49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf

PDF 229 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a technical specification document for finish grading, seeding, and sodding work associated with a FEMA demolition project at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The specification outlines comprehensive requirements for restoring unpaved surfaces following demolition activities, including topsoil placement, soil conditioning, finish grading, seeding, sodding, and maintenance. The work encompasses site preparation with subgrade treatment for hard pan or loose loam conditions; application of topsoil with minimum compacted thickness of 6 inches; incorporation of lime at 90 pounds per 1,000 square feet and basic fertilizer at 25 pounds per 1,000 square feet; and seeding using specified formulas (B for sunny areas, D for shady areas, or as indicated on drawings) applied during prescribed seasonal windows. Sod specifications require at least three-year-old, well-rooted Kentucky Bluegrass (Poa pratensis) with proper establishment procedures including tamping, watering, and staking on slopes. Four primary seed formulas are detailed: Formula B (perennial ryegrass and fescue mix), Formula D (tall fescue and fescue mix), Formula E (annual ryegrass for temporary stabilization), and Formula L and W for specialized conditions, with seeding rates ranging from 10.0 to 24.0 pounds per 1,000 square yards.

The contractor is responsible for all materials, equipment, labor, and supervision, with quality assurance through soil testing performed by a contractor-engaged laboratory approved by the Engineer. Submittals include sod samples (three strips 4.5 feet by 12 inches) and material certifications for topsoil analysis, fertilizer, lime, and seed mixtures. Seed must be fresh, clean, and dated within nine months of sowing, with specific purity and germination standards; mulching materials include hay, straw, wood cellulose, or mushroom manure applied within 48 hours of seeding at rates of 135 pounds per 1,000 square feet for hay/straw or 35 pounds per 1,000 square feet for wood cellulose. Maintenance obligations are extensive and continue until the Owner's Representative accepts the project, including daily watering during the first week to maintain 4-inch soil depth moisture, mowing at heights between 2.5 and 3 inches with no more than one-third blade removal, re-seeding or re-sodding of bare spots, and reconstruction of damaged areas. Final acceptance requires establishment of a stabilized lawn area meeting specification standards, with the contractor bearing all costs for re-establishment if turf stand is not accepted by the following seeding season.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINISH GRADING, SEEDING AND SODDING

32 92 00-1

SECTION 32 92 00

PART 1 - GENERAL

1.01 DESCRIPTION

A. The Work of This Section Includes, but is not limited to:

1. Placing topsoil

2. Soil conditioning

3. Finish grading

4. Seeding

5. Sodding

6. Maintenance

B. Restore unpaved surfaces to a condition similar to that prior to excavation as specified and indicated on the Drawings.

C. The "Seeding Restoration Table" at the end of this section lists specific seeding restoration requirements. Refer to Drawings for seeding restoration requirements at each specific location of Work.

D. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 11 00: Clearing and Grubbing

3. Section 31 23 33: Excavation, Backfill and Compaction

1.02 QUALITY ASSURANCE

A. Testing Agency:

1. The Contractor has the option to use soil testing to justify decreasing lime and fertilizer rates. When soil testing is selected by the Contractor, the soil and soil supplement testing shall be performed by a Soils Testing Laboratory engaged and paid for by the Contractor and approved by the Engineer. Collect soil samples under the direction of the Resident Project Representative.

B. Reference Standards:

1. Pennsylvania Department of Transportation Publication 408 Specifications

2. Pennsylvania Seed Act of 1965, Act 187, as amended

3. Agricultural Liming Materials Act of 1978, P.L. 15, No. 9 (3P.S. 132-1), as amended

4. Pennsylvania Soil Conditioner and Plant Growth Substance Law, Act of December 1, 1977, P.L. 258, No. 86 (3P.S.68.2), as amended'

5. Rules for Testing Seeds of the Association of Official Seed Analysts

1.03 SUBMITTALS

A. Samples:

1. When directed, furnish three strips of sod, 4-1/2 feet long by 12" wide, laid on 3" of

32 92 00-2 topsoil and tamped in place in accordance with Section 01 33 00. The samples shall be representative of the sod and workmanship to be provided.

2. Advise the Resident Project Representative of the location of the field, and area within the field, from which the sod is to be taken for approval.

B. Certificates:

1. Prior to use or placement of material, submit certifications of material composition of the following for approval:

a. Topsoil analysis

b. Fertilizer

c. Lime

d. Seed mixture(s)

2. If soil tests are performed to justify decreased lime and fertilizer rates, submit certified soil sample analyses, including laboratory's recommend soil supplement formulation.

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Seed:

1. Deliver seed fully tagged and in separate packages according to species or seed mix.

Seed which has become wet, moldy, or otherwise damaged in transit or storage will not be accepted.

B. Sod:

1. Mow sod in the field to a height of not more than 2-1/2" within 5 days prior to lifting.

2. Cut sod to a depth equal to the growth of the fibrous roots, but in no case less than 1-1/2", exclusive of grass and thatch. Do not cut sod when the ground temperature is below 32 degrees Fahrenheit.

3. Deliver sod to the project site within 24 hours after being cut and place sod within 36 hours after being cut. Do not deliver small, irregular, or broken pieces of sod.

4. During wet weather, allow sod to dry sufficiently to prevent tearing during handling and placing. During dry weather, moisten sod to ensure its vitality and to prevent dropping of the soil during handling. Sod which dries out will be rejected.

C. Other Requirements:

1. Section 01 60 00 also addresses Storage and Protection of Materials and Equipment.

PART 2 - PRODUCTS

2.01 TOPSOIL

A. Having a pH of between 6.0 and 7.0; containing not less than 2% or more than 10% organic matter as determined by AASHTO T194.

B. Fertile friable loam, sand loam, or clay loam which will hold a ball when squeezed with the hand, but which will crumble shortly after being released.

32 92 00-3

C. Free of clods, grass, roots, or other debris harmful to plant growth.

D. Free of pests, pest larvae, and matter toxic to plants.

2.02 FERTILIZER

A. Basic Dry Formulation Fertilizer:

1. Analysis 0-20-20 as defined by the Pennsylvania Soil Conditioner and Plant Growth Substance Law.

B. Starter Fertilizer:

1. Analysis 10-5-5 or 12-6-6 as defined by the Pennsylvania Soil Conditioner and Plant Growth Substance Law.

2.03 LIME

A. Raw ground limestone conforming to Section 804.2(a), Publication 408 Specifications.

2.04 SEED

A. Fresh, clean, dated material from the last available crop and within the date period specified, with a date of test not more than 9 months prior to the date of sowing. Percentage of pure seed present shall represent freedom from inert matter and from other seeds distinguishable by their appearance. All seeds will be subject to analysis and testing.

2.05 SEED MIXTURES

A. See "Seeding Restoration Table" at end of this Section and “Seeding and Mulching Schedule” on Drawings.

2.06 INOCULANT

A. Inoculate leguminous seed before seeding with nitrogen fixing bacteria culture prepared specifically for the species.

B. Do not use inoculant later than the date indicated by the manufacturer.

C. Protect inoculated seed from prolonged exposure to sunlight prior to sowing.

D. Reinoculate seed not sown within 24 hours following initial inoculation.

2.07 MULCHING MATERIALS

A. Mulches for seeded areas shall be one, or a combination of, the following:

1. Hay:

a. Cured to less than 20% moisture content by weight.

b. Contain no stems of tobacco, soybeans, or other coarse or woody material.

c. Timothy hay or mixed clover and timothy hay.

32 92 00-4

2. Straw:

a. Cured to less than 20% moisture content by weight.

b. Contain no stems of tobacco, soybeans, or other coarse or woody material.

c. Wheat or oat straw.

3. Wood Cellulose:

a. No growth or germination inhibiting substances.

b. Green, air dried. Packages shall not exceed 100 pounds.

c. Requirements:

Moisture content: 12% + 3% Organic Matter: 98.6% + 0.2% on the oven dry basis.

Ash Content: 1.4% + 0.2% Minimum Water-Holding Capacity: 1,000%

4. Mushroom Manure:

a. Organic origin, free of foreign material larger than 2" and substances toxic to plant growth.

b. Organic Matter: 20% minimum

c. Water-Holding Capacity: 120% minimum

d. pH: 6.0

2.08 SOD

A. At least three-year-old, well-rooted Kentucky Bluegrass (Poa pratensis) sod containing a growth of not more than 10% of other grasses and clovers.

B. Free from noxious weeds such as Bermuda grass, wild mustard, crab grass, and kindred grasses.

PART 3 - EXECUTION

3.01 TIME OF OPERATIONS

A. Apply seed within the following time periods unless otherwise directed by Engineer.

• Formula B, D, and L - March 15 to June 1 August 1 to October 15

• Formula E - March 15 to October 15

• Formula W - April 1 to June 15 August 16 to September 15

B. Formula E (annual ryegrass) to be utilized for temporary stabilization of areas disturbed by construction may be applied anytime.

3.02 PREPARATION OF SUBGRADE

A. "Hard pan" or heavy shale:

1. Plow to minimum depth of 6".

32 92 00-5

2. Loosen and grade by harrowing, discing, or dragging.

3. Hand rake subgrade. Remove stones over 2" in diameter and other debris.

B. Loose loam, sandy loam, or light clay:

1. Loosen and grade by harrowing, discing, or dragging.

2. Hand rake subgrade. Remove rocks over 2" in diameter and other debris.

3.03 PLACING TOPSOIL

A. Replace topsoil and spread over the prepared subgrade to obtain the required depth and grade elevation. Final compacted thickness of topsoil shall not be less than 6".

B. Hand rake topsoil and remove all materials unsuitable or harmful to plant growth.

C. Do not place topsoil when the subgrade is frozen, excessively wet, or extremely dry.

D. Do not handle topsoil when frozen or muddy.

3.04 TILLAGE

A. After seed bed areas have been brought to proper compacted elevation, thoroughly loosen to a minimum depth of 6" by discing, harrowing, or other approved methods. Do not work topsoiled areas when frozen or excessively wet.

B. Liming:

1. Distribute limestone uniformly at a rate of 90 pounds per 1,000 square feet.

2. Thoroughly incorporate into the topsoil to a minimum depth of 6".

3. Incorporate as a part of the tillage operation.

C. Basic Fertilizer:

1. Distribute basic fertilizer uniformly at a rate of 25 pounds per 1,000 square feet.

2. Incorporate into soil to depth of 6" by approved methods.

3. Incorporate as part of tillage operation.

D. Liming and Fertilizer rates may be decreased if lesser rates are indicated by soil tests provided by the Contractor.

3.05 FINISH GRADING

A. Remove unsuitable material larger than 2" in any dimension.

B. Uniformly grade surface to the required contours without the formation of water pockets.

C. Rework areas which puddle by the addition of topsoil and fertilizer. Re-rake.

32 92 00-6

D. Distribute starter fertilizer at the following rates:

10-5-5: 10 pounds per 1,000 square feet.

12-6-6: 10 pounds per 1,000 square feet.

E. Incorporate starter fertilizer into the upper 1" of soil.

3.06 SEEDING

A. See Drawings for seeding restoration at each specific location of Work; otherwise, use Formula B for sunny areas and Formula D for shady areas.

B. Uniformly sow specified seed mix at the rate noted in the Seeding Restoration Table by use of approved hydraulic seeder, power-drawn drill, power-operated seeder, hand-operated seeder or by hand. Do not seed when winds are over 15 mph.

C. Upon completion of sowing, cover seed to an average depth of 1/4" by hand re-raking or approved mechanical methods.

3.07 MULCHING

A. Mulch within 48 hours of seeding.

B. Place hay and straw mulch in a continuous blanket at a minimum rate of 135 pounds per 1,000 square feet.

1. Anchor hay or straw mulch by use of twine, stakes, wire staples, paper, or plastic nets.

2. Emulsified asphalt may be used for anchorage provided it is applied uniformly at a rate not less than 31 gallons per 1,000 square yards.

3. Apply approved chemical mulch binders at the manufacturer's recommended rate.

C. Chemical mulch binders or a light covering of topsoil may be used for anchorage when the size of the area precludes the use of mechanical equipment.

D. Apply wood cellulose fiber hydraulically at a rate of 35 pounds per 1,000 square feet.

1. Incorporate as an integral part of the slurry after seed and soil supplements have been thoroughly mixed.

E. Spread mushroom manure uniformly to a minimum depth of 1/2" or to the depth indicated on the Drawings.

F. When mulch is applied to grass areas by blowing equipment, the use of cutters in the equipment will be permitted to the extent that a minimum of 95% of the mulch is 6" or more in length. For cut mulches applied by the blowing method, achieve a loose depth in place of not less than 2".

G. When mulching by the asphalt mix method, apply the mulch by blowing. Spray the asphalt binder material into the mulch as it leaves the blower. Apply the binder to the mulch in the proportion of 1.5 to 2.0 gallons per 45 pounds of mulch.

1. Protect structures, pavements, curbs, and walls to prevent asphalt staining.

32 92 00-7

2. Erect warning signs and barricades at intervals of 50 feet or less along the perimeter of the mulched area.

3. Do not spray asphalt and chemical mulch binders onto any area within 100 feet of a stream or other body of water.

3.08 SODDING

A. Prior to sod placement, complete soil preparation or topsoiling.

B. Apply lime and fertilizer as specified. Work into the soil a minimum of 2".

C. Do not place sod when the temperature is lower than 32 degrees Fahrenheit.

D. Place sod by hand with tight joints and no overlap. Transverse joints shall be broken or staggered.

E. Place sod so that the top of the sod is flush with the surrounding grade.

F. Use of tools which damage the sod or dumping of sod from vehicles will not be permitted.

G. Water sod to the saturation point immediately after placement.

H. After watering, tamp with an approved tamper to close all joints and insure close contact between sod and sod bed. After tamping, the sod shall present a smooth, even surface free from bumps and depressions. If so directed, use a light roller, weighing not more than 65 pounds per foot of roller width to complete firming and smoothing the sod.

I. When placing sod in ditches, place the strip with the long dimension at right angles to the flow of water. At any point where water will start flowing over a sodded area, the upper edge of the sod strips shall be turned into the soil below the adjacent area and a layer of compacted earth placed over this juncture to conduct the water over the edge of the sod.

J. In ditches and on slope areas, stake each strip of sod securely with at least 1 wood stake for each 2 square feet of sod. Stakes shall be 1/2" by 1" with a length of 8" to 12". Drive stakes flush with the top of the sod, with the long face parallel to the slope contour.

3.09 MAINTENANCE OF NEWLY SEEDED AND SODDED AREAS

A. Maintenance of grass areas shall consist of watering, mowing, weeding, re-seeding and/or re-sodding, edging and repair of depressions, washouts or gullies as necessary to obtain a stabilized lawn area. Maintenance shall continue until Owner’s Representative accepts the project.

B. In the absence of rainfall, during the first week of seed or sod installation, watering shall be performed daily by the Contractor or as often as deemed necessary by the Owner’s Representative. Water must be in sufficient quantities to maintain moist soil to a depth of 4 inches. The total shall be equal to the equivalent of at least 1 inch of water per week.

Watering shall continue until the stabilized lawn area is accepted. For seeded areas, bare spots, which persist after three weeks of favorable growing weather, shall be re-cultivated, re-seeded, raked and rolled. Re-seeding of bare spots shall be done as many times as necessary until an acceptable stabilized lawn area is established. For sodded areas, bare spots shall be re-sodded until deemed acceptable. If the turf stand is not accepted by the

32 92 00-8 following seeding and sod season, the Contractor shall re-seed or sod and fertilize, as necessary, the unaccepted areas at no additional charge to the Owner.

1. If lawn area provides between 40% and 90% ground coverage, overseed and fertilize using half of the rates originally applied.

2. If lawn area provides less than 40% coverage, reestablish stand following original rates and procedures.

C. Flooded, washed-out, rilled or otherwise damaged or defective areas of seeding, sod, mulch, grade, swales or berms shall be reconstructed and all grades re-established in accordance with the grade plans or other specifications or when, in the judgment of the Owner’s Representative, such defects or damages are the result of poor workmanship, or failure to meet the requirements of the specifications.

D. All mowing shall be the Contractor's responsibility until final acceptance of the project.

No mowing shall remove more than one-third of the grass blade length. Heavy mowing, resulting in grass piles shall be "double mowed" or the Contractor shall remove piles.

Height of the grass shall be maintained between two and a half and three inches, unless otherwise specified.

E. Following are some examples of delays in final acceptance of a project:

1. Improper Grades:

a. Low or high spots on flat or fairly level areas.

b. Improper drainage such as, swales, low areas, rip-rapped outlets and paved areas.

c. Washed out or rilled areas.

d. Exposed debris.

2. Turf Grass Conditions:

a. Poor or thin stand; improper application of sod, dead grass or sod; use of seed mixtures or sod, other than approved in specifications.

b. Improper fertilizer application - Uneven spreading, insufficient amounts, failure to re-fertilize during extended acceptance.

c. Persistent weeds established in turf areas.

F. Seeded areas shall be maintained by the Contractor until fully established and accepted by the Owner. Fully established grass areas shall meet the specification for ‘stabilized lawn area’ as noted on the Drawings.

NOTE: SEEDING RESTORATION TABLE IS ATTACHED AT END OF THIS SECTION.

END OF SECTION

SEEDING RESTORATION TABLE

* Recommended 10% hardseed and 70% normal sprouts.

This table has been extracted from Section 804 of PennDOT Publication 408/2007 and modified for specific site conditions.

FORMULA AND SPECIES

% BY

WEIGHT

MINIMUM %

PURITY GERMINATION

MAX %

WEED SEED

SEEDING RATE

LBS PER 1000 SY

Formula B

• Perennial Ryegrass mixture (Lolium perenne). A combination of improved certified varieties with no one variety exceeding 50% of the total Ryegrass component.

• Creeping Red Fescue or Chewings Fescue

• Kentucky Bluegrass mixture (Poa pratensis). A combination of improved certified varieties with no one variety exceeding 25% of the total Bluegrass component.

98 90

98 85

98 80

0.15

0.20

21.0 Total

4.0

6.0

11.0

Formula D

• Tall Fescue (Festuca arundinacea var. Kentucky 31)

• Creeping Red Fescue or Chewings Fescue

21.0 Total

15.0 6.0

Formula E

• Annual Ryegrass (Lolium multiflorum)

10.0 Total

10.0

Formula L

• Hard Fescue mixture (Festuca longifolia). A combination of improved certified varieties with no one variety exceeding 50% of the total Hard Fescue component.

• Creeping Red Fescue

• Annual Ryegrass (Lolium multiflorum)

24.0 Total

13.0

8.5 2.5

Formula W

• Tall Fescue (Festuca arundinacea var. Kentucky 31)

• Birdsfoot Trefoil mixture (Lotus corniculatus). A combination of varieties (Viking, Empire, Norcen, Dawn, Leo, Bull, Maitland) with no one variety exceeding 50% of the total Trefoil component.

• Redtop (Agrostis alba)

98 80*

92 80

0.10

11.0 Total

7.5 2.5

1.0