This is a technical specification document for alteration project procedures, Section 01 35 16, applicable to the FEMA-funded demolition project at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The specification establishes standard procedures for patching, extending work, and managing transitions during alteration and renovation activities. The document outlines requirements for examining existing conditions, preparing work areas, installing new materials, and managing transitions between new and existing work. Key procedural requirements include verifying demolition completion before beginning restoration work, removing unsuitable materials such as rotted wood and corroded metals, coordinating alteration work to expedite completion, minimizing damage during cutting and patching operations, and restoring exposed mechanical and electrical work. The specification mandates that new materials match existing products in type and quality, determined through inspection and testing where necessary, and requires smooth transitions between new and existing work with patches matching existing textures and appearances.
The specification establishes quality standards for surface repairs and finishes, requiring that damaged, lifted, discolored, or imperfect portions of existing surfaces be patched or replaced with substrate repairs completed prior to finish patching. All finished surfaces must achieve uniform finish and texture, with entire surfaces refinished to the nearest intersections when matches cannot be achieved. The document references related sections covering coordination and meetings, construction facilities and temporary controls, and demolition procedures, and requires contractors to request engineer instruction when changes of plane equal or exceed one-quarter inch. Cleaning of owner-occupied areas is mandated in addition to standard construction cleaning requirements. This specification applies to the demolition and site restoration work for the single-family home removal at 82 West Indian Lane, which includes erosion control, grading, soil compaction, and replacement with grass surfaces.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALTERATION PROJECT PROCEDURES
01 35 16-1
SECTION 01 35 16
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Products and installation for patching and extending Work.
B. Transition and adjustments.
C. Repair of damaged surfaces, finishes, and cleaning.
1.02 RELATED SECTIONS
A. Section 01 31 00: Coordination and Meetings: Cutting and Patching.
B. Section 01 50 00: Construction Facilities and Temporary Controls: Protection of Installed Work, and Progress Cleaning and Waste Removal.
C. Section 02 41 16: Demolition.
PART 2 PRODUCTS
2.01 PRODUCTS FOR PATCHING AND EXTENDING WORK
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that demolition is complete and areas are ready for installation of new Work.
B. Beginning of restoration Work means acceptance of existing conditions.
3.02 PREPARATION
A. Cut, move, or remove items as necessary for access to alterations and renovation Work.
Replace and restore at completion.
B. Remove unsuitable material not marked for salvage, such as rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished Work.
C. Remove debris and abandoned items from area and from concealed spaces.
D. Prepare surface to provide for proper installation of new Work.
3.03 INSTALLATION
A. Coordinate Work of alterations and renovations to expedite completion.
01 35 16-2
B. Remove, cut, and patch Work in a manner to minimize damage and to provide a means of restoring Products and finishes to specified condition in accordance with Section 01 31 00.
C. Re-cover and refinish Work that exposes mechanical and electrical work exposed accidentally during the Work.
D. Install Products as specified in individual sections.
3.04 TRANSITIONS
A. Where new Work abuts or aligns with existing, perform a smooth and even transition. Patch Work to match existing adjacent work in texture and appearance.
B. When finished surface are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and make recommendation to Engineer.
3.05 ADJUSTMENTS
A. Where a change of plane of 1/4 inch or more occurs, request instruction from Engineer.
3.06 REPAIR OF DAMAGED SURFACES
A. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections.
B. Repair substrate prior to patching finish.
3.07 FINISHES
A. Finish surfaces as specified in individual Product sections.
B. Finish patches to produce uniform finish and texture over entire area. When finish cannot be matched, refinish entire surface to nearest intersections.
3.08 CLEANING
A. In addition to cleaning specified in Section 01 50 00, clean Owner-occupied areas of Work.
END OF SECTION