9-Sec 01 57 13 Soil Erosion and Sediment Control.pdf
PDF 111 KB Posted
- Attached to
- 234 McKean Road Demolition (26-00182)
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a Soil Erosion and Sediment Control specification document for a Horsham Township project in Pennsylvania involving demolition and site restoration work. The specification outlines the contractor's responsibility to implement and maintain a comprehensive Soil Erosion and Sediment Control Plan to minimize soil erosion, turbid stormwater runoff, and sedimentation during construction activities. The project requires installation of temporary and permanent control measures including silt fencing, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, and perimeter swales as shown on the project drawings. All erosion and sediment control devices must be inspected on a weekly basis and after every storm event throughout the project duration. A mandatory pre-bid meeting is scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, PA 19002 (Kohler Park). Upon project completion and stabilization of disturbed areas, the contractor must remove all temporary control devices.
The specification references the Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual and Pennsylvania Department of Transportation Publication 408 Specifications as governing standards. Control measures must include 12-inch silt sock installations and rock construction entrances as needed to prevent dirt tracking onto Stump Road. The Owner reserves the right to require modifications to any sediment control measures and shall promptly implement any measures recommended or required by the County Conservation District. Temporary and permanent seeding requirements are detailed in Section 32 93 00 of the specifications. The document does not specify pricing terms, bid amounts, or financial details, as it focuses exclusively on technical requirements for erosion and sediment control execution during the demolition and site restoration work.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOIL EROSION AND SEDIMENT CONTROL
01 57 13-1
SECTION 01 57 13
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work of This Section Includes:
1. Contractor shall implement and maintain the Soil Erosion and Sediment Control Plan prepared for the Project and/or Work as shown on the Drawings and described in this Section.
2. Contractor shall carry out the construction operations in such a manner that soil erosion and resulting turbid stormwater runoff and sedimentation are minimized.
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 31 11 00: Clearing and Grubbing
2. Section 31 23 33: Excavation, Backfill and Compaction
1.03 QUALITY ASSURANCE
A. Reference Standards:
1. Pennsylvania Department of Environmental Protection Soil Erosion and Sediment Pollution Control Manual.
2. Pennsylvania Department of Transportation Publication 408 Specifications
1.04 JOB CONDITIONS
A. The associated work activities include but are not limited to the following items:
1. Temporary and permanent measures will have to be undertaken before, during and after construction to control sediment from being carried onto adjoining properties and into swales or watercourses as a result of stormwater runoff.
2. The use of temporary control devices as shown on the Drawings and as described in these Specifications are for providing the trapping of sediment resulting from construction activities and to reduce the velocities of the temporary stormwater courses to minimize erosion.
3. The erosion and sediment control devices shall be inspected on a weekly basis and after every storm event and shall be maintained throughout the life of this project.
These shall include, but are not limited to, temporary sediment basins and traps, stabilized construction entrances, perimeter dikes, perimeter swales and silt fences, as shown on the Drawings or other measures that are required for the construction of the Project and/or Work.
4. Upon completion of the Project and/or Work, and stabilization of disturbed areas, the
01 57 13-2 temporary control devices shall be removed by Contractor.
5. Soil erosion and sediment control practices shall be consistent with the procedures outlined in the latest edition of the "Soil Erosion and Sediment Pollution Control Manual", Commonwealth of Pennsylvania, Department of Environmental Protection.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Silt Sock:
1. Section 865, Publication 408 Specifications.
B. Temporary Seeding
1. See Section 32 93 00
C. Permanent Seeding
1. See Section 32 93 00
PART 3 - EXECUTION
3.01 TEMPORARY CONTROL MEASURES
A. 12” Silt Sock:
1. Install silt sock in accordance with the drawings.
B. Rock Construction Entrance:
1. Install rock construction entrance in accordance with the drawings. Installation is only as needed if dirt is tracked onto Stump Road.
3.02 FIELD MODIFICATIONS
A. Owner reserves the right to require modifications to any or all sediment control measures provided in order to establish proper soil erosion and sedimentation control. In addition, any measures recommended or required by the County Conservation District shall be promptly implemented.
END OF SECTION