9-Sec 01 57 13 Soil Erosion and Sediment Control.pdf

PDF 111 KB Posted

Attached to
234 McKean Road Demolition (26-00182)
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This is a Soil Erosion and Sediment Control specification document for a Horsham Township project in Pennsylvania involving demolition and site restoration work. The specification outlines the contractor's responsibility to implement and maintain a comprehensive Soil Erosion and Sediment Control Plan to minimize soil erosion, turbid stormwater runoff, and sedimentation during construction activities. The project requires installation of temporary and permanent control measures including silt fencing, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, and perimeter swales as shown on the project drawings. All erosion and sediment control devices must be inspected on a weekly basis and after every storm event throughout the project duration. A mandatory pre-bid meeting is scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, PA 19002 (Kohler Park). Upon project completion and stabilization of disturbed areas, the contractor must remove all temporary control devices.

The specification references the Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual and Pennsylvania Department of Transportation Publication 408 Specifications as governing standards. Control measures must include 12-inch silt sock installations and rock construction entrances as needed to prevent dirt tracking onto Stump Road. The Owner reserves the right to require modifications to any sediment control measures and shall promptly implement any measures recommended or required by the County Conservation District. Temporary and permanent seeding requirements are detailed in Section 32 93 00 of the specifications. The document does not specify pricing terms, bid amounts, or financial details, as it focuses exclusively on technical requirements for erosion and sediment control execution during the demolition and site restoration work.

View the file

Other files

File Type Posted
11-Doc 00 43 13 - BID BOND.pdf PDF
18-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
16-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
21-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
44-X2 ES Plan.pdf PDF
51-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
3-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
42-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
43-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
13-Doc 00 52 00 - AGREEMENT.pdf PDF
22-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
6-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
20-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
41-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
7-Sec 31 11 00 - CLEAR AND GRUB.pdf PDF
45-X1 Demo Plan.pdf PDF
25-Doc 00 41 00 - BID FORM - EBID.pdf PDF
12-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
46-X3 ES Notes and Details.pdf PDF
30-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
50-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
34-Doc 00 91 13 - ADDENDA.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 234 McKean Road Demo.pdf PDF
33-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
19-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
37-Doc 00 62 76 - Application for Payment.pdf PDF
29-Doc 00 73 00 2 - Appendix A - cover sht.pdf PDF
5-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
31-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 02 41 16 - DEMOLITION.pdf PDF
49-X4 Easement Exhibit.pdf PDF
27-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
1-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
17-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
8-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
28-Doc 00 63 63 - Change Order.pdf PDF
26-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
24-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Doc 00 45 10 - BIDDER’S ACKNOWLEDGEMENT FORM.pdf PDF
47-Doc 00 73 00 3 - Appendix A - Prevailing Wage Determination.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
14-Doc 00 73 00 4 - Appendix B - cover sht.pdf PDF
39-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
35-Doc 00 21 13.2 - PennBid - How To Submit a Bid.pdf PDF
15-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
36-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
23-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
38-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
4-Sec 32 93 00 Landscaping.pdf PDF
52-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOIL EROSION AND SEDIMENT CONTROL

01 57 13-1

SECTION 01 57 13

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of This Section Includes:

1. Contractor shall implement and maintain the Soil Erosion and Sediment Control Plan prepared for the Project and/or Work as shown on the Drawings and described in this Section.

2. Contractor shall carry out the construction operations in such a manner that soil erosion and resulting turbid stormwater runoff and sedimentation are minimized.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 31 11 00: Clearing and Grubbing

2. Section 31 23 33: Excavation, Backfill and Compaction

1.03 QUALITY ASSURANCE

A. Reference Standards:

1. Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual.

2. Pennsylvania Department of Transportation Publication 408 Specifications

1.04 JOB CONDITIONS

A. The associated work activities include but are not limited to the following items:

1. Temporary and permanent measures will have to be undertaken before, during and after construction to control sediment from being carried onto adjoining properties and into swales or watercourses as a result of stormwater runoff.

2. The use of temporary control devices as shown on the Drawings and as described in these Specifications are for providing the trapping of sediment resulting from construction activities and to reduce the velocities of the temporary stormwater courses to minimize erosion.

3. The erosion and sediment control devices shall be inspected on a weekly basis and after every storm event and shall be maintained throughout the life of this project.

These shall include, but are not limited to, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, perimeter swales and silt fences, as shown on the Drawings or other measures that are required for the construction of the Project and/or Work.

4. Upon completion of the Project and/or Work, and stabilization of disturbed areas, the

01 57 13-2 temporary control devices shall be removed by Contractor.

5. Soil erosion and sediment control practices shall be consistent with the procedures outlined in the latest edition of the "Soil Erosion and Sediment Pollution Control Manual", Commonwealth of Pennsylvania, Department of Environmental Protection.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Silt Sock:

1. Section 865, Publication 408 Specifications.

B. Temporary Seeding

1. See Section 32 93 00

C. Permanent Seeding

1. See Section 32 93 00

PART 3 - EXECUTION

3.01 TEMPORARY CONTROL MEASURES

A. 12” Silt Sock:

1. Install silt sock in accordance with the drawings.

B. Rock Construction Entrance:

1. Install rock construction entrance in accordance with the drawings. Installation is only as needed if dirt is tracked onto Stump Road.

3.02 FIELD MODIFICATIONS

A. Owner reserves the right to require modifications to any or all sediment control measures provided in order to establish proper soil erosion and sedimentation control. In addition, any measures recommended or required by the County Conservation District shall be promptly implemented.

END OF SECTION