Verification
As a witness, sign and date this Decommission Checklist to confirm the document was completed on-site.
Confirmed By:
Printed NameSignatureDate

image1.png

File details come from the government source that posted it. Updated .