This solicitation requests proposals for an infrastructure upgrade construction project at the Leavenworth VA Medical Center campus. The project involves replacing all telecommunications cabling across multiple buildings, including installing CAT6A copper cabling, OM4 and OS2 optical fiber, new patch panels, equipment racks, and ladder racks. Additional scope includes adding new computer room air conditioning systems, electrical panels, backup generators, and a new 600-ton water-cooled chiller. Proposals are due by the date specified in the solicitation. The awarded firm will be responsible for project management, installation, testing, documentation, and training in accordance with the drawings and specifications.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 01 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections
6 01 91 00 Third-Party Commissioning -$ -$ -$ -$ -$ -$
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys
8 02 41 00 Demolition
9 02 82 11 Traditional Asbestos Abatement -$ -$ -$ -$ -$ -$
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing -$ -$ -$ -$ -$ -$
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT.
Roofing
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings
26 MULT.
Flooring
27 09 91 00 Painting
DIVISION 10 - SPECIALTIES
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
28 10 14 00 Signage
29 10 44 13 Fire Extinguisher Cabinets
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
31 21 13 13 Wet-Pipe Fire Suppression -$ -$ -$ -$ -$ -$
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11 Common Work Results for HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for
HVAC
39 23 21 13 Hydronic Piping
40 23 21 23 Hydronic Pumps
41 23 64 00 Packaged Water Chillers
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards
51 26 29 21
Enclosed Circuit Breakers and
Switches -$ -$ -$ -$ -$ -$
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
52 26 33 53 Static UPS/PDU
53 26 36 53 Automatic Transfer Switches
54 MULT.
Lighting
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for Communications
Installations
56 MULT. Grounding and Bonding
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00 Telecommunications Room Fittings
59 27 15 00 Communications Structured Cabling
60 27 15 00 Communications Horizontal Cabling
61 27 15 00
Communications Horizontal Cabling
(15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for Safety and
Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 02 (Building 21) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT. Roofing -$ -$ -$ -$ -$ -$
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$
26 MULT. Flooring -$ -$ -$ -$ -$ -$
27 09 91 00 Painting -$ -$ -$ -$ -$ -$
DIVISION 10 - SPECIALTIES
28 10 14 00 Signage -$ -$ -$ -$ -$ -$
29 10 44 13 Fire Extinguisher Cabinets -$ -$ -$ -$ -$ -$
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Fire Suppression
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for
Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water -$ -$ -$ -$ -$ -$
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11
Common Work Results for
HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for HVAC
39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$
40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$
41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$
51 26 29 21
Enclosed Circuit Breakers and
Switches
52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$
53 26 36 53
Automatic Transfer Switches
54 MULT.
Lighting -$ -$ -$ -$ -$ -$
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for
Communications Installations
56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00
Telecommunications Room
Fittings
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
59 27 15 00
Communications Structured
Cabling
60 27 15 00
Communications Horizontal
Cabling
61 27 15 00
Communications Horizontal
Cabling (15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for
Safety and Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 03 (BUILDING 39)- CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT. Roofing -$ -$ -$ -$ -$ -$
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$
26 MULT. Flooring -$ -$ -$ -$ -$ -$
27 09 91 00 Painting -$ -$ -$ -$ -$ -$
DIVISION 10 - SPECIALTIES
28 10 14 00 Signage -$ -$ -$ -$ -$ -$
29 10 44 13 Fire Extinguisher Cabinets
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Fire Suppression
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for
Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water -$ -$ -$ -$ -$ -$
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11
Common Work Results for
HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for HVAC
39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$
40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$
41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$
51 26 29 21
Enclosed Circuit Breakers and
Switches
52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$
53 26 36 53
Automatic Transfer Switches
54 MULT.
Lighting -$ -$ -$ -$ -$ -$
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for
Communications Installations
56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00
Telecommunications Room
Fittings
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
59 27 15 00
Communications Structured
Cabling
60 27 15 00
Communications Horizontal
Cabling
61 27 15 00
Communications Horizontal
Cabling (15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for
Safety and Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 05 (BUILDING 42) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT. Roofing -$ -$ -$ -$ -$ -$
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$
26 MULT. Flooring -$ -$ -$ -$ -$ -$
27 09 91 00 Painting -$ -$ -$ -$ -$ -$
DIVISION 10 - SPECIALTIES
28 10 14 00 Signage -$ -$ -$ -$ -$ -$
29 10 44 13 Fire Extinguisher Cabinets
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Fire Suppression
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for
Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water -$ -$ -$ -$ -$ -$
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11
Common Work Results for
HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for HVAC
39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$
40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$
41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$
51 26 29 21
Enclosed Circuit Breakers and
Switches
52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$
53 26 36 53
Automatic Transfer Switches
54 MULT.
Lighting -$ -$ -$ -$ -$ -$
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for
Communications Installations
56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00
Telecommunications Room
Fittings
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
59 27 15 00
Communications Structured
Cabling
60 27 15 00
Communications Horizontal
Cabling
61 27 15 00
Communications Horizontal
Cabling (15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for
Safety and Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 06 (BUILDING 54) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT. Roofing -$ -$ -$ -$ -$ -$
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$
26 MULT. Flooring -$ -$ -$ -$ -$ -$
27 09 91 00 Painting -$ -$ -$ -$ -$ -$
DIVISION 10 - SPECIALTIES
28 10 14 00 Signage -$ -$ -$ -$ -$ -$
29 10 44 13 Fire Extinguisher Cabinets
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Fire Suppression
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for
Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water -$ -$ -$ -$ -$ -$
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11
Common Work Results for
HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for HVAC
39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$
40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$
41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$
51 26 29 21
Enclosed Circuit Breakers and
Switches
52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$
53 26 36 53
Automatic Transfer Switches
54 MULT.
Lighting -$ -$ -$ -$ -$ -$
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for
Communications Installations
56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00
Telecommunications Room
Fittings
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
59 27 15 00
Communications Structured
Cabling
60 27 15 00
Communications Horizontal
Cabling
61 27 15 00
Communications Horizontal
Cabling (15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for
Safety and Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 07 (BUILDING 71) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing
15 05 50 00 Metal Fabrications -$ -$ -$ -$ -$ -$
DIVISION 06 - WOOD AND PLASTIC
16 MULT. Capentry -$ -$ -$ -$ -$ -$
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
17 MULT. Roofing -$ -$ -$ -$ -$ -$
18 07 21 13 Thermal Insulation -$ -$ -$ -$ -$ -$
19 07 60 00 Flashing and Sheet Metal -$ -$ -$ -$ -$ -$
20 07 81 00 Applied Fireproofing -$ -$ -$ -$ -$ -$
21 07 84 00 Firestopping -$ -$ -$ -$ -$ -$
22 07 92 00 Joint Sealants -$ -$ -$ -$ -$ -$
DIVISION 08 - OPENINGS
23 MULT. Doors/Harware -$ -$ -$ -$ -$ -$
DIVISION 09 - FINISHES
24 MULT. Gypsum Board/Framing -$ -$ -$ -$ -$ -$
25 09 51 00 Ceilings -$ -$ -$ -$ -$ -$
26 MULT. Flooring -$ -$ -$ -$ -$ -$
27 09 91 00 Painting -$ -$ -$ -$ -$ -$
DIVISION 10 - SPECIALTIES
28 10 14 00 Signage -$ -$ -$ -$ -$ -$
29 10 44 13 Fire Extinguisher Cabinets
DIVISION 13 - SPECIAL CONSTRUCTION
30 13 05 41 Seismic Bracing -$ -$ -$ -$ -$ -$
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Fire Suppression
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
32 21 22 00 Clean Agent Fire Suppression
DIVISION 22 - PLUMBING
22 05 11 Common Work Results for
Plumbing
34 MULT.
Sanitary Sewer/Condensate
Drains/Domestic Water -$ -$ -$ -$ -$ -$
35 MULT. Medical Gas and Vacuum -$ -$ -$ -$ -$ -$
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
36 23 05 11
Common Work Results for
HVAC
37 MULT.
HVAC Ducts/Inlets and Outlets
38 23 09 23
Direct-Digital Control System for HVAC
39 23 21 13 Hydronic Piping -$ -$ -$ -$ -$ -$
40 23 21 23 Hydronic Pumps -$ -$ -$ -$ -$ -$
41 23 64 00 Packaged Water Chillers -$ -$ -$ -$ -$ -$
42 MULT.
Computer Room Air
Conditioners/Refrigerant Piping -$ -$ -$ -$ -$ -$
DIVISION 25 - INTEGRATED AUTOMATION
25 13 00 Building Automation System
Integration
DIVISION 26 - ELECTRICAL
44 26 05 11
Requirements for Electrical
Installations
45 MULT. Low-Voltage Electrical -$ -$ -$ -$ -$ -$
46 26 05 41 Underground Electrical -$ -$ -$ -$ -$ -$
47 26 05 73
Overcurrent Protective Device
Coordination Study -$ -$ -$ -$ -$ -$
48 26 05 91 Integrated Power Assembly -$ -$ -$ -$ -$ -$
49 26 22 00 Low-Voltage Transformers -$ -$ -$ -$ -$ -$
50 26 24 13 Panelboards -$ -$ -$ -$ -$ -$
51 26 29 21
Enclosed Circuit Breakers and
Switches
52 26 33 53 Static UPS/PDU -$ -$ -$ -$ -$ -$
53 26 36 53
Automatic Transfer Switches
54 MULT.
Lighting -$ -$ -$ -$ -$ -$
DIVISION 27 -COMMUNICATIONS
55 27 05 11
Requirements for
Communications Installations
56 MULT. Grounding and Bonding -$ -$ -$ -$ -$ -$
57 27 05 33
Raceway and Boxes for
Communications Systems
58 27 11 00
Telecommunications Room
Fittings
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
59 27 15 00
Communications Structured
Cabling
60 27 15 00
Communications Horizontal
Cabling
61 27 15 00
Communications Horizontal
Cabling (15% Allowance)
62 MULT. Underground Telecom -$ -$ -$ -$ -$ -$
DIVISION 28 - SECURITY
63 28 05 00
Common Work Results for
Safety and Security
64 28 13 00 PACS -$ -$ -$ -$ -$ -$
65 28 23 00 Video Surveillance -$ -$ -$ -$ -$ -$
66 28 31 00 Fire Detection and Alarm -$ -$ -$ -$ -$ -$
DIVISION 31/32/33 - SITE WORK
67 MULT. Earthwork/Dewatering -$ -$ -$ -$ -$ -$
68 MULT. Exterior Concrete/Asphalt -$ -$ -$ -$ -$ -$
69 MULT. Planting/Irrigation -$ -$ -$ -$ -$ -$
70 33 08 00 Site Utilities
CLOSE-OUT DOCUMENTS
As-Builts, O&M Manuals, Training
LS -$ -$ -$ -$ -$ -$
SUBTOTALS:
OVERHEAD: 0% -$
PROFIT: 0% -$
INSURANCE: 0% -$
BOND: 0% -$
TOTAL:
CLIN 08 (BUILDING 88/89/90/91) - CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER $
WORK LOCATION
MATERIAL COST
LINE
NO. SPEC (#)
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5) DIVISION OF LABOR
GC Elec/Tech FP Mech
LINE TOTAL
(10)
DIVISION 01 - GENERAL REQUIREMENTS
1 01 00 00 General Requirements -$ -$ -$ -$ -$ -$
2 01 35 26 Safety/ICRA -$ -$ -$ -$ -$ -$
3 01 45 00 Quality Control -$ -$ -$ -$ -$ -$
4 01 45 00 Third-Party Inspections -$ -$ -$ -$ -$ -$
5 01 45 35 Special Inspections -$ -$ -$ -$ -$ -$
6 01 91 00 Third-Party Commissioning
DIVISION 02 - EXISTING CONDITIONS
7 02 21 13 Site Surveys -$ -$ -$ -$ -$ -$
8 02 41 00 Demolition -$ -$ -$ -$ -$ -$
9 02 82 11 Traditional Asbestos Abatement
DIVISION 03 - CONCRETE
10 03 30 53 Cast-in-Place Concrete -$ -$ -$ -$ -$ -$
DIVISION 04 - MASONRY
11 MULT. Masonry -$ -$ -$ -$ -$ -$
DIVISION 05 - METALS
12 05 12 00 Structural Steel Framing -$ -$ -$ -$ -$ -$
13 MULT. Decking -$ -$ -$ -$ -$ -$
14 05 40 00 Cold-Formed Metal Framing