About this file
This is a Prevailing Wage Determination document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the 234 McKean Road Demolition project in Horsham Township, Montgomery County. The project, classified as Highway work, involves the demolition of an existing residential home, detached garage, two sheds, and asphalt driveway removal, along with domestic water well capping, sanitary service line abandonment, temporary restoration of a stream crossing damaged by previous flooding, and site grading and stabilization. The determination was issued on March 12, 2026, with an effective date corresponding to the contract award date of April 15, 2026 (Serial Number 26-02438). A mandatory pre-bid meeting is scheduled for Thursday, April 2, 2026, at 1100 Limekiln Pike, Ambler, PA 19002 (Kohler Park). The Philadelphia Field Office of the Department of Labor & Industry (contact: 215-560-1858) assigned this determination.
The document establishes prevailing wage rates for both Building and Heavy/Highway classifications applicable to the project, with rates effective from various dates between January 2023 and May 2026. Wage rates span multiple trade categories including carpenters, laborers (classified by type), operators (classified by equipment class), painters, electricians, plumbers, and various specialized trades, with hourly rates ranging from approximately $24.52 to $74.86 plus fringe benefits totaling between $12.08 and $52.17 per hour. All contractors and subcontractors performing work on this public works project must comply with these prevailing wage rates as a condition of bidding and contract execution. The determination reflects Pennsylvania's prevailing wage requirements for public construction projects and establishes the mandatory labor cost floor for project budgeting and bid submission.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: 234 McKean Road Demolition
General Description: This project involves demolition of an existing residential home, detached garage, two sheds, along with the removal of an asphalt driveway. A domestic water well will need to be capped, and a sanitary service line will need to be abandoned at the main.
The site will require temporary restoration of an existing stream crossing/access point damaged by previous flooding. All disturbed areas are to be graded to match the surrounding topography and permanently stabilized.
Project Locality Horsham Township
Awarding Agency: Horsham Township
Contract Award Date: 4/15/2026
Serial Number: 26-02438
Project Classification: Highway
Determination Date: 3/12/2026
Assigned Field Office: Philadelphia
Field Office Phone Number: (215)560-1858
Toll Free Phone Number:
Project County: Montgomery County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 3/12/2026 Page 1 of 6
Project: 26-02438 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Bricklayer 5/1/2023 $47.50 $31.42 $78.92
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36
Carpenters 5/1/2024 $45.72 $29.02 $74.74
Carpenters 5/1/2025 $47.47 $29.02 $76.49
Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96
Cement Masons 5/1/2024 $46.70 $32.46 $79.16
Cement Masons 5/1/2025 $48.70 $32.46 $81.16
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49
Electricians 4/29/2024 $56.67 $46.24 $102.91
Electricians 5/1/2025 $58.63 $47.28 $105.91
Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62
Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72
Floor Coverer 5/1/2025 $51.67 $31.69 $83.36
Floor Coverer 5/1/2026 $52.84 $32.86 $85.70
Glazier 5/1/2024 $48.00 $37.50 $85.50
Glazier 5/1/2025 $49.96 $38.34 $88.30
Interior Finish 5/1/2023 $34.60 $25.80 $60.40
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2024 $44.64 $34.39 $79.03
Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04
Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47
Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45
Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70
Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93
Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45
Marble Finisher 5/1/2023 $39.52 $29.30 $68.82
Marble Finisher 5/1/2025 $41.17 $30.75 $71.92
Marble Mason 5/1/2023 $47.20 $31.95 $79.15
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/12/2026 Page 2 of 6
Expiration Date
Hourly Rate Fringe Benefits
Total
Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01
Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01
Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90
Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90
Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69
Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69
Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58
Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58
Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40
Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40
Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01
Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01
Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78
Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78
Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50
Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50
Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81
Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21
Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43
Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83
Painters Class 1 (see notes) 5/1/2024 $42.97 $34.11 $77.08
Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 4 (see notes) 5/1/2024 $45.06 $34.11 $79.17
Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02
Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2024 $67.53 $38.31 $105.84 plumber 5/1/2025 $70.53 $39.46 $109.99
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90
Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80
Roofers (Shingle) 5/1/2023 $32.85 $22.10 $54.95
Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55
Roofers (Slate & Tile) 5/1/2023 $35.85 $22.10 $57.95
Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55
Sheet Metal Workers 5/1/2024 $59.22 $50.56 $109.78
Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/12/2026 Page 3 of 6
Expiration Date
Hourly Rate Fringe Benefits
Total
Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22
Steamfitters 5/1/2024 $70.32 $43.09 $113.41
Steamfitters 5/1/2025 $72.52 $44.89 $117.41
Stone Masons 5/1/2023 $47.20 $31.95 $79.15
Stone Masons 5/1/2025 $50.00 $32.80 $82.80
Terrazzo Finisher 5/1/2023 $43.75 $27.86 $71.61
Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02
Terrazzo Grinder 5/1/2023 $44.02 $27.86 $71.88
Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29
Terrazzo Mechanics 5/1/2023 $50.26 $29.56 $79.82
Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47
Tile Finisher 5/1/2023 $39.52 $29.30 $68.82
Tile Finisher 5/1/2025 $41.17 $30.75 $71.92
Tile Setter 5/1/2023 $50.26 $29.56 $79.82
Tile Setter 5/1/2025 $52.21 $31.26 $83.47
Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33
Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43
Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60
Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20
Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/12/2026 Page 4 of 6
Project: 26-02438 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51
Carpenter 5/1/2025 $57.36 $30.09 $87.45
Carpenter 5/1/2026 $58.71 $30.44 $89.15
Cement Masons 5/1/2023 $43.20 $32.91 $76.11
Cement Masons 5/1/2025 $46.55 $32.66 $79.21
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/ Pile driver diver 5/1/2025 $60.31 $44.97 $105.28
Dockbuilder/ Pile driver diver 5/1/2026 $61.88 $45.47 $107.35
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Electric Lineman 6/3/2024 $62.07 $33.96 $96.03
Electric Lineman 6/2/2025 $65.10 $34.45 $99.55
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67
Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47
Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00
Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80
Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85
Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90
Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75
Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35
Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40
Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10
Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13
Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80
Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83
Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33
Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/12/2026 Page 5 of 6
Project: 26-02438 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.52 $34.49 $89.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.67 $35.34 $91.01
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.52 $35.38 $92.90
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.68 $36.22 $94.90
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.27 $34.42 $88.69
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.43 $35.26 $90.69
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.29 $35.29 $92.58
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.44 $36.14 $94.58
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2025 $50.18 $33.22 $83.40
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.34 $34.06 $85.40
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2025 $49.88 $33.13 $83.01
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.04 $33.97 $85.01
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2025 $48.16 $32.62 $80.78
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2026 $49.32 $33.46 $82.78
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2025 $47.17 $32.33 $79.50
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2026 $48.34 $33.16 $81.50
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2025 $66.26 $39.55 $105.81
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.73 $40.48 $108.21
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2025 $65.97 $39.46 $105.43
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.44 $40.39 $107.83
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76
Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61
Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76
Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62
Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18
Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/12/2026 Page 6 of 6