This is a de-installation and installation checklist template for the L3 Implant Sciences QSB220 Explosive Trace Detection (ETD) system used by TSA at airport checkpoints. The checklist serves as a Contractor Deliverable Requirements List (CDRL) document that provides detailed procedures for contractors performing equipment deployment services under the Screening Equipment Deployment Services (SEDS) solicitation.

The checklist establishes comprehensive evaluation criteria across multiple operational phases: inventory verification (system components, power supply, hand wand, swabs, printer paper, filter, and software version); unit condition assessment (exterior and interior damage documentation); functionality testing (power-on verification, supervisor login, time accuracy, alarm functions, and printer operation); and cleaning protocols using Isopropyl Alcohol Wipes with specific cautions regarding hot desorber surfaces. The document requires contractors to document all procedures with photographs of the unit while operational, front, back, sides, serial number, barcode, power cord, hand wand, and final packaging. Packaging specifications mandate a 26L x 24W x 22H Triple Wall 80lb Edge Crushed Test Fiberboard box with foam insert and a 23"X21"X56" Black Electrostatic Discharge (ESD) bag secured with zip ties. The template includes signature blocks for subcontractor verification, contractor review, and federal employee witness confirmation, with all parties required to document completion on-site. This checklist is directly associated with RFP 70T04026R7672N005 for TSA Checkpoint Screening Equipment Deployment Services.

View the file

Other files

File Type Posted
SEDS CP RFP Questions and Answers.4.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_Amendment 3.xlsx XLSX spreadsheet
SEDS CP RFP - Amendment 3 SF30.pdf PDF
SEDS CP RFP 70T04026R7672N005 Amendment 3 track changes.docx DOCX document
SEDS CP RFP 70T04026R7672N005 Amendment 3 clean.docx DOCX document
SEDS CP RFP Questions and Answers.3.pdf PDF
SEDS CP RFP Questions and Answers.2.pdf PDF
SEDS CP RFP - Amendment 2 SF30.pdf PDF
RFP Att2 - CP SEDS Pricing Sheet_amendment 2.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 track changes.docx DOCX document
RFP Att2 - CP SEDS Pricing Sheet_amendment 1.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005 Amendment 1 clean.docx DOCX document
SEDS CP RFP Questions and Answers.pdf PDF
SEDS CP RFP - Amendment 1 SF30.pdf PDF
RFP Att3 - CP SEDS II Program Management Amendment 1.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att3 - CP SEDS II Program Management.docx DOCX document
RFP Att4 -DHS Subcontracting Plan Review Checklist.pdf PDF
Contract Att09 - CDRL D001 - WTMD - CEIA Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att01 - CDRL D001 - AIT-1 and AIT-2 - Leidos Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att17 - ITAR_Terms-ConditionsTemplate_11.17.2025.docx DOCX document
Contract Att06 - CDRL D001 - CT De-install Decommission Checklist_05.28.2025.xlsx XLSX spreadsheet
RFP Att2 - CP SEDS Pricing Sheet_04.06.2026.xlsx XLSX spreadsheet
Contract Att03- CDRL D001 - AT Decommission Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att05 - CDRL D001 - BLS - Smiths Responder Decomm Checklist_05.21.2025.xlsx XLSX spreadsheet
Contract Att13 - CDRL B006 - Closeout Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att11 - CDRL A004 - Weekly Status Report (WSR)_08.11.2025.xlsx XLSX spreadsheet
Contract Att10 - CDRL B002 - PSP Site Survey_08.11.2025.xlsx XLSX spreadsheet
Contract Att15 - Checkpoint Deployment IMS_Example_01.26.2026.pdf PDF
Contract Att12 - CDRL B001- Daily Site Report_08.11.2025.xlsx XLSX spreadsheet
Contract Att02 - CDRLD001 - AIT - RS Decommission Checklist _08.18.2025.xlsx XLSX spreadsheet
Contract Att16 - DSD Acronym List 03-11-26.docx DOCX document
Contract Att07 - CDRL D001 - ETD - 500DT Install - De-Installation Checklist_05.19.2025.xlsx XLSX spreadsheet
Contract Att04 - CDRL D001 - BLS - CEIA EMA-MS Decommission Checklist_05.21.2025.xlsx XLSX spreadsheet
SEDS CP RFP 70T04026R7672N005.pdf PDF
RFP Att1 - SEDS CP SF-1449.pdf PDF
Questions on SEDS CP RFP.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CDRL D001

De-Installation / Installation Checklist For the L3 Implant Sciences QSB220 TSA Bar Code Number:

Airport Code: Location of Unit: Date of Test: Time:

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition
SectionEvaluation CriteriaYe sNoComments/Concerns
InventoryL3 Implant Sciences QS-B220 System?
Power Supply?
Unit Hand Wand?
Unit Swabs?
Printer Paper?
Unit Filter?
Current Software Version
Unit
ConditionDoes the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) If external damage is identified during De-installation, stop and notify your PM,(your PM will provide you next steps) & notify local TSA is to open a ILS work order so that contractual repairs can be completed before de-install continues. If damage occurred during shipping notify your PM (your PM will provide your next steps) & notify local TSA.

Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers) Testing Did you SHUTDOWN the software and wait for the screen to turn black?

Did you turn off the power switch and disconnect power cords?
Unit FunctionalityDoes the System turn on?
Does the System become "Ready"?
Does the System allow Supervisor-level log on?
Is the System time correct?
Does the System pass the verification check?
Does the System alarm correctly?
Does the System clear alarms correctly?
Does the Printer function correctly?
Cleaning UnitOuter House Cleaning

The Contractor shall use Isopropyl Alcohol Wipes to wipe down all surfaces of the system, including the touchscreen.

• Caution! The Contractor shall use care when wiping down the Desorber Cover as the Desorber is hot and may cause burns.

Visual Verification Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

Take a photo of the POWER CORD and document any damage or concerns.

Unit
PackagingThe Contractor shall use a 26L x 24W x 22H Triple Wall 80lb Edge Crushed Test (ECT) Fiberboard box with a foam insert. The ETD is to be placed into 23”X21”X56” Black Electrostatic Discharge (ESD) bag and secured with a zip tie or similar fastener to ensure the ETD is encased within the bag. The ETD is secured inside the bag prior to securing inside the case.
Take photo of ETD to document the serial number, barcode, Front, Back, Sides, Top, Bottom, unit in bag, sealed box, power cord, wand and shipping address. If damaged photo of the damage, notify the local TSA and Program Manager and document incident report.ake photo of the unit PACKAGED and document any damage or concerns.
Is the labeling correct on the packaging?
Subcontractor Contact Information and Verification
Print your name, signature and date this De-Installation / Installation Checklist and leave a copy with the unit.
Performed By:
Printed NameEmail Address
Company NameDateDateSignature/ Phone
Contractor Section (This section should be filled in by the Contractor ONLY)
Evaluation CriteriaYesNoComments/Concerns

Contractor Additional Comments

Contractor Contact Information and Verification
Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.
Reviewed By:
Email Address
Company NameSignature
Federal Employee Comments/Concerns
Federal Employee Verification
As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site.

Confirmed By:

Signature Date: