Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf

PDF 25 MB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a revised drawing set (Amendment 002) for the USCG Offshore Patrol Cutter (OPC) Homeport Initiative Pier 1 project at Naval Station Newport, Newport, Rhode Island. The drawings document the design-bid-build construction project for a new pier and associated infrastructure to support the Coast Guard's OPC fleet.

The project includes demolition of the existing Pier 1 and construction of a replacement 1,000-foot pier with comprehensive supporting systems. Key structural components consist of 36-inch and 30-inch concrete-filled steel pipe piles (approximately 432 piles total), fender piles (400 total), precast concrete planks, cast-in-place concrete deck slabs, and a new S45S bulkhead structure. The pier deck elevation is 13.00 feet NAVD88 with a 10-inch minimum concrete topping slab. Mechanical systems include fresh water mains (10-inch ductile iron), sanitary sewer force mains (4-inch), compressed air systems, and fire protection infrastructure. Electrical work encompasses substations (P1W and P1E), ductbanks, cathodic protection systems, grounding systems, lightning protection, and high-mast lighting. Civil work includes site utilities, stormwater management with bioretention areas, utility trenches, and erosion control measures. The drawings indicate base bid work (demolition and bulkhead S45S) and bid alternate work for additional improvements. The project is subject to hazardous materials management requirements related to Site 19 operable units, with OSHA 40-hour HAZWOPER training mandated for personnel contact with contaminated soils or sediments.

View the file

Other files

File Type Posted
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Amendment 0001 USCG OPC.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:3

:3

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

G-002

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

IN

D

E X

O F

D R

A W

IN

G

S

S H

E E

T

O F

MN

12936571

CHG HBF

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

G -0

06 FEB 2026

GENERAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

1 G-001 12936570 TITLE SHEET

2 G-002 12936571 INDEX OF DRAWINGS - SHEET 1 OF 2

3 G-003 12936572 INDEX OF DRAWINGS - SHEET 2 OF 2

4 G-004 12936573 GENERAL ABBREVIATIONS

5 G-101 12936574 OVERVIEW EXISTING SITE CONTROLS

6 G-102 12936575 GENERAL SITE PLAN

7 G-103 12936576 GENERAL ARRANGEMENT PLAN

8 G-104 12936577 GENERAL ARRANGEMENT SECTION

9 G-105 12936578 CONTRACTOR ACCESS ROUTE PLAN

10 G-106 12936579 MOORING ARRANGEMENT PLAN

11 G-107 12936580 BATHYMETRIC SURVEY PLAN

LIST OF SHEETS

GEOTECHNICAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

23 B-101 12936592 ESTIMATED TOP OF WEATHERED ROCK CONTOUR PLAN

24 B-601 12936593 SOIL BORING LOGS - SHEET 1 OF 6

25 B-602 12936594 SOIL BORING LOGS - SHEET 2 OF 6

26 B-603 12936595 SOIL BORING LOGS - SHEET 3 OF 6

27 B-604 12936596 SOIL BORING LOGS - SHEET 4 OF 6

28 B-605 12936597 SOIL BORING LOGS - SHEET 5 OF 6

29 B-606 12936598 SOIL BORING LOGS - SHEET 6 OF 6

STRUCTURAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

50 S-001 12936619 STRUCTURAL ABBREVIATION (BASE BID)

51 S-002 12936620 STRUCTURAL GENERAL NOTES - SHEET 1 OF 2 (BASE BID)

52 S-003 12936621 STRUCTURAL GENERAL NOTES - SHEET 2 OF 2 (BASE BID)

53 S-004 12936622 STRUCTURAL DESIGN LOADS AND STANDARD DETAILS - SHEET 1 OF 2

54 S-005 12936623 STRUCTURAL DESIGN LOADS AND STANDARD DETAILS - SHEET 2 OF 2

55 SD001 12936624 STRUCTURAL DEMOLITION NOTES (BASE BID)

56 SD101 12936625 OVERALL STRUCTURAL DEMOLITION PLAN (BASE BID)

57 SD102 12936626 PIER 1 DEMOLITION PLAN

58 SD103 12936627 S45N BULKHEAD DEMOLITION PLAN

59 SD104 12936628 S45S BULKHEAD DEMOLITION PLAN (BASE BID)

60 SD201 12936629 S45N BULKHEAD DEMOLITION ELEVATION

61 SD202 12936630 TEMPORARY SHEETING BULKHEAD ELEVATION

62 SD301 12936631 TYPICAL SECTION FOR PIER 1 DEMOLITION (BASE BID)

63 SD302 12936632 TYPICAL SECTION FOR BULKHEAD DEMOLITION

64 SD303 12936633 SECTION OF DEMOLITION AT S45N BULKHEAD (BASE BID)

65 SD501 12936634 MISCELLANEOUS DEMOLITION DETAILS

66 SD601 12936635 PIER 1 AND S45N BULKHEAD DEMOLITION PHOTOGRAPHS (BASE BID)

67 SD602 12936636 S45N BULKHEAD DEMOLITION PHOTOGRAPHS (BASE BID)

68 S-101 12936637 OVERALL BULKHEAD PLAN (BASE BID)

69 S-102 12936638 GENERAL DECK PLAN

70 S-103 12936639 PILE PLAN - SHEET 1 OF 7

71 S-104 12936640 PILE PLAN - SHEET 2 OF 7

72 S-105 12936641 PILE PLAN - SHEET 3 OF 7

73 S-106 12936642 PILE PLAN - SHEET 4 OF 7

74 S-107 12936643 PILE PLAN - SHEET 5 OF 7

75 S-108 12936644 PILE PLAN - SHEET 6 OF 7

76 S-109 12936645 PILE PLAN - SHEET 7 OF 7

77 S-110 12936646 FRAMING PLAN - SHEET 1 OF 7

78 S-111 12936647 FRAMING PLAN - SHEET 2 OF 7

79 S-112 12936648 FRAMING PLAN - SHEET 3 OF 7

80 S-113 12936649 FRAMING PLAN - SHEET 4 OF 7

81 S-114 12936650 FRAMING PLAN - SHEET 5 OF 7

82 S-115 12936651 FRAMING PLAN - SHEET 6 OF 7

83 S-116 12936652 FRAMING PLAN - SHEET 7 OF 7

84 S-117 12936653 CONCRETE PLANKS PLAN - SHEET 1 OF 7

85 S-118 12936654 CONCRETE PLANKS PLAN - SHEET 2 OF 7

86 S-119 12936655 CONCRETE PLANKS PLAN - SHEET 3 OF 7

87 S-120 12936656 CONCRETE PLANKS PLAN - SHEET 4 OF 7

88 S-121 12936657 CONCRETE PLANKS PLAN - SHEET 5 OF 7

89 S-122 12936658 CONCRETE PLANKS PLAN - SHEET 6 OF 7

90 S-123 12936659 CONCRETE PLANKS PLAN - SHEET 7 OF 7

91 S-124 12936660 DECK PLAN - SHEET 1 OF 7

92 S-125 12936661 DECK PLAN - SHEET 2 OF 7

93 S-126 12936662 DECK PLAN - SHEET 3 OF 7

94 S-127 12936663 DECK PLAN - SHEET 4 OF 7

95 S-128 12936664 DECK PLAN - SHEET 5 OF 7

96 S-129 12936665 DECK PLAN - SHEET 6 OF 7

97 S-130 12936666 DECK PLAN - SHEET 7 OF 7

98 S-131 12936667 FENDER PILE PLAN - SHEET 1 OF 6

99 S-132 12936668 FENDER PILE PLAN - SHEET 2 OF 6

STRUCTURAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

100 S-133 12936669 FENDER PILE PLAN - SHEET 3 OF 6

101 S-134 12936670 FENDER PILE PLAN - SHEET 4 OF 6

102 S-135 12936671 FENDER PILE PLAN - SHEET 5 OF 6

103 S-136 12936672 FENDER PILE PLAN - SHEET 6 OF 6

104 S-137 12936673 DECK DRAINAGE PLAN - SHEET 1 OF 2

105 S-138 12936674 DECK DRAINAGE PLAN - SHEET 2 OF 2

106 S-201 12936675 PIER SOUTHERN ELEVATION - SHEET 1 OF 3

107 S-202 12936676 PIER SOUTHERN ELEVATION - SHEET 2 OF 3

108 S-203 12936677 PIER SOUTHERN ELEVATION - SHEET 3 OF 3

109 S-204 12936678 PIER NORTHERN ELEVATION - SHEET 1 OF 3

110 S-205 12936679 PIER NORTHERN ELEVATION - SHEET 2 OF 3

111 S-206 12936680 PIER NORTHERN ELEVATION - SHEET 3 OF 3

112 S-207 12936681 REPAIRED S45N BULKHEAD ELEVATION & PIER 1 SECTION

113 S-208 12936682 S45S BULKHEAD ELEVATION (BASE BID)

114 S-301 12936683 PIER LONGITUDINAL SECTIONS - SHEET 1 OF 2

115 S-302 12936684 PIER LONGITUDINAL SECTIONS - SHEET 2 OF 2

116 S-303 12936685 PIER ABUTMENT & APPROACH SLAB LONGITUDINAL SECTION

117 S-304 12936686 LONGITUDINAL SECTIONS AT UTILITY TRENCH

118 S-305 12936687 LONGITUDINAL SECTION CROSS UTILITY TRENCH AT ABUTMENT

119 S-306 12936688 PIER ABUTMENT & UTILITY TRENCH TRANSVERSE SECTION

120 S-307 12936689 PIER TRANSVERSE SECTIONS - SHEET 1 OF 5

121 S-308 12936690 PIER TRANSVERSE SECTIONS - SHEET 2 OF 5

122 S-309 12936691 PIER TRANSVERSE SECTIONS - SHEET 3 OF 5

123 S-310 12936692 PIER TRANSVERSE SECTIONS - SHEET 4 OF 5

124 S-311 12936693 PIER TRANSVERSE SECTIONS - SHEET 5 OF 5

125 S-401 12936694 ABUTMENT & LANDSIDE FRAMING PART PLAN

126 S-402 12936699 OUTBOARD SUBSTATION PART PLAN

127 S-403 12936700 INBOARD SUBSTATION PART PLAN

128 S-404 12936697 S45S BULKHEAD PART PLAN & SECTION (BASE BID)

129 S-501 12936698 TURBIDITY CURTAIN NOTES & DETAILS (BASE BID)

130 S-502 12936699 PILE DETAILS - CONCRETE-FILLED STEEL PIPE PILES

131 S-503 12936704 PILE DETAILS - STEEL PILES

132 S-504 12936701 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3

133 S-505 12936706 CONCRETE PILE CAP DETAILS - SHEET 2 OF 3

134 S-506 12936703 CONCRETE PILE CAP DETAILS - SHEET 3 OF 3

135 S-507 12936708 REINFORCED BOLLARD FOUNDATION DETAILS

136 S-508 12936705 REINFORCEMENT DETAILS FOR CONCRETE BLOCKOUT AT BENT 43 - SHEET 1 OF 2

137 S-509 12936706 REINFORCEMENT DETAILS FOR CONCRETE BLOCKOUT AT BENT 43 - SHEET 2 OF 2

138 S-510 12936707 CONCRETE DUCTBANK REINFORCEMENT DETAILS

139 S-511 12936708 REINFORCEMENT DETAILS

140 S-512 12936709 CONCRETE BEAM DETAILS

141 S-513 12936710 TYPICAL PIER DUCTBANK DETAILS

142 S-514 12936711 LANDSIDE PIPE PILES CONNECTION DETAILS

143 S-515 12936712 PRECAST CONCRETE PLANK DETAILS

144 S-516 12936713 CONDUITS AND FITTINGS AT EXPANSION JOINT

145 S-517 12936714 PRECAST MANHOLE DETAILS

146 S-518 12936715 UTILITY TRENCH COVER DETAILS

147 S-519 12936716 FENDER SYSTEM DETAILS - SHEET 1 OF 2

148 S-520 12936717 FENDER SYSTEM DETAILS - SHEET 2 OF 2

149 S-521 12936718 PIPE SUPPORT DETAILS

150 S-522 12936719 MISCELLANEOUS SECTIONS & DETAILS - SHEET 1 OF 2

151 S-523 12936720 MISCELLANEOUS SECTIONS & DETAILS - SHEET 2 OF 2

152 S-524 12936721 S45N BULKHEAD MODIFICATION DETAILS - SHEET 1 OF 2

153 S-525 12936722 S45N BULKHEAD MODIFICATION DETAILS - SHEET 2 OF 2

154 S-526 12936723 S45S BULKHEAD DETAILS - SHEET 1 OF 3 (BASE BID)

155 S-527 12936724 S45S BULKHEAD DETAILS - SHEET 2 OF 3 (BASE BID)

156 S-528 12936725 S45S BULKHEAD DETAILS - SHEET 3 OF 3 (BASE BID)

157 S-529 12936730 AIR COMPRESSOR FOUNDATION & STEEL FRAME PART PLAN

158 S-530 12936727 AIR COMPRESSOR DETAILS

159 S-531 12936728 AIR COMPRESSOR FOUNDATION DETAILS

160 S-532 12936729 AIR COMPRESSOR STAIRS ACCESS DETAILS - SHEET 1 OF 2

161 S-533 12936730 AIR COMPRESSOR STAIRS ACCESS DETAILS - SHEET 2 OF 2

162 S-534 12936731 15KV SWITCHGEAR STRUCTURE DETAILS

163 S-601 12936732 STEEL PILE SCHEDULE

164 S-602 12936733 FENDER PILE SCHEDULE - SHEET 1 OF 2

165 S-603 12936734 FENDER PILE SCHEDULE - SHEET 2 OF 2

DREDGE SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

30 CN101 12936599 OVERALL DREDGING PLAN (BASE BID)

31 CN301 12936600 DREDGING SECTIONS - SHEET 1 OF 3 (BASE BID)

32 CN302 12936601 DREDGING SECTIONS - SHEET 2 OF 3 (BASE BID)

33 CN303 12936602 DREDGING SECTIONS - SHEET 3 OF 3 (BASE BID)

HAZARDOUS MATERIALS SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

12 H-101 12936581 HAZARDOUS MATERIALS NOTES & PLAN

CIVIL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

34 C-001 12936603 CIVIL LEGEND, ABBREVIATIONS & GENERAL NOTES (BASE BID)

35 C-002 12936604 GENERAL NOTES (BASE BID)

35A C-003 ORIGINAL EXISTING CONDITIONS - SHEET 1 OF 3

35B C-004 ORIGINAL EXISTING CONDITIONS - SHEET 2 OF 3

35C C-005 ORIGINAL EXISTING CONDITIONS - SHEET 3 OF 3

35D C-006 EXISTING LANDSIDE STRUCTURAL CONDITIONS - SHEET 1 OF 2

35E C-007 EXISTING LANDSIDE STRUCTURAL CONDITIONS - SHEET 2 OF 2

36 CD101 12936605 SITE DEMOLITION PLAN (BASE BID)

37 CD102 12936606 UTILITY DEMOLITION PLAN - PIER 1 LANDSIDE (BASE BID)

38 C-101 12936607 SITE PLAN (BASE BID)

39 C-102 12936608 UTILITY PLAN - PIER 1 LAND SIDE (BASE BID)

40 C-103 12936613 COMPOSITE UTILITY LAYOUT PLAN - PIER 1 LANDSIDE (BASE BID)

41 C-201 12936610 UTILITY PROFILES - SHEET 1 OF 2

42 C-202 12936611 UTILITY PROFILES - SHEET 2 OF 2 (BASE BID)

43 C-501 12936612 EROSION CONTROL NOTES & DETAILS (BASE BID)

44 C-502 12936613 SITE DETAILS - SHEET 1 OF 6 (BASE BID)

45 C-503 12936614 SITE DETAILS - SHEET 2 OF 6

46 C-504 12936615 SITE DETAILS - SHEET 3 OF 6

47 C-505 12936616 SITE DETAILS - SHEET 4 OF 6

48 C-506 12936617 SITE DETAILS - SHEET 5 OF 6

49 C-507 12936618 SITE DETAILS - SHEET 6 OF 6

SURVEY SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

13 V-001 12936582 CODDINGTON COVE EXISTING CONDITIONS OVERVIEW

14 V-101 12936583 EXISTING CONDITIONS - PIER 2 LANDSIDE

15 V-102 12936584 EXISTING CONDITIONS - PIER 1 LANDSIDE

16 V-103 12936585 EXISTING CONDITIONS - RETENTION POND

17 V-104 12936586 EXISTING CONDITIONS - NOAA BUILDING

18 V-105 12936587 EXISTING CONDITIONS - PIER 1 SHEET 1 OF 5

19 V-106 12936588 EXISTING CONDITIONS - PIER 1 SHEET 2 OF 5

20 V-107 12936589 EXISTING CONDITIONS - PIER 1 SHEET 3 OF 5

21 V-108 12936590 EXISTING CONDITIONS - PIER 1 SHEET 4 OF 5

22 V-109 12936591 EXISTING CONDITIONS - PIER 1 SHEET 5 OF 5

A

M E

N D

M

EN

T

/2 3/

V M

G hfriberg Image

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:3

:4

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

G-003

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

IN

D

E X

O F

D R

A W

IN

G

S

S H

E E

T

O F

MN

12936572

CHG HBF

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

G -0

06 FEB 2026

ELECTRICAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

190 E-001 12936759 ELECTRICAL LEGEND, ABBREVIATIONS & GENERAL NOTES

191 E-101 12936760 ELECTRICAL DECK PLAN - SHEET 1 OF 7

192 E-102 12936761 ELECTRICAL DECK PLAN - SHEET 2 OF 7

193 E-103 12936762 ELECTRICAL DECK PLAN - SHEET 3 OF 7

194 E-104 12936763 ELECTRICAL DECK PLAN - SHEET 4 OF 7

195 E-105 12936764 ELECTRICAL DECK PLAN - SHEET 5 OF 7

196 E-106 12936765 ELECTRICAL DECK PLAN - SHEET 6 OF 7

197 E-107 12936766 ELECTRICAL DECK PLAN - SHEET 7 OF 7

198 E-108 12936767 ELECTRICAL SITE PLAN - PIER 2

199 E-109 12936768 ELECTRICAL SITE PLAN - PIER 1

200 E-110 12936769 ELECTRICAL SITE PLAN - NOAA BUILDING

201 E-111 12936770 ELECTRICAL SITE PLAN - BUILDING 76

202 E-112 12936771 CATHODIC PROTECTION PILE PLAN

203 E-113 12936772 GROUNDING PLAN - PIER WEST

204 E-114 12936773 GROUNDING PLAN - PIER EAST

205 E-115 12936774 LIGHTNING PROTECTION PLAN - PIER WEST

206 E-116 12936775 LIGHTNING PROTECTION PLAN - PIER EAST

207 E-401 12936776 SUBSTATION P1W PART PLAN & ELEVATION

208 E-402 12936777 SUBSTATION P1E PART PLAN & ELEVATION

209 E-403 12936778 SUBSTATION GROUNDING PART PLANS

210 E-404 12936779 SUBSTATION P1W VAULT PART PLAN & ELEVATION

211 E-405 12936780 SUBSTATION P1E VAULT PART PLAN & ELEVATION

212 E-501 12936781 MANHOLE & DUCTBANK DETAILS

213 E-502 12936782 15KV SWITCHGEAR STRUCTURE DETAILS

214 E-503 12936783 POWER MOUND DETAILS - SHEET 1 OF 2

215 E-504 12936784 POWER MOUND DETAILS - SHEET 2 OF 2

216 E-505 12936785 METERING SYSTEM DETAILS - SHEET 1 OF 3

217 E-506 12936786 METERING SYSTEM DETAILS - SHEET 2 OF 3

218 E-507 12936787 METERING SYSTEM DETAILS - SHEET 3 OF 3

219 E-508 12936788 LUMINAIRE SCHEDULE & DETAILS

220 E-509 12936789 HIGH MAST LIGHTING DETAILS

221 E-510 12936790 SUBSTATION P1E SWITCHGEAR ELEVATIONS

222 E-511 12936791 SUBSTATION P1W SWITCHGEAR ELEVATIONS

223 E-512 12936792 MISCELLANEOUS DETAILS - SHEET 1 OF 2

224 E-513 12936793 MISCELLANEOUS DETAILS - SHEET 2 OF 2

225 E-514 12936794 HEAT TRACE CABINET & DETAILS

226 E-601 12936795 PRIMARY & DEMOLITION ONE LINE DIAGRAM

227 E-602 12936796 PIER ONE LINE DIAGRAM - EAST

228 E-603 12936797 PIER ONE LINE DIAGRAM - WEST

229 E-604 12936798 COMMUNICATIONS ONE LINE DIAGRAM

230 E-605 12936799 MANHOLE SCHEDULE & FOLDOUT DIAGRAMS

231 E-606 12936800 MINI POWER CENTER PANEL SCHEDULES

232 E-607 12936801 SWITCHGEAR BREAKER CONTROL DIAGRAM

233 E-608 12936802 HEAT TRACE ONE LINE DIAGRAM & SCHEDULES

234 E-609 12936803 LIGHTING CONTROL DIAGRAMS

235 E-610 12936804 SUBSTATION P1E SWITCHGEAR SCHEDULE

236 E-611 12936805 SUBSTATION P1W SWITCHGEAR SCHEDULE

237 E-612 12936806 SUBSTATION P1E PANEL SCHEDULES

238 E-613 12936807 SUBSTATION P1W PANEL SCHEDULES

239 E-614 12936808 FEEDER SCHEDULE - SHEET 1 OF 2

240 E-615 12936809 FEEDER SCHEDULE - SHEET 2 OF 2

MECHANICAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

166 M-001 12936735 MECHANICAL LEGEND, ABBREVIATIONS & GENERAL NOTES

167 M-101 12936736 MECHANICAL PLAN - SHEET 1 OF 7

168 M-102 12936737 MECHANICAL PLAN - SHEET 2 OF 7

169 M-103 12936738 MECHANICAL PLAN - SHEET 3 OF 7

170 M-104 12936739 MECHANICAL PLAN - SHEET 4 OF 7

171 M-105 12936740 MECHANICAL PLAN - SHEET 5 OF 7

172 M-106 12936741 MECHANICAL PLAN - SHEET 6 OF 7

173 M-107 12936742 MECHANICAL PLAN - SHEET 7 OF 7

174 M-301 12936743 MECHANICAL LONGITUDINAL SECTIONS - SHEET 1 OF 2

175 M-302 12936744 MECHANICAL LONGITUDINAL SECTIONS - SHEET 2 OF 2

176 M-303 12936745 MECHANICAL TRANSVERSE SECTIONS

177 M-401 12936746 MECHANICAL COMPRESSED AIR ENCLOSURE - PART PLAN

178 M-402 12936747 REDUCED PRESSURE BACKFLOW PREVENTER DETAILS - SHEET 1 OF 2

178A M-403 REDUCED PRESSURE BACKFLOW PREVENTER DETAILS - SHEET 2 OF 2

179 M-501 12936748 NORTHERN MECHANICAL ENCLOSURE DETAILS

180 M-502 12936749 SOUTHERN MECHANICAL ENCLOSURE DETAILS

181 M-503 12936750 PIER HEATED ENCLOSURE - SANITARY AND FRESH WATER

182 M-504 12936751 PIPE SUPPORT DETAILS - SHEET 1 OF 2

183 M-505 12936752 PIPE SUPPORT DETAILS - SHEET 2 OF 2

184 M-506 12936753 MECHANICAL ENCLOSURE VFD PUMP CONTROLLER DETAILS

185 M-601 12936754 MECHANICAL PIPE SCHEDULES

186 M-701 12936755 COMPRESSED AIR SCHEMATIC (BID OPTION)

187 M-702 12936756 COMPRESSED AIR HEAT RECOVERY SCHEMATIC

188 M-703 12936757 POTABLE FRESH WATER (FW) SCHEMATIC

189 M-901 12936758 MECHANICAL UTILITIES ISOMETRIC VIEWS

ELECTRICAL SUBSTATION 1 SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

241 ES101 12936810 ELECTRICAL SITE PLAN - SUBSTATION 1

242 ES102 12936811 SUBSTATION 1 PLAN VIEW

243 ES501 12936812 BREAKER 152-11 ELEVATION VIEW

244 ES601 12936813 SUBSTATION 1 SINGLE LINE DIAGRAM

245 ES602 12936814 BREAKER 152-11 SCHEMATIC DIAGRAM

246 ES603 12936815 BREAKER 152-11 DIGITAL CONTROL DIAGRAM

247 ES604 12936816 BREAKER 152-11 COMMUNICATIONS DIAGRAM

A

M E

N D

M

EN

T

/2 3/

V M

G

G-101

OV

ER

VI

EW

E

XI

ST

IN

G

SI

TE

C

ON

TR

OL

S

AJP MC MN

NOT TO SCALE

OVERVIEW EXISTING SITE CONTROLS

PLAN

NORTH

GENERAL SHEET NOTES:

1. SITE 19 INCLUDE TWO OPERABLE UNITS (OUs): OU5 CONTAINING

MARINE SEDIMENTS IN CODDINGTON COVER AND OU12 CONSISTING OF

THE ONSHORE AREA INCLUDING SOIL AND GROUNDWATER.

2. LAND USE CONTROLS (LUCs) HAVE BEEN ESTABLISHED FOR CONSTRUCTION WITHIN OUs. COORDINATE PERFORMANCE OF WORK

WITH THE CONTRACTING OFFICER AND PROVIDE A SOIL AND

CONTAMINATED MATERIAL MANAGEMENT PLAN.

3. AT A MINIMUM, OSHA 40-HR HAZWOPER AND ANNUAL 8-HR REFRESHER

TRAINING IS REQUIRED FOR ALL PERSONNEL WHO COME IN CONTACT

WITH SOIL, GROUNDWATER, OR SEDIMENTS. EQUIPMENT MAKING

CONTACT WITH IR SOILS OR GROUNDWATER MUST BE

DECONTAMINATED PRIOR TO LEAVING THE IR SITE.

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

HPN

1826479

NEK

Approved by Frank Cole USGC MASI

06 FEB 2026

OU5

OU12

DESTROYER PIERS

HISTORIC DISTRICT, TYP

DSY-MW-02A

(SEE DRAWING C-101)

12936574

AM

EN

DM

EN

T

/23

/20

VM

G

T

T

D

D

D

D

D

D

D

D

D

D

D D

ACU

CR

C R

CR

HH

HH

ACUACU

HH

HH

HH

HH

HH

HH

HH

CR ACU

HH

HH

M

M

HH

HH

HH

HH

HH

HH

ACU

CR

HH

HH

HH

HH

HH

M

CB TYPE CL

TF=14.19

INV OUT=12.52

DMH

TF=15.12

INV IN=12.52 12"HDPE(SW)

INV OUT=9.62 8"RCP(NE)

DMH

TF=15.07

INV IN=12.77

INV OUT=9.17

8"RCP(S)

CB TYPE CL

TF=14.21

INV OUT=12.77

SIZE?

MH

TF=12.68

FILLED W/DIRT

STEAM MH

TF=17.64

STEAM MH

TF=17.66

STEAM MH

TF=15.65

CONCRETE

PAD

CONCRETE

PAD

CONCRETE

STRUCTURE

CODDINGTON COVECODDINGTON COVE

CODDINGTON COVE CODDINGTON COVE

BITUMINOUS CURB

A N

D E

R S

E N

A V

E

PIER ACCESS RD

PIER ACCESS RD

BURMA RD

CODDINGTON COVE

CODDINGTON COVE

CODDINGTON COVE

CODDINGTON COVE

CODDINGTON COVE

s tan te c ad de d pe r c lient s no te s x;E x;E x;E x; D x; D x ;D x; D x; D x; D x; D x; D x; D

W x;T W x;T x;E x;T x; D x;T

FLOOD

EBB

FLOOD

EBB

W W

W W

W

W

W x; D x;E x;E x;E

FLOOD

EBB

FLOOD

EBB

FLOOD

EBB

FLOOD

EBB

FLOOD

EBB

FLOOD

EBB

FLOOD

EBB

x; D x;E x;T x;E x; D x;E

W x; Dx;D

UP

MECHANICAL COMPRESSED AIR

ENCLOSURE

EXIST S45N BULKHEAD

EXIST S366

BULKHEAD

423' DIA TURNING CLEAR SPACE EXIST STONE BREAKWATER

NOAA OAMA SHIP AND

SUPPORT FACILITY

(TO BE EXISTING)

PROVIDE PIER 1

LCU LIMIT

EXIST T-PIER

EXIST PIER 1 TO BE

DEMOLISHED (BASE BID)

100' - 0"+/-

5' - 0" 80' - 0"

CODDINGTON COVE

EEL GRASS AREA

AREA OF IMPACTED EEL

GRASS BED 705 SQ. FT.

FLOOD

EBB

BUILDING 396

BUILDING 395

BUILDING 394

EMH 4123E

NOAA SITE LIMITS, TYP

EXISTING PIER HAS

BEEN DISCONNECTED

FROM LANDSIDE

COAST GUARD

LAYDOWN AREA

APPROXIMATELY

40, 000 SF

340'± 20 0'±

0'±

WATER LEVEL & STRUCTURE ELEVATIONS

100 YEAR FLOOD (ZONE VE) 16.0 FT

PIER 1 13.00 FT

EXIST PIER 1 9.36 FT

MHHW 1.86 FT

MHW 1.62 FT

NAVD88 0.00 FT (DATUM)

MLW -1.97 FT

MLLW -2.12 FT

1. THE BASE BID INCLUDES DEMOLITION OF THE EXISTING PIER 1 AND THE

CONSTRUCTION OF THE NEW S45S BULKHEAD INCLUDING LIMITED

DEMOLITION REQUIRED TO CONSTRUCT THE NEW BULKHEAD. ALL

OTHER WORK MUST BE AN OPTION. SEE THE CLIN SCHEDULE FOR

ADDITIONAL INFORMATION.

GENERAL SHEET NOTES:

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:3

:5

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

G-102

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

G E

N E

R A

L S

IT

E

P

LA

N

MN

12936575

CHG HBF

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

G -1

06 FEB 2026

PLAN

NORTH

SCALE: 1" = 100'

GENERAL SITE PLAN

1" = 100' 0 100' 400'200'

A

M E

N D

M

EN

T

/2 3/

V M

G

+10.46

+10.68

10.58100-YR FLOODPLAIN

EL 14.0

100-YR FLOODPLAINEL 14.0

X X X X X X X

X X X X X

X

XXXXXXXXXXXXXX

X

X X

X X

X X

X

X X X

X X X

X

X X

X

E

W

T

T

E

X X X X X X X

X

E

E

E

E

W

N = 162258.24' E = 379554.06'

N = 162215.20' E = 379586.23'

N = 162121.59' E = 379501.69'

N = 161832.69' E = 379557.58'

N = 161655.93' E = 379577.85'

N = 161625.63' E = 379462.80'

N = 162051.59' E = 379378.07'

N = 162128.47' E = 379355.94'

LIMIT OF BITUMINOUS

CONCRETE CURBING

N = 162248.33' E = 379400.87'

N = 162204.18' E = 379412.41'

N = 162034.87' E = 379418.98'

N = 162002.42' E = 379434.59'

N = 162002.14' E = 379385.27'

N = 162037.05' E = 379375.22'

BEGIN C PIER 1

N = 162084.18' E = 379346.68'

C-101

SI

TE

P

LA

N (B

AS

E

BI

D)

KPG ASM PJK

PLAN

NORTH

1" = 30' 30' 0 30' 60'

GENERAL SHEET NOTES:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 2026

1. BITUMINOUS CONCRETE PAVEMENT. SEE DETAIL C1 / C-502.

BID ALTERNATE: CONCRETE PAVEMENT. SEE DETAIL D4 / C-503.

2. LIMITS OF BITUMINOUS CONCRETE PAVEMENT.

(SAWCUT AND SEAL JOINT, MATCH EXISTING PAVEMENT FLUSH).

3. BITUMINOUS CONCRETE CURBING (TOTAL = 545 LF).

4. MEET EXISTING CONCRETE PAVEMENT FLUSH.

5. SET MONITORING WELL FLUSH WITH GRADE. REMOVE

BOLLARDS. SEE DETAIL A2 / C-503.

6. 30-FOOT OPENING IN BITUMINOUS CONCRETE CURBING FOR

STORMWATER RUNOFF LEAKOFF.

7. FILTER STONE DIAPHRAGM.

8. 4" MULCH LAYER.

9. CONCRETE FILLED STEEL GUARD POST (TYP.).

10. CONCRETE PAD FOR DUMPSTERS (36' X 15'). SEE DETAIL D3 /

C-503.

11. CONCRETE WHEEL STOP (TYP.). SEE DETAIL D4 / C-502.

12. CONCRETE CURBING (120 LF).

13. BITUMINOUS CONCRETE CURBING (197 LF).

14. VE ZONE LIMITS, TYP.

15. PROVIDE ACCESSIBLE PARKING SIGN AND POST.

16. ACCESSIBLE PARKING SPACE. PROVIDE ACCESSIBLE PARKING

SYMBOL PAVEMENT MARKING.

17. PROVIDE 1.5" LIP ALONG TRAVEL WAY TO MAINTAIN PIER

ACCESS ROAD GUTTER.

18. 6" LOAM AND SEED ALL DISTURBED AREAS NOT SCHEDULED

FOR OTHER IMPROVEMENTS (TYP.).

19. BIORETENTION PLANTER. SEE DETAIL A1 / C-505 AND SHEET

C-506.

20. 4" WIDE WHITE PAVEMENT MARKING FOR ALL LAYDOWN AREA

STRIPING (TYP.)

21. LIMITS OF BITUMINOUS CONCRETE PAVEMENT. MEET

APPROACH SLAB FLUSH. REFER TO STRUCTURAL DRAWINGS.

22. PERMANENT TRENCH REPAIR - CONCRETE PAVEMENT. (FOR

SANITARY PIPE INSTALLATION.)

23. 15KV SWITCHGEAR STRUCTURE. SEE DRAWING E-502 FOR

DETAILS.

24. PERMANENT TRENCH REPAIR IN LAWN AND TOPSOIL.

25. LIMITS OF FULL DISTURBANCE.

26. STEEL BEAM GUIDERAIL. REFER RIDOT STANDARD HIGHWAY

DETAIL 34.1.0 - 34.3.0

1. DISTURBED AREAS WITHIN THE SITE MUST BE RECAPPED WITH APPROVED

ENGINEERED CONTROLS (I.E. 6 INCHES OF A CLEAN SOIL ENCAPSULATION AND

COVER SYSTEM, 2 INCHES OF ASPHALT, OR CONCRETE) IN ACCORDANCE WITH

THE EPA RECORD OF DECISION FOR SITE 19 - ON-SHORE DERECKTOR

SHIPYARD OPERABLE UNIT 12, SEPTEMBER 2014, AND IN ACCORDANCE WITH

CONTRACT DOCUMENTS

2. SEE ELECTRICAL SITE WORK SHEETS E-108, E-109, E-110, AND E-111 FOR SITE

IMPROVEMENTS OUTSIDE THE WORK LIMITS DETAILED ON C-101 AND C-102.

3. SEE SHEET C-506 FOR BIORETENTION AREA PLANTING SCHEDULES.

4. SEE SHEET C-001 AND C-002 FOR LEGEND ABBREVIATIONS, AND GENERAL

NOTES.

5. SEE WORK KEYNOTES FOR SPECIFIC ITEMS INCLUDED WITHIN THE BASE BID

WORK. ALL WORK NOT IDENTIFIED AS 'BASE BID' SHOULD BE CONSIDERED

PART OF THE BID ALTERNATE WORK.

WORK KEYNOTES:

9'-0"

20'-0"

12'-0"

35'-0"

10'-0"

'-0

23'-0"±

100-YR FLOODPLAIN

ZONE AE ELEV. 14.0

BOAT TRAILER PARKING (12)

CRANE PARKING

REFER TO STRUCTURE DRAWINGS FOR

APPROACH SLAB AND PIER DETAILS

PIER 1

LIMIT OF BITUMINOUS

CONCRETE CURBING

LIMIT OF BITUMINOUS

CONCRETE CURBING

BIORETENTION AREA NO. 1 BIORETENTION AREA NO. 2

5 12

NOAA PROPERTY

LINE

C PIER 1L

L

VEHICLE PARKING (8)

1" = 30'SCALE:

SITE PLAN

LIMIT OF CONCRETE

CURBING

27. STEEL BEAM GUIDERAIL TERMINAL END SECTION. REFER RIDOT

STANDARD HIGHWAY DETAIL 34.3.1

28. CONCRETE PAD FOR REDUCED PRESSURE ZONE BACKFLOW

PREVENTER. CONFIRM SIZE WITH FINAL APPROVED HEATED

ENCLOSURE.

29. REFER SHEET S-404 FOR TYPICAL BULKHEAD SECTION (BASE

BID).

30. ELECTRICAL MANHOLE. REFER ELECTRICAL DRAWINGS FOR

DETAILS.

31. PERMANENT TRENCH REPAIR IN BITUMINOUS CONCRETE

PAVEMENT.

32. RESET EXISTING CHAIN LINK FENCE TO ACCOMMODATE GRADE

ADJUSTMENTS ALONG CONCRETE CURBING.

33. CONCRETE EQUIPMENT PAD (2' X 6') . SEE DETAIL D3/C-503.

LIMIT OF BITUMINOUS

CONCRETE CURBING

SEE DRAWING C-506 FOR ENLARGEMENT

DETAILS FOR PLANTINGS

SEE DRAWING C-506 FOR ENLARGEMENT

DETAILS FOR PLANTINGS

LIMIT OF CONCRETE

CURBING

12936607

SEE GENERAL SHEET NOTE 2

SEE GENERAL

SHEET NOTE 2

AM

EN

DM

EN

T

/23

/20

VM

G

Cx

Cx

Cx

Cx

Cx

+10.46

+10.68

10.58

C x

Cx

G

G G

G G G G G G G G G G G G G G G G G G

G

G

G G G G G

G

12"Ø C.I.

12"Ø

DD

D

DD

D

D

D

D

D

X X X X X X X

X X X X X

X

XXXXXXXXXXXXXX

X

X X

X X

X X

X

X X X

X X X X X X X

X

X X

X

E

W

T

T

E

X X X X X X X

X

E

E

E

E

W W

W

W W W W W W W W

W

W

S

W W

W

10 9 8 7 6

SD

SS

SS

SS SS

SS SS SS SS SS SS SS

D

D

D

SD

SD

D

SD

SS

SS

D

D

SD

W

W

W

W

C-102

UT

ILI

TY

P

LA

N

- P

IE

R 1 L

AN

DS

ID

E

(B

AS

E

BI

D)

KPG ASM PJK

PLAN

NORTH

1" = 30' 30' 0 30' 60'

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 2026

1. LIMITS OF BITUMINOUS CONCRETE PAVEMENT.

2. 10" Ø DUCTILE IRON WATER PIPE.

3. REDUCED PRESSURE BACKFLOW PREVENTER WITH HEATED

ENCLOSURE. SEE DRAWING M-402 FOR DETAILS.

4. 6" Ø DUCTILE IRON WATER PIPE.

5. CONNECT 10" WATER SERVICE TO EXISTING 12" MAIN USING

12"X10" TAPPING SLEEVE.

6. 10" GATE VALVE, (TYP)

7. 4" Ø DUCTILE IRON SANITARY SEWER FORCE MAIN (SSFM).

8. SANITARY SEWER PUMP STATION ASSEMBLY. SEE SHEET

C-504.

9. 41 LF OF 15" RCP (BASE BID).

10. 4" Ø DUCTILE IRON SANITARY SEWER FORCE MAIN (SSFM).

11. COMPRESSED AIR ENCLOSURE. SEE DRAWING M-401 FOR

DETAILS.

12. 3" DIA. STAINLESS STEEL COMPRESSED AIR LINE.

13. 44 LF OF 15" RCP (BASE BID).

14. 36 LF OF 15" PVC SDR 35.

15. 77 LF OF 8" PVC PERFORATED UNDERDRAIN.

16. 78 LF OF 15" PVC SDR 35.

17. 57 LF OF 8" PVC PERFORATED UNDERDRAIN.

18. RESET MANHOLE AND PROVIDE RIDOT STANDARD DETAIL

6.4.1, ROUND AREA FRAME AND GRATE.

TF = 9.80

19. RESET MANHOLE AND PROVIDE RIDOT STANDARD DETAIL

6.4.1, ROUND AREA FRAME AND GRATE.

TF = 9.90

20. EXISTISTING STORM DRAINAGE OUTLET REMAIN. PROTECT

IN PLACE.

21. RESET MANHOLES, TF = MATCH EXIST, PROVIDE RIDOT

STANDARD DETAIL 6.4.1, ROUND AREA FRAME AND GRATE.

22. RESET HYDRODYNAMIC SEPARATOR MANHOLE. TF = 9.30

23. RESET HYDRODYNAMIC SEPARATOR MANHOLE. TF = 9.20

24. 15" RCP INVERT OUT = 1.60 (BASE BID).

25. EXISTING BASIN TO BE USED AS HIGH LEVEL BIORETENTION

SYSTEM OVERFLOW. CORE FOR 8" PVC UNDERDRAIN, INV =

5.0.

26. 86 LF OF 8" PVC PERFORATED UNDERDRAIN.

27. 15KV SWITCHGEAR STRUCTURE. SEE DRAWING E-502 FOR

DETAILS.

28. CONNECT 4"Ø DUCTILE IRON SSFM TO EXISTING MANHOLE.

29. SET STONE DIAPHRAGM FLUSH WITH ROADWAY FOR ENTIRE

LENGTH OF BIORETENTION AREA.

30. FIRE HYDRANT.

31. RESET EXISTING ELECTRICAL / TELECOM MANHOLE COVERS

FLUSH TO GRADE.

32. SEE DRAWING M-107 FOR CONTINUATION OF PIPE TOWARDS

THE PIER.

33. 3" Ø GRAVITY SANITARY PIPE.

34. ELECTRICAL MANHOLE, SEE ELECTRICAL DRAWINGS FOR

DETAILS, TYP.

35. DRAINAGE MANHOLE DMH 1 (BASE BID).

36. DRAINAGE MANHOLE DMH 2.

37. ROUND CATCH BASIN CB 1 (RIDOT STANDARD DETAIL 6.4.0,

ROUND FRAME AND GRATE AND 4.4.0 ROUND CATCH BASIN).

38. ROUND CATCH BASIN CB 2 (RIDOT STANDARD DETAIL 6.4.0,

ROUND FRAME AND GRATE AND 4.4.0 ROUND CATCH BASIN).

39. 10" x 6" DUCTILE IRON TEE. PROVIDE 6" GATE VALVE FOR

FIRE HYDRANT SERVICE LINE.

40. ELECTRICAL DUCT BANK, SEE ELECTRICAL DRAWINGS FOR

ADDITIONAL ROUTING AND DETAILS, TYP.

41. AIR RELEASE MANHOLE. TF = 10.00

42. CONCRETE EQUIPMENT PAD (2' X 6') . SEE DETAIL D3/C-503.

WORK KEYNOTES: GENERAL SHEET NOTES:

DRAINAGE STRUCTURES

STRUCTURE ID NORTHING EASTING RIM INVERTS

DMH 1 161790.47' 379463.95' 9.50 2.00 (E,W), 2.27 (SE)

DMH 2 161772.25' 379499.99' 9.10 2.67 (SE, NE, NW)

CB 1 (4-FT DIAM.) 161729.92 379571.50 7.75 3.5 (N,S,NW)

CB 2 (4-FT DIAM.) 161803.24 379536.82 7.75 4.0 (S)

PIER 1

100-YR FLOODPLAIN

ZONE AE ELEV. 14.0

10.0

10.0

10.010.0 10.0

9.90

10.0

1. DISTURBED AREAS WITHIN THE SITE MUST BE RECAPPED WITH

APPROVED ENGINEERED CONTROLS (I.E. 6 INCHES OF A CLEAN SOIL

ENCAPSULATION AND COVER SYSTEM, 2 INCHES OF ASPHALT, OR

CONCRETE) IN ACCORDANCE WITH THE EPA RECORD OF DECISION

FOR SITE 19 - ON-SHORE DERECKTOR SHIPYARD OPERABLE UNIT 12,

SEPTEMBER 2014, AND IN ACCORDANCE WITH CONTRACT

DOCUMENTS.

2. SEE ELECTRICAL SITE WORK SHEETS E-108, E-109, E-110, AND E-111

FOR SITE IMPROVEMENTS OUTSIDE THE WORK LIMITS DETAILED ON

C-101 AND C-102.

3. SEE WORK KEYNOTES FOR SPECIFIC ITEMS INCLUDED WITHIN THE

BASE BID WORK. ALL WORK NOT IDENTIFIED AS 'BASE BID' SHOULD BE

CONSIDERED PART OF THE BID ALTERNATE WORK.

NOAA PROPERTY

LINE

C PIER 1L

BEGIN C PIER 1

N = 162084.18' E = 379346.68'

L

0+00.00

0+83.09

1+22.66

1+68.80

3+67.73

20.5 20.5

20.5 20.5

1" = 30'SCALE:

UTILITY PLAN - PIER 1 LANDSIDE

EXIST. EEL GRASS BED

12936608

SEE GENERAL SHEET NOTE 2

SEE GENERAL

SHEET NOTE 2

EXISTING SHEET

PILING (TYP.)

10.1

10.1

AM

EN

DM

EN

T

/23

/20

VM

G

SD

SS

SS

SS SS

SS SS SS SS SS SS SS

D

D

D

SD

SD

D

SD

SS

SS

D

D

SD

W

W

W

W

X X X X X X X

X X X X X

X

XXXXXXXXXXXXXX

X

X X

X X

X X

X

X X X

X X X X X X X

X

X X

X

E

W

T

T

E

X X X X X X X

X

E

E

E

E

W W

W

W W W W W W W W

W

W

S

W W

W

12"Ø C.I.

12"Ø

DD

D

DD

D

D

D

D

D

Cx

Cx

Cx

Cx

Cx

+10.46

+10.68

10.58

Cx

C-103

CO

MP

OS

IT

E

UT

ILI

TY

LA

YO

UT

P

LA

N

- P

IE

R 1 L

AN

DS

ID

E

(B

AS

E

BI

D)

KPG ASM PJK

PLAN

NORTH

1" = 30' 30' 0 30' 60'

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 2026

100-YR FLOODPLAIN

ZONE AE ELEV. 14.0

NOAA PROPERTY

LINE

C PIER 1L

0+00.00

0+65.86

1+42.08

1+85.25

BEGIN C PIER 1

N = 162084.18' E = 379346.68'

L

0+00.00

0+83.09

1+22.66

1+68.80

REFER A1 / C-202

FOR PROFILE VIEW

REFER B1 / C-202

FOR PROFILE VIEW

10+00.00

10+46.06 10+59.73

0+00.00 0+14.10

0+18.89

0+58.72 0+61.74

0+96.51

1+13.12

1+51.55

1+20.89

3+67.73

N = 162138.09' E = 379422.76'

REFER A1 / C-201

FOR PROFILE VIEW

REFER B1 / C-201

FOR PROFILE VIEW

0+28.36

0+80.70

1+14.35

20+00.00 20+15.72

20+03.85

10" Ø FRESH WATER MAIN

3" Ø SANITARY SEWER GRAVITY MAIN

STORMWATER DRAINAGE PIPE

LEGEND:

4" Ø SANITARY SEWER FORCE MAINSS

REFER A2 / C-201

FOR PROFILE VIEW

W

SD

UNDERDRAIN DRAINAGE PIPEUD

ELECTRICAL DUCTBANK / CONDUIT

12936609

GENERAL SHEET NOTES:

1. DISTURBED AREAS WITHIN THE SITE MUST BE RECAPPED WITH

APPROVED ENGINEERED CONTROLS (I.E. 6 INCHES OF A CLEAN SOIL

ENCAPSULATION AND COVER SYSTEM, 2 INCHES OF ASPHALT, OR

CONCRETE) IN ACCORDANCE WITH THE EPA RECORD OF DECISION

FOR SITE 19 - ON-SHORE DERECKTOR SHIPYARD OPERABLE UNIT 12,

SEPTEMBER 2014, AND IN ACCORDANCE WITH CONTRACT

DOCUMENTS.

2. SEE ELECTRICAL SITE WORK SHEETS E-108, E-109, E-110, AND E-111

FOR SITE IMPROVEMENTS OUTSIDE THE WORK LIMITS DETAILED ON

C-101 AND C-102.COMPRESSED AIRCA

1" = 30'SCALE:

COMPOSITE UTILITY LAYOUT PLAN - PIER 1 LANDSIDE

AM

EN

DM

EN

T

/23

/20

VM

G

ELEVATIO

N

(FT) EL

EV

AT

IO

N (F

T)

-5

-5

-0+50 0+00 0+50 1+00 1+50 2+00

MINIMUM DEPTH

OF COVER = 4.5'

MINIMUM

SEPARATION = 6"

PROPOSED GROUNDEXISTING GROUND

CONNECT TO EXISTING

12" WATER PIPE

CONNECT TO 10" WATER PIPE

(SEE DRAWINGS M-107 & M-302

FOR DETAILS)

EXISTING UTILITY DUCTBANKS

(CONTRACTOR TO FIELD

VERIFY LOCATION, SIZE, AND DEPTH)

PROPOSED ELECTRICAL

DUCTBANK

CONTINUE TO RPZ UNIT

3" Ø SANITARY PIPE

4" Ø FORCED SANITARY MAIN10" Ø GATE VALVE

10" Ø 45° BEND

10" X 8" TEE

10" Ø 90° VERTICAL BEND

10" Ø 45° BEND

10" Ø 45° BEND

10" Ø GATE VALVE

PROPOSED ELECTRICAL

DUCTBANK

PROPOSED ELECTRICAL

DUCTBANK

ELEVATIO

N

(FT) EL

EV

AT

IO

N (F

T)

-5

-5

-0+50 0+00 0+50 1+00 1+50 2+00

CB 1 (INLET TOP)

TF = 7.75

PROPOSED

GRADE

DMH 2

TF = 9.10 DMH 1

TF = 9.50

INV = 3.50 INV = 2.67

INV = 2.27INV = 2.67 OUTFALL INV = 1.60

INV = 2.00

15" Ø RCP

15" Ø PVC SDR 35

15" Ø PVC SDR 35

S45S BULKHEAD

15" RCP FROM

HYDRODYNAMIC

SEPARATOR

INV. = 2.00

15" Ø PVC SDR 35 FROM CB 2

INV = 3.50

C-202

UT

ILI

TY

P

RO

FI

LE

S

- S

HE

ET

OF

(B

AS

E

BI

D)

KPG ASM PJK

1" = 20' 20' 0 20' 40'

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 20261" = 20'SCALE:

10" FRESH WATER PIPE PROFILEB1 C-102

GENERAL SHEET NOTES:

1. SEE C-001 AND C-002 FOR LEGEND, ABBREVIATIONS, AND GENERAL

NOTES.

2. ALL STATIONING IS BASED UPON THE CENTERLINE OF THE UTILITY.

3. FIELD VERIFY PRESENCE, LOCATION, AND DEPTH OF EXISTING

UTILITIES.

HORIZONTAL

1" = 4' 4' 0 4' 8'

VERTICAL

1" = 20'SCALE:

STORM DRAINAGE PIPE NETWORK PROFILE (BASE BID)

A1 C-102

AS NOTED

AS NOTED

12936611

AM

EN

DM

EN

T

/23

/20

VM

G

EL = -14.09'

6' I.D.

SELF CLEANING

WET WELL

6" DI VENT WITH

BIRD SCREEN

(SEE PLAN FOR

ORIENTATION)

4" DI

FORCE MAIN

4" BYPASS PUMP

CONNECTION WITH

COMPANION FLANGE

AND QUICK CONNECT

HOSE ADAPTER

COUPLING TO

4" DI FORCE MAIN

4" x 4" x 4" TEE

SECTION VIEW

CLASS I, DIV. 2

GROUP D AREA

CLASS I, DIV. 2

GROUP D AREA

FINISH GRADE

SEE GRADING PLAN

30" VENTED MANHOLE

FRAME AND COVER (UNLESS OTHERWISE

NOTED) TO BE MARKED SEWER

PROVIDE 6" MIN. COVER

GUIDE

RAIL

PIPE

SUPPORT

(TYP. OF 2)

SELF CLEANING WET WELL INFILL PER HYDRAULIC INSTITUTE

2" RIGID CONDUIT TO

HOUSE TRANSDUCER CABLE

TIDEFLEX FLANGED

CHECK VALVE (TYP.)

MAGNETIC FLOW

METER

CONCRETE CRADLE OR PIPE SUPPORT

12" CRUSHED STONE

3" SDR 35 PVC DRAIN

SLOPE 5%

WITH GROUT 12" MIN

5'- 0"

M

IN

" M

IN

" M

IN

8"

10"12

INV OUT = -8.41'

30" VENTED MANHOLE FRAME &

COVER (UNLESS OTHERWISE NOTED)

TO BE MARKED "SEWER"

SET CASTING IN GROUT AND

GROUT ALL AROUND TO 4"

ABOVE THE FLANGE

(UNLESS OTHERWISE NOTED)

SET RIM AT FINISHED GRADE

USE BRICK COURSES AS NEEDED TO BRING

MANHOLE RIM TO REQUIRED ELEVATION (MAX

3 COURSES OF BRICKS) SEAL INSIDE AND

OUTSIDE OF BRICK WITH HYDRAULIC CEMENT

COAT WITH (2) COATS

OF BITUMINOUS

DAMPPROOFING

SEAL ALL HOLES WITH

HYDRAULIC CEMENT

BUTYL RUBBER

JOINT (TYP.)

FINISH GRADE

STANDARD PRECAST BARREL SECTION

COMBINATIONS OF 1', 2', 3' OR 4'

LENGTHS AS NEEDED TO BRING MANHOLE

RIM TO REQUIRED ELEVATION (SEE MANHOLE

GENERAL NOTE 4)

SEAL ALL INTERIOR

AND EXTERIOR

JOINTS WITH

HYDRAULIC CEMENT

4'-0" DIAMETER

2'6" Ø

OPENING

8" MIN

5"

" M

AX

STANDARD PRECAST

ECCENTRIC OR

CONCENTRIC CONE

SECTION, OR

FLAT TOP

(AS REQUIRED)

NOTE 1

NOTE 2

NOTE 3

NOTE 4

NOTE 5

NOTE 6

NOTE 7

NOTE 9

NOTE

NOTE 11

NOTE 12

NOTE 14

6' I.D.

SELF CLEANING

WET WELL

4" DI

(TYP. 0F 2)

HYMAX COUPLING

4" DI FORCE MAIN

4" PLUG VALVE

(TYP. OF 3)

4" SWING CHECK VALVE (TYP. OF 2)

CONDUIT W/ SEALING FITTING

SEE ELECTRICAL DRAWINGTWO (2) COATS OF ASPHALT

WATERPROOFING APPLIED AT THE

FACTORY

INFLUENT PIPE,

INV. EL. VARIES

SEE WATER AND SEWER

UTILITY PLAN

RGS CONDUIT TO

CONTROL PANEL

SEE DRAWING E-109

PVC DRAIN

HYMAX

COUPLING

(TYP.)

6' I.D. VALVE VAULT

MANHOLE RUNGS

@ 12" O.C.

FLOW RECORDER

MAGNETIC FLOW METER

2 LAYERS OF

ASPHALT

COATING

PLAN VIEW

PMP-1

PMP-2

12' DIA STORAGE TANK

MANHOLE RUNGS

@ 12" O.C.

30" VENTED MANHOLE FRAME &

COVER (UNLESS OTHERWISE NOTED)

TO BE MARKED "SEWER" (TYP.)

TO WET WELL

4" DI FM, INVERT IN = 5.15

MAX WSE = -1.33

ADDITIONAL NOTES:

1. 48" X 30" WATERTIGHT HS-20 ALUMINUM ACCESS DOORS WITH LOCKS, SIZED FOR DUPLEX

PUMP STATION.

2. TOP OF CASING EL. SEE SHEET C-102.

3. SLOPE FINISH GRADE AWAY FROM STRUCTURE TO PROMOTE DRAINAGE.

4. SENSOR FLOAT HOLDER.

5. RIGID GALVANIZED STEEL CONDUITS FROM CONTROL PANEL (TYP. OF 2).

6. HIGH WATER ALARM/LAG PUMP ON TO BE CONNECTED TO ALARM SYSTEM.

7. STAINLESS STEEL LIFT-OUT RAILS WITH NONSPARKING BAR.

8. EXTERIOR OF ALL JOINTS MUST BE RECOATED WITH ASPHALTIC WATER-PROOFING AFTER

SETTING.

9. 10" SCH 35 PVC PIPE INV IN = -8.59'

10. PROPOSED FLYGT MODEL NP 3085 SH 3~ ADAPTIVE 256 4 HP EXPLOSION PROOF.

SUBMERSIBLE PUMP 60 HZ, 3Ø, 460V, DESIGNED FOR 150 GPM FLOW, 27.10' TDH (TYP. OF 2).

11. 1

2" NATIONAL PIPE TAPERED THREAD (NPT) MALE CONDUIT FITTING WHERE THE CABLE EXITS

THE TRANSDUCER.

12. PRESSURE TRANSDUCER PUMP SETPOINTS PER SPECIFICATION.

13. DIMENSION PER MANUFACTURER'S RECOMMENDATION OR 6" WHICHEVER IS GREATER.

14. 12" CRUSHED STONE.

15. PUMP STATION WILL OPERATE AS ONE DUTY AND ONE STANDBY PUMP.

3' 4"

COMPACTED SUBGRADE

COMPACTED SUBGRADE

COMPACTED SUBGRADE

CAST-IN-PLACE

STRUCTURE

MAX WSE

= -9.09

MIN WSE

= -13.01

INV EL. 0.58

NOTE 13

3" SDR 35 PVC, INVERT IN = -0.23

12"

12"

SLOPE TO

DRAIN

4" DI FM

3" PVC

4" DI FM

3"x4" FLANGED INCREASER

NOTE 8

0% SLOPE

4% SLOPE

SEE DETAIL A3 /C-507

12" CRUSHED STONE

4' 4"

SEE DETAIL B5/C-504 (TYP.)

SEE DETAIL A3/C-507 (TYP.)

12"

FINISHED GRADE PAVED AREA

45° WYE

WYE

4" THICK

CONCRETE COLLAR

LEBARON FOUNDRY, INC.

SEWER CLEANOUT RING

AND COVER, CATALOG

NUMBER LA0910

45° BEND

SCH. 40 PVC RISER

WITH THREADED CAP

6" MIN TYP.

NEOPRENE SEAL

NON SHRINK

GROUT

MANHOLE

STORMWATER,

GRAVITY AND

FORCE MAIN

PIPE

FOR FORCE MAIN, INSTALL 22

1/2° BEND AT END OF FORCE

MAIN WITHIN MANHOLE

C-504

SI

TE

D

ET

AI

LS

SH

EE

T

3 O F

KPG ASM PJK

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 2026

NOT TO SCALE

SANITARY PUMP STATION DETAILA1

NOT TO SCALE

TYPICAL CLEANOUT DETAILC5

NOT TO SCALE

FLEXIBLE RUBBER BOOT DETAILB5

12936615

AM

EN

DM

EN

T

/23

/20

VM

G

PLAN

VARIES

SEE NOTE 2

SIDE SLOPES

(SEE BELOW)

HAY BALES OR COMPACTED EARTH

BERM (SEE NOTE 3)

DEPTH VARIES

SEE NOTE 2

SIDE SLOPES TO BE

2H:1V OR 3H:1V

(NOMINAL)

SAND BAGS TO SECURE

SHEETING

10 MIL

POLYETHYLENE

SHEETING

GENERAL NOTES:

1. CONCRETE WASHOUT AREA(S) INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. THE CONCRETE WASHOUT AREA TO BE

ENTIRELY SELF-CONTAINED.

2. THE CONTRACTOR TO SUBMIT THE DESIGN, LOCATION AND SIZING OF THE CONCRETE WASHOUT AREA(S) WITH THE PROJECT'S EROSION AND SEDIMENTATION CONTROL PLAN, TO BE APPROVED BY THE CONTRACTING OFFICER.

3. LOCATION: WASHOUT AREA(S) ARE TO BE LOCATED AT LEAST 50 FEET FROM ANY STEAM, WETLAND, STORM DRAINS OR OTHER SENSITIVE RESOURCE. THE FLOOD CONTINGENCY PLAN MUST ADDRESS THE CONCRETE WASHOUT IF THE WASHOUT IS TO BE

LOCATED WITHIN THE FLOODPLAIN.

4. SIZE: THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING, BUT LIMITED TO, OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.

5. SURFACE DISCHARGE IS UNACCEPTABLE. THEREFORE, HAY BALES OR OTHER CONTROL MEASURES, AS APPROVED BY THE CONTRACTING OFFICER, TO BE USED AROUND THE PERIMETER OF THE CONCRETE WASHOUT AREA FOR CONTAINMENT.

6. SIGNS TO BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CONCRETE AREA(S) AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.

WASHOUT AREA(S) MUST BE FLAGGED WITH SAFETY FENCING OR OTHER APPROVED METHOD.

7. WASHOUT AREA(S) ARE TO BE INSPECTED AT LEAST ONCE A WEEK FOR STRUCTURAL INTEGRITY, ADEQUATE HOLDING CAPACITY AND CHECKED FOR LEAKS, TEARS, OR OVERFLOWS. WASHOUT AREA(S) TO BE CHECKED AFTER HEAVY RAINS.

8. HARDENED CONCRETE WASTE TO BE REMOVED AND DISPOSED OF WHEN THE WASTE HAS ACCUMULATED TO HALF OF THE CONCRETE WASHOUT'S DEPTH. THE WASTE CAN BE STORED AT AN UPLAND LOCATION, AS APPROVED BY THE CONTRACTING OFFCIER. ALL CONCRETE WASTE TO BE DISPOSED OF IN A MANNER CONSISTENT WITH ALL APPLICABLE LAWS, REGULATIONS AND

GUIDELINES.

SECTION

2'-0"

MAX.

LIMIT OF PAYMENT INCLUDING COUPLINGS

2'-0"

MAX.

12" CRUSHED STONE

UNDISTURBED EARTH

DRESSER STYLE 127

FLANGED ADAPTER (TYP.)

4" PLUG VALVE (TYP.)

1" X 1-1/4" STEEL STRAP

BOLTED TO SUPPORT (TYP.)

4"Ø BAR GROUTED 3" INTO

BASE, TOP 3" THREADED

CONCRETE PIPE SUPPORT

5'- 0"

M

IN

IM

UM

4" X 4" TEE

REDUCING FLANGE

1" NPT INLET APCO

SEWAGE COMBINATION

AIR VALVE, MODEL TBD

POLYPROPYLENE MANHOLE

RUNGS PRECAST INTO

CONCRETE MANHOLE AT

12" O.C. MAX

MORTAR

FINISHED GRADE (TYP.)

2'-6" OPENING

2'-2" MAX. TO FIRST

MANHOLE RUNG

MANHOLE FRAME WITH VENTED COVER:

NEEMAN CATALOG NO. R-1582 OR APPROVED SIMILAR.

SET FLUSH WITH FINISHED GRADE

ADJUST TO GRADE WITH

CONCRETE GRADE RING

APPLY TWO (2) COATS ASPHALT

WATERPROOFING AT THE FACTORY

WATERTIGHT JOINT USING AN

APPROVED MASTIC-TYPE SEALANT

OR 'O' RING GASKET (EXTERIOR OF

ALL JOINTS MUST BE RECOATED

WITH ASPHALTIC WATER-PROOFING

AFTER SETTING)

FILL ANNULAR SPACE WITH LINK SEALS (TYP.)

CL OF

FORCE

MAIN

4'-0" I.D. PRECAST

CONCRETE MANHOLE

4" PIPE

COUPLING (TYP.)

SECTION A-A SECTION B-B SECTION C-C

PIPE STRAP

6" PVC

VERTICAL DROP PIPE AND

90° SHORT RADIUS BEND

4" CLASS 350

DUCTILE IRON PIPE

STORAGE TANK

SEE DETAIL A1/C-504

6" X 6" x 4" SCH 80 PVC

TEE (SOCKET END

CONNECTIONS)

8" x 1- 12" TYPE 304 STAINLESS STEEL PIPE STRAPS AND

STAINLESS STEEL FASTENERS SET W/ LAG BOLTS AND

SHIELDS. MIN. 4'-0" O.C.

REFER TO PIPE

CONNECTION DETAILS

8" X 1 - 12" STAINLESS

STEEL TYPE 304

PIPE SUPPORT

6" M

AX

4" FLG X PE

ADAPTER

FLOW

5 5 16"

ORIENT BEND TO

ROUTE TOWARD

STRUCTURE

OUTLETSEE DETAIL B5/C-504

C-507

SI

TE

D

ET

AI

LS

SH

EE

T

6 O F

KPG ASM PJK

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 25 AUGUST 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

CI

C

OR

E

- H

AM

PT

ON

R

OA

DS

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NE

W

PO

RT

NE

W

PO

RT

, R

I

US

CG

O

CR

H O

M

EP

O

RT

IN

IT

IA

TI

VE

O

PC

P

IE

R

MRI/CWJ

JWJ

Approved by Frank Cole USGC MASI

06 FEB 2026

NOT TO SCALE

CONCRETE WASHOUT AREA DETAILC1

NOT TO SCALE

TYPICAL SEWER AIR RELEASE VALVE AND CLEANOUT MANHOLEA1 NOT TO SCALE

TYPICAL CONCRETE INSIDE DROP PIPE DETAILA3 12936618

A-A

B-B

C-C

AM

EN

DM

EN

T

/23

/20

VM

G

M H

T F

.6

F

IL

L E

D W

/D

IR

T

S T

E E

L S

H E

E T P

IL

E

B

IT

U M

IN

O

U S

C U

R B

W

WW

W x;D

W x;D x;D

W

W

REMOVED BY

OTHERS, SEE NOTE 2

BULKHEAD S45N

M A

T C

H

LI

N E

STONE BREAKWATER

EXPANSION JOINT, TYP

LIGHT POLE, TYP

TIMBER, TYP

RAILROAD TRACKS, TYP

METAL PLATE, TYP

BUILDING 395

BUILDING 394

SD103

A2

DEMO PART PLAN

FENDER SYSTEM, TYP

BULKHEAD S366

RIP RAP REVETMENT

1954 BULKHEAD

1,567' - 0"±

C3

SD301

TYP

SD104

B2

C3

SD601

C1

SD601

A3

SD602

- - - - - - - - - - - - - - - - - - - - - - - - - - - - C1

SD602

A1

SD602

C4

SD601

C3

SD602

A1

SD601

A4

SD601

A3

SD601

M A

T C

H

LI

N E

BUILDING 396

1,567'-0" ±

EJ, TYP

LIGHT POLE, TYP

0'

0"

LEGEND:

LIMITS OF DEMOLITION

SHEET KEYNOTES:

1. DEMOLISH EXISTING PORTION OF PIER 1 AND ALL APPURTENANCES. PIER

SUPPORT AND FENDER PILES WILL ALL BE CUT OFF AT THE LOWER ELEVATION

OF EITHER

A) THREE FEET BELOW THE DREDGE ELEVATION OR

B) TWO FEET BELOW THE MUDLINE ELEVATION IF THE MUDLINE ELEVATION IS

AT OR BELOW THE MINIMUM DRAFT ELEVATION. ALL REMOVED AND CUT-OFF

PILES WILL BE SHOWN ON THE AS-BUILT DRAWINGS.

2. REMOVE AND DISPOSE OF EXISTING TIMBER DEBRIS.

3. STONE FILL AT EXISTING STONE BREAKWATER TO BE REMOVED AND

REINSTALLED AFTER BULKHEAD S45S INSTALLATION.

4. CUT DOWN AND DISPOSE OF EXISTING STEEL SHEET PILING TO ELEVATION 4.0

ADJACENT TO PIER REPLACEMENT LIMIT, TYPICAL. SEE DRAWING SD201 FOR

DETAILS.

5. CUT DOWN AND DISPOSE OF EXISTING STEEL SHEET PILING TO ELEVATION 4.5.

6. REMOVAL OF EXISTING PIER PILES WILL BE PERFORMED USING ONLY THE

METHODS DESCRIBED HEREIN. VIBRATORY EXTRACTION METHODS ARE

EXPRESSLY PROHIBITED. REMOVAL OF SEDIMENT AROUND THE PILES USING A

CLAMSHELL BUCKET OR ANY METHOD THAT INVOLVES EXCAVATING AND

RELOCATING SEDIMENT IS NOT PERMITTED AND WILL BE CONSIDERED

DREDGING. ACCEPTABLE PILE REMOVAL METHODS INCLUDE: (1) ATTEMPTING

DIRECT EXTRACTION OF PILES USING A CRANE; (2) USE OF A LONG-REACH

EXCAVATOR EQUIPPED WITH A SMALL BUCKET TO GENTLY DISPLACE

SURROUNDING SEDIMENT TO PROVIDE ACCESS TO APPROXIMATELY 2 TO 3

FEET BELOW THE MUDLINE, PROVIDED THAT SEDIMENT IS NOT EXCAVATED,

STOCKPILED, OR SIDE-CAST; (3) USE OF WATER JETTING TO CREATE A

TEMPORARY VOID AROUND THE PILES TO FACILITATE ACCESS AND REMOVAL.

FOR ALL APPROVED METHODS, TURBIDITY GENERATED DURING PILE REMOVAL

ACTIVITIES WILL BE CONTAINED WITHIN TURBIDITY CURTAINS INSTALLED

AROUND THE PIER DEMOLITION AREA AND MAINTAINED FOR THE DURATION OF

WORK. IN ADDITION, LARGE RIP RAP AND DEBRIS LOCATED ALONG THE

SURFACE OF THE EXISTING S45S REVETMENT MAY BE REMOVED AS

NECESSARY TO FACILITATE THE WORK, TEMPORARILY STORED, AND

REPLACED IN THEIR ORIGINAL LOCATION FOLLOWING COMPLETION OF PILE

REMOVAL ACTIVITIES; HOWEVER NO DREDGING OR REMOVAL OF UNDERLYING

SEDIMENTS WILL BE ALLOWED.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:4

:2

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a tiv e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

SD101

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

TI

V

E O

P C

P

IE

R

O V

E R

A

LL

S

TR

U C

TU

R

A L

D E

M O

LI

TI

O N

P

LA

N

B A

S E

B

ID

MJF

12936625

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S D

06 FEB 2026

PLAN

NORTH

SCALE: 1" = 60'-0"

OVERALL STRUCTURAL DEMOLITION PLAN

1" = 60' 0 60' 240'120'

1. PROTECT EXISTING BULKHEAD SHEET PILES, TIE RODS, DEADMAN SYSTEM

AND CONCRETE HEADWALL AND COPING DURING DEMOLITION.

2. A PORTION OF THE EXISTING PIER 1 AND EXISTING BULKHEAD S366 NEAR THE

LANDWARD END OF THE PIER HAS BEEN DEMOLISHED TO FACILITATE

CONSTRUCTION OF BULKHEAD S366 UNDER A SEPARATE CONTRACT.

3. FOR EXISTING PORTION OF PIER STRUCTURE, SEE AS-BUILTS AND SURVEY

DRAWINGS V-105 THROUGH V-109. ALL ITEMS SHOWN ON THE DRAWINGS

SHALL BE DEMOLISHED.

4. THE EXISTING PIER IS CONDEMNED AND MUST NOT BE USED FOR ANY

PURPOSE.

5. VERTICAL LOAD AT BULKHEAD ALONG PIER 1 IS RESTRICTED TO AN

ALLOWABLE UNIFORM LIVE LOADING OF 600 PSF.

6. FOR ADDITIONAL INFORMATION ON DEMOLITION WITHIN BULKHEAD S45S

LIMITS, SEE DRAWING SD104.

7. REFER TO APPENDIX A OF THE SPECIFICATIONS FOR THE RECORD DRAWINGS

OF EXISTING CONDITIONS. NOTE THAT RECORD DRAWINGS REFLECT

ORIGINAL CONSTRUCTION AND SITE CONDITIONS ARE SUBJECT TO CHANGES

OVER TIME.

GENERAL SHEET NOTES:

A

M E

N D

M E

N T

/2

3/

V

M G

TYP EL FOR SHEETING DEMO

BULKHEAD CAP CHANNEL, EL 11.00±

CL OF TIE RODS

MLW EL -1.97

MHW EL 1.62

STL SHT PILE DEADMAN, TOP

CL OF TIE RODS

MLW EL -1.97

NAVD88

EL 0.00'

30" DIA STL PIPE

PILES TO REMAIN

DEMO RC HEADWALL SEE NOTE 2

DEMO BULKHEAD

CAP CHANNEL,

TYP

C CONC

OUTFALL

L

0+2.88 TO 0+87.58±

84' - 9" ±

3' - 0" ±

APPROX NORTH EDGE OF PIER 1

EDGE OF EXIST

PIER 1 TO BE DEMO 5' - 0"±

KING PILE TO REMAIN

1' - 9"±

0+400+300+200+10STA BK 0+00 0+50 0+60 0+70 0+80 0+90

DEMO 30" DIA 5/8" THK STL PIPE PILE TO EL 6.50' , TYP

STL SHT PILE BULKHEAD

(PZ35), TYP

4' - 0"±

APPROX SOUTH

EDGE OF PIER 1

EL 3.00 ±

EXIST 18" RCP TO REMAIN, PIP

EL 4.00 (SEE NOTE 3)

PIER 1 DECK EL 9.36 ±

NAVD88

EL 0.00'

C 18" DIA RCPL

DEMO EXIST STL

SHT DEADMAN, TYP

0+81.07 TO 0+83.15

2' - 1"

0+400+300+200+10STA DM 0+00 0+50 0+60 0+70 0+80 0+90

0+49.48±

EL 7.00 ±

EL 3.00 ±

0+68.26 TO

0+73.29±

0+16.46 TO 0+21.67

5' - 2 1/2"

2'

1/

2"

4' - 3"

0+58.15 TO 0+63.45

5' - 3 1/2"

8"

2'

3"

3'

1"

NOTE:

WIDTH AND DEPTH AS REQUIRED TO SUIT ELECTRICAL DUCT BANK

BUT NOT LARGER THAN 6" IN EITHER DIRECTION

LEGEND:

LIMITS OF BULKHEAD AND DEADMAN

DEMOLITION

1. SEE DRAWING SD103 FOR REFERENCE AND NOTE 5 ON SD103 TO

ESTABLISH STATIONING SYSTEMS.

2. RETAIN AND PROTECT STEEL SHEETING AND 18" RCP BETWEEN

THE TWO EXISTING 30" DIAMETER STEEL PIPE PILES. SEE APPENDIX

A IN THE SPECIFICATIONS FOR REINFORCEMENT DETAILS.

3. VERIFY IN THE FIELD AND PROVIDE 6" CLEARANCE BETWEEN

BOTTOM OF SHEET PILE DEMOLITION AND TOP OF STEEL OF WALE.

4. SEE CIVIL DRAWINGS FOR FILL AND PAVEMENT DEMOLITION.

GENERAL SHEET NOTES:

SD103 SD103

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:4

:3

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a tiv e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

SD201

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

TI

V

E O

P C

P

IE

R

S

N B

U

LK

H E

A D

D E

M O

LI

TI

O N

E

LE

V A

TI

O

N

MJF

12936629

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S D

06 FEB 2026

SCALE: 1/4" = 1'-0" (SD103)

B3

DEMOLITION ELEVATION OF S45N BULKHEAD AT PIER LIMITS

SCALE: 1/4" = 1'-0" (_SD103)

A3

DEMOLITION ELEVATION OF DEADMAN STEEL SHEETING PILE

1/4" = 1' - 0" 0 5' 10' 15'1'

(SD103)

A

M E

N D

M E

N T

/2

3/

V

M G

DEMO SHT PILE TO EL 5.50

STL SHT PILE (PZ35) TOP EL 9.00±

MHW EL 1.62

MLW EL -1.97

TOP OF GROUND, EL 10.00±

STL SHT PILE (PZ35) TOP EL 9.00±

MLW EL -1.97

MHW EL 1.62

BULKHEAD CAP CHANNEL, EL 11.00±

TOP OF GROUND, EL 10.00±

LEGEND:

LIMITS OF BULKHEAD DEMOLITION

NAVD88

EL 0.00'

0+300+200+10STA TEMP 2

0+00

3'

6"

0+16.75 TO 0+22.50

5' - 9"

NAVD88

EL 0.00'

0+400+300+200+10STA TEMP 1

0+00

0+50 0+60

0+38.75 TO

0+43.17±2' - 2"

0+6.50 TO 0+14.50±

8' - 0"

5'

6"

1'

6"

APPROX 0+04.33 TO 0+38.75±

34' - 5"± 4' - 5"

1954 BULKHEAD TIE ROD AND DEADMAN

1. SEE DRAWING SD103 FOR REFERENCE AND NOTE 5 ON SD103 TO

ESTABLISH STATIONING SYSTEMS.

2. RETAIN AND PROTECT STEEL SHEETING AND 18" RCP BETWEEN

THE TWO EXISTING 30" DIAMETER STEEL PIPE PILES. SEE APPENDIX

A IN THE SPECIFICATIONS FOR REINFORCEMENT DETAILS.

3. VERIFY IN THE FIELD AND PROVIDE 6" CLEARANCE BETWEEN

BOTTOM OF SHEET PILE DEMOLITION AND TOP OF STEEL OF WALE.

4. SEE CIVIL DRAWINGS FOR FILL AND PAVEMENT DEMOLITION.

GENERAL SHEET NOTES:

SD103 SD103

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .