30-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf

PDF 130 KB Posted

Attached to
234 McKean Road Demolition (26-00182)
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

This is a specification document for landscape protection requirements issued by Horsham Township, Pennsylvania, as part of the 234 McKean Road Demolition project (26-00182). The specification establishes standards and procedures for protecting existing plant materials during construction activities, including the installation of temporary protective fencing around trees and vegetation designated to remain on the site. The contractor is responsible for conducting a site assessment to determine appropriate protection measures based on plant type and location, with the engineer arranging a pre-construction site inspection to review specific landscape protection concerns. Key requirements include erection of temporary fencing at a minimum distance of 15 feet from tree trunks or to the dripline, whichever is greater, prior to any earthmoving or construction activities. Temporary fencing specifications call for standard picket snow fence at 4 feet high or approved alternatives such as orange open mesh construction fencing, supported by high carbon channel bar steel posts of 7 feet in length with rivet-type fence holding lugs. The fencing must remain in place throughout the construction period and be periodically inspected and maintained to ensure continued integrity.

The specification establishes strict protocols for site management within protection areas, prohibiting toxic materials storage within 100 feet, prohibition of building, material storage, vehicle and equipment parking, and proper handling of exposed tree roots within four hours of severance through trimming and temporary coverage with moist biodegradable materials. Tree stumps within 10 feet of protection areas must be removed using stump grinders to minimize root system damage, and sediment retention or detention basins cannot be located within or discharge into protection areas. The project references Pennsylvania Department of Transportation Publication 408 Specifications as the applicable quality assurance standard and relates to concurrent work specified in sections covering soil erosion and sediment control, clearing and grubbing, and excavation, backfill and compaction. A mandatory pre-bid meeting is scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, PA 19002, with the broader project involving residential demolition, well capping, sanitary line abandonment, stream crossing restoration, and site grading and stabilization.

View the file

Other files

File Type Posted
11-Doc 00 43 13 - BID BOND.pdf PDF
18-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
9-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
16-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
21-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
44-X2 ES Plan.pdf PDF
51-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
3-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
42-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
43-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
13-Doc 00 52 00 - AGREEMENT.pdf PDF
22-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
6-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
20-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
41-Doc 00 73 00 5 - Appendix B - Public Works Employment Verification Form.pdf PDF
7-Sec 31 11 00 - CLEAR AND GRUB.pdf PDF
45-X1 Demo Plan.pdf PDF
25-Doc 00 41 00 - BID FORM - EBID.pdf PDF
12-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
46-X3 ES Notes and Details.pdf PDF
50-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
34-Doc 00 91 13 - ADDENDA.pdf PDF
48-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 234 McKean Road Demo.pdf PDF
33-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
19-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
37-Doc 00 62 76 - Application for Payment.pdf PDF
29-Doc 00 73 00 2 - Appendix A - cover sht.pdf PDF
5-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
31-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
40-Sec 02 41 16 - DEMOLITION.pdf PDF
49-X4 Easement Exhibit.pdf PDF
27-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
1-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
17-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
8-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
28-Doc 00 63 63 - Change Order.pdf PDF
26-Doc 00 45 19 - NON-COLLUSION AFFIDAVIT.pdf PDF
24-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
32-Doc 00 45 10 - BIDDER’S ACKNOWLEDGEMENT FORM.pdf PDF
47-Doc 00 73 00 3 - Appendix A - Prevailing Wage Determination.pdf PDF
10-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
14-Doc 00 73 00 4 - Appendix B - cover sht.pdf PDF
39-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
35-Doc 00 21 13.2 - PennBid - How To Submit a Bid.pdf PDF
15-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
36-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
23-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
38-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
4-Sec 32 93 00 Landscaping.pdf PDF
52-Doc 00 73 00 1 - SUPPLEMENTARY CONDITIONS.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LANDSCAPE PROTECTION

01 56 39-1

SECTION 01 56 39

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of this Section Includes:

1. Provisions for landscape protection including the location and erection of protective fencing as may be appropriate for specific plant materials so as to insure their survival during and after completion of construction.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 11 00: Clearing and Grubbing

3. Section 31 23 33: Excavation, Backfill and Compaction

1.03 QUALITY ASSURANCE

A. Reference Standards

1. Pennsylvania Dept. of Transportation Publication 408 Specifications.

1.04 JOB CONDITIONS

A. Contractor is responsible for determining through site inspection and assessment of construction requirements what protection standards are necessary and practical based on plant type and location.

B. Engineer will arrange for a site inspection with Contractor prior to initiation of construction to review specific landscape protection concerns.

PART 2 - PRODUCTS

2.01 FABRICATED PRODUCTS

A. Temporary Fencing:

1. Undamaged, standard picket snow fence, 4' high, formed of wooden slats, tightly woven with wire cable; orange, open mesh construction fencing; or other acceptable, highly visible, weather resistant, easily maintained fencing that provides a substantial barrier.

2. High carbon channel bar steel posts, 7 feet in length. Designed to drive satisfactorily into the ground and with at least ten fence holding lugs of the rivet type. Alternate post types may be approved by Engineer.

PART 3 - EXECUTION

01 56 39-2

3.01 PREPARATION

A. Prior to initiating construction, Contractor shall assess the site area and determine the protection standards required in addition to any specifically noted on the Drawings. Unusual circumstances or exceptions to the standards specified shall be resolved by agreement with Engineer.

3.02 GENERAL REQUIREMENTS

A. Grade changes and excavation shall not encroach upon a protection area.

B. No toxic materials shall be stored within 100 feet of a protection area including petroleum based and/or derived products.

C. The area within a protection area shall not be built upon, nor shall any materials be stored there either temporarily or permanently. Vehicles and equipment shall not be parked in a protection area.

D. When tree stumps are located within ten feet of a protection area the stumps shall be removed by means of a stump grinder to minimize the effect on surrounding root systems.

E. Tree roots which must be severed shall be cut by a backhoe or similar equipment aligned radially to the tree to reduce the lateral movement of the roots during excavation, which could damage the intertwined roots of adjacent trees. Within four (4) hours of any severance of roots, all tree roots that have been exposed and/or damaged shall be trimmed cleanly and covered temporarily with moist peat moss, moist burlap or other moist biodegradable material to keep them from drying out until permanent cover can be installed.

F. Sediment, retention and detention basins shall not be located within the protection area or discharge into the protection area.

3.03 ERECTION OF TEMPORARY FENCING

A. Prior to start of construction or earthmoving, a snow fence or approved alternate shall be placed around plant material specified to remain at a distance of 15' from the trunk of the plant material or the distance from the trunk to the dripline whichever is greater. For a group of trees or woodlands, the fence location shall be determined by the aggregate distance or driplines for the individual plant. Exceptions to this requirement must be approved by Engineer.

B. Temporary fencing shall be periodically inspected and repairs accomplished to insure continued integrity during the construction period.

C. Temporary fencing shall remain in place until final restoration of the site is to occur.

END OF SECTION