Attachment 5 - 589A6-21-700 LEHRM IFC_R1 B71 Part 2 of 2 Drawing.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77622R0061
About this file
This solicitation is for a construction project to upgrade communications cabling and infrastructure at the Leavenworth VA Medical Campus in preparation for Electronic Health Record Modernization. The scope of work includes replacing all telecommunications cable, outlets and associated equipment across multiple buildings on the campus with CAT6A copper and various fiber optic cable types. In addition to a one-for-one replacement, an additional 15% capacity must be provided. New cable management structures, patch panels, equipment racks and patch cables will also be installed in the telecommunications rooms. The project will require temporarily relocated equipment racks during construction. Additional scope items include new computer room air conditioning systems, electrical panels and backup generators. The period of performance and response date are not specified. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
ELECTRICAL ABBREVIATIONS
CR
MD
MD
DC
ES
RX
SECURITY DOOR CONTACT. PROVIDE AND INSTALL 4S BACK BOX ABOVE DOOR WITH A 1" EMT
CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING SPACE. PROVIDE ALL CONDUIT,
CONDUIT SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET
BOX AND MUD RING.
WALL MOUNTED SINGLE SENSOR CAMERA. PROVIDE AND INSTALL 4S BACK BOX W/ A 1" EMT
CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING SPACE (U.O.N). PROVIDE ALL CONDUIT, CONDUIT SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX
AND MUD RING. EACH CAMERA TO HAVE ONE(1) CATEGORY 6A CABLE PROVIDED BY SECURITY
CONTRACTOR. PROVIDE WITH MANUFACTURER'S WALL MOUNTING ACCESSORIES.
CARD READER OUTLET. PROVIDE AND INSTALL 4S BACK BOX AT SWITCH HEIGHT WITH A 1" EMT
CONDUIT CONNECTED TO THE DOOR CONTACT OUTLET BOX. PROVIDE ALL CONDUIT, CONDUIT
SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX AND MUD
RING.
DATA/VOICE OUTLET - FLOORBOX. PROVIDE AND INSTALL (4) CAT 6A CMP CABLES/JACKS
TERMINATED IN FLOOR BOX. PROVIDE AND INSTALL (2) 1-1/4" CONDUIT STUBBED TO NEAREST FURRED WALL , ROUTE CONDUIT TO ACCESSIBLE LOCATION ABOVE FINISHED CEILING. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. USE EXISTING CONDUIT RISERS IN-WALL AND EXTEND ALL
CABLES TO NEW CABLE TRAY AND ROUTE TO TR INDICATED. SEE T-700 SERIES SHEETS FOR
NUMBER OF CABLES REQUIRED AT EACH WAO.
DATA/VOICE OUTLET - WALL MOUNTED. PROVIDE AND INSTALL (4) CAT 6A CMP CABLES / JACKS TERMINATED IN 6-PORT FACEPLATE AT 18" AFF. PROVIDE AND INSTALL 5S JBOX WITH SINGLE GANG MUDRING AND 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER). USE EXISTING
CONDUIT RISERS IN-WALL AND EXTEND ALL CABLES TO NEW CABLE TRAY AND ROUTE TO TR
INDICATED. SEE T-700 SERIES SHEETS FOR NUMBER OF CABLES REQUIRED AT EACH WAO.
DATA/VOICE OUTLET - CEILING MOUNTED. PROVIDE AND INSTALL (2) CAT 6A CMP CABLES / JACKS
TERMINATED IN A 2-PORT FACEPLATE AT FINISHED CEILING. (NOTE: AT HARDLID CEILING
LOCATIONS PROVIDE AND INSTALL 5SJBOX WITH 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.) SURFACE TYPE ("F" DENOTES FLUSH TYPE) USE EXISTING CONDUIT RISERS IN-WALL AND EXTEND ALL CABLES TO NEW CABLE TRAY AND ROUTE TO TR INDICATED. SEE T-700 SERIES SHEETS FOR NUMBER OF CABLES REQUIRED AT EACH
WAO.
REQUEST-TO-EXIT. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL 1" EMT CONDUIT
CONNECTED TO THE DOOR POSITION SWITCH BOX. PROVIDE
ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUIT, CONDUIT SUPPORT, CONNECTORS,
COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX AND MUD RING.
ELECTRIFIED DOOR HARDWARE. PROVIDE AND INSTALL 1" EMT CONDUIT CONNECTED TO THE
DOOR CONTACT OUTLET BOX.
CEILING MOUNTED SECURITY MOTION SENSOR. PROVIDE AND INSTALL 1-GANG BACK BOX AND (1) 1" CONDUIT STUBBED UP TO ACCESSIBLE CEILING SPACE. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.
WALL MOUNTED SECURITY MOTION SENSOR. PROVIDE AND INSTALL 1-GANG BACK BOX AND (1) 1" CONDUIT STUBBED UP TO ACCESSIBLE CEILING SPACE. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.
DATA/VOICE OUTLET - ABOVE CEILING.
A INTERCOMMUNICATION SYSTEM ( AI PHONE)
D D
FURNITURE/EQUIPMENT FEED DEDICATED JUNCTION BOX. PROVIDE AND INSTALL RACO 260 5S
JUNCTION BOX WITH (1) 1-1/4" CONDUIT TO ACCESSIBLE CEILING. EXTEND TO CABLE TRAY.
MOUNTING HEIGHT NOTES:
1. ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS OTHERWISE NOTED.
2. REFER TO EQUIPMENT ELEVATION DRAWINGS FOR COORDINATION WITH
CASEWORK.
3. MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.
4. REFER TO ARCHITECTURAL A0 SERIES FOR ADDITIONAL ELECTRICAL DEVICE
MOUNTING HEIGHTS AND DEVICE ALIGNMENT RULES.
WALL SWITCHES
RECEPTACLES
TELECOMMUNICATIONS OUTLETS
TELECOMMUNICATIONS OUTLETS - WALL PHONE
CLOCK OUTLETS
TV OUTLETS
PUSHBUTTONS
VOLUME CONTROLS
NURSE CALL STATIONS
NURSE CALL DOME LIGHTS
DIMMERS
ACCESS CONTROL DEVICES
VANITY LIGHT IN TOILET
INTERCOM
FIREMAN'S PHONE
FIRE ALARM - PULL STATIONS
FIRE ALARM DEVICES HORN/SPEAKERS/STROBES
(MOUNTING HEIGHT AT THE TOP OF THE FIRE ALARM DEVICE OR
6" BELOW CEILING WHICH IS LOWER)
4'-0" AFF
1'-6" AFF
1'-6" AFF
4'-0" AFF
7'-0" AFF
1'-6" AFF
4'-0" AFF
4'-0" AFF
4'-0" AFF
7'-6" AFF
4'-0" AFF
4'-0" AFF
6" ABOVE THE MIRROR, UON
4'-0" AFF
4'-0" AFF
4'-0" AFF
7'-2" AFF TO TOP
SECURITY SYSTEM SYMBOLS
TELECOMMUNICATION SYMBOLS
MOUNTING HEIGHTS
REFERENCE SYMBOLS
SECTION NUMBER
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
E1-1.0
KEY NOTE
E1-1.0
DISCONNECT SWITCHES
MOTOR STARTERS
PANELBOARDS & CABINETS
INDIVIDUAL CIRCUIT BREAKERS
5'-6" AFF
5'-6" AFF
6'-0" AFF TO TOP
5'-6" AFF
WAP
WIRELESS ACCESS POINT OUTLET - CEILING MOUNTED. PROVIDE AND INSTALL (1) CAT 6A CMP CABLES / JACKS TERMINATED IN A SURFACE MOUNT BOX ABOVE FINISHED CEILING. (NOTE: AT HARDLID CEILING LOCATIONS, PROVIDE AND INSTALL 5S JBOX WITH 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. TERMINATE CABLES ON JACKS IN 2-PORT FACE PLATE. PROVIDE 25FT. SLACK ON EVERY CABLE IF THE DISTANCE
ALLOWS. PROVIDE (1) CAT6A CMP PURPLE TO VA-IDF.
SPST
SWBD
SYM
STD
SW
SPEC(S)
SPDT
SPKR
SF
SEC
SINGLE POLE SINGLE THROW
SINGLE POLE DOUBLE THROW
SYMMETRICAL
SWITCHBOARD
STANDARD
SWITCH
SECONDARY
SQUARE FOOT
SPECIFICATION(S)
SPEAKER
PRI
RCLP
RM
SCH, SCHED
RP
REF
REC/RCPT
RSC
RLA
RF
R, RE
QTY
PWR
PT
PVC
PA
PH, ∅
PF
PNL
PE
PB
P
OPP
OHE/T
OH
OFOI
OFCI
NO., NUM, #
OC
NTS
AMERICAN WIRE GAUGE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTOMATIC TRANSFER SWITCH
AMPERE INTERRUPTING CAPACITY
ALTERNATING CURRENT
ABOVE FINISHED COUNTER
AWG
BDF
B/BUR
BUILDING DISTRIBUTION FRAME
BURIED
AUTO
AUX
ARCH
AT
ATS
ALT
AFG
AIC
AFC
AFF
AC
AF
AUXILIARY
ALTERNATE
ARCHITECT
AUTOMATIC
AMPERES TRIP
AMPERE FRAME (BREAKER RATING)
MTG
NC
NEMA
NO
NIC
NEC
N
MV
MH
MOCP
MTD
MLO
MIN
MISC
MECH
MCC
MFR
MCA
MCB
RIGID STEEL CONDUIT
RATED (RUNNING) LOAD AMPS
RECEPTACLE PANELBOARD
ROOM
SCHEDULE
RADIO FREQUENCY
RECEPTACLE
REFRIGERATOR
RELOCATE AS SHOWN
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE
REMOTE CONTROL LIGHTING PANEL
QUANTITY
POWER
PUBLIC ADDRESS
PANEL
PRIMARY
PULL BOX
POWER FACTOR
PHOTO ELECTRIC
PHASE
POLE
OPPOSITE
OWNER FURNISHED, CONTRACTOR INSTALLED
OWNER FURNISHED, OWNER INSTALLED
OVERHEAD ELECTRIC/TELEPHONE
OVERHEAD
ON CENTER
NOT TO SCALE
NUMBER
MOUNTING
NATIONAL ELECTRICAL CODE
MEDIUM VOLTAGE (OVER 600V LESS THAN
35KV)
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
NEUTRAL
MINIMUM CIRCUIT AMPACITY
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAXIMUM OVERCURRENT PROTECTION
MOUNTED
MISCELLANEOUS
MAIN LUGS ONLY
MINIMUM
MANHOLE
MANUFACTURER
MECHANICAL
SWGR SWITCHGEAR
AIR HANDLING UNITAHU
MTS MANUAL TRANSFER SWITCH
PDP POWER DISTRIBUTION PANEL
AMPERESA OR AMP
OCPD OVERCURRENT PROTECTION DEVICE
A
M
B
N
O
P
Q
R
S
T
SPD SURGE PROTECTIVE DEVICE
OD OUTLET DESIGNATOR
LOW VOLTAGE (BELOW 50 VOLTS)
L-L
L-N
LTG
LV
LIGHTING
LINE TO LINE
LINE TO NEUTRAL
1000 CIRCULAR mils
KILOVOLTS (THOUSAND VOLTS)
KILOWATTS (THOUSAND WATTS)
LIGHTNING ARRESTOR
LOCAL AREA NETWORK
KILOVOLTS-AMPERES (THOUSAND VOLT-AMPS)
ISOLATED GROUND
KWH
LAN
LA
KW
KVA
Kcmil
KV
KILOWATT-HOURS
IR
KEY INTERLOCK
JUNCTION BOX
INCH/INCHES (")
INFRARED
GROUND FAULT INTERRUPTER
HAND-OFF-AUTOMATIC
HIGH PRESSURE SODIUM
HEATING VENTILATION AND AIR CONDITIONING
HERTZ
HVAC
HZ
HTR
HR
HT
HPS
HOA
HP
HEATER
HEIGHT
HORSEPOWER
HOUR
GFI
G, GND, GRD
GEN
FLUOR
FL, FLR
GROUND
GENERATOR
FOOT/FEET (')
FLUORESCENT
FLOOR
CMP
FIRE ALARM ANNUNCIATOR PANEL
EQUIPMENT GROUND
FAAP
FLA
FDR
FA
FULL LOAD AMPS
FEEDER
FIRE ALARM
FUSE
EG
CONTROL POWER TRANSFORMER
CURRENT TRANSFORMER
DBB
dB
DAS
DISPLAY BACKBOX
DISTRIBUTED ANTENNA SYSTEM
DECIBEL
CPT
CU
CT
COM, COMM
CKT
CLG
COPPER
COMMUNICATIONS
CIRCUIT
CEILING
COMMUNICATIONS PLENUM (CABLE JACKET
RATING)
CB CONDUIT BANK
COMMUNICATIONS RISER (CABLE JACKET RATING)
FIRE ALARM CONTROL PANELFACP
FIRE ALARM EXTENDER PANELFAEP
CCTV CLOSED CIRCUIT TELEVISION
CP CONSOLIDATION POINT
FLEX FLEXIBLE
HAND HOLEHH
LIGHTING CONTROL PANELLC, LCP
LIGHTING PANEL
L-G LINE TO GROUND
CMR
F
FT
IN
IG
JB, JBOX
K
LP
FOOT CANDLEFC
DMARC POINT OF DEMARCATION BETWEEN UTILITIES OR
BETWEEN UTILITIES AND OWNER PREMISE
EQUIPMENT
C
D
E
F
G
H
I
J
K
L
HORIZONTAL MOUNTINGH
COR CONTRACTING OFFICER'S REPRESENTATIVE
X
XFMR
WP
WHM
W/
W/O
W
VFD
VA
V
UPS
UL
UON
UG
UGS
UGT
UGP
TYP
TV
TP
TEL,TELE
TELECOM
TC
TRANSFORMER
REMOVE DEVICE
WATT HOUR METER
WEATHERPROOF
VOLTS
VARIABLE FREQUENCY DRIVE/
VARIABLE FREQUENCY MOTOR
CONTROLLER
WITHOUT
WITH
WATTS
VETERANS ADMINISTRATION
UNDERGROUND PRIMARY
UNDERGROUND SECONDARY
UNDERGROUND TELEPHONE
UNDERWRITER'S LABORATORY
UNLESS OTHERWISE NOTED
UNINTERRUPTIBLE POWER SUPPLY
UNDERGROUND
TELECOMMUNICATIONS
TYPICAL
TELEVISION
TAMPERPROOF
TIME CLOCK
TELEPHONE
TB TERMINAL BLOCK
TBB TELEPHONE BACKBOARD
U
V
W
X
Z
TPST TRIPLE POLE SINGLE THROW
FDS FORWARD DEPLOYED SERVICES
JOINT SECURITY ARCHITECTUREJSA
PIV PERSONAL IDENTITY VERIFICATION
GENERAL NOTES
1. ALL TELECOMMUNICATIONS WORK SHALL COMPLY WITH THE LATEST EDITION OF VA STANDARDS TELECOMMUNICATIONS INFRASTRUCTURE STANDARDS AND CURRENT MANUFACTURER AND BICSI INSTALLATION PRACTICES. THESE STANDARDS HAVE BEEN ESTABLISHED TO EXCEED ALL CURRENT CODE AND BICSI INSTALLATION PRACTICE. ANY ITEMS THAT RAISE QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND REPRESENTATIVE IN WRITING. IT IS ALWAYS A BEST PRACTICE TO PROVIDE THE AHJ WITH DETAIL ON ANY AND ALL CONSTRUCTION ITEMS THAT COULD BE QUESTIONED BY THE AHJ. THE PROJECT DOCUMENTATION PACKAGE STANDARDS ARE NOT TO BE INTERPRETED NOR CONSIDERED AS AUTHORIZATION TO DEVIATE FROM ANY CODE OR REGULATION. IT IS THE CONTRACTOR’S RESPONSIBILITY TO VALIDATE THAT THESE REQUIREMENTS WILL MEET THE EQUIPMENT MANUFACTURER’S REQUIREMENT TO
PROVIDE A MINIMUM 25-YEAR SCS FOR ALL LABOR AND MATERIALS WARRANTIES.
2. IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND/OR SPECIFICATIONS OR WITH THE AHJ REQUIREMENTS, THE DOCUMENT WHICH PRESCRIBES AND ESTABLISHES THE COMPLETE JOB AS PER MANUFACTURER OR THE HIGHER STANDARD SHALL PREVAIL. ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION
MANAGER AND THE VA REPRESENTATIVE IN WRITING IMMEDIATELY UPON DISCOVERY.
3. OMISSIONS FROM THE DRAWINGS OR FROM THE SPECIFICATIONS OR THE MISDESCRIPTION OF DETAILS OF WORK WHICH ARE CLEAR AND NECESSARY TO CARRY OUT THE INTENT FOR THE DRAWINGS AND SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MISDESCRIBED DETAILS OF THE WORK.
THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER AND VA REPRESENTATIVE UPON IDENTIFICATION OF SUCH OMISSIONS, MISDESCRIPTION, AND UNCLEAR DIRECTIONS IMMEDIATELY.
THE CONTRACTOR SHALL PERFORM ALL PROJECT TASKS AND ASSEMBLY BUILDS AS PER BICSI STANDARDS AND MANUFACTURER’S REQUIREMENTS ALONG WITH COORDINATING AND WORKING
WITH THE VA TO CORRECT SUCH DOCUMENTATION ERRORS.
4. THE CONTRACTOR SHALL CHECK ALL DRAWINGS FURNISHED IMMEDIATELY UPON THEIR RECEIPT AND PROMPTLY NOTIFY THE VA OF ANY DISCREPANCIES. THIS INCLUDES BUT NOT LIMITED TO, DISCREPANCIES BETWEEN DRAWINGS AND SPECIFICATIONS, OR DRAWINGS AND MANUFACTURER INSTALLATION INSTRUCTIONS, OR DRAWINGS AND GOVERNING CODES AND BEST PRACTICES. THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND VA COR ANY DISCREPANCIES BETWEEN DRAWINGS AND HOW THE CONTRACTOR NORMALLY DELIVERS THE
SERVICES DESCRIBED IN THE DRAWINGS OR SPECIFICATIONS.
5. ALL MATERIALS AND EQUIPMENT FURNISHED AND INSTALLED SHALL BE NEW AND FREE FROM ANY KNOWN DEFECT. ALL EQUIPMENT SHALL BEAR THE UNDERWRITERS LABORATORIES LABEL (UL™) LISTING, CLASSIFIED, AND/OR PERFORMANCE VERIFIED MARK OR FROM A VA APPROVED ALTERNATIVE TESTING ORGANIZATION. ALL MATERIALS SHALL BE INSTALLED AND USED IN THE MANNER FOR WHICH THE MANUFACTURER INTEND THEM FOR. THIS APPLIES FOR BOTH PIECE PARTS AND COMPLETE FUNCTIONING ASSEMBLIES.
6. CONTRACTOR IS REQUIRED TO RECEIVE WRITTEN APPROVAL FOR ALL RECOMMENDED AND REQUIRED WORK DEVIATIONS AND CLARIFICATIONS TO THE PLANS AND SPECIFICATIONS OF THIS
PROJECT BY THE VA AND ITS REPRESENTATIVES PRIOR TO ANY FIELD ACTIVITY.
7. ALL WORK MUST BE COMPLETED IN AS PER MANUFACTURER INSTALLATION REQUIREMENTS AND BICSI INSTALLATION PRACTICES. THE VA DEMANDS THE UTMOST PROFESSIONALISM WHEN WORK IS BEING PERFORMED ON CAMPUS AND HOLDS ALL CONTRACTORS TO THAT LEVEL OF PROFESSIONALISM. THE WORK SITE SHALL BE KEPT CLEAN AND FREE FROM DEBRIS. IT IS EVERY CONTRACTOR AND ALL THEIR REPRESENTATIVE’S RESPONSIBILITY TO GUARD AGAINST ANY DAMAGE TO VA PROPERTY AND THE IMMEDIATE REPAIR IF ANY DAMAGE IS CAUSED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING A FINAL CLEANUP OF THE WORK SITE PRIOR TO FINAL SYSTEM ACCEPTANCE AS PART OF THE PUNCH-LIST PROCESS.
8. THE CONTRACTOR SHALL NOT BORE, NOTCH, OR IN ANY WAY CUT INTO ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL FROM THE VA, ARCHITECT, AND STRUCTURAL ENGINEER. WITH PERMISSION FROM THE ABOVE AND PRIOR TO ALL CUTTING, DRILLING, NOTCHING, CORING, ETC. OF CONCRETE STRUCTURE AND FAÇADE THESE SURFACES SHALL BE X-RAYED OR GROUND PENETRATING RADAR USED TO ACCURATELY LOCATE REBAR, POST-TENSION CABLES & RODS, CONDUITS, AND ANY OTHER EMBEDDED POTENTIAL OBSTRUCTIONS TO
ENSURE THAT NO DAMAGE IS CAUSED TO ANY STRUCTURAL REINFORCEMENTS.
9. FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY THE TELECOM DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC. THE SIZE AND LOCATION OF EQUIPMENT IS SHOWN TO SCALE WHEREVER POSSIBLE. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS WITH INFORMATION INDICATED ON THE DRAWINGS AND DESCRIBED IN THE SPECIFICATION SECTIONS WHERE TELECOM WORK
INTERFACES WITH OTHER TRADES.
10. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS WHEN WORKING IN AREAS WITH EXISTING CEILINGS AND SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING TILES WITHOUT DAMAGING OR SOILING THE CEILING TILES. CHIPPED, DAMAGED, CRACKED, OR BROKEN TILES ARE THE CONTRACTOR’S RESPONSIBILITY TO REPLACE WITH LIKE TILES.
11. ALL FOOTAGES IDENTIFIED ON DRAWINGS OR SCALED OFF OF DRAWINGS ARE TO BE CONSIDERED ESTIMATES AND ARE RECOMMENDED TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO
ORDERING OF MATERIAL
12. ALL CABLE TRAYS, LADDER (TYPE) RACKING, CONDUIT, EQUIPMENT RACKS, PROTECTION PANELS, AND CABLE SHEATHS SHALL BE BONDED TO AN APPROVED TELECOMMUNICATIONS BONDING
ASSEMBLY.
13. ACCORDING TO TIA STANDARDS AND BICSI METHODOLOGIES PULL-BOXES LOCATED WITHIN A STRUCTURE ARE TO BE PLACED AT 100’ INCREMENTS AND PROPERLY SPACED WITHIN RUNS OF MORE THAN 150’. PULL-BOXES ARE TO BE PLACED IN CONDUIT RUNS THAT EXCEED A MAXIMUM OF 180-DEGREES IN CHANGES OF DIRECTION. TELECOMMUNICATIONS PULL-BOXES ARE TO BE SIZED AT A MINIMUM OF TWELVE (12) TIMES THE DIAMETER OF THE LARGEST CONDUIT. PULL-BOXES SHOULD NOT BE USED FOR CHANGES OF DIRECTION. THESE STANDARDS ARE TO BE ADHERED TO WHERE EVER PRACTICAL AND ANY DEVIATION TO THESE STANDARDS REQUIRES A SHOP-DRAWING, IF DISCOVERED DURING THE SUBMITTAL PHASE, TO REMEDIATE THE ISSUE OR BY AN RFI DURING THE CONSTRUCTION INSTALLATION PHASE. THE VA MAY ELECT TO INCREASE THE CONDUIT SIZE OR QUANTITY OF CONDUITS TO MITIGATE THE ISSUE FOR THE EXCESS LENGTH, ADDITIONAL QUANTITY OF CHANGES OF DIRECTION, AND/OR THE REDUCED SIZE OF PULL-BOXES WITHIN THE GIVEN PATHWAY. THE CONTRACTOR IS REQUIRED TO HAVE APPROVAL IN WRITING PRIOR TO ANY ROUGH-IN
WORK OR MATERIAL PROCUREMENT.
14. AS A STANDARD, ALL INTER-BUILDING PATHWAYS SHALL HAVE A MINIMUM OF 20% AVAILABLE CAPACITY AT THE SCHEDULED END OF THE PROJECT. SHOULD THIS PERCENTAGE NOT BE ACHIEVABLE, THIS ISSUE MUST BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND THE VA REPRESENTATIVE.
15. WHERE PATHWAY CONSISTS OF MULTIPLE CONDUITS OR SLEEVES, A PATHWAY MUST BE FILLED TO CURRENT TIA AND BICSI INSTALLATION RECOGNIZED MAXIMUM FILL BEFORE UTILIZING THE NEXT
VACANT OR PARTIALLY FILLED PATHWAY.
16. OVERHEAD AND WALL MOUNTED LADDER (TYPE) RACKING INSTALLATION SHALL MATCH THE DRAWINGS AS CLOSELY AS POSSIBLE AND REQUIRES A SHOP DRAWING FOR EACH ROOM LOCATION.
THE PACKAGE IS TO INCLUDE A BILL OF MATERIALS WITH PART NUMBERS FROM RACKING MANUFACTURER FOR MOUNTING AND CONNECTION PIECE PARTS. PRIOR TO ANY ROUGH-IN WORK BEING
PERFORMED THESE SUBMITTALS MUST BE APPROVED BY THE VA REPRESENTATIVE.
17. ALL CABLING AND THEIR PATHWAYS PASSING THROUGH A RATED FIRE OR SMOKE BARRIER MUST BE PROPERLY SLEEVED AND FIRE STOPPED USING APPROVED (UL CLASSIFIED) FIRE STOP ASSEMBLIES. FIRESTOP ASSEMBLIES ARE TO BE INSTALLED PER THE MANUFACTURER’S INSTRUCTIONS FOR THE TYPE OF BARRIER, PATHWAY SIZE, AND QUANTITY OF CABLES THE FIRESTOP ASSEMBLY IS BEING INSTALLED FOR. CONTRACTOR IS REQUIRED TO MAINTAIN TRAINING RECORDS FOR ALL STAFF PERFORMING FIRESTOP ASSEMBLY INSTALLATION WORK.
18. CABLE PULLING – LINE/ROPE/TAPE SHALL BE PLACED IN ALL NEW CONDUITS. ALL CONDUITS SHALL ALSO BE CAPPED AND/OR PROPERLY FIRE STOPPED IN A MANNER APPROVED BY THE VA AND THE
AHJ.
19. EACH OSP CABLE SHALL BE EQUIPPED WITH A PERMANENT LABEL INDICATING CABLE TYPE, PAIR OR OPTICAL STRAND COUNTS, DISTANT END COMMONLY USED BUILDING NAME/NUMBER AND CABLE LENGTH. BOTH ENDS OF EACH CABLE SHALL BE LABELED CLEARLY SO THAT THEY CAN BE EASILY MATCHED TO EACH OTHER.
20. ALL CABLE SPLICES SHALL BE CONTAINED WITHIN AN APPROVED SPLICE CASE DESIGNED FOR THE LOCATION AND PURPOSE. THE SUBMITTAL FOR THE ENCLOSURE SHALL IDENTIFY WEATHER THE ENCLOSURE IS RE-ENTERABLE. AS PART OF THE SUBMITTAL A LISTING OF ANY AND ALL ADDITIONAL PARTS ARE REQUIRED TO RESTORE THE INTEGRITY OF THE ENCLOSURE SHOULD THE SPLICE
CASE BE REQUIRED TO BE ENTERED OPERATIONALLY.
21. OPTICAL FIBER CABLE SHALL BE PLACED WITH A MINIMUM OF THREE (3) METER MAINTENANCE LOOP AT EACH END OF THE RUN, AT EACH SIDE OF A SEISMIC JOINT, IN EACH MAINTENANCE HOLE (MH), VAULT, ETC. THE MAINTENANCE LOOP SHALL BE SECURED IN SUCH A MANNER TO PROVIDE MECHANICAL PROTECTION OF THE CABLE. AS PART OF THE SUBMITTAL PHASE THE CONTRACTOR IS TO PROVIDE SINGLE-LINE SHOP DRAWINGS OF THE LOCATIONS OF ALL MAINTENANCE LOOPS AND TO INCLUDE ANY RECOMMENDED LOOPS TO BE ADDED IN PULL-BOXES FOR EACH INDIVIDUAL
PATHWAY RUNS.
22. ALL OPTICAL FIBER CABLE SHALL BE TESTED USING ANSI/TIA STANDARDS AND BICSI INSTALLATION APPROVED TESTING PLATFORM. THIS TEST MUST BE PERFORMED BI-DIRECTIONALLY ON ALL STRANDS AND ALL RECORDS ARE TO BE OPENED AND VIEWED IN A STANDARD PLATFORM THAT DOES NOT CAUSE THE VA TO PURCHASE OR LICENSE FOR SUCH VIEWING. THE VA AT ITS DESECRATION MAY REQUIRE TO SEE THE TESTER’S CALIBRATION RECORD AND WILL NOTIFY THE CONTRACTOR OF THIS REQUEST PRIOR TO OR POST TESTING OPERATION. ALL BI- DIRECTIONAL
TESTING SHALL PERFORM TO THE FOLLOWING STANDARDS:
A. ANSI/TIA - 568.3-D
B. ANSI/TIA - 526.7
C. ANSI/TIA - 455
23. OPTICAL FIBER CABLE SPLICING SHALL UTILIZE FUSION SPLICING TECHNIQUES AND REQUIRE A SHOP DRAWING DURING THE SUBMITTAL PHASE OF THE PROJECT PRIOR TO ANY ROUGH-IN. ANY AND ALL CABLE SPICING REQUIRES A WRITTEN APPROVAL BY THE VA BEFORE ANY MATERIAL PURCHASING OR ROUGH-IN.
24. CONTRACTOR TO COORDINATE WAO AND SUPPORTING CONDUIT AND CABLE TRAY WITH THE ELECTRICAL CONTRACTOR WHERE THE ELECTRICAL CONTRACTOR IS A DIFFERENT ORGANIZATION
THAN LOW-VOLTAGE CABLING/CONDUIT CONTRACTOR FOR PROPER PLACEMENT.
25. ALL STATION CABLES SHALL BE NEATLY DRESSED AND SECURED EVERY FIVE FEET AT A MINIMUM.
26. ALL VA-IT STATION CABLES SHALL BE TERMINATED ON THE SAME FLOOR AS THE FLOOR SERVING BDF/IDF UNLESS OTHERWISE NOTED IN THESE DRAWINGS.
27. ALL STATION CABLING IS TO BE MECHANICALLY PROTECTED IN PLACE UNLESS OTHERWISE IDENTIFIED IN THESE DRAWINGS, BY A CONTRACT CHANGE RECORD, OR BY A RFI RESPONSE FROM THE
VA REPRESENTATIVE IN WRITING DIRECTING SURFACE-MOUNT EXPOSED AS THE CABLE INSTALLATION MEANS.
28. ALL NEW STATION CABLES SHALL BE TESTED AND DOCUMENTED USING RECOGNIZED MANUFACTURER INSTALLATION REQUIREMENTS AND BICSI INSTALLATION PRACTICES. UTP (CATEGORY) CABLE
TESTING RESULTS SHALL BE ONE TEST RECORD FOR EACH CABLE AND THE RECORD MUST INCLUDE THE VA APPROVED CABLE IDENTIFICATION STANDARD NAMING/NUMBERING SCHEME. OPTICAL FIBER TESTING SHALL FOLLOW ALL VA AND MANUFACTURER INSTALLATION PRACTICES. COAX TESTING SHALL FOLLOW BOTH VA AND SCTE CABLE TESTING PRACTICES.
29. THE VA REQUIRES A ONE (1) METER SLACK LOOP FOR ALL WAO SUPPORTED BY OPEN CEILING CABLE DISTRIBUTION. THE SLACK LOOP MUST BE SUPPORTED ABOVE THE WAO IN NEAT AND REPEATABLE FASHION THAT MEETS BOTH BICSI INSTALLATION AND MANUFACTURER PRACTICES.
30. ALL STATION OUTLETS, WAO, AND TERMINATION POINTS INCLUDING EXISTING WAO UTILIZED UNDER THIS PROJECT SCOPE SHALL BE PROPERLY LABELED AND IDENTIFIED USING THE STANDARD VA INTERNAL DISTRIBUTION NAMING/NUMBERING SCHEME. ALL LABELS ARE TO BE MACHINE GENERATED AND AN EXCEL TYPE MATRIX CREATED DEFINING LOCATION OF BOTH ENDS OF EACH LABELED CABLE. AS-BUILT CLOSEOUT PACKAGE MUST INCLUDE THESE STATION AND TERMINATION POINTS IDENTIFIED ON FLOOR PLANS FOR EACH LEVEL/FLOOR IN ADDITION TO THE STATION CABLING MATRIX. THE SAME CABLE IDENTIFICATION IS ALSO REQUIRED TO BE INCLUDED ON EACH CABLE TESTED RECORD BOTH HARD AND SOFT-COPY RECORD.
31. STANDARD WORKSTATION OUTLET (AKA WORK AREA OUTLETS OR WAO) SHALL CONSIST OF A 5S X 2-7/8” DEEP METAL BOX, FED WITH A MINIMUM 1-1/4” CONDUIT. BACK BOX TO BE FITTED WITH
SINGLE-GANG FINISH RING FOR 6-PORT FACEPLATE.
32. STANDARD WAO FACEPLATE SHALL CONSIST OF A SINGLE-GANG PLATE, 6-POSTION, WHITE IN COLOR, AND UNIVERSAL MULTI-PURPOSE PORTS TO SUPPORT THE FOLLOWING TERMINATIONS; UTP, SCTP, COAX, OPTICAL FIBER, USB, VARIOUS A/V CONNECTORS, ETC. ALL UNUSED PORTS SHALL BE FITTED WITH BLANK INSERTS.
33. STANDARD WORKSTATION CONSISTS OF A MINIMUM OF FOUR (4) CATEGORY 6A, CMP, GRAY, BLUE, AND WHITE CABLES.
34. INCLUDED AS PART OF THE CABLING AS-BUILT DOCUMENTATION PACKAGE, IT IS THE CONTRACTOR’S RESPONSIBILITY TO PROVIDE TO THE VA THE STRUCTURED CABLING SOLUTION
MANUFACTURER’S 25-YEAR WARRANTY CERTIFICATE FOR THE PROJECT.
35. THE WAO UTP 8-CONDUCTOR JACKS ARE DESCRIBED WITHIN THIS DOCUMENT SET AS RJ-45 JACKS/INSERTS. THE DESIGNERS ARE AWARE THAT ABBREVIATION RJ-45 IS A FCC –REGISTERED JACK
WITH 8-CONDUCTORS AND DESCRIPTION IN THIS DOCUMENT SET IS FOR A UTP CATEGORY CABLE RATED JACK/INSERT AND NOT FOR FCC INTERFACE JACKS.
36. ALL NEW CABLING SHALL CONFORM TO THE SCS INCLUDING BEING INSTALLED BY A CERTIFIED INSTALLER AND SIGNED OFF BY A MANUFACTURER REPRESENTATIVE.
37. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET ARE USED IN THE DRAWING SET CURRENTLY, BUT ARE THERE, SHOULD THE SCOPE GROW TO INCLUDE SUCH WORK.
38. THE CONTRACTOR SHALL PROVIDE WIRE GUARDS FOR ALL EXPOSED AUDIO, VISUAL, AND NETWORK DEVICES LOCATED IN AREAS THAT CAN BE SUBJECT TO VANDALISM SUCH AS WAITING ROOMS, RESTROOMS, LOCKER AND SHOWER ROOMS, MULTI-PURPOSE/DINING, CHECK-IN AREAS/LABS, & ASSEMBLY ROOMS. AND ALL HALLWAYS AND CORRIDORS ASSOCIATED WITH THESE SPACES
39. ALL CONDUITS CROSSING BUILDING SEISMIC SEPARATIONS OR EXPANSION JOINTS SHALL BE PROVIDED WITH APPROVED CONNECTORS. REFER TO ARCHITECTURAL PLANS FOR ALL EXPANSION
JOINT LOCATIONS.
40. COORDINATE INSTALLATION OF LIGHTING FIXTURES WITH CABLE TRAY AND EQUIPMENT IN BDF, IDF, AND ALL A/V ROOMS/SPACES TO MAINTAIN REQUIRED LIGHTING LEVELS WITH ALL EQUIPMENT IN
PLACE.
41. FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS OR SHOP DRAWINGS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE ELECTRICAL
ENGINEER AND THE FIELD REPRESENTATIVE FOR THE VA.
42. VA, MANUFACTURER, BICSI INSTALLATION PRACTICES FOR PROJECT SUBMITTALS AND SHOP DRAWINGS ARE IDENTIFIED IN SPECIFICATIONS SECTIONS LISTED IN DIVISION 26, 27, AND 28, OF THE
PROJECT CONTRACT DOCUMENTATION SET.
