40-Sec 01 56 39 Landscape Protection.pdf

PDF 134 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a Section specification document for Landscape Protection (01 56 39) applicable to a FEMA demolition project at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania. The specification outlines the contractor's responsibilities for protecting existing plant materials during construction through the installation of temporary protective fencing and related measures. The work includes assessing site conditions to determine appropriate protection standards, erecting temporary fencing at a minimum distance of 15 feet from tree trunks or to the dripline (whichever is greater), and maintaining fencing integrity throughout the construction period. The specification references Pennsylvania Department of Transportation Publication 408 Specifications as the quality assurance standard and requires coordination with the project engineer through a pre-construction site inspection to identify specific landscape protection concerns.

The specification requires the use of fabricated products including standard picket snow fence (4 feet high with wooden slats and wire cable), orange open mesh construction fencing, or other weather-resistant alternatives approved by the engineer, along with high carbon channel bar steel posts (7 feet in length) designed for driving into the ground. Additional execution requirements include prohibiting toxic and petroleum-based materials within 100 feet of protection areas, preventing equipment storage or parking in protected zones, removing tree stumps within 10 feet of protection areas using grinders, and cutting exposed tree roots cleanly and covering them with moist materials within four hours. All trees experiencing disturbance or root/branch damage shall be fertilized in early fall or mid-spring using a 3-1-1 nitrogen-to-phosphorus-potassium ratio fertilizer applied at one pound of nitrogen per 1,000 square feet, with a minimum of 1,000 square feet per tree receiving treatment.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
25-Sec 01 00 00 Basic Requirements.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LANDSCAPE PROTECTION

01 56 39-1

SECTION 01 56 39

PART 1 - GENERAