This is Attachment E to a federal solicitation for a Design-Bid-Build contract for USCG Offshore Patrol Cutters (OPC) Homeport Pier at Naval Station Newport, Newport, Rhode Island (Contract N40085-26-R-0001). The attachment is a template form that all offerors, both large and small businesses, must complete to document their historical small business utilization and participation in support of Factor 5 evaluation criteria.

The form requires offerors to complete project details for up to five (5) prior projects submitted under Factor 1 Corporate Experience. For each project, offerors must provide the contract/task order number, project title, business size classification, performance role (prime, subcontractor, or JV member), and subcontracting plan requirement status. Offerors must enter actual dollar values and percentages for all subcontracting categories including Small Business Concerns (SB), Large Business Concerns, Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business, Veteran-Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business (SDVOSB). Goals must be included where applicable, and offerors must provide detailed explanations for any unmet goals and projects with zero small business subcontracting achievement. All percentages must be rounded to the nearest tenth of a percent. Offerors may expand form sections as needed but cannot submit information in alternative formats or as attachments; only the completed Attachment E will be evaluated.

View the file

Other files

File Type Posted
Amendment 0009 USCG OPC.pdf PDF
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0007 USCG OPC.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf PDF
Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf PDF
JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf PDF
JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf PDF
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Amendment 0001 USCG OPC.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment J Site Visit Meeting Location.pdf PDF
Specifications USCG OPC Newport.pdf PDF
1826479dwg02of05_STRUC1.pdf PDF
1826479dwg03of05_STRUC2.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

N40085-26-R-0001

ATTACHMENT E

HISTORICAL SMALL BUSINESS UTILIZATION

N4008526R0001

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment E. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

- Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

- Enter dollar values actually subcontracted for each of the categories listed.

- Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

Complete the “GOAL” column - Enter goals, if applicable.

- If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

- Goals shall be included for standalone contracts when established.

- Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

- Explanation is required for each unmet goal.

- Item #1 is to be completed for each Project with unmet goal(s).

If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), complete the “TO BE COMPLETED AS REQUIRED” under item #2.

- Item #2 is to be addressed for each Project with no small business subcontracting achievement.

Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or

JV.

Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor Subcontractor JV Member

Subcontracting Plan Required: Yes No

ACTUAL GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole Dollars

Percent of line (a) or

(c)

Whole Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor Subcontractor JV Member

Subcontracting Plan Required: Yes No

ACTUAL GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole Dollars

Percent of line (a) or

(c)

Whole Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor Subcontractor JV Member

Subcontracting Plan Required: Yes No

ACTUAL GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole Dollars

Percent of line (a) or

(c)

Whole Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor Subcontractor JV Member

Subcontracting Plan Required: Yes No

ACTUAL GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole Dollars

Percent of line (a) or

(c)

Whole Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor Subcontractor JV Member

Subcontracting Plan Required: Yes No

ACTUAL GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole Dollars

Percent of line (a) or

(c)

Whole Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

File details come from the government source that posted it. Updated .