43. J-HOOK ROUTING IS AN "IN-THE-FIELD" INSTALLATION CHOICE AND SHALL BE REQUIRED TO BE DOCUMENTED ON ALL AS-BUILT PACKAGES. SLEEVES REQUIRED TO COMPLETE THESE J- HOOK
ROUTINGS SHALL BE CONSIDERED AND INCLUDED IN THE J-HOOK ROUTE EQUIPMENT PACKAGE FROM THE CONTRACTOR AS CPCI PATHWAY EQUIPMENT. J-HOOK SLEEVES THROUGH RATED AND NON-RATED ASSEMBLIES SHALL NOT BE A REQUIREMENT OF THIS DRAWING PACKAGE AS THEY ARE FIELD DEFINED LOCATIONS AND QUANTITIES.
44. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS SHOWING ALL PROPOSED CABLE ROUTING, CABLE TRAY LOCATIONS AND SIZING, J-HOOK LOCATIONS, PENETRATIONS, DEVICE LOCATIONS, EQUIPMENT LOCATIONS, WAO LOCATIONS, ETC. PRIOR TO BEGINNING WORK. THESE DRAWINGS SHALL BE COORDINATED WITH NEW AND EXISTING SYSTEMS TO MAINTAIN ALL REQUIRED CLEARANCES AND ACCESS FOR NEW AND EXISTING EQUIPMENT. COORDINATION DRAWINGS MUST BE REVIEWED AND APPROVED BY VA/AE PRIOR TO BEGINNING INSTALLATION WORK.
45. CONTRACTOR SHALL SUBMIT PROPOSED NEW RACK ELEVATIONS FOR EACH TELECOMMUNICATIONS ROOM/ RACK PRIOR TO BEGINNING WORK. TERMINATION LOCATIONS AND RACK
CONFIGURATIONS SHALL BE APPROVED PRIOR TO BEGINNING WORK.
46. CONTRACTOR SHALL SUBMIT WEEKLY CABLE TESTING/ TERMINATION REPORTS FOR VA/AE REVIEW AS AREAS ARE COMPLETED TO ENSURE CABLE PERFORMANCE MEETS BICSI AND CONTRACT
REQUIREMENTS.
47. INFECTION CONTROL PROTOCOL SHALL BE MAINTAINED AT ALL TIMES, INCLUDING NEGATIVE AIR HEPA FILTERED CONTAINMENTS. MOBILE HEPA CARTS SHALL BE USED FOR CABLE PULLING ACTIVITIES AS REQUIRED BY THE SPECIFICATIONS. COORDINATE ALL ACTIVITY WITH THE VA. SEE SPECIFICATION SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION.
STANDARD OUTLET INFORMATION
X ROOM NUMBER - OUTLET DESIGNATOR
W WALL PHONE JACK @ +42" AFF (ADA)
H WALL PHONE JACK @ +84" AFF (ADA)
WP WEATHERPROOF
AV AUDIO VIDEO CABLES (SPECIFIC USE,
INSTALLED POINT TO POINT)
# NUMBER (IDENTIFICATION) OR COUNT
(#) NUMBER IS QUANTITY
A/E ARCHITECT/ENGINEER
AH AMPERE HOUR
AUTHORITY HAVING JURISDICTIONAHJ
ASSISTIVE LISTENING SYSTEMALS
ACCESS POINTAP
ALUMINUM, STEEL, POLYETHYLENEASP
AMERICAN SOCIETY FOR TESTING AND MATERIALSASTM
AUDIOVISUAL CONTRACTORAVC
BMS
BLDG
BUILDING
BUILDING
BS-IDF
BRKR, BKR
BUILDING SERVICES INTERMEDIATE DISTRIBUTION
FRAME
BREAKER
BTU BRITISH THERMAL UNIT
CATV COMMUNITY ANTENNA TELEVISION (CABLE
TELEVISION)
C CONDUIT
CONDUIT ONLY - WITH PULL WIREC.O.
CONSOLIDATION POINTCP
CAPTURED SCREW CONNECTORCSC
DISTRIBUTION PANEL
DOUBLE POLE SINGLE THROW
DOUBLE POLE DOUBLE THROWDPDT
DWG
DPST
DIST
DISC
DC
DP
DN
DRAWING
DISTRIBUTION
DIRECT CURRENT
DISCONNECT
DOWN
DIV DIVISION
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
ELECTRIC, ELECTRICAL
ELECTRIC METALLIC CONDUIT
ELECTRICAL CONTRACTOR
EWC
EWH
ELEC
EQ, EQUIP
EM, EMERG
EMT
ELEV
ENCL
E.C.
EQUIPMENT
ELEVATOR
EMERGENCY
ENCLOSURE
EXISTINGE, EX, EXIST
X EMPTY (OUTLET WITH NO CABLE,
FUTURE USE).
F FURNITURE SYSTEM JACK
C COAXIAL CABLE RG-11
M WALL MOUNTED MONITOR
T VOIP - TELEPHONE
TV TELEVISION OUTLET
WAP WIRELESS ACCESS POINT
NOTES
1. WORK AREA OUTLET CONDUIT HAS BEEN DESIGNED FOR CATEGORY 6A CMP CABLE DISTRIBUTION WITH 5S BACK-BOX AND
1-1/4" IN CONDUIT.
2. FILL FACTOR IS CALCULATED USING 0.275 IN O.D. FOR SUPERIOR ESSEX CAT6A CMP 77-246-YB AT A WEIGHT OF 23 LBS/KFT.
EACHEA
ENTRANCE FACILITYEF
EMI ELECTROMAGNETIC INTERFERENCE
EMS EMERGENCY MANAGEMENT SYSTEM
ENT ELECTRICAL NONMETALLIC TUBING
FLOOR BOXFB
FDC OPTICAL - FIBER DISTRIBUTION CENTER
FEXT FAR END CROSSTALK
FIN FINISH
FIXT FIXTURE
FOC FIBER OPTIC CABLE
FPS FRAMES PER SECOND
GA GAUGE
GC GENERAL CONTRACTOR
GALVANIZD RIGID CONDUITGRC
INTERCOM
IDF
INSIDE DIAMETER OR INSIDE DIMENSION
INTERMEDIATE DISTRIBUTION FRAME
ID
IC
ISP INTERNET SERVICE PROVIDER
M METER
MAC MEDIA ACCESS CONTROL
MDF MAIN DISTRIBUTION FRAME
MM MULTI-MODE
MOB MEDICAL OFFICE BUILDING
MTU MULTI TENNET UNIT
WS WORK STATION
WiFi
WIRELESS FIDELITY (LOCALIZED WIRELESS USER
ACCESS INTERNET/NETWORK)
WAO WORK AREA OUTLET / WORK STATION OUTLET
WBS WORK BREAKDOWN STRUCTURE
V-A VOLTS-AMPERES
ND NETWORK DEVICE
NE NETWORK ENCLOSURE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEXT NEAR END CROSSTALK
OF OPTICAL FIBER
OSP OUTSIDE PLANT
OTDR OPTICAL TIME DOMAIN REFLECTOMETER
POE POWER OVER ETHERNET
PPF PIXELS PER FOOT
PR PAIR
PSU POWER SUPPLY UNIT
PTP POINT-TO-POINT
REQ'D REQUIRED
RM ROOM
RMC RIGID METAL CONDUIT
RMS RACK MOUNTED SPACE
RNC RIGID NONMETALLIC CONDUIT
RU RACK UNIT
SAC SECURITY AND ACCESS CONTROL
SCS STUCTURED CABLING SOLUTION
ScTP SCREENED TWISTED PAIR
SM SINGLE-MODE
SNR SIGNAL TO NOISE RATIO
SQ SQUARE
STP SHIELDED TWISTED PAIR
SYS SYSTEM
TCP/IP TRANSMISSION CONTROL PROTOCOL/
INTERNET PROTOCOL
TE TELECOMMUNICATION ENCLOSURE
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR
TR TELECOMMUNICATIONS ROOM OR SPACE
UD UNDERGROUND DUCT
UTP UNSHIELDED TWISTED PAIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B71
B
IM
/5
A
-2
-7
E H
R M
I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h
K S
V A
M C
/5
A
-2
-7
.L
E H
R M
.G E
N E
R A
L .S
H E
E T
S .M
E P
.r v t
/1
/2
:0
:1
P
M
71T-001
TELECOMMUNICATION ABBREVIATIONS AND
SYMBOLS
589A6-21-700
01/19/2022 M. Perkins G. Weaver
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
Revisions: Date:
/19
/20
1/19/2022
WAP
WAP
WAP
WAP
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
23B-AP-A
20B-AP-A
22-AP-A
B-C3-AP-A
20-AP-A
16-AP-A 14-AP-A
B-C2-AP-A
12-AP-A
11-AP-A
B-S1-AP-A
08-AP-B
08-AP-A
25-AP-A
25A-AP-A
23-A
A
-E
A
-F
25A-G
25A-H
A
-A
A
-B
25A-C
25A-D
-C
-D
-F
-E
-A
25-B
-A
-A
-B
-C
-D
08-E
-F
-A
-B
-C
-D
12-A
12-B
-C
-F
-E
-D
-A
-B
-C
-A
-B
14-C
-A
15-G
-B
15-C
15-D
16-B
-A
17-A
17-C
17-B19-A
19-B
20-B
20-A
21-A
21-B
21-C
-D
22-A
22-B22-C2 -D
22-E
-F
-G
NO DATA
NO DATA
NO DATA
NO DATA
NO DATA
NO DATA NO DATA NO DATA
NO DATA NO DATA
NO DATA NO DATA NO DATA NO DATA NO DATA
NO DATA NO DATA
15-F
-E
LOBBY
23B
OIT TRAINING
ROOM
SUPERVISOR
INFO
MANAGEMENT
CORRIDOR
B-C3
OFFICE
WORK ROOM
20 OFFICE
MEDICAL MEDIA
STORAGE
OFFICE
OFFICE
MEDICAL MEDIA
16A
STORAGE
STORAGE
15A
CORRIDOR
B-C1
BREAK ROOM
05A
EQUIPMENT
ROOM
04B
ELEV#1
B-E1OIT
MEDICAL MEDIA
DEPARTMENT
MEDICAL MEDIA
CLASSROOM
25A
WOMEN
RESTROOM
MAILROOM/
REPRODUCTION
STAIR
B-S1
DESKTOP
SUPPORT
SYSTEM
ADMINISTRATORS
SYSTEM
ANALYST/
NETWORK
MANAGER
OFFICE
MENS RESTROOM
MECHANICAL
UNIV. WASTE
STORAGE
04A
71T-100
D7 71T-100
D5
C
-C A
M -0
TYP.
ROOM
20B
TYP.
TYP.
TYP.
15C-CAM-01
TYP.
262' - 0"
STORAGE
TELECOM ROOM
15B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.B
.M E
P .r v t
/1
/2
:1
:5
P
M
71T-100
TELECOMMUNICATION PLAN & ENLARGED PLANS
- BASEMENT LEVEL
589A6-21-700
B71
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 4-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’ – 6” A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. PROVIDE NEW iSTAR EDGE (ESTAR002) ACCESS CONTROL SYSTEM. INSTALL
PER MANUFACTURERS RECOMMENDATIONS.
14. ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL
REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.
PROTECT IN PLACE.
15. HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.
16. EXISTING RACK TO BE DEMOLISHED. CONTRACTOR TO COORDINATE WITH COR.
17. EXISTING CABLE TRAY TO BE DEMOLISHED. CONTRACTOR TO COORDINATE
WITH COR.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/8" = 1'-0"
F1
TELECOMMUNICATION PLAN -
BASEMENT LEVEL
SCALE: 1/2" = 1'-0"
D7
TELECOMMUNICATIONS ENLARGED
PLAN - BASEMENT LEVEL - ROOM 15C
- NEW
SCALE: 1/2" = 1'-0"
D5
TELECOMMUNICATIONS ENLARGED
PLAN - BASEMENT LEVEL - ROOM 15B
- DEMO
SCALE: 1" = 100'-0"
B2
DIAMOND ANALYSIS - BASEMENT
LEVEL
Revisions: Date:
/19
/20
WAP
WAP
WAP
WAP
WAP
WAPWAPWAPWAP
WAP
WAP
102-AP-A
1-C3-AP-A
104-AP-A
100-AP-B
116-AP-A
118B-AP-A
120-AP-A
124-AP-A126-AP-A
100-AP-A
132-AP-A
135-AP-A
NO
DATA
NO
DATA NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
100-A
100-B
102-B
-C
102-A
103-A
104-A
104-B
107-B
107-A
-A
108-B
107-AP-A
111-A
116-A
-B
118-C
-D
-A
118-E
118-F 118B-B
118B-A
118B-C
120A-B
120A-A
120-A
120-B
122-A
122-B
122-C
122-D
123-A 124-A
125-A
126-B
126-A
-C
126-D
-E
100-A
-E
1-C3-A
-A
-B
-D
129-C
-A
-B
-C131-D
132-A
132-B
133-B
133-A 134-A135-A
HUMAN
RESOURCES
SPECIALIST
VISN 15 PBM
MANAGER
HUMAN
RESOURCES
SPECIALIST
KC/COLUMBIA
CIVILIAN PAY
TECH
KC/COLUMBIA
CIVILIAN PAY
TECH
WOMEN
KC/COLUMBIA
CIVILIAN PAY
TECH
KC/COLUMBIA
CIVILIAN PAY
TECH
ALCOVE
109B
TELECOM ROOM
ENTRY
MAIL/
WORKROOM
VISN SCAN ROOM
REGION 2 ROC
132OFFICE
HUMAN
RESOURCES
ASSISTANT
VISN RESOURCES
SPECIALIST
ELEV
1-E1
BREAKROOM
KC/COLUMBIA
CIVILIAN PAY
TECH
MEN
113 OFFICE
PAYROLL
SPECIALIST
PROJECTS
EKS/WICHITA P&R
ASSISTANTS
EKS/WICHITA
SENIOR P&R
118B
STAIR
SUPERVISORY
P&R
120A
VISN HUMAN
RESOURCES
ASSISTANT
HRRO
RECRUITER
122EKS/WICHITA
CIVILIAN PAY
TECH
EKS/WICHITA
CIVILIAN PAY
TECH
EKS/WICHITA
CIVILIAN PAY
TECH
KC/COLUMBIA
P&R ASSISTANTS
71T-101
B7 71T-101
B4
110-CAM-01
TYP.
-C
A M
-0
TELECOM ROOM
7 TYP.
TYP.
TYP.
TYP.
TELECOM ROOM
262' - 0"
TELECOM ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.B
.M E
P .r v t
/1
/2
:1
:0
P
M
71T-101
TELECOMMUNICATION PLAN & ENLARGED PLANS
- FIRST LEVEL
589A6-21-700
B71
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 4-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING RACK TO THE NEW RACK.
PROVIDE TEMPORARY EXTRA LENGTH JUMPER CABLES TO EXISTING SWITCHES
AND OTHER DEVICES TO ENSURE UNINTERRUPTED SERVICE. ONCE ALL
EXISTING DATA CIRCUITS ARE RELOCATED TO NEW PATCH PANELS ON THE
NEW RACK AND ALL EXISTING DEVICES TO REMAIN ARE TRANSFERRED TO THE
NEW RACK, REMOVE THE EXISTING RACK AND INSTALL THE NEW RACKS IN THE
FINAL PERMANENT POSITION.
4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE
CAREFULLY PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING
RACK SHALL BE TRANSFERRED TO THE NEW SECOND LEVEL LOCATION ON THE
NEW RACK. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS SHOWING THE
PROPOSED NEW RACK ELEVATION AND PROVIDE A PHASING PLAN FOR
TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.
6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY
SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT
COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK.
COORDINATE FIXTURES WITH OVERHEAD TRAY. SEE T-500 SERIES SHEETS FOR
ADDITIONAL REQUIREMENTS. COORDINATE LIGHT FIXTURES WITH OVERHEAD
CABLE TRAY.
7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION
SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. BASIS OF DESIGN
WISENET XNP-6320. MOUNT AT 8’ – 6” A.F.F. TO TOP OF WALL BRACKET.
INTEGRATE CAMERA INTO EXISTING VMS. PROVIDE CONTROLLABILITY THROUGH
EXISTING IT NETWORK.
8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.
9. NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR
HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH
ENDS TO PROTECT CABLES. FIRE CAULK PENETRATION PER SPECIFICATIONS.
10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE
PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS
INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE
AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN
FOR TRANSFERRING FIBER.
11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.
12. EXISTING WALL MOUNTED FIBER SPLICE WITH MULTI-MODE OPTICAL CABLE TO
BE PROTECTED IN PLACE UNTIL NEW SPEED FIBER IS INSTALLED. DEMOLISH
EXISTING FIBER SPLICE ONCE NEW SPEED CONDUIT SLEEVE AND FIBER ARE
OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR
TRANSFERRING FIBER.
13. PROVIDE NEW iSTAR EDGE (ESTAR002) ACCESS CONTROL SYSTEM. INSTALL
PER MANUFACTURERS RECOMMENDATIONS.
14. ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL
REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.
PROTECT IN PLACE.
15. HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.
16. EXISTING RACK TO BE DEMOLISHED. CONTRACTOR TO COORDINATE WITH COR.
17. EXISTING CABLE TRAY TO BE DEMOLISHED. CONTRACTOR TO COORDINATE
WITH COR.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
SCALE: 1/8" = 1'-0"
F1
TELECOMMUNICATION PLAN - FIRST
LEVEL
SCALE: 1/2" = 1'-0"
B7
TELECOMMUNICATIONS ENLARGED
PLAN - FIRST LEVEL - ROOM 110 -
NEW
SCALE: 1/2" = 1'-0"
B4
TELECOMMUNICATIONS ENLARGED
PLAN - FIRST LEVEL - ROOM 110 -
DEMO
SCALE: 1" = 100'-0"
B2
TELECOMMUNICATION PLAN - FIRST
LEVEL
Revisions: Date:
/19
/20
WAP
WAP
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAPWAP
WAP
WAPWAP
WAP
WAP
WAP
WAP
WALL SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
SMOKE AND 1-HR RATED FIRE
BARRIER AND OPENINGS
SMOKE AND 2-HR RATED FIRE BARRIER
AND OPENINGS
SMOKE BARRIER AND OPENINGS
1 HR RATED FIRE BARRIER AND
OPENINGS
2 HR RATED FIRE BARRIER AND OPENINGS
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
200-AP-A
203-AP-C
209-AP-A
212B-AP-A
212-AP-A 216-AP-D
219-AP-A
215A-AP-A
221A-AP-A
221-AP-A
224-AP-A
227-AP-A
232-AP-A
236-AP-A
238-AP-A239-AP-A
204A-AP-A
240-AP-A
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
NO
DATA
200-A
200-B
201-A
201-B
202-B
202-A
203-A
203-B
205-B
205-A
207-B
207-A
207-C
207-D
-A
212-B
212-C 213-B
213-A
-A 216-A
216-B
216-C
217-A 217-B
218-A
218-B
218-C 219-A
-B
221-A222-A 222-B
222-C
222-D223-A
223-B
224-A
224-B
225-A
225-B
226-B
226-A
227-A
227-B
228-B
228-A
229-A
229-B
-B
230-B
230-A
231-A
231-B
231-C
-A
232-D
232-C
232-A
232-B
233-B
233-A
236-B
236-A
237-A
237-B
238-A
239-A
239-B
239-C
211-AP-A
238-B
VISN SYSTEMS
PROGRAM
ANALYST
HUMAN
RESOURCES
SPECIALIST
HUMAN
RESOURCES
SPECIALIST
VISN CIVILIAN
PAY TECH
VISN CIVILIAN
PAY TECH
WOMEN
P&R ASSISTANT
SENIOR P&R
BREAKROOM
STAIR
200C
ELEV
2-E1
TELECOM ROOM
212B
OFFICE
VISN HUMAN
RESOURCES
SPECIALIST
MEN
VISN WORKROOM
HUMAN
RESOURCES
ASSISTANT
VISN HUMAN
RESOURCES
SPECIALIST
CONFERENCE
ROOM
STAIR
215A
CORRIDOR
VISN HUMAN
RESOURCE
OFFICER
VISN IT
VISN HUMAN
RESOURCES
SPECIALIST
HUMAN
RESOURCES
SPECIALIST
VISN HUMAN
RESOURCES
SPECIALIST
HUMAN
RESOURCES
SPECIALIST
VISN HUMAN
RESOURCES
SPECIALIST
VISN HR
SPECIALIST
ST LOUIS SENIOR
P&R
ST LOUIS P&R
ASSISTANTS
OFFICE
OFFICE
SUPERVISORY
PAYROLL
PAYROLL
SPECIAL
PROJECTS
BATHROOM
233C
SENIOR CIVILIAN
PAY TECH
SENIOR CIVILIAN
PAY TECH
VISN CIVILIAN
PAY TECH
STAIR
204A
71T-102
C6
71T-102
C3
212B-CAM-01
TYP.
VESTIBULE
221A
B
-C A
M -0
TYP.
TYP.
212B-AP-A
TYP.
4TELECOM ROOM
212B
TYP.
TELECOM ROOM
212B2
262' - 0"
TELECOM ROOM
212B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.B
.M E
P .r v t
/1
/2
:1
:0
P
M
71T-102
TELECOMMUNICATION PLAN & ENLARGED PLANS
- SECOND LEVEL
589A6-21-700
B71
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,
FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.
B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL
OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL
NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &
NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.
C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END
WARRANTEED SOLUTION FOR THE CABLING.
D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.
E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR
EXCEED CATEGORY 6A STANDARDS.
F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.
G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN
WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.
UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR
PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A
MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR
TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE
TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF
EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE
TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL
PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE
EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE
REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH
EXISTING CONDUIT CAPACITY.
H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO
PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE
OR JUNCTION BOX.
I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.
J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW
EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.
K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING
BACK TO THE RACK.
L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL
STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL
INFORMATION
M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL
TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE
DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.
N. REFER TO T-600 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING
CONDITIONS.
1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH
EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS
ON SHEET T-501 FOR ADDITIONAL INFORMATION.
2. EXISTING WIRELESS ACCESS POINT TO BE RETAINED AND REUSED. PROVIDE
NEW CABLING AND TELECOMMUNICATIONS OUTLET. REFER TO DETAILS ON
SHEET T-501 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW 4-POST RACK, PDU, UPS AND WIRE MANAGEMENT COMPONENTS
AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN THE
SPECIFICATIONS. PHASE TO PROVIDE NEW RACK IN A TEMPORARY LOCATION
AND TRANSFER DATA CIRCUITS FROM THE EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .