46-X3 ES Notes and Details.pdf
PDF 2 MB Posted
- Attached to
- 234 McKean Road Demolition (26-00182)
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This file contains engineering and construction detail specifications prepared by Gilmore & Associates, Inc. for a demolition and site restoration project in West Mifflin, Pennsylvania, located at 925 Irwin Run Road. The project scope includes demolition of an existing residential home, detached garage, two sheds, and an asphalt driveway, along with capping a domestic water well and abandoning a sanitary service line at the main. The project requires temporary restoration of an existing stream crossing/access point damaged by previous flooding. A mandatory pre-bid meeting is scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, PA 19002 (Kohler Park), with the meeting commencing at 11:00 a.m. The document specifies detailed standard construction details, including compost filter sock installation for erosion and sediment control, comprehensive site stabilization requirements, and tree protection protocols. All earth disturbance activities must comply with Pennsylvania One Call System notification requirements at 1-800-242-1776, with notification required at least three working days prior to commencing work.
The specifications mandate extensive erosion and sediment control measures throughout the demolition process, including maintenance of control best management practices (BMPs) until site stabilization is complete, with inspections required following each rainfall event and on a weekly basis. Topsoil placement is required to a minimum depth of six inches on all disturbed non-paved areas, with fill materials placed in compacted layers not exceeding eight inches in thickness. Permanent seeding must occur between March 15 and June 1 or August 1 and October 15 using Formula B seed (50% Kentucky bluegrass, 30% Pennlawn red fescue, 20% perennial ryegrass) at 21 pounds per 1,000 square yards, with hay or straw mulch applied at 3.0 tons per acre minimum. The contractor bears responsibility for waste removal in compliance with Pennsylvania Department of Environmental Protection solid waste management regulations at 25 PA Code 260.1, 271.1, and 287.1, with no burning, burial, or dumping of demolition materials permitted on-site. Non-compliance with erosion and sediment control requirements may result in administrative, civil, and criminal penalties up to $10,000 per day in civil penalties, $10,000 in summary criminal penalties, and $25,000 in misdemeanor criminal penalties per violation under the Pennsylvania Clean Streams Law.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
ES
T
M
AI
N S
TR
EE
T, S
U
IT
E
0, T
R
AP
PE
, P
A
(6
) 4
-4 w w w
.g ilm or e-as so c.
co m
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
AutoCAD SHX Text ONLY THOSE PLANS INCORPORATING THE PROFESSIONAL SEAL SHOULD THOSE PLANS INCORPORATING THE PROFESSIONAL SEAL SHOULD THOSE PLANS INCORPORATING THE PROFESSIONAL SEAL SHOULD PLANS INCORPORATING THE PROFESSIONAL SEAL SHOULD PLANS INCORPORATING THE PROFESSIONAL SEAL SHOULD INCORPORATING THE PROFESSIONAL SEAL SHOULD INCORPORATING THE PROFESSIONAL SEAL SHOULD THE PROFESSIONAL SEAL SHOULD THE PROFESSIONAL SEAL SHOULD PROFESSIONAL SEAL SHOULD PROFESSIONAL SEAL SHOULD SEAL SHOULD SEAL SHOULD SHOULD SHOULD BE CONSIDERED OFFICIAL AND RELIED UPON BY USER. THIS PLAN IS CONSIDERED OFFICIAL AND RELIED UPON BY USER. THIS PLAN IS CONSIDERED OFFICIAL AND RELIED UPON BY USER. THIS PLAN IS OFFICIAL AND RELIED UPON BY USER. THIS PLAN IS OFFICIAL AND RELIED UPON BY USER. THIS PLAN IS AND RELIED UPON BY USER. THIS PLAN IS AND RELIED UPON BY USER. THIS PLAN IS RELIED UPON BY USER. THIS PLAN IS RELIED UPON BY USER. THIS PLAN IS UPON BY USER. THIS PLAN IS UPON BY USER. THIS PLAN IS BY USER. THIS PLAN IS BY USER. THIS PLAN IS USER. THIS PLAN IS USER. THIS PLAN IS THIS PLAN IS THIS PLAN IS PLAN IS PLAN IS IS IS PREPARED SPECIFICALLY FOR THE CLIENT AND PROJECT DESIGNATED SPECIFICALLY FOR THE CLIENT AND PROJECT DESIGNATED SPECIFICALLY FOR THE CLIENT AND PROJECT DESIGNATED FOR THE CLIENT AND PROJECT DESIGNATED FOR THE CLIENT AND PROJECT DESIGNATED THE CLIENT AND PROJECT DESIGNATED THE CLIENT AND PROJECT DESIGNATED CLIENT AND PROJECT DESIGNATED CLIENT AND PROJECT DESIGNATED AND PROJECT DESIGNATED AND PROJECT DESIGNATED PROJECT DESIGNATED PROJECT DESIGNATED DESIGNATED DESIGNATED HEREON. MODIFICATION, REVISION, DUPLICATION OR USE WITHOUT THE MODIFICATION, REVISION, DUPLICATION OR USE WITHOUT THE MODIFICATION, REVISION, DUPLICATION OR USE WITHOUT THE REVISION, DUPLICATION OR USE WITHOUT THE REVISION, DUPLICATION OR USE WITHOUT THE DUPLICATION OR USE WITHOUT THE DUPLICATION OR USE WITHOUT THE OR USE WITHOUT THE OR USE WITHOUT THE USE WITHOUT THE USE WITHOUT THE WITHOUT THE WITHOUT THE THE THE CONSENT OF GILMORE & ASSOCIATES, INC. IS PROHIBITED. COPYRIGHT 2023 GILMORE & ASSOCIATES, INC. ALL RIGHTS RESERVED
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
PA LAW REQUIRES THREE WORKING DAYS
AutoCAD SHX Text
NOTICE TO UTILITIES BEFORE YOU EXCAVATE,
AutoCAD SHX Text
DRILL, BLAST OR DEMOLISH
AutoCAD SHX Text
PENNSYLVANIA ONE CALL SYSTEM, INC.
AutoCAD SHX Text
NON-MEMBERS MUST BE CONTACTED DIRECTLY
AutoCAD SHX Text
PENNSYLVANIA! CALL 1-800-242-1776
AutoCAD SHX Text
BEFORE YOU DIG ANYWHERE IN
AutoCAD SHX Text West Mifflin, Pennsylvania
AutoCAD SHX Text 925 Irwin Run Road
AutoCAD SHX Text 15122 - 1078
AutoCAD SHX Text
SERIAL NO.
AutoCAD SHX Text 20260412988
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text MUNICIPAL FILE No.:
AutoCAD SHX Text TAX MAP PARCEL No.:
AutoCAD SHX Text
TOTAL AREA:
AutoCAD SHX Text
TOTAL LOTS:
AutoCAD SHX Text
ENGINEERING & CONSULTING SERVICES
AutoCAD SHX Text
GILMORE & ASSOCIATES, INC.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
OWNERS INFO:
AutoCAD SHX Text
ENGINEERING & CONSULTING SERVICES
AutoCAD SHX Text
GILMORE & ASSOCIATES, INC.
AutoCAD SHX Text STANDARD PLAN NOTES: 1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING INCLUDING CLEARING AND GRUBBING AS WELL AS THE BUILDING CLEARING AND GRUBBING AS WELL AS THE BUILDING CLEARING AND GRUBBING AS WELL AS THE BUILDING AND GRUBBING AS WELL AS THE BUILDING AND GRUBBING AS WELL AS THE BUILDING GRUBBING AS WELL AS THE BUILDING GRUBBING AS WELL AS THE BUILDING AS WELL AS THE BUILDING AS WELL AS THE BUILDING WELL AS THE BUILDING WELL AS THE BUILDING AS THE BUILDING AS THE BUILDING THE BUILDING THE BUILDING BUILDING BUILDING DEMOLITION SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ACCORDANCE WITH THE CONTRACT DOCUMENTS AND WITH THE CONTRACT DOCUMENTS AND WITH THE CONTRACT DOCUMENTS AND THE CONTRACT DOCUMENTS AND THE CONTRACT DOCUMENTS AND CONTRACT DOCUMENTS AND CONTRACT DOCUMENTS AND DOCUMENTS AND DOCUMENTS AND AND AND PLANS. 2. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR ANY EARTH DISTURBANCE ACTIVITIES, OR ANY EARTH DISTURBANCE ACTIVITIES, OR EARTH DISTURBANCE ACTIVITIES, OR EARTH DISTURBANCE ACTIVITIES, OR DISTURBANCE ACTIVITIES, OR DISTURBANCE ACTIVITIES, OR ACTIVITIES, OR ACTIVITIES, OR OR OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM THE PENNSYLVANIA ONE CALL SYSTEM THE PENNSYLVANIA ONE CALL SYSTEM PENNSYLVANIA ONE CALL SYSTEM PENNSYLVANIA ONE CALL SYSTEM ONE CALL SYSTEM ONE CALL SYSTEM CALL SYSTEM CALL SYSTEM SYSTEM SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING AT 1-800-242-1776 FOR THE LOCATION OF EXISTING AT 1-800-242-1776 FOR THE LOCATION OF EXISTING 1-800-242-1776 FOR THE LOCATION OF EXISTING 1-800-242-1776 FOR THE LOCATION OF EXISTING FOR THE LOCATION OF EXISTING FOR THE LOCATION OF EXISTING THE LOCATION OF EXISTING THE LOCATION OF EXISTING LOCATION OF EXISTING LOCATION OF EXISTING OF EXISTING OF EXISTING EXISTING EXISTING UNDERGROUND UTILITIES. 3. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROCEED IN ACCORDANCE WITH THE SEQUENCE PROCEED IN ACCORDANCE WITH THE SEQUENCE IN ACCORDANCE WITH THE SEQUENCE IN ACCORDANCE WITH THE SEQUENCE ACCORDANCE WITH THE SEQUENCE ACCORDANCE WITH THE SEQUENCE WITH THE SEQUENCE WITH THE SEQUENCE THE SEQUENCE THE SEQUENCE SEQUENCE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. 4. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE BE ALLOWED TO ENTER AREAS OUTSIDE THE BE ALLOWED TO ENTER AREAS OUTSIDE THE ALLOWED TO ENTER AREAS OUTSIDE THE ALLOWED TO ENTER AREAS OUTSIDE THE TO ENTER AREAS OUTSIDE THE TO ENTER AREAS OUTSIDE THE ENTER AREAS OUTSIDE THE ENTER AREAS OUTSIDE THE AREAS OUTSIDE THE AREAS OUTSIDE THE OUTSIDE THE OUTSIDE THE THE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE OF DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE OF DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE SHOWN ON THE PLANS. THESE AREAS MUST BE SHOWN ON THE PLANS. THESE AREAS MUST BE ON THE PLANS. THESE AREAS MUST BE ON THE PLANS. THESE AREAS MUST BE THE PLANS. THESE AREAS MUST BE THE PLANS. THESE AREAS MUST BE PLANS. THESE AREAS MUST BE PLANS. THESE AREAS MUST BE THESE AREAS MUST BE THESE AREAS MUST BE AREAS MUST BE AREAS MUST BE MUST BE MUST BE BE BE CLEARLY DELINEATED IN THE FIELD PRIOR TO COMMENCEMENT OF ANY DELINEATED IN THE FIELD PRIOR TO COMMENCEMENT OF ANY DELINEATED IN THE FIELD PRIOR TO COMMENCEMENT OF ANY IN THE FIELD PRIOR TO COMMENCEMENT OF ANY IN THE FIELD PRIOR TO COMMENCEMENT OF ANY THE FIELD PRIOR TO COMMENCEMENT OF ANY THE FIELD PRIOR TO COMMENCEMENT OF ANY FIELD PRIOR TO COMMENCEMENT OF ANY FIELD PRIOR TO COMMENCEMENT OF ANY PRIOR TO COMMENCEMENT OF ANY PRIOR TO COMMENCEMENT OF ANY TO COMMENCEMENT OF ANY TO COMMENCEMENT OF ANY COMMENCEMENT OF ANY COMMENCEMENT OF ANY OF ANY OF ANY ANY ANY CONSTRUCTION/DEMOLITION ACTIVITIES ON THE PROJECT SITE. 5. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS CONTRACTOR SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS CONTRACTOR SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS SHALL BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS BE REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS REQUIRED TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS TO PROVIDE AND PLACE TOPSOIL TO THE DEPTHS PROVIDE AND PLACE TOPSOIL TO THE DEPTHS PROVIDE AND PLACE TOPSOIL TO THE DEPTHS AND PLACE TOPSOIL TO THE DEPTHS AND PLACE TOPSOIL TO THE DEPTHS PLACE TOPSOIL TO THE DEPTHS PLACE TOPSOIL TO THE DEPTHS TOPSOIL TO THE DEPTHS TOPSOIL TO THE DEPTHS TO THE DEPTHS TO THE DEPTHS THE DEPTHS THE DEPTHS DEPTHS DEPTHS SPECIFIED ON THE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ON THE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ON THE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE THE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE THE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE PLANS ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ON ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE ALL DISTURBED NON-PAVED AREAS AS PART OF THE SITE DISTURBED NON-PAVED AREAS AS PART OF THE SITE DISTURBED NON-PAVED AREAS AS PART OF THE SITE NON-PAVED AREAS AS PART OF THE SITE NON-PAVED AREAS AS PART OF THE SITE AREAS AS PART OF THE SITE AREAS AS PART OF THE SITE AS PART OF THE SITE AS PART OF THE SITE PART OF THE SITE PART OF THE SITE OF THE SITE OF THE SITE THE SITE THE SITE SITE SITE STABILIZATION AND RESTORATION. 6. ALL BUILDING DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE ALL BUILDING DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE BUILDING DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE BUILDING DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE DEMOLITION MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE MATERIALS AND PROJECT WASTES SHALL BE REMOVED FROM THE AND PROJECT WASTES SHALL BE REMOVED FROM THE AND PROJECT WASTES SHALL BE REMOVED FROM THE PROJECT WASTES SHALL BE REMOVED FROM THE PROJECT WASTES SHALL BE REMOVED FROM THE WASTES SHALL BE REMOVED FROM THE WASTES SHALL BE REMOVED FROM THE SHALL BE REMOVED FROM THE SHALL BE REMOVED FROM THE BE REMOVED FROM THE BE REMOVED FROM THE REMOVED FROM THE REMOVED FROM THE FROM THE FROM THE THE THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID IN ACCORDANCE WITH THE DEPARTMENT'S SOLID IN ACCORDANCE WITH THE DEPARTMENT'S SOLID ACCORDANCE WITH THE DEPARTMENT'S SOLID ACCORDANCE WITH THE DEPARTMENT'S SOLID WITH THE DEPARTMENT'S SOLID WITH THE DEPARTMENT'S SOLID THE DEPARTMENT'S SOLID THE DEPARTMENT'S SOLID DEPARTMENT'S SOLID DEPARTMENT'S SOLID SOLID SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. 260.1 ET SEQ., 271.1, AND 287.1 ET. 260.1 ET SEQ., 271.1, AND 287.1 ET. ET SEQ., 271.1, AND 287.1 ET. ET SEQ., 271.1, AND 287.1 ET. SEQ., 271.1, AND 287.1 ET. SEQ., 271.1, AND 287.1 ET. 271.1, AND 287.1 ET. 271.1, AND 287.1 ET. AND 287.1 ET. AND 287.1 ET. 287.1 ET. 287.1 ET. ET. ET. SEQ. NO BUILDING DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, NO BUILDING DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, NO BUILDING DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, BUILDING DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, BUILDING DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, DEMOLITION MATERIALS OR PROJECT WASTES SHALL BE BURNED, MATERIALS OR PROJECT WASTES SHALL BE BURNED, MATERIALS OR PROJECT WASTES SHALL BE BURNED, OR PROJECT WASTES SHALL BE BURNED, OR PROJECT WASTES SHALL BE BURNED, PROJECT WASTES SHALL BE BURNED, PROJECT WASTES SHALL BE BURNED, WASTES SHALL BE BURNED, WASTES SHALL BE BURNED, SHALL BE BURNED, SHALL BE BURNED, BE BURNED, BE BURNED, BURNED, BURNED, BURIED, DUMPED, OR DISCARDED AT THE SITE. 7. IF PUMPING OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE IF PUMPING OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE PUMPING OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE PUMPING OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE OF GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE GROUNDWATER FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE FROM ANY WORK AREA BECOMES NECESSARY, IT SHALL BE ANY WORK AREA BECOMES NECESSARY, IT SHALL BE ANY WORK AREA BECOMES NECESSARY, IT SHALL BE WORK AREA BECOMES NECESSARY, IT SHALL BE WORK AREA BECOMES NECESSARY, IT SHALL BE AREA BECOMES NECESSARY, IT SHALL BE AREA BECOMES NECESSARY, IT SHALL BE BECOMES NECESSARY, IT SHALL BE BECOMES NECESSARY, IT SHALL BE NECESSARY, IT SHALL BE NECESSARY, IT SHALL BE IT SHALL BE IT SHALL BE SHALL BE SHALL BE BE BE PUMPED THROUGH AN APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO THROUGH AN APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO THROUGH AN APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO AN APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO AN APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO APPROVED DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO DESILTING DEVICE OVER UNDISTURBED AREAS PRIOR TO DEVICE OVER UNDISTURBED AREAS PRIOR TO DEVICE OVER UNDISTURBED AREAS PRIOR TO OVER UNDISTURBED AREAS PRIOR TO OVER UNDISTURBED AREAS PRIOR TO UNDISTURBED AREAS PRIOR TO UNDISTURBED AREAS PRIOR TO AREAS PRIOR TO AREAS PRIOR TO PRIOR TO PRIOR TO TO TO ALLOWING THE WATER TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE THE WATER TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE THE WATER TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE WATER TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE WATER TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE TO ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE ENTER ANY DRAINAGE SYSTEM OR WATERS OF THE ANY DRAINAGE SYSTEM OR WATERS OF THE ANY DRAINAGE SYSTEM OR WATERS OF THE DRAINAGE SYSTEM OR WATERS OF THE DRAINAGE SYSTEM OR WATERS OF THE SYSTEM OR WATERS OF THE SYSTEM OR WATERS OF THE OR WATERS OF THE OR WATERS OF THE WATERS OF THE WATERS OF THE OF THE OF THE THE THE COMMONWEALTH. 8. THE COMPOST FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL THE COMPOST FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL COMPOST FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL COMPOST FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL FILTER SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL SOCK AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL AND ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL ANY OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL OTHER EROSION & SEDIMENT CONTROL BMP'S SHALL EROSION & SEDIMENT CONTROL BMP'S SHALL EROSION & SEDIMENT CONTROL BMP'S SHALL & SEDIMENT CONTROL BMP'S SHALL & SEDIMENT CONTROL BMP'S SHALL SEDIMENT CONTROL BMP'S SHALL SEDIMENT CONTROL BMP'S SHALL CONTROL BMP'S SHALL CONTROL BMP'S SHALL BMP'S SHALL BMP'S SHALL SHALL SHALL BE MAINTAINED UNTIL THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. MAINTAINED UNTIL THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. MAINTAINED UNTIL THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. UNTIL THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. UNTIL THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. THE DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. DEMOLITION IS COMPLETE AND THE SITE IS STABILIZED. IS COMPLETE AND THE SITE IS STABILIZED. IS COMPLETE AND THE SITE IS STABILIZED. COMPLETE AND THE SITE IS STABILIZED. COMPLETE AND THE SITE IS STABILIZED. AND THE SITE IS STABILIZED. AND THE SITE IS STABILIZED. THE SITE IS STABILIZED. THE SITE IS STABILIZED. SITE IS STABILIZED. SITE IS STABILIZED. IS STABILIZED. IS STABILIZED. STABILIZED. STABILIZED. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S SHALL INCLUDE INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S SHALL INCLUDE INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S INCLUDE INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S INCLUDE INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S INSPECTIONS OF ALL EROSION & SEDIMENT CONTROL BMP'S OF ALL EROSION & SEDIMENT CONTROL BMP'S OF ALL EROSION & SEDIMENT CONTROL BMP'S ALL EROSION & SEDIMENT CONTROL BMP'S ALL EROSION & SEDIMENT CONTROL BMP'S EROSION & SEDIMENT CONTROL BMP'S EROSION & SEDIMENT CONTROL BMP'S & SEDIMENT CONTROL BMP'S & SEDIMENT CONTROL BMP'S SEDIMENT CONTROL BMP'S SEDIMENT CONTROL BMP'S CONTROL BMP'S CONTROL BMP'S BMP'S BMP'S AFTER EACH RAINFALL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL EACH RAINFALL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL EACH RAINFALL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL RAINFALL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL RAINFALL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL BASIS. ALL PREVENTATIVE AND REMEDIAL BASIS. ALL PREVENTATIVE AND REMEDIAL ALL PREVENTATIVE AND REMEDIAL ALL PREVENTATIVE AND REMEDIAL PREVENTATIVE AND REMEDIAL PREVENTATIVE AND REMEDIAL AND REMEDIAL AND REMEDIAL REMEDIAL REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, OUT, REPAIR, REPLACEMENT, REGRADING, OUT, REPAIR, REPLACEMENT, REGRADING, REPAIR, REPLACEMENT, REGRADING, REPAIR, REPLACEMENT, REGRADING, REPLACEMENT, REGRADING, REPLACEMENT, REGRADING, REGRADING, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE MUST BE PERFORMED IMMEDIATELY. IF THE MUST BE PERFORMED IMMEDIATELY. IF THE BE PERFORMED IMMEDIATELY. IF THE BE PERFORMED IMMEDIATELY. IF THE PERFORMED IMMEDIATELY. IF THE PERFORMED IMMEDIATELY. IF THE IMMEDIATELY. IF THE IMMEDIATELY. IF THE IF THE IF THE THE THE EROSION & SEDIMENT BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR & SEDIMENT BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR & SEDIMENT BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR SEDIMENT BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR SEDIMENT BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR AS EXPECTED, REPLACEMENT BMP'S, OR AS EXPECTED, REPLACEMENT BMP'S, OR EXPECTED, REPLACEMENT BMP'S, OR EXPECTED, REPLACEMENT BMP'S, OR REPLACEMENT BMP'S, OR REPLACEMENT BMP'S, OR BMP'S, OR BMP'S, OR OR OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 9. A LOG SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS A LOG SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS LOG SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS LOG SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS SHOWING DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS DATES THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS THAT EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS EROSION & SEDIMENT BMP'S WERE INSPECTED AS WELL AS & SEDIMENT BMP'S WERE INSPECTED AS WELL AS & SEDIMENT BMP'S WERE INSPECTED AS WELL AS SEDIMENT BMP'S WERE INSPECTED AS WELL AS SEDIMENT BMP'S WERE INSPECTED AS WELL AS BMP'S WERE INSPECTED AS WELL AS BMP'S WERE INSPECTED AS WELL AS WERE INSPECTED AS WELL AS WERE INSPECTED AS WELL AS INSPECTED AS WELL AS INSPECTED AS WELL AS AS WELL AS AS WELL AS WELL AS WELL AS AS AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED DATE THEY WERE CORRECTED SHALL BE MAINTAINED DATE THEY WERE CORRECTED SHALL BE MAINTAINED THEY WERE CORRECTED SHALL BE MAINTAINED THEY WERE CORRECTED SHALL BE MAINTAINED WERE CORRECTED SHALL BE MAINTAINED WERE CORRECTED SHALL BE MAINTAINED CORRECTED SHALL BE MAINTAINED CORRECTED SHALL BE MAINTAINED SHALL BE MAINTAINED SHALL BE MAINTAINED BE MAINTAINED BE MAINTAINED MAINTAINED MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME TO REGULATORY AGENCY OFFICIALS AT THE TIME TO REGULATORY AGENCY OFFICIALS AT THE TIME REGULATORY AGENCY OFFICIALS AT THE TIME REGULATORY AGENCY OFFICIALS AT THE TIME AGENCY OFFICIALS AT THE TIME AGENCY OFFICIALS AT THE TIME OFFICIALS AT THE TIME OFFICIALS AT THE TIME AT THE TIME AT THE TIME THE TIME THE TIME TIME TIME OF ANY INSPECTION. 10. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE TRACKED ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE TRACKED ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE ANY PUBLIC ROADWAY SHALL BE RETURNED TO THE PUBLIC ROADWAY SHALL BE RETURNED TO THE PUBLIC ROADWAY SHALL BE RETURNED TO THE ROADWAY SHALL BE RETURNED TO THE ROADWAY SHALL BE RETURNED TO THE SHALL BE RETURNED TO THE SHALL BE RETURNED TO THE BE RETURNED TO THE BE RETURNED TO THE RETURNED TO THE RETURNED TO THE TO THE TO THE THE THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO SITE BY THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO SITE BY THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO BY THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO BY THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO THE END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO END OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO OF EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO EACH WORK DAY, STOCKPILED AND STABILIZED. IN NO WORK DAY, STOCKPILED AND STABILIZED. IN NO WORK DAY, STOCKPILED AND STABILIZED. IN NO DAY, STOCKPILED AND STABILIZED. IN NO DAY, STOCKPILED AND STABILIZED. IN NO STOCKPILED AND STABILIZED. IN NO STOCKPILED AND STABILIZED. IN NO AND STABILIZED. IN NO AND STABILIZED. IN NO STABILIZED. IN NO STABILIZED. IN NO IN NO IN NO NO NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, OR SWEPT INTO ANY ROADSIDE DITCH, OR SWEPT INTO ANY ROADSIDE DITCH, SWEPT INTO ANY ROADSIDE DITCH, SWEPT INTO ANY ROADSIDE DITCH, INTO ANY ROADSIDE DITCH, INTO ANY ROADSIDE DITCH, ANY ROADSIDE DITCH, ANY ROADSIDE DITCH, ROADSIDE DITCH, ROADSIDE DITCH, DITCH, DITCH, STORM SEWER, OR SURFACE WATER. 11. RESTORE SITE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE RESTORE SITE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE SITE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE SITE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE TO EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE EXISTING GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE THE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE CONTRACTOR SHALL BE RESPONSIBLE TO GRADE SHALL BE RESPONSIBLE TO GRADE SHALL BE RESPONSIBLE TO GRADE BE RESPONSIBLE TO GRADE BE RESPONSIBLE TO GRADE RESPONSIBLE TO GRADE RESPONSIBLE TO GRADE TO GRADE TO GRADE GRADE GRADE ALL DISTURBED AREAS TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE DISTURBED AREAS TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE DISTURBED AREAS TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE AREAS TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE AREAS TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE TO UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE UNIFORM GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE GRADE TO ELIMINATE HIGH AND LOW SPOTS. THE TO ELIMINATE HIGH AND LOW SPOTS. THE TO ELIMINATE HIGH AND LOW SPOTS. THE ELIMINATE HIGH AND LOW SPOTS. THE ELIMINATE HIGH AND LOW SPOTS. THE HIGH AND LOW SPOTS. THE HIGH AND LOW SPOTS. THE AND LOW SPOTS. THE AND LOW SPOTS. THE LOW SPOTS. THE LOW SPOTS. THE SPOTS. THE SPOTS. THE THE THE CONTRACTOR SHALL PROVIDE AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES SHALL PROVIDE AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES SHALL PROVIDE AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES PROVIDE AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES PROVIDE AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES AND PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES PLACE TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES TOPSOIL TO A MINIMUM DEPTH OF SIX INCHES TO A MINIMUM DEPTH OF SIX INCHES TO A MINIMUM DEPTH OF SIX INCHES A MINIMUM DEPTH OF SIX INCHES A MINIMUM DEPTH OF SIX INCHES MINIMUM DEPTH OF SIX INCHES MINIMUM DEPTH OF SIX INCHES DEPTH OF SIX INCHES DEPTH OF SIX INCHES OF SIX INCHES OF SIX INCHES SIX INCHES SIX INCHES INCHES INCHES TO ACHIEVE FINISH GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS ACHIEVE FINISH GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS ACHIEVE FINISH GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS FINISH GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS FINISH GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS GRADE WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS WHERE REQUIRED ON DISTURBED AREAS AND AREAS AS REQUIRED ON DISTURBED AREAS AND AREAS AS REQUIRED ON DISTURBED AREAS AND AREAS AS ON DISTURBED AREAS AND AREAS AS ON DISTURBED AREAS AND AREAS AS DISTURBED AREAS AND AREAS AS DISTURBED AREAS AND AREAS AS AREAS AND AREAS AS AREAS AND AREAS AS AND AREAS AS AND AREAS AS AREAS AS AREAS AS AS AS DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF BY THE OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF BY THE OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF THE OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF THE OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OWNER OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OR OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF OWNER'S REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF REPRESENTATIVE. THE TOPSOIL SHALL BE FREE OF THE TOPSOIL SHALL BE FREE OF THE TOPSOIL SHALL BE FREE OF TOPSOIL SHALL BE FREE OF TOPSOIL SHALL BE FREE OF SHALL BE FREE OF SHALL BE FREE OF BE FREE OF BE FREE OF FREE OF FREE OF OF OF SUBSOIL, CLAY, WEEDS, STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER CLAY, WEEDS, STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER CLAY, WEEDS, STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER WEEDS, STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER WEEDS, STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER STONES, ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER ROOTS, OTHER OBJECTIONABLE VEGETATION AND OTHER OTHER OBJECTIONABLE VEGETATION AND OTHER OTHER OBJECTIONABLE VEGETATION AND OTHER OBJECTIONABLE VEGETATION AND OTHER OBJECTIONABLE VEGETATION AND OTHER VEGETATION AND OTHER VEGETATION AND OTHER AND OTHER AND OTHER OTHER OTHER UNSUITABLE OR HARMFUL MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH OR HARMFUL MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH OR HARMFUL MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH HARMFUL MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH HARMFUL MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH MATERIAL. THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH THE TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH TOPSOIL SHALL BE GRADED TO A SMOOTH FINISH SHALL BE GRADED TO A SMOOTH FINISH SHALL BE GRADED TO A SMOOTH FINISH BE GRADED TO A SMOOTH FINISH BE GRADED TO A SMOOTH FINISH GRADED TO A SMOOTH FINISH GRADED TO A SMOOTH FINISH TO A SMOOTH FINISH TO A SMOOTH FINISH A SMOOTH FINISH A SMOOTH FINISH SMOOTH FINISH SMOOTH FINISH FINISH FINISH FOR SEEDING. RESTORATION SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING SEEDING. RESTORATION SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING SEEDING. RESTORATION SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING RESTORATION SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING RESTORATION SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING SHALL ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING ALSO INCLUDE PREPARING SEED BEDS AND RESEEDING INCLUDE PREPARING SEED BEDS AND RESEEDING INCLUDE PREPARING SEED BEDS AND RESEEDING PREPARING SEED BEDS AND RESEEDING PREPARING SEED BEDS AND RESEEDING SEED BEDS AND RESEEDING SEED BEDS AND RESEEDING BEDS AND RESEEDING BEDS AND RESEEDING AND RESEEDING AND RESEEDING RESEEDING RESEEDING WITH FORMULA "B" SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION FORMULA "B" SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION FORMULA "B" SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION "B" SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION "B" SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION SEED AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION AND MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION MULCHING ALL AREAS DISTURBED DURING THE DEMOLITION ALL AREAS DISTURBED DURING THE DEMOLITION ALL AREAS DISTURBED DURING THE DEMOLITION AREAS DISTURBED DURING THE DEMOLITION AREAS DISTURBED DURING THE DEMOLITION DISTURBED DURING THE DEMOLITION DISTURBED DURING THE DEMOLITION DURING THE DEMOLITION DURING THE DEMOLITION THE DEMOLITION THE DEMOLITION DEMOLITION DEMOLITION OPERATION. ALL DEBRIS AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE ALL DEBRIS AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE ALL DEBRIS AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE DEBRIS AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE DEBRIS AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE AS WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE WELL AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE AS ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE ANY UNSUITABLE OR HARMFUL MATERIAL SHALL BE UNSUITABLE OR HARMFUL MATERIAL SHALL BE UNSUITABLE OR HARMFUL MATERIAL SHALL BE OR HARMFUL MATERIAL SHALL BE OR HARMFUL MATERIAL SHALL BE HARMFUL MATERIAL SHALL BE HARMFUL MATERIAL SHALL BE MATERIAL SHALL BE MATERIAL SHALL BE SHALL BE SHALL BE BE BE REMOVED FROM THE SEEDING AREA BEFORE SEEDING APPLICATION IS DONE. . 12. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES COMPACTED LAYERS NOT TO EXCEED 8 INCHES COMPACTED LAYERS NOT TO EXCEED 8 INCHES LAYERS NOT TO EXCEED 8 INCHES LAYERS NOT TO EXCEED 8 INCHES NOT TO EXCEED 8 INCHES NOT TO EXCEED 8 INCHES TO EXCEED 8 INCHES TO EXCEED 8 INCHES EXCEED 8 INCHES EXCEED 8 INCHES 8 INCHES 8 INCHES INCHES INCHES IN THICKNESS. 13. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER PARTICLES, BRUSH, ROOTS, SOD, OR OTHER PARTICLES, BRUSH, ROOTS, SOD, OR OTHER BRUSH, ROOTS, SOD, OR OTHER BRUSH, ROOTS, SOD, OR OTHER ROOTS, SOD, OR OTHER ROOTS, SOD, OR OTHER SOD, OR OTHER SOD, OR OTHER OR OTHER OR OTHER OTHER OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT MATERIALS THAT WOULD INTERFERE WITH OR PREVENT MATERIALS THAT WOULD INTERFERE WITH OR PREVENT THAT WOULD INTERFERE WITH OR PREVENT THAT WOULD INTERFERE WITH OR PREVENT WOULD INTERFERE WITH OR PREVENT WOULD INTERFERE WITH OR PREVENT INTERFERE WITH OR PREVENT INTERFERE WITH OR PREVENT WITH OR PREVENT WITH OR PREVENT OR PREVENT OR PREVENT PREVENT PREVENT CONSTRUCTION OF SATISFACTORY FILLS. 14. 15. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. 16. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF CEASE IN ANY AREA OR SUBAREA OF CEASE IN ANY AREA OR SUBAREA OF IN ANY AREA OR SUBAREA OF IN ANY AREA OR SUBAREA OF ANY AREA OR SUBAREA OF ANY AREA OR SUBAREA OF AREA OR SUBAREA OF AREA OR SUBAREA OF OR SUBAREA OF OR SUBAREA OF SUBAREA OF SUBAREA OF OF OF THE PROJECT, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING PROJECT, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING PROJECT, THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING THE CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING CONTRACTOR SHALL STABILIZE ALL DISTURBED AREAS. DURING SHALL STABILIZE ALL DISTURBED AREAS. DURING SHALL STABILIZE ALL DISTURBED AREAS. DURING STABILIZE ALL DISTURBED AREAS. DURING STABILIZE ALL DISTURBED AREAS. DURING ALL DISTURBED AREAS. DURING ALL DISTURBED AREAS. DURING DISTURBED AREAS. DURING DISTURBED AREAS. DURING AREAS. DURING AREAS. DURING DURING DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED. 17. EROSION & SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL EROSION & SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL & SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL & SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL SEDIMENT CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL CONTROL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL FUNCTIONAL AS SUCH UNTIL ALL FUNCTIONAL AS SUCH UNTIL ALL AS SUCH UNTIL ALL AS SUCH UNTIL ALL SUCH UNTIL ALL SUCH UNTIL ALL UNTIL ALL UNTIL ALL ALL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED STABILIZED OR UNTIL THEY ARE REPLACED STABILIZED OR UNTIL THEY ARE REPLACED OR UNTIL THEY ARE REPLACED OR UNTIL THEY ARE REPLACED UNTIL THEY ARE REPLACED UNTIL THEY ARE REPLACED THEY ARE REPLACED THEY ARE REPLACED ARE REPLACED ARE REPLACED REPLACED REPLACED BY ANOTHER APPROVED BMP. 18. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND HAS BEEN ACHIEVED, TEMPORARY EROSION AND HAS BEEN ACHIEVED, TEMPORARY EROSION AND BEEN ACHIEVED, TEMPORARY EROSION AND BEEN ACHIEVED, TEMPORARY EROSION AND ACHIEVED, TEMPORARY EROSION AND ACHIEVED, TEMPORARY EROSION AND TEMPORARY EROSION AND TEMPORARY EROSION AND EROSION AND EROSION AND AND AND SEDIMENT CONTROL BMP'S MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONTROL BMP'S MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONTROL BMP'S MUST BE REMOVED OR CONVERTED TO PERMANENT POST BMP'S MUST BE REMOVED OR CONVERTED TO PERMANENT POST BMP'S MUST BE REMOVED OR CONVERTED TO PERMANENT POST MUST BE REMOVED OR CONVERTED TO PERMANENT POST MUST BE REMOVED OR CONVERTED TO PERMANENT POST BE REMOVED OR CONVERTED TO PERMANENT POST BE REMOVED OR CONVERTED TO PERMANENT POST REMOVED OR CONVERTED TO PERMANENT POST REMOVED OR CONVERTED TO PERMANENT POST OR CONVERTED TO PERMANENT POST OR CONVERTED TO PERMANENT POST CONVERTED TO PERMANENT POST CONVERTED TO PERMANENT POST TO PERMANENT POST TO PERMANENT POST PERMANENT POST PERMANENT POST POST POST CONSTRUCTION STORMWATER MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR STORMWATER MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR STORMWATER MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR BMP'S. AREAS DISTURBED DURING REMOVAL OR BMP'S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .