01 00 00 Appendix A - Bid Form Template.20220505.xlsx
XLSX spreadsheet 3 MB Posted
- Solicitation number
- 36C77622R0061
About this file
This federal solicitation seeks a contractor to upgrade telecommunications infrastructure at the Leavenworth VA Medical Center campus in Kansas. The selected vendor will replace all cabling, outlets, and associated equipment in multiple buildings, including the installation of new CAT6A copper cabling, OM4 and OS-2 optical fiber cabling, cable supports, patch panels, equipment racks, and patch cables. The vendor will also provide and install new computer room air conditioning systems, electrical panels, backup generators, and a new 600-ton water-cooled chiller. All cable installations must adhere to specific color-coding and labeling requirements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 01
| CLIN 01 (BASE BID) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||
| WORK LOCATION | |||||||||||||||
| MATERIAL COST | |||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| DIVISION 03 - CONCRETE | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| DIVISION 04 - MASONRY | |||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| DIVISION 05 - METALS | |||||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| DIVISION 06 - WOOD AND PLASTIC | |||||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 08 - OPENINGS | |||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 09 - FINISHES | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||
| DIVISION 13 - SPECIAL CONSTRUCTION | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 21 - FIRE SUPPRESSION | |||||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||
| DIVISION 25 - INTEGRATED AUTOMATION | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 28 - SECURITY | |||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | |||||||||||||||
| SUBTOTALS: | |||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 02
| CLIN 02 (Building 21) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 05 - METALS | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 06 - WOOD AND PLASTIC | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 21 - FIRE SUPPRESSION | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||||||||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | Work Days | 64 | ||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | ERROR:#REF! | |||||
| DIVISION 25 - INTEGRATED AUTOMATION | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 28 - SECURITY | |||||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | |||||||||||||||||
| SUBTOTALS: | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 03
| CLIN 03 (BUILDING 39)- CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 05 - METALS | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 06 - WOOD AND PLASTIC | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 21 - FIRE SUPPRESSION | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||||||||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | Work Days | 64 | ||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | ERROR:#REF! | |||||
| DIVISION 25 - INTEGRATED AUTOMATION | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 28 - SECURITY | |||||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | |||||||||||||||||
| SUBTOTALS: | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 04
| CLIN 004 (BUILDING 41) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 05 - METALS | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 06 - WOOD AND PLASTIC | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 21 - FIRE SUPPRESSION | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||||||||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | Work Days | 64 | ||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | ERROR:#REF! | |||||
| DIVISION 25 - INTEGRATED AUTOMATION | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 28 - SECURITY | |||||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | |||||||||||||||||
| SUBTOTALS: | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 05
| CLIN 05 (BUILDING 42) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 05 - METALS | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 06 - WOOD AND PLASTIC | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 21 - FIRE SUPPRESSION | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||||||||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | Work Days | 64 | ||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | ERROR:#REF! | |||||
| DIVISION 25 - INTEGRATED AUTOMATION | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 28 - SECURITY | |||||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | |||||||||||||||||
| SUBTOTALS: | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 06
| CLIN 06 (BUILDING 54) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||||
| WORK LOCATION | |||||||||||||||||
| MATERIAL COST | |||||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 03 - CONCRETE | |||||||||||||||||
| 10 | 03 30 53 | Cast-in-Place Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 04 - MASONRY | |||||||||||||||||
| 11 | MULT. | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 05 - METALS | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 12 | 05 12 00 | Structural Steel Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 13 | MULT. | Decking | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 14 | 05 40 00 | Cold-Formed Metal Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 15 | 05 50 00 | Metal Fabrications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 06 - WOOD AND PLASTIC | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||||||||||
| 16 | MULT. | Capentry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION | |||||||||||||||||
| 17 | MULT. | Roofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| 18 | 07 21 13 | Thermal Insulation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 19 | 07 60 00 | Flashing and Sheet Metal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 20 | 07 81 00 | Applied Fireproofing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 21 | 07 84 00 | Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 22 | 07 92 00 | Joint Sealants | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 08 - OPENINGS | |||||||||||||||||
| 23 | MULT. | Doors/Harware | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 09 - FINISHES | |||||||||||||||||
| 24 | MULT. | Gypsum Board/Framing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 25 | 09 51 00 | Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 26 | MULT. | Flooring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 27 | 09 91 00 | Painting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 10 - SPECIALTIES | |||||||||||||||||
| 28 | 10 14 00 | Signage | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 29 | 10 44 13 | Fire Extinguisher Cabinets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 13 - SPECIAL CONSTRUCTION | |||||||||||||||||
| 30 | 13 05 41 | Seismic Bracing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 125,688.89 | 125688.888888889 | ERROR:#DIV/0! | |||||
| DIVISION 21 - FIRE SUPPRESSION | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||||||||||
| 31 | 21 13 13 | Wet-Pipe Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 32 | 21 22 00 | Clean Agent Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 22 - PLUMBING | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||||||||||
| 33 | 22 05 11 | Common Work Results for Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 34 | MULT. | Sanitary Sewer/Condensate Drains/Domestic Water | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 35 | MULT. | Medical Gas and Vacuum | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) | |||||||||||||||||
| 36 | 23 05 11 | Common Work Results for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | $ - 0 | ERROR:#DIV/0! | |||||
| 37 | MULT. | HVAC Ducts/Inlets and Outlets | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 604,806.05 | $ 604,806.05 | ERROR:#DIV/0! | |||||
| 38 | 23 09 23 | Direct-Digital Control System for HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 39 | 23 21 13 | Hydronic Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 40 | 23 21 23 | Hydronic Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ 311,664.12 | $ 311,664.12 | ERROR:#DIV/0! | |||||
| 41 | 23 64 00 | Packaged Water Chillers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | Work Days | 64 | ||||
| 42 | MULT. | Computer Room Air Conditioners/Refrigerant Piping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | ERROR:#DIV/0! | ERROR:#REF! | |||||
| DIVISION 25 - INTEGRATED AUTOMATION | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 43 | 25 13 00 | Building Automation System Integration | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| DIVISION 26 - ELECTRICAL | ERROR:#DIV/0! | $ - 0 | |||||||||||||||
| 44 | 26 05 11 | Requirements for Electrical Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | $ - 0 | |||||||
| 45 | MULT. | Low-Voltage Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 46 | 26 05 41 | Underground Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 47 | 26 05 73 | Overcurrent Protective Device Coordination Study | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 48 | 26 05 91 | Integrated Power Assembly | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 49 | 26 22 00 | Low-Voltage Transformers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 50 | 26 24 13 | Panelboards | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 51 | 26 29 21 | Enclosed Circuit Breakers and Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 52 | 26 33 53 | Static UPS/PDU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 53 | 26 36 53 | Automatic Transfer Switches | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 54 | MULT. | Lighting | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 27 -COMMUNICATIONS | |||||||||||||||||
| 55 | 27 05 11 | Requirements for Communications Installations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 56 | MULT. | Grounding and Bonding | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 57 | 27 05 33 | Raceway and Boxes for Communications Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 58 | 27 11 00 | Telecommunications Room Fittings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 59 | 27 15 00 | Communications Structured Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 60 | 27 15 00 | Communications Horizontal Cabling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 61 | 27 15 00 | Communications Horizontal Cabling (15% Allowance) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 62 | MULT. | Underground Telecom | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 28 - SECURITY | |||||||||||||||||
| 63 | 28 05 00 | Common Work Results for Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 64 | 28 13 00 | PACS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 65 | 28 23 00 | Video Surveillance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 66 | 28 31 00 | Fire Detection and Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| DIVISION 31/32/33 - SITE WORK | |||||||||||||||||
| 67 | MULT. | Earthwork/Dewatering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 68 | MULT. | Exterior Concrete/Asphalt | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 69 | MULT. | Planting/Irrigation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| 70 | 33 08 00 | Site Utilities | |||||||||||||||
| CLOSE-OUT DOCUMENTS | |||||||||||||||||
| 71 | As-Builts, O&M Manuals, Training | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | |||||||||||||||||
| SUBTOTALS: | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OVERHEAD: | 0% | $ - 0 |
| PROFIT: | 0% | $ - 0 |
| INSURANCE: | 0% | $ - 0 |
| BOND: | 0% | $ - 0 |
| TOTAL: | |
| $ - 0 |
Page &P
CLIN 07
| CLIN 07 (BUILDING 71) - CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | $ | |||||||||||||
| WORK LOCATION | |||||||||||||||
| MATERIAL COST | |||||||||||||||
| LINE NO. | SPEC (#) | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | DIVISION OF LABOR | ||||||||
| GC | Elec/Tech | FP | Mech | LINE TOTAL (10) | |||||||||||
| DIVISION 01 - GENERAL REQUIREMENTS | |||||||||||||||
| 1 | 01 00 00 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 2 | 01 35 26 | Safety/ICRA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 3 | 01 45 00 | Quality Control | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 4 | 01 45 00 | Third-Party Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 5 | 01 45 35 | Special Inspections | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 6 | 01 91 00 | Third-Party Commissioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 02 - EXISTING CONDITIONS | |||||||||||||||
| 7 | 02 21 13 | Site Surveys | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 8 | 02 41 00 | Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 9 | 02 82 11 | Traditional Asbestos Abatement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| DIVISION 03 - CONCRETE |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .