28-Doc 00 63 63 - Change Order.pdf
PDF 91 KB Posted
- Attached to
- 234 McKean Road Demolition (26-00182)
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a Change Order form issued by Horsham Township in Pennsylvania for a demolition project (Contract No. 2026-00182). The change order document, EJCDC Form C-941, is prepared by Gilmore & Associates, Inc. (Engineer) and pertains to work being performed by a contractor under the township's direction. The form provides a standardized template for documenting modifications to the original contract, including changes to the scope of work, contract price, and contract timeline. The project involves demolition of an existing residential home, detached garage, two sheds, and an asphalt driveway at 234 McKean Road, along with capping of a domestic water well and abandonment of a sanitary service line. Site restoration includes temporary reconstruction of a stream crossing damaged by previous flooding, grading of disturbed areas to match surrounding topography, and permanent stabilization. A mandatory Pre-Bid Meeting was scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, Pennsylvania.
The Change Order form itself does not contain specific pricing information, contract time adjustments, or completion details, as these fields remain blank in the template document. The form is structured to capture net increases or decreases to the contract price and contract times, with designated signature lines for authorization by the Engineer, Owner, and Contractor. No information regarding set-asides, incumbent contractors, funding sources, or specific budget amounts is provided within this particular change order document. The form serves as the administrative mechanism for formally documenting any modifications agreed upon by all parties to the original contract agreement.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOCUMENT 00 63 63
No.
PROJECT:
DATE OF ISSUANCE EFFECTIVE DATE
OWNER:
OWNER'S Contract No.
CONTRACTOR: ENGINEER:
You are directed to make the following changes in the Contract Documents.
Description:
Reason for Change Order:
Attachments:
Original Contract Price Original Contract Times
Substantial Completion:
$ Ready for final payment:
Net changes from previous Change Orders No. to No. Net changes from previous Change Orders No. to No.
$ days
Contract Price prior to this Change Order Contract Times prior to this Change Order
Substantial Completion:
$ Ready for final payment:
Net increase (decrease) of this Change Order Net increase (decrease) of this Change Order
$ days
Contract Price with all approved Change Orders Contract Times with all approved Change Orders
Substantial Completion:
$ Ready for final payment:
RECOMMENDED: APPROVED: ACCEPTED:
By: By: By:
Date: Date: Date:
Engineer (authorized signature)
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Owner (authorized signature) Contractor (authorized signature)
CHANGE ORDER
Horsham Township
2026-00182
Gilmore & Associates, Inc.
EJCDC Form C-941
CHANGE ORDER
00 63 63-1
File details come from the government source that posted it. Updated .