01 00 00 Appendix A - Bid Form Template.20220505.pdf

PDF 297 KB Posted

Attached to
Y1DZ--589A6-21-700 EHRM Infrastructure Upgrades Construction Leavenworth VAMC
Solicitation number
36C77622R0061
Issued by

About this file

This solicitation requests proposals for an infrastructure upgrade construction project at the Leavenworth VA Medical Center campus. The project involves replacing all telecommunications cabling across multiple buildings, including installing CAT6A copper cabling, OM4 and OS2 optical fiber, new patch panels, equipment racks, and ladder racks. Additional scope includes adding new computer room air conditioning systems, electrical panels, backup generators, and a new 600-ton water-cooled chiller. Proposals are due by the date specified in the solicitation. The awarded firm will be responsible for project management, installation, testing, documentation, and training in accordance with the drawings and specifications.

View the file

Other files

File Type Posted
01 00 00 Appendix A - Bid Form Template.20220505.xlsx XLSX spreadsheet
36C77622R0061 0004.pdf PDF
Follow Up Technical Questions Tracking Spreadsheet - 5-5-22.pdf PDF
Leavenworth VA EHRM Project Lidar Links - Rev01.pdf PDF
36C77622R0061 0003.pdf PDF
01 00 00 Appendix A - Bid Form Template.xlsx XLSX spreadsheet
589A6-21-700.LEHRM.ASI-001.B54.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B161.20220418.pdf PDF
Site Visit Attendance Sheet - LV EHRM Infra 4-11-22.pdf PDF
TR Space Impact - Leavenworth.pdf PDF
Technical Questions Tracking Spreadsheet - 4-27-22.pdf PDF
Leavenworth VA EHRM Project Lidar Links.pdf PDF
B7 Electrical Panel Photos.zip ZIP file
589A6-21-700.LEHRM.ASI-001.SITE.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B42.20220418.pdf PDF
Attachment 14 - DBA Wage Rates - Leavenworth County - 4-15-22.pdf PDF
Unitary Disconnect Photos.zip ZIP file
589A6-21-700.LEHRM.ASI-001.B41.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B39.20220418.pdf PDF
Attachment 17 - Rev Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
01 00 00 Appendix A - Bid Form Template.pdf PDF
Unitary Cooling Photos.zip ZIP file
21 22 00 - Clean Agent Fire Suppression Systems.pdf PDF
23 64 00 - Packaged Water Chillers.ASI001.pdf PDF
589A6-21-700.LEHRM.ASI-001.B71.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B153.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.Summary.Log.20220419.pdf PDF
B88.89.90.91 Photos.zip ZIP file
Panel Photos.zip ZIP file
UPS Data Photos.zip ZIP file
589A6-21-700.LEHRM.IFC_R1.B39.20220119.pdf PDF
589A6-21-700.LEHRM.ASI-001.B21.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B160.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B122.20220418.pdf PDF
589A6-21-700.LEHRM.ASI-001.B90.20220419.pdf PDF
36C77622R0061 Amendment 0002.pdf PDF
36C77622R0061 Amendment 0001.pdf PDF
RFP 36C77622R0061.pdf PDF
Attachment 10 - 589A6-21-700 LEHRM IFC_R1 B161 Drawing.pdf PDF
Attachment 17 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 4 - 589A6-21-700 LEHRM IFC_R1 B54 Drawing.pdf PDF
Attachment 3 - 589A6-21-700 LEHRM IFC_R1 B42 Drawing.pdf PDF
Attachment 18 - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Attachment 13 - Asbestos Report Part 2 of 7.zip ZIP file
Attachment 5 - 589A6-21-700 LEHRM IFC_R1 B71 Part 1 of 2 Drawing.pdf PDF
Attachment 7 - 589A6-21-700 LEHRM IFC_R1 B122 Drawing.pdf PDF
Attachment 2 - 589A6-21-700 LEHRM IFC_R1 B41 Drawing.pdf PDF
Attachment 13 - Asbestos Report Part 4 of 7.zip ZIP file
Attachment 13 - Asbestos Report Part 5 of 7.zip ZIP file
Attachment 6 - 589A6-21-700 LEHRM IFC_R1 B88-89-90-91 Part 3 of 3 Drawing.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 01 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections

6 01 91 00 Third-Party Commissioning -$ -$ -$ -$ -$ -$

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys

8 02 41 00 Demolition

9 02 82 11 Traditional Asbestos Abatement -$ -$ -$ -$ -$ -$

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing -$ -$ -$ -$ -$ -$

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT.

Roofing

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings

26 MULT.

Flooring

27 09 91 00 Painting

DIVISION 10 - SPECIALTIES

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

28 10 14 00 Signage

29 10 44 13 Fire Extinguisher Cabinets

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

31 21 13 13 Wet-Pipe Fire Suppression -$ -$ -$ -$ -$ -$

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11 Common Work Results for HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for

HVAC

39 23 21 13 Hydronic Piping

40 23 21 23 Hydronic Pumps

41 23 64 00 Packaged Water Chillers

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards

51 26 29 21

Enclosed Circuit Breakers and

Switches -$ -$ -$ -$ -$ -$

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

52 26 33 53 Static UPS/PDU

53 26 36 53 Automatic Transfer Switches

54 MULT.

Lighting

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for Communications

Installations

56 MULT. Grounding and Bonding

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00 Telecommunications Room Fittings

59 27 15 00 Communications Structured Cabling

60 27 15 00 Communications Horizontal Cabling

61 27 15 00

Communications Horizontal Cabling

(15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for Safety and

Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 02 (Building 21) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT. Roofing -$ -$ -$ -$ -$ -$

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$

26 MULT. Flooring -$ -$ -$ -$ -$ -$

27 09 91 00 Painting -$ -$ -$ -$ -$ -$

DIVISION 10 - SPECIALTIES

28 10 14 00 Signage -$ -$ -$ -$ -$ -$

29 10 44 13 Fire Extinguisher Cabinets -$ -$ -$ -$ -$ -$

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

21 13 13 Wet-Pipe Fire Suppression

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for

Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water -$ -$ -$ -$ -$ -$

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11

Common Work Results for

HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for HVAC

39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$

40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$

41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$

51 26 29 21

Enclosed Circuit Breakers and

Switches

52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$

53 26 36 53

Automatic Transfer Switches

54 MULT.

Lighting -$ -$ -$ -$ -$ -$

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for

Communications Installations

56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00

Telecommunications Room

Fittings

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

59 27 15 00

Communications Structured

Cabling

60 27 15 00

Communications Horizontal

Cabling

61 27 15 00

Communications Horizontal

Cabling (15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for

Safety and Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 03 (BUILDING 39)- CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT. Roofing -$ -$ -$ -$ -$ -$

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$

26 MULT. Flooring -$ -$ -$ -$ -$ -$

27 09 91 00 Painting -$ -$ -$ -$ -$ -$

DIVISION 10 - SPECIALTIES

28 10 14 00 Signage -$ -$ -$ -$ -$ -$

29 10 44 13 Fire Extinguisher Cabinets

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

21 13 13 Wet-Pipe Fire Suppression

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for

Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water -$ -$ -$ -$ -$ -$

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11

Common Work Results for

HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for HVAC

39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$

40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$

41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$

51 26 29 21

Enclosed Circuit Breakers and

Switches

52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$

53 26 36 53

Automatic Transfer Switches

54 MULT.

Lighting -$ -$ -$ -$ -$ -$

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for

Communications Installations

56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00

Telecommunications Room

Fittings

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

59 27 15 00

Communications Structured

Cabling

60 27 15 00

Communications Horizontal

Cabling

61 27 15 00

Communications Horizontal

Cabling (15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for

Safety and Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 05 (BUILDING 42) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT. Roofing -$ -$ -$ -$ -$ -$

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$

26 MULT. Flooring -$ -$ -$ -$ -$ -$

27 09 91 00 Painting -$ -$ -$ -$ -$ -$

DIVISION 10 - SPECIALTIES

28 10 14 00 Signage -$ -$ -$ -$ -$ -$

29 10 44 13 Fire Extinguisher Cabinets

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

21 13 13 Wet-Pipe Fire Suppression

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for

Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water -$ -$ -$ -$ -$ -$

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11

Common Work Results for

HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for HVAC

39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$

40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$

41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$

51 26 29 21

Enclosed Circuit Breakers and

Switches

52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$

53 26 36 53

Automatic Transfer Switches

54 MULT.

Lighting -$ -$ -$ -$ -$ -$

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for

Communications Installations

56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00

Telecommunications Room

Fittings

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

59 27 15 00

Communications Structured

Cabling

60 27 15 00

Communications Horizontal

Cabling

61 27 15 00

Communications Horizontal

Cabling (15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for

Safety and Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 06 (BUILDING 54) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT. Roofing -$ -$ -$ -$ -$ -$

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$

26 MULT. Flooring -$ -$ -$ -$ -$ -$

27 09 91 00 Painting -$ -$ -$ -$ -$ -$

DIVISION 10 - SPECIALTIES

28 10 14 00 Signage -$ -$ -$ -$ -$ -$

29 10 44 13 Fire Extinguisher Cabinets

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

21 13 13 Wet-Pipe Fire Suppression

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for

Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water -$ -$ -$ -$ -$ -$

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11

Common Work Results for

HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for HVAC

39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$

40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$

41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$

51 26 29 21

Enclosed Circuit Breakers and

Switches

52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$

53 26 36 53

Automatic Transfer Switches

54 MULT.

Lighting -$ -$ -$ -$ -$ -$

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for

Communications Installations

56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00

Telecommunications Room

Fittings

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

59 27 15 00

Communications Structured

Cabling

60 27 15 00

Communications Horizontal

Cabling

61 27 15 00

Communications Horizontal

Cabling (15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for

Safety and Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 07 (BUILDING 71) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$

DIVISION 06 - WOOD AND PLASTIC

16 MULT. Capentry -$ -$ -$ -$ -$ -$

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

17 MULT. Roofing -$ -$ -$ -$ -$ -$

18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$

19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$

20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$

21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$

22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$

DIVISION 08 - OPENINGS

23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$

DIVISION 09 - FINISHES

24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$

25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$

26 MULT. Flooring -$ -$ -$ -$ -$ -$

27 09 91 00 Painting -$ -$ -$ -$ -$ -$

DIVISION 10 - SPECIALTIES

28 10 14 00 Signage -$ -$ -$ -$ -$ -$

29 10 44 13 Fire Extinguisher Cabinets

DIVISION 13 - SPECIAL CONSTRUCTION

30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$

DIVISION 21 - FIRE SUPPRESSION

21 13 13 Wet-Pipe Fire Suppression

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

32 21 22 00 Clean Agent Fire Suppression

DIVISION 22 - PLUMBING

22 05 11 Common Work Results for

Plumbing

34 MULT.

Sanitary Sewer/Condensate

Drains/Domestic Water -$ -$ -$ -$ -$ -$

35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

36 23 05 11

Common Work Results for

HVAC

37 MULT.

HVAC Ducts/Inlets and Outlets

38 23 09 23

Direct-Digital Control System for HVAC

39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$

40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$

41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$

42 MULT.

Computer Room Air

Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$

DIVISION 25 - INTEGRATED AUTOMATION

25 13 00 Building Automation System

Integration

DIVISION 26 - ELECTRICAL

44 26 05 11

Requirements for Electrical

Installations

45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$

46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$

47 26 05 73

Overcurrent Protective Device

Coordination Study -$ -$ -$ -$ -$ -$

48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$

49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$

50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$

51 26 29 21

Enclosed Circuit Breakers and

Switches

52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$

53 26 36 53

Automatic Transfer Switches

54 MULT.

Lighting -$ -$ -$ -$ -$ -$

DIVISION 27 -COMMUNICATIONS

55 27 05 11

Requirements for

Communications Installations

56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$

57 27 05 33

Raceway and Boxes for

Communications Systems

58 27 11 00

Telecommunications Room

Fittings

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

59 27 15 00

Communications Structured

Cabling

60 27 15 00

Communications Horizontal

Cabling

61 27 15 00

Communications Horizontal

Cabling (15% Allowance)

62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$

DIVISION 28 - SECURITY

63 28 05 00

Common Work Results for

Safety and Security

64 28 13 00 PACS -$ -$ -$ -$ -$ -$

65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$

66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$

DIVISION 31/32/33 - SITE WORK

67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$

68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$

69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$

70 33 08 00 Site Utilities

CLOSE-OUT DOCUMENTS

As-Builts, O&M Manuals, Training

LS -$ -$ -$ -$ -$ -$

SUBTOTALS:

OVERHEAD: 0% -$

PROFIT: 0% -$

INSURANCE: 0% -$

BOND: 0% -$

TOTAL:

CLIN 08 (BUILDING 88/89/90/91) - CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER $

WORK LOCATION

MATERIAL COST

LINE

NO. SPEC (#)

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

(4)

TOTAL

(5) DIVISION OF LABOR

GC Elec/Tech FP Mech

LINE TOTAL

(10)

DIVISION 01 - GENERAL REQUIREMENTS

1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$

2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$

3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$

4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$

5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$

6 01 91 00 Third-Party Commissioning

DIVISION 02 - EXISTING CONDITIONS

7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$

8 02 41 00 Demolition -$ -$ -$ -$ -$ -$

9 02 82 11 Traditional Asbestos Abatement

DIVISION 03 - CONCRETE

10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$

DIVISION 04 - MASONRY

11 MULT. Masonry -$ -$ -$ -$ -$ -$

DIVISION 05 - METALS

12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$

13 MULT. Decking -$ -$ -$ -$ -$ -$

14 05 40 00 Cold-Formed Metal Framing

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .