41-Sec 01 55 26 Traffic Regulation.pdf

PDF 133 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a Traffic Regulation specification document (Section 01 55 26) applicable to construction projects in Pennsylvania, specifically for the demolition project at 82 West Indian Lane in West Norriton Township, Montgomery County, under the jurisdiction of local municipal authorities and potentially PennDOT. The specification establishes the contractor's obligations for maintaining safe and efficient traffic movement in the construction vicinity through the provision and maintenance of traffic control devices including cones, drums, barricades, flashing lights, directional signs, and trained flagmen as required by the Traffic Control Plan and local permit requirements. Key execution requirements include advance notification to the local municipal Police Department at least ten days prior to traffic restrictions, with twenty-four hour advance notice to Police, Fire, Fire Company, School District, and Ambulance Service if road closure is necessary. The contractor must maintain at least one open traffic lane during non-working periods and ensure emergency vehicle passage at all times, provide trained flagmen to regulate traffic when construction operations encroach on public lanes, install flares and lights during low visibility hours, establish haul routes in consultation with the authority having jurisdiction, and install and relocate traffic signs and signals as work progresses. Additional requirements include maintaining access to adjacent properties and driveways, providing safe decking over open trenches using steel plates or equivalent materials capable of supporting truck loads during non-work periods, controlling construction vehicle parking to prevent interference with public traffic and emergency access, and removing all traffic control equipment and devices upon completion with post settings removed to a depth of two feet.

The specification does not contain pricing information, contract award dates, bid due dates, site visit requirements, or bidder conference details. No set-asides, incumbent information, or specific funding sources are identified in this document. The specification functions as a standard contractual requirement document that obligates the contractor to comply with all state and local traffic control regulations and permit requirements specific to the demolition project location in Pennsylvania.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAFFIC REGULATION

01 55 26-1

SECTION 01 55 26

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. This Section involves the Contractor’s obligations relative to maintaining the safe and efficient movement of traffic in the vicinity of construction.

B. Contractor will be required to furnish, erect, and maintain traffic cones, drums, barricades, flashing danger signal lights, directional signs and provide trained and equipped flagmen as required by the Traffic Control Plan and State and local permit requirements to restrict the movement of traffic within the construction areas and to clearly indicate the restrictions well in advance to vehicular traffic.

1.02 SECTION INCLUDES

A. Traffic Control Plan

B. Notification

C. Construction parking controls

D. Flag persons

E. Flares and lights

F. Haul routes

G. Traffic signs and signals

H. Other Requirements

I. Removal

1.03 RELATED SECTIONS

A. Section 01 31 00 - Coordination and Meetings: Coordination and Project conditions

B. Section 01 50 00: Construction Facilities and Temporary Controls: Barriers and Fencing, Access Roads, and Parking

PART 2 - PRODUCTS

2.01 SIGNS, SIGNALS, AND DEVICES

A. Post Mounted and Wall Mounted Traffic Control and Informational Signs: As approved by the authority having jurisdiction.

B. Traffic Cones and Drums, Flares and Lights: As approved by the authority having jurisdiction.

C. Flag person Equipment: As required by the authority having jurisdiction.

01 55 26-2

PART 3 - EXECUTION

3.01 NOTIFICATIONS

A. Contractor shall provide advance notification to any parties so noted in the local municipal Road Opening Permit (as required) in accordance with the required time schedule. In any event, the local municipal Police Department shall be notified at least ten (10) days prior to the date Contractor desires to restrict traffic in or along any highways or roads.

B. Contractor shall obtain advance approval from the authority having jurisdiction (PennDOT or local municipality) should it be necessary to temporarily close a road. The following parties shall be notified at least twenty-four (24) hours in advance.

1. Local Municipal Police

2. Local Fire Company

3. Local School District

4. Local Ambulance Service

5. All affected residents

At least one lane must be open for traffic during non-working periods and Contractor must be prepared to allow passage of emergency vehicles at any time.

3.02 CONSTRUCTION PARKING CONTROLS

A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and Owner's operations.

B. Monitor parking of construction personnel’s vehicles. Maintain vehicular access to and through parking areas.

C. Prevent parking on or adjacent to access roads or in non-designated areas.

3.03 FLAG PERSONS

A. Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes.

3.04 FLARES AND LIGHTS

A. Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.

3.05 HAUL ROUTES

A. Consult with authority having jurisdiction, establish public thoroughfares to be used for haul routes and site access.

3.06 TRAFFIC SIGNS AND SIGNALS

A. At approaches to site and on site, install at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.

B. Relocate as Work progresses to maintain effective traffic control.

01 55 26-3

3.07 OTHER REQUIREMENTS

A. Maintain access at all times during non-working periods and to the maximum extent feasible during working periods to all driveways and entrances of adjacent properties. In this regard, use and maintenance of steel plates or other decking across the trench may be necessary to reduce to a minimum interference with access to the adjacent properties.

B. Provide safe decking over open trenches in or along highways or roads during non-work periods by the use and maintenance of steel plates or other decking, which shall have sufficient strength to safely support all traffic including truck loads.

3.08 REMOVAL

A. Remove equipment and devices when no longer required.

B. Repair damage caused by installation.

C. Remove post settings to a depth of 2 feet.

END OF SECTION