Attachment H - UCCG OPC Pier Price Proposal Form.pdf
PDF 244 KB Posted
- Attached to
- Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
- Solicitation number
- N4008526R0001
About this file
This is a Bid Price Schedule for the USCG OCR Homeport Initiative OPC Pier project at Newport Naval Station in Newport, Rhode Island (eProject No. 1826479). The solicitation requires bidders to provide line item pricing for construction and demolition work associated with the new Offshore Patrol Cutter (OPC) Pier.
The base price (Line Item 0001) encompasses the entire project including demolition of existing Pier 1, construction of the landside area and new Bulkhead S45S, and construction of the new OPC Pier 1. This is broken down into 26 detailed unit-priced line items (0001A through 0001Z) covering major work categories: OPC Pier construction and associated site work and utilities (0001A); furnish and install of various pile types including 36-inch diameter reinforced concrete filled steel pipe piles (27,868 linear feet at 0001B), HP 14x102-inch piles (416 linear feet at 0001D), HP 10x42-inch piles (512 linear feet at 0001E), 30-inch diameter reinforced concrete filled steel pipe piles (537 linear feet at 0001F), and polymeric fender piles (40,996 linear feet at 0001G); dynamic pile load testing (0001H and 0001I); subsurface water sampling and disposal (0001J); Bulkhead S45S steel sheet pile sheeting installation (213 tons at 0001L); and an in-lieu fee for potential eel grass damage (0001M). The schedule also includes pricing for demolition of existing Pier 1 (0001N); removal and disposal of nonhazardous soil (21,630 tons at 0001O) and hazardous soil (1,350 tons at 0001P); asbestos-containing materials removal from glazing compound (372 linear feet at 0001Q) and tar roofing (4,000 square feet at 0001R); and removal of PCB-containing caulking (510 linear feet at 0001S), light ballasts (14 each at 0001T), transformers (1 each at 0001W), and mercury-containing light ballasts (14 each at 0001V) and thermostats (2 each at 0001X); lead removal from anchors (2 tons at 0001Y); and dredging and dredge disposal including over dredge (11,950 cubic yards at 0001Z).
Two Option Items are included: Option Item No. 1 (Line Item 0002) for a Compressed Air System and Option Item No. 2 (Line Item 0003) for additional costs to provide cast-in-place concrete pavement for the designated laydown area in lieu of asphalt pavement. The Government reserves the unilateral right to award Option Items within 365 calendar days after contract award, with the contract completion date remaining 918 days after award if options are exercised. Quantities marked with an asterisk are estimated quantities subject to FAR 52.211-18 variation provisions (15 percent threshold for non-pile items, 25 percent for piling). The Government will evaluate offers by adding Option Item prices to the base bid price for award purposes, though evaluation does not obligate the Government to exercise options. Offers may be rejected as non-responsive if materially unbalanced. All line items require pricing; failure to enter a price for any line item results in rejection. If Line Items 0002 and 0003 are exercised, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG OCR Homeport Initiative OPC Pier eProject No. 1826479 Newport Naval Station – Newport, RI
BID PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item Description Quantity Unit Unit Price Sub-Total Total Price
0001 BASE PRICE: Total Price for (subtotals of Line Items 0001A through 0001Z) the entire work for USCG OCR Homeport OPC Pier, including demolition of existing Pier 1, construction of landside area and new Bulkhead S45S, and construction of new OPC Pier 1 at Naval Station Newport, RI, in accordance with the drawings and specifications, complete, but excluding work provided as Option Items.
1 LS $___________
0001A Price for the construction of the new OPC Pier, and all associated site work and utilities as indicated on the drawings and in the specifications excluding work provided in another priced line item.
1 LS
0001B
Unit price to furnish and install 36” diameter reinforced concrete filled steel pipe piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
27,868* LF
0001C
Unit Price for providing all work in connection with installation of Steel Pipe Pile/Casing Pipe Obstruction (less than one cubic yard).
Documents, complete in accordance with the drawings and specifications, but excluding work provided
52*
EA
0001CA
Unit price for demolition, removal, and disposal of debris larger than 1 cubic yards (i.e.
abandoned foundations, utility structures, timber piles, etc.) encountered within planned excavations (i.e., utilities, foundations) or encountered at planned pile locations that is not indicated on the Demolition Plans.
50*
Tons (Truck Scale
Measure)
0001D install HP 14x102” piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
416* LF
0001E install HP 10x42” piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
512* LF
0001F install 30” diameter reinforced concrete filled steel pipe piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
537* LF
0001G install polymeric fender piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided
40,996* LF
0001H
Unit price to provide dynamic pile load PDA test for 36" diameter steel pipe piles (includes re-strike) for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
5 EA
0001I
Unit price to provide dynamic pile load test for polymeric fender piles with steel H-pile extension, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
3 EA
0001J Sampling, testing, treatment, and discharge or off-site disposal of subsurface water encountered during construction. On-site discharge must comply with RIPDES Remediation General Permit requirements, complete in accordance with the drawings and specifications, but excluding work provided
0001K Price for entire work for Bulkhead S45S construction, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
0001L Unit price to furnish and install steel sheet pile sheeting for Bulkhead S45S, including delivery, handling, driving, splicing, trimming, and application of coatings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item. Costs of deadman anchors, tie rods, wales, should not be included in this line item.
213 TON
0001M “In lieu” Fee for potential Eel Grass damage / disturbance adjacent to new S45S bulkhead.
0001N Price for the demolition of existing Pier 1 in its entirety and all associated landside demolition excluding work provided in another priced line item.
0001O
Unit price to remove and dispose of all soil considered to be non-hazardous from the site to a licensed RCRA facility, complete in accordance with the
21,630*
Tons (Truck Scale drawings and specifications, but excluding work provided item
0001P
Unit price to remove and dispose of all soil considered hazardous from the site to a licensed RCRA facility, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item
1,350*
Tons (Truck Scale
0001Q Unit price to remove and dispose of asbestos containing materials (>1% ACM) from existing Pier 1 – Glazing compound from 24 windows at existing Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
372 LF
0001R Unit price to remove and dispose of asbestos containing materials (>1% ACM) from existing Pier 1 –Tar roofing on existing buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
4,000 SF
0001S Unit price to remove and dispose of caulking containing PCBs on existing Pier 1 Buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
510 LF
0001T Unit price to remove and dispose of PCB containing light ballasts from Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
14 Each
0001U Unit price to remove and dispose of PCB- Impacted CMU and Concrete/Asphalt from existing Pier 1 and existing Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
606 CF
0001V Unit price to remove and dispose of Mercury containing light ballasts from Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line
14 Each
0001W Unit price to remove and dispose of PCB containing transformers from existing Pier 1, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
1 Each
0001X Unit price to remove and dispose of mercury containing thermostats from Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
2 Each
0001Y Unit price to remove and dispose of lead from anchors in cleats and bollards from existing Pier 1, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
2 Tons
0001Z Unit price for dredging and dredge disposal (Including allowable over dredge), complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
11,950 CY
0002 Option Item No. 1:
Compressed Air System:
Furnish and install in accordance with the drawings and specifications
Option Item No. 2:
Additional costs to provide cast-in-place concrete pavement for the designated laydown area in lieu of asphalt pavement, complete.
1 LS $___________
TOTAL
Line Items 0001 – 0003
GENERAL BID NOTES
a. Award will be evaluated on the total proposed price for Line Items 0001 – 0003, Base Price and the sum of all Option Item prices. The subtotal of Line Item 0001A-0001Z is included in Line Item 0001.
b. The Government reserves the unilateral right to award Line Items 0002 and 0003 to the Contractor at the proposed price within 365 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for Line Item 0001-0003. No provision is made for economic price adjustment. If Line Items 0002 and 0003 are exercised, the contract completion date (CCD) remains 918 days after contract award.
c. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities and FAR 52.211- 18, Variations in Estimated Quantity shall apply to these Line Items. In accordance with FAR 52.211-18; If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 15 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
d. Pile quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Requirements of FAR 52.211-18, Variation in Estimated Quantity, shall not apply to payment for piling. Each pile and test pile acceptably provided will be paid for at the bid unit price for units actually installed. The unit price shall include items incidental to furnishing and driving the piles including mobilization and demobilization, predrilling, probing, redriving uplifted piles, and cutting off piles at the cutoff elevation. Payment shall be made for production and test piles at the bid unit price for the length of pile, from tip to final cutoff, actually provided, including buildups and splices directed by the Contracting Officer to be made. Should the actual cumulative pile length driven (tip to cutoff) vary more than 25 percent from the total estimated pile length specified as a basis for bidding, the price shall be adjusted based upon any increase or decrease in costs due solely to the variation.
e. Evaluations of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 through 0003 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).
f. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
g. Failure to enter a price for any Line Item will result in a proposal being rejected.
h. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
i. If Line Item 0002 and 0003 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.