Attachment_S_-Southcore_Monthly_maintenance_schedule.pdf

PDF 120 KB Posted

Attached to
Management Services, City Parking Facilities
Solicitation number
RFP- 25 - 001
Issued by
Pinellas County, Florida

About this file

The document is a Monthly/Weekly Maintenance Schedule for the Southcore Garage, associated with the City of St. Petersburg's parking facilities management contract. The schedule provides a comprehensive daily, weekly, biweekly, and monthly maintenance checklist for various tasks including equipment checks, cleaning, safety inspections, and facility maintenance. Tasks range from daily activities like walking the garage and picking up trash to weekly responsibilities such as checking fire pumps and inspecting safety equipment, and monthly duties like touch-up painting and cleaning the maintenance room.

The maintenance schedule is part of a broader contract for managing multiple parking facilities in St. Petersburg, Florida, which includes six different parking locations. The contract requires a comprehensive approach to facility management, covering operations, staffing, security, maintenance, and financial management. The maintenance document specifically outlines a detailed tracking system where tasks are to be completed and initialed, with a requirement to notify management immediately if any issues are discovered that are not part of the standard maintenance routine. The schedule provides flexibility for maintenance personnel to document and track their activities systematically across different frequencies of required maintenance tasks.

View the file

Other files

File Type Posted
Management_Services,_City_Parking_Facilities_(Addendum_#6_Revision).pdf PDF
Attachment_D_-_Bid_Bond_(00525848).pdf PDF
Attachment_EE_-_All_billing-monthly_reports_except_MSC_Garage_and_Baseball_Lot.pdf PDF
Attachment_DD_-_Organizational_Chart.pdf PDF
Attachment_CC_-_Agreement_and_contract_with_SP+.pdf PDF
Attachment_BB_-_Current_Positions_and_Rates.pdf PDF
Attachment_K_-_South_Core_Garage_May_2024_P&L_Statement.pdf PDF
Attachment_B_-_Cost_Proposal_(REVISED_11.10.2024).xlsx XLSX spreadsheet
Attachment_O_-_Daily_Revenue_Summary.pdf PDF
Attachment_P_-Rate_Structure_Detail_for_SouthCore_Public_&_James_Museum.pdf PDF
Attachment_T_-_FY23.24_SouthCore_Revenue.Expenses.pdf PDF
Attachment_X_-_Payroll_Distribution_Report.pdf PDF
Attachment_Q_-Summary_of_Posting_-_aka_Monthly_itemized_expenses.pdf PDF
Attachment_R_-MSC_Maintenance_check_list.pdf PDF
Attachment_U_-_FY_23.24_Revenue.Expenses_MSC.pdf PDF
Attachment_V_-_FY_23.24_Revenue.Expenses_Al_Lang.pdf PDF
Attachment_Y_-_St_Pete_labor_and_schedule_10-2024.pdf PDF
Attachment_AA_-_FY_23.24_Revenue.Expenses_Baseball_Lot.pdf PDF
Attachment_W_-_FY_23.24_Revenue.Expenses_Lot_2.pdf PDF
Attachment_N_-_Grand_Prix_Special_Event_Staffing_Plan.pdf PDF
Attachment_Z_-_FY_23.24_Revenue.Expenses_800_Lot.pdf PDF
Attachment_J_-_Baseball_Lot_P&L_Statement_June_2024.pdf PDF
Attachment_F_-_MSC_P&L_Statement_June_2024.pdf PDF
Attachment_M_-_August_2024_Southcore_Private_P&L_Statement.pdf PDF
Attachment_H_-_Al_Lang_P&L_Statement_June_2024.pdf PDF
Attachment_I_-_Lot_2_P&L_Statement_June_2024.pdf PDF
Attachment_G_-_800_Lot_P&L_Statement_June_2024.pdf PDF
Attachment_L_-_August_2024_Southcore_Condo_P&L_Statement.pdf PDF
Attachment_C_-_S-05,_Regularly_scheduled_services,_sample_agreement.pdf PDF
Attachment_A_-_Proposal_Requirements.pdf PDF
Attachment_E_-_Payment_&_Performance_Bond_(00525850).pdf PDF
Attachment_R_-_Base_Agreement_-_Servicesrev2.docx DOCX document
Attachment_W_-_Claim_Status_as_SBE.docx DOCX document
Attachment_B_-_Pricing_Summary.xls XLS spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MONTHLY/WEEKLY MAINTENANCE SCHEDULE

Month

Location Southcore Garage CHECK DATE TASK COMPLETED USING YOUR INITIAL, WHEN ITEM NEEDS MANAGEMENT ATTENTION NOTIFY THEM IMMEDIATELY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

D

Check spitters for correct time and number front/back and inventory D

D

D

D

Wipe down charging station and stow cord correctly D

D

D

D

D

D

D

D

Clean for standing water and remove using a squeegee or wet vac D

W

W

Lights- Check and replace bulbs W

Fire Pump- Inspect (Monday) for operation, oil level and drip rate W

Safety- Exit lights, emergency lights, trip/fall hazards W

Signage- Wipe all signage BW

Fire Protection- Inspect all extinguishers for damage W

Painting- Check touch up doors, all rails, pipes, curbs and signs M

Clean out maintenance room M

Frequency D Daily Note:

BW Biweekly

M Monthly

W Weekly

SA Semi-Annual

3 Mon, Wed, Fri

This items need to be done on a Daily, Biweekly, Weekly, Semi Annual, and 3 times a week. If you notice something that is not on this list please document this in the notes section.

Doors- Check for proper operation

Clean elevator floors,doors,lights and check alarm / Clean tracks

Clean stair floors, windows, and trash

Clean lobby office floors, windows, and trash

Inspect landscaping- remove trash from shrubs and grass

Floor drains- Clear and unclog

Task

Clean equipment- PM inspect and blow out gates and spitters

Check all gates and level if needed

Walk garage and pick up trash, inspect for any structural damages

Sweep assigned areas including curbs

Wipe down equipment

Empty and clean all trash cans, place liners in all trash cans

Clean toilets floors and fixtures

File details come from the government source that posted it. Updated .