About this file
This is a Demolition specification document (Section 02 41 16) for a FEMA-funded project involving the demolition of a single-family home located at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The scope of work encompasses the complete removal and disposal of the existing structure, associated facilities, and designated trees in accordance with construction sequencing shown on the project drawings. The contractor is responsible for all erosion control measures, grading, soil compaction, debris removal, and local permitting. The demolition work must be conducted in an orderly manner with careful attention to protecting adjacent areas and maintaining public safety, including the implementation of temporary barriers, security devices, and dust control measures. Prior to commencing demolition activities, the contractor must locate and verify all existing active utilities, arrange for disconnection of utilities with proper authorities, pump out and clean all wells and cesspools in a sanitary manner, and disinfect structures as required by health authorities.
The specification requires that concrete slabs and foundations be removed to 18 inches below grade, with backfill and grading performed in accordance with Section 31 23 33 standards to ensure proper drainage. Demolition must proceed horizontally on a floor-by-floor basis from top to bottom, with bay or sectional demolition permitted only upon submission and acceptance of a detailed structural plan. All sanitary sewer pipes and structures must be abandoned or plugged per governing sewer authority requirements, and tree removal must include complete stump and root mass removal with the area backfilled with clean topsoil, seeded, and mulched. The contractor shall not use swinging ball demolition adjacent to public thoroughfares, burn debris without written permission from local fire or police authorities and compliance with State Air Pollution Control Commission regulations, or interfere with functioning utilities and structures outside the designated demolition area. All demolished materials must be removed from the site as work progresses, with work areas left in clean condition upon project completion.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION
02 41 16-1
SECTION 02 41 16
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Remove and dispose of all items shown on the Drawings in accordance with the construction sequence provided on the plans including the following:
1. Remove and dispose of designated structures and associated facilities.
2. Remove and dispose of designated trees.
1.02 RELATED WORK
A. Section 01 11 13: Summary of Work.
B. Section 01 70 00: Contract Closeout: Project record documents.
1.03 SUBMITTALS
A. Submit demolition and removal procedures and schedule under provisions of Section 01 33 00 if Contractor proposes to use procedures and schedule which are not in accordance with those procedures and schedule presented in the Work Sequence portion of Section 01 11 13.
1.04 EXISTING CONDITIONS
A. Conduct demolition to minimize interference with adjacent areas. Maintain protected egress and access at all times.
B. Provide, erect, and maintain temporary barriers and security devices as required.
C. Satisfactorily prevent or control dust resulting from demolition.
D. Comply with the National Emission Standard for Asbestos, as contained in the Federal
Register, Volume 38, No. 66.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
3.01 PREPARATION
A. Locate existing active utilities and verify whether each utility will remain in service and therefore require protection or is part of the demolition and removal activity.
B. Protect existing items which are not indicated to be altered.
C. Prior to starting work, make arrangements with the proper authorities for turning off and disconnecting utilities in conjunction with demolition activities. Disconnect, remove, and cap designated utility services within demolition areas. Mark location of disconnected utilities.
Identify and indicate capping locations on Project Record Documents.
02 41 16-2
3.02 EXECUTION
A. Before beginning demolition, pump out and clean all wells, cesspools and outbuildings within the area to be cleared, in a sanitary manner. Disinfect all structures as required by the appropriate health authorities, then backfill to the proposed ground level in accordance with specification Section 31 23 33 Excavation, Backfill and Compaction.
B. Do not interfere with functioning wells, cisterns, cesspools or other ground openings outside of the condemned area. Securely and permanently cap well casings. Cut off and cap pipes leading into or out of wells.
C. Demolish in an orderly and careful manner. Protect any existing structures to remain from damage.
D. Remove existing fences and guide rail posts, unless otherwise directed. Do not disturb existing pavement areas that are to remain unless it becomes necessary to do so in order to complete other work.
E. Do not use a swinging ball immediately adjacent to any public thoroughfare or in any area where it may create a public hazard.
F. Do not, under any circumstances, set fire to structures. Burning of debris shall not be allowed except by written permission of local police or fire authorities and unless the burning conforms with State Air pollution Control Commissions regulations. Do not begin burning until a copy of the written permission has been received by the Engineer.
G. Restrict demolition to horizontal operations, one floor of a structure at a time. Progressively demolish a structure or structures, except for the stripping of fixtures, from top to bottom, one floor at a time. Bay, or sectional type demolition will be considered, provided a detailed plan, including the building’s structural framework, is submitted and accepted prior to the work.
Progressively demolish each bay or sectional-type structure from top to bottom as well.
Completely demolish each bay or section before starting operations on any adjacent bay or section. Remove each bay or section in a manner that maintains the integrity and proper support of adjacent bays or sections.
H. Remove concrete slab and foundations to 18 inches below grade.
I. Except where noted otherwise, immediately remove demolished materials from site.
J. Remove materials to be re-installed or retained in manner to prevent damage.
K. Remove, store, and protect materials and equipment for re-installation as necessary and/or as noted.
L. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.
M. Remove demolished materials from site as work progresses. Upon completion of work, leave areas of work in clean condition.
N. Carefully backfill excavated subsurfaces, and grade to the proposed ground level. Backfill in accordance with specification Section 31 23 33 Excavation, Backfill and Compaction and grade to ensure proper drainage.
O. Remove, demolish, or abandon sanitary sewer pipe and structures in the following manner:
02 41 16-3
1. All sanitary sewer pipe to be abandoned shall be plugged, bricked and parged in accordance with governing sewer authority requirements. If accessible, this shall be done at both ends of the sanitary sewer pipe to be abandoned.
2. All sanitary sewer manholes to be abandoned shall either be removed in their entirety or cut-off a minimum of two (2) feet below proposed grade and filled with sand or flowable fill in accordance with governing sewer authority requirements.
P. Remove trees in the following manner:
1. Tree removal includes removal of stumps/root mass. Removed stumps/root mass shall not be buried on property. Tree removal area shall be backfilled with clean topsoil to proposed grade followed by seeding and mulching.
END OF SECTION