589A6-21-700.LEHRM.ASI-001.SITE.20220418.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77622R0061
About this file
This solicitation seeks proposals for an infrastructure upgrade construction project at the Leavenworth VA Medical Center campus in Kansas. The scope of work includes replacing the telecommunications cabling for 15 buildings, installing new fiber optic and copper cabling, upgrading wall jacks and patch panels, and adding telecommunications rooms with new equipment racks and air conditioning systems. Respondents must have experience replacing cabling on an active medical campus and transitioning circuits with minimal disruption. Proposals are due within 60 days, with project completion expected within 12 months of award. The Department of Veterans Affairs Technology Acquisition Center is the contracting agency.
The document provides details on the communications cabling replacement work for multiple buildings. Respondents must replace all copper and fiber cabling, outlets, and equipment. This includes installing smoke-rated OM4 intra-building fiber and OS-2 inter-building fiber. CAT6A cabling will be used for all copper with additional spare capacity. Conduit must be properly marked and cabling installed per code. New patch panels, equipment racks, cable management, and air conditioning are also required in upgraded telecommunications rooms. Temporary infrastructure will facilitate a phased transition with no disruption to existing services.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.S
IT
E .M
E P
.r v t
/1
/2
:5
:3
A
M
G-001
DRAWING INDEX 589A6-21-700
SITE
01/19/2022 M. PERKINS K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME
INCLUDED IN
FINAL BID
DOCUMENTS
ISSUED FOR
CONSTRUCTION
GENERAL
G-000 COVER SHEET Yes Yes
G-001 DRAWING INDEX Yes Yes
G-010 GENERAL PROJECT NOTES Yes Yes
G-011 GENERAL INFECTION CONTROL NOTES AND SYMBOLS Yes Yes
G-012 GENERAL NOTES AND ABBREVIATIONS Yes Yes
ELECTRICAL
ES100 ELECTRICAL SITE PLAN - OVERALL Yes Yes
90ES100 ELECTRICAL ENLARGED SITE PLAN - B88/89/90/91 Yes Yes
TELECOMMUNICATION
VF101 SITE SURVEY PLAN - OVERALL Yes Yes
TN100 TELECOMMUNICATION NETWORK SITE PLAN Yes Yes
T-501 TELECOMMUNICATION DETAILS Yes Yes
T-601 TELECOMMUNICATION SITE DIAGRAM Yes Yes
Grand total: 11
Revisions: Date:
/19
/20
1/19/2022
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
P B
P B
P B
P B
P B
P B
S. ROW
LAND ROAD
KANSAS HIGHWAY 5
ENTRANCE DRIVE
R
IV
E R
V
IE
W A
V E
LAKESIDE DRIVE
N R
O W
L A
N D
R O
A D
B
AC
K S
TR
E
ET
F R
A N
K L
IN
A V
E N
U E
RIVERVIEW AVE
W A
T E
R S
T R
E E
T
HILLSIDE DRIVE
BLDG 54
BLDG 160
BLDG
BLDG 42
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
BLDG
T17
T37
BLDG 14
T25
T16
90ES100
F3
T5
T1
BLDG 07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.S
IT
E .M
E P
.r v t
/1
/2
:5
:4
P
M
ES100
ELECTRICAL SITE PLAN - OVERALL 589A6-21-700
SITE
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
SCALE: 1" = 200'-0"
F4
ELECTRICAL SITE PLAN
A. EXTERIOR ELECTRICAL EQUIPMENT ENCLOSURE
BASIS OF DESIGN SHALL BE PER SPECIFICATION
SECTION 26 05 91. THIS SHALL BE A DELEGATED
DESIGN SOLUTION SUBMITTED DURING THE SHOP
SUBMITTAL REVIEW PHASE OF CONSTRUCTION.
DUE TO THE ACTIVE NATURE OF THIS STATION,
CONTRACTOR TO ENSURE POC IS AVAILABLE AT
THE TIME OF SHOP/COORDINATION DRAWING
SUBMISSION.
B. EXISTING PANELS HAD CAPACITY AT THE TIME OF
DESIGN SURVEY. SINCE THIS IS AN ACTIVE
FACILITY, THE SCOPE REQUIRES THE CONTRACTOR
TO (1) PROVIDE 30-DAY LOAD MEASUREMENTS, (2)
VERIFY PROPOSED BREAKER LOCATIONS AND (3)
PREPARE OVERCURRENT PROTECTIVE DEVICE
COORDINATION STUDY PER 26 05 73 FOR EACH
BUILDING. LOAD TESTS, BREAKER
LOCATIONS/TYPE/RATING AND COORDINATION
STUDIES, COORDINATION DRAWINGS SHALL BE
SUBMITTED FOR APPROVAL PRIOR TO
INSTALLATION.
NOT TO SCALE
B1
INTEGRATED POWER ASSEMBLY BASIS OF DESIGN
NOT TO SCALE
D1
POWER ASSEMBLY EXTERIOR
NOT TO SCALE
F1
POWER ASSEMBLY
NOT TO SCALE
D3
TECHNICAL DATA
Revisions: Date:
ASI-001 04/18/22
1. CONTRACTOR TO PROVIDE NEW 4" CONDUIT AND
FEEDERS FROM EXISTING PANEL IN B07 TO NEW
PANEL IN B21, COORDINATE ROUTING WITH
EXISTING AND NEW CONDITIONS. SEE B21
ELECTRICAL SHEETS FOR ADDITIONAL
INFORMATION.
2. CONTRACTOR TO TRENCH AND REPLACE EXISTING
LANDSCAPE BACK TO EXISTING CONDITIONS.
COORDINATE TRENCHING WITH EXISTING AND NEW
CONDITIONS, SEE DETAIL C6, SHEET T-501 FOR
ADDITIONAL INFORMATION.
/18
/20
04/18/2022
S
S
S
S
S
D
D
D
D
D
D D
BLDG 90
BLDG 88
BLDG 91
BLDG 89
T17
T16
E X
. W A
T E
R
EX. S
TO
RM
EX. SAN. SEWER
E X
. E L E
C
E X
C
O M
M
90ES100
F1
(E) XFMR
ELEC EQUP.
ELEC EQUP.
90ES100
E1
NP-B91-01
EP-B91-01
ATS-B91-01
XFMR-B91-01
XFMR-B91-02
TYP.
150 SF
ELEC EQUP.
T16
3 46
BUILDING 91
TYP.
N P
-B
-0
E P
-B
-0
N P
-B
-0
E P
-B
-0
BUILDING 90
TYP.
150 SF
ELEC EQUP.
(E) XFMR
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.S
IT
E .M
E P
.r v t
/1
/2
:5
:4
P
M
90ES100
ELECTRICAL ENLARGED SITE PLAN - B88/89/90/91 589A6-21-700
SITE
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
Revisions: Date:
ASI-001 04/18/22
1. CONTRACTOR TO PROVIDE NEW 4" CONDUIT AND
FEEDERS FROM EXISTING PANELS TO NEW
EQUIPMENT WITHIN ELECTRICAL EQUIPMENT
ENCLOSURE, COORDINATE ROUTING WITH EXISTING
AND NEW CONDITIONS. SEE B90 E-600 AND E-700
SERIES SHEETS FOR ADDITIONAL INFORMATION.
2. CONTRACTOR TO PROVIDE NEW 4" CONDUIT AND
FEEDERS FROM NEW PANELS WITHIN ELECTRICAL
EQUIPMENT ENCLOSURE TO NEW PANELS WITHIN
THE TELECOMMUNICATION ROOMS, COORDINATE
ROUTING WITH EXISTING AND NEW CONDITIONS.
SEE B90 E-600 AND E-700 SERIES SHEETS FOR
ADDITIONAL INFORMATION.
3. 10'x15' ELECTRICAL EQUIPMENT ENCLOSURE.
COORDINATE EXACT LOCATION OF NEW
ELECTRICAL EQUIPMENT ENCLOSURE WITH
EXISTING AND NEW SITE CONDITIONS AND COR
PRIOR TO COMMENCING WORK.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A
PREFABRICATED DESIGN PER 26 05 91.
CONTRACTOR SHALL SUBMIT DESIGN FOR AE/COR
REVIEW AND APPROVAL, SEE ONE-LINES ON B90
E-600 SERIES SHEETS FOR EQUIPMENT REQUIRED
FOR EACH BUILDING.
5. NEW TRANSFORMER, SEE ONE-LINES ON B90 E-600
SERIES SHEETS FOR EQUIPMENT RATINGS.
6. CONSTRUCT OUTDOOR EQUIPMENT PAD PER
DETAIL F8, SHEET T-501. COORDINATE PLACEMENT
AND ANCHORING OF NEW ELECTRICAL EQUIPMENT
ENCLOSURE ON NEW EQUIPMENT PAD WITH THE
MANUFACTURER’S REQUIREMENTS.
7. CONTRACTOR TO TRENCH AND REPLACE EXISTING
LANDSCAPE BACK TO EXISTING CONDITIONS.
COORDINATE TRENCHING WITH EXISTING AND NEW
CONDITIONS, SEE DETAIL C6, SHEET T-501 FOR
ADDITIONAL INFORMATION.
8. NEW AUTOMATIC TRANSFER SWITCH, SEE ONE-LINE
ON B90 SHEET 91E-603 FOR EQUIPMENT RATINGS.
9. CONSTRUCT NEW REMOVEABLE BOLLARD PER
DETAIL F3 ON SHEET T-501, COORDINATE
PLACEMENT WITH EXISTING AND NEW CONDITIONS.
A. EXTERIOR ELECTRICAL EQUIPMENT ENCLOSURE
BASIS OF DESIGN SHALL BE PER SPECIFICATION
SECTION 26 05 91. THIS SHALL BE A DELEGATED
DESIGN SOLUTION SUBMITTED DURING THE SHOP
SUBMITTAL REVIEW PHASE OF CONSTRUCTION.
DUE TO THE ACTIVE NATURE OF THIS STATION,
CONTRACTOR TO ENSURE POC IS AVAILABLE AT
THE TIME OF SHOP/COORDINATION DRAWING
SUBMISSION.
B. EXISTING PANELS HAD CAPACITY AT THE TIME OF
DESIGN SURVEY. SINCE THIS IS AN ACTIVE
FACILITY, THE SCOPE REQUIRES THE CONTRACTOR
TO (1) PROVIDE 30-DAY LOAD MEASUREMENTS, (2)
VERIFY PROPOSED BREAKER LOCATIONS AND (3)
PREPARE OVERCURRENT PROTECTIVE DEVICE
COORDINATION STUDY PER 26 05 73 FOR EACH
BUILDING. LOAD TESTS, BREAKER
LOCATIONS/TYPE/RATING AND COORDINATION
STUDIES, COORDINATION DRAWINGS SHALL BE
SUBMITTED FOR APPROVAL PRIOR TO
INSTALLATION.
SCALE: 1" = 20'-0"
F3
ELECTRICAL ENLARGED SITE PLAN -
BUILDING 88/89/90/91
SCALE: 1" = 10'-0"
F1
ELECTRICAL EQUIPMENT
ENCLOSURE B91
SCALE: 1" = 10'-0"
E1
ELECTRICAL EQUIPMENT
ENCLOSURE B88/89/90
/18
/20
UGE
UGE
U G E
U G E
UG
E
UG
E
UGE
UGE
UG
E
U G E
U G E
U G E
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G E
U G E
UG
E
U G E
U G E
UG
E
UGE UGE UGE
UG
E
UGE
U G E
UGE
UGE
U G E
UG
E
UG
E
UGE
UGE
U G E
UG
E
UG
E
UG
E
UG
E
UG
E
U G E
U G
E UGE
U G E
U G E
U G E
U G E
UG
E
UGE UGE
UGE
UG
E
UG
E
U G E
U G E
UG
E
U G E
U G E
U G E
UGE
U G E
U G E
UGE
UGE
UGE
UGE
U G E
U G E
U G E
UGE
UGE
U G E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G E
U G E
UGE
UGE
UGE UGE
UG
E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UG
E
UG
E
UG
E
UGE
UG
E
UGE
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UG
E
UG
E
UGE
U G E
U G E
UG
E
UG
E
UGE
UGE
UG
E
U G E
U G E
UGE
U G E
UGE
UGE
UGE
UGE
U G E
U G E
U G E
U G E
U G E
U G E
UG
E
UG
E
U G E
U G E
U G E
UGE
UGE
U G E
UGE
UGE
U G E
U G E
U G E
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
U G E
U G E
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
U G E
U G E
U G E
U G E
UGE
UGE
UGE
U G E
U G E
UG
E
UGE
U G E
UG
E
U G E
U G E
U G E
UGE
U G E
U G E
U G E
UG
E
UG
E
UGE
UGE UGE
UGE UGE UGE UGE UGE
UGE
U G E
U G E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE UGE
UGE
UGE
UGE
UGE
UGE UGE
UG
E
UG
E
UG
E
UG
E
UG
E
U G E
UGE
UG
E U
G E
U G E
UGE
UGE
U G E
U G E
U G E
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E UGE
UGE UGE
UGE
UGE
UGE
UGE UGE
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UGE
U G E
U G E
UGE
U G E
U G E
U G E
U G E
U G E
UG
E
UG
E
U G E
UGE
UGE
UGE
UGE UGE
U G E
UGE
UGE
U G E
U G E
U G E
UGE UGE
UG
E
U G E
U G E
UGE U
G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UGE
UG
E
UGE UGE
UGE
U G E
U G E
U G E
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
U G E
U G
EU
G E
UG
E
UGE
UGE
UG
E UGE
UGE
UG
E
UG
E
UG
E UGE
UG
E
UGE
UGE
UG
E
UG
E
U G E
UG
E
U G E
UGE
UGE
U G E
U G E
U G E
UG
E
U G E
U G E
UG
E
UG
E
UGE
UGE
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT ISSUED FOR
CONSTRUCTIONA/E:
TRIPLE C - THE A/E GROUP
4625 Lindell Blvd., 2nd Floor, 2064 St. Louis, MO 63108
MAT PERKINS
314-372-0067
01/19/2022
EHRM INFRASTRUCTURE
UPGRADES
4010 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
589A6-21-700
SITE
Revisions: Date:
SITE SURVEY PLAN
OVERALL
VF101
STRUBLEPERKINS
UGE
D
S
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
BACK OF CURB
EDGE OF PAVEMENT
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
LIGHT POLE / STREETLIGHT
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING
TELECOMUNNICATIONS
STORM DRAIN CATCH BASIN
F1 SITE SURVEY PLAN - OVERALL
1"=120'
0120' 120' 240'60'
UNDERGROUND CABLE
PROPERTY LINE
/19
/20
1/19/2022
STAMP
4.35"/4.5" STEPPED
DUCT TERMINATOR
(16 LOCATIONS)
18 HOLE CABLE RACK
(8 LOCATIONS)
∅36"x12" GRADE RING
(2 LOCATIONS)
∅30"x10"
CAST IRON RING
∅30" HEAVY TRAFFIC
CAST IRON COVER
∅12"x4"
SUMP
PULL IRON
(4 LOCATIONS)
4'-0"x4'-0"x4'-0"
FIBER OPTIC
MANHOLE
TRAFFIC RATED
MATERIAL LIST
DESCRIPTION
WEIGHT
(LBS)
4'-0" x 4'-0" x 4'-0" BASE SECTION RACKED AND PAINTED 7,964
4'-0" x 4'-0" x 8" TOP SLAB WITH 36" OPENING 1,533
36" x 12" GRADE RINGS (2 QTY) 812
30"x10" HEAVY TRAFFIC CAST IRON FRAME 359
30" HEAVY TRAFFIC CAST IRON COVER 302
8'-1"
4'-0"
6"
6"
5'-0" 4'-0"
6"
6"
5'-0"
4'-8 1_
7"
4'-1 1_
1_
8"
24"
10"
(4) CONCRETE BRICKS
51mmx203mmx406mm (2"x8"x16")
CONDUIT(S) WITH BELL ENDS
(TYP). SIZE, QUANTITY AND
WIRING AS INDICATED ON
PLANS
CLEAN 19mm (3/4")
CRUSHED ROCK
GRADE. FEATHER & TAMP BACKFILL
TO CREATE FLUSH INSTALLATION
AND POSITIVE DRAINAGE AWAY
FROM BOX
V A
R
IE
S (1
PULLBOX (SEE SPECIFICATIONS)
LINE SIDES OF EXCAVATION
WITH 13.6 KG (30 LBS.) FELT
PAPER
(12") m m
305mm
(4) CONCRETE BRICKS
51mmx203mmx406mm (2"x8"x16")
CONDUIT(S) WITH BELL ENDS
(TYP). SIZE, QUANTITY AND
WIRING AS INDICATED ON
PLANS
CLEAN 19mm (3/4") CRUSHED
ROCK
FINISHED PAVING
V A
R
IE
S (1
PULLBOX (SEE SPECIFICATIONS)
LINE SIDES OF EXCAVATION
WITH 13.6 KG (30 LBS.) FELT
PAPER
(12") m m
305mm
PIPE
OD
12"
MIN
MAX
(TYP) 6"
2' M
IN
IM
U M
C
O V
E R
M
IN
V A
R
IE
S
AREAS WITHIN PUBLIC RIGHTS-OF WAY TRENCH BACKFILL
REQUIREMENTS ABOVE PIPE ZONE - TYPE II AGGREGATE BASE
BACKFILL COMPACTED TO 90% OF MAX DENSITY, OR CLSM
EXIST GRADE
4" MIN
BEDDING
PIPE ZONE (INCLUDING BEDDING)
PIPE SIZES 24" AND SMALLER:
TYPE II AGGREGATE BASE BACKFILL COMPACTED
TO 90% OF MAX DENSITY, OR CLSM
IN AREAS OF EXCESSIVE GROUND WATER OR POOR SUBGRADE MATERIAL,
USE DRAIN BACKFILL SECTION TO A MAXIMUM DEPTH OF 18" FOR
STABILIZATION. INSTALL AND COMPACT AS DIRECTED BY THE ENGINEER.
MATERIAL & STYLE
Polyolefin Blend
Straight Wall
2436-18
ANSI/SCTE-77, Tier 22
55.8 lbs
2436-24
ANSI/SCTE-77, Tier 22
79.2 lbs
2436-36
ANSI/SCTE-77, Tier 22
100.7 lbs
A B
2436-36 28 5/16” 39 15/16”
C
36”
HEAVY DUTY
ANSI/SCTE TIER 22
OPTIONS
Available Covers: • Duralite™, Flush Solid
• Duralite™, T-Cover Solid
• Polymer Concrete, Flush Solid
Fasteners: • Hex Head Coil Thread Bolt
• Penta Head Coil Thread Bolt
Detail: Bolt Down
Add On Options: • Logos and Special Markings
• Marking Plate
• EMS Marker
• Rack Mount / Cable Rack
• Cable Arms
• Unistrut
• Pulling Eye
• Ground Buss
• Dividers
RAW MATERIAL
SPECIFICATION
BODY : Material Property Density Tensile Strength, at break Flexural Modulus Impact Resistance
Test Method
ASTM D1505
ASTM D638
ASTM D790
ASTM D5420
Typical Value1
0.960 to 0.980, g/cm3 5,500 to 7,700 psi 400,000 to 500,000 psi
60.0 in-lb
1 The values listed for physical property measurements are nominal values only. Certain physical property measurements are subject to variations consistent with the test methods and are within a generally accepted range for such values.
0.
C
LR
0.
0.50'
MIN
1.
2.
3.
4.
5.
6.
EQUIPMENT.
MINIMUM 12" THICK
CONCRETE SLAB ON
SUBGRADE.
#4 AT 12" O.C. EACH WAY TOP
AND BOTTOM.
TOOLED EDGE.
EXISTING GROUND
FOR SUBBASE
REQUIREMENTS, SEE PLANS.
NOTE:
COORDINATE EQUIPMENT PAD
EDGE DIMENSION AND
DIMENSION ABOVE FINISHED
FLOOR REQUIREMENTS WITH
MECHANICAL DRAWINGS.
UNDISTURBED EARTH
18"
6" SAND BED.
CONCRETE
DUCTBANK.
3"4"4"3" 3"
M
IN
#4/0 BARE CU. GROUND, FULL
LENGTH OF TRENCH
FINISHED GRADE
OR SURFACE
4" SCH 80 PVC
CONDUIT (TYP. OF 2).
YELLOW PLASTIC
WARNING TAPE. PROVIDE
LABEL "HIGH VOLTAGE"
FOR 12.5kV DUCTBANKS.
COMPACTED TO 90% RELATIVE
DENSITY. FREE FROM LARGE
ROCKS AND DEBRIS.
(COMPACTED IN 6" LAYERS).
NOTES:
1. REMOVABLE BOLLARD SHALL NOT BE CONCRETE FILLED.
2. HAND TIGHTEN BOLT & NUT USING WASHERS EACH SIDE OF STRAPS. CUT BOLT
APPROX. 1/8" FROM FACE OF NUT & PEEN EXPOSED END OF BOLT.
3. REFER TO VA STANDARD DETAIL 32 02 23-04 "CONCRETE POST BARRICADES" FOR
POST DETAILS.
BOLLARD STRAP, COORDINATE WITH COR
(AND VA STANDARD DETAIL 32 05 23-06)
2" X 1-1/2" X 1/4" BOLLARD STRAP
1/2" X 1" HEX BOLT, 2 WASHERS, NUT
3-1/2" X 1-1/2" X 1/4"
UTILITY CONCRETE PER VA
SPECIFICATIONS
BOLLARD FOOTING, COORDINATE WITH
COR (AND VA STANDARD DETAIL 32 02
23-04)
6" DIA.X3' PIPE SLEEVE
2" X 1-1/2" X 1/4" BOLLARD STRAP 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/5
A -2
-7
E
H R
M I n fr a s tr u c tu re U p g ra d e a t L e a v e n w o rt h K
S V
A M
C /5
A
-2
-7
.L
E H
R M
.S
IT
E .M
E P
.r v t
/1
/2
:5
:4
P
M
T-501
TELECOMMUNICATION DETAILS 589A6-21-700
SITE
01/19/2022 M. Perkins K.Hutchinson
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
4101 4TH ST TRAFFICWAY, LEAVENWORTH, KS 66048
Revisions: Date:
ASI-001 04/18/22
NTS
C1
PRECAST CONCRETE FIBER OPTIC MANHOLE
NTS
B4
COMMUNICATIONS PULLBOX - UNPAVED AREAS
NTS
C4
COMMUNICATIONS PULLBOX - PAVED AREAS
NTS
C6
TRENCHING DETAIL - UNPAVED AREAS
NTS
D8
OLDCASTLE DURALITE 2436 OR APPROVED EQUAL
NTS
F8
OUTDOOR EQUIPMENT PAD
NTS
F6
PRIMARY DUCT BANK
SCALE: 12" = 1'-0"
F3
REMOVABLE BOLLARD DETAIL
/18
/20
| Sheets |
| ES100 - ELECTRICAL SITE PLAN - OVERALL |
| 90ES100 - ELECTRICAL ENLARGED SITE PLAN - B88/89/90/91 |
| T-501 - TELECOMMUNICATION DETAILS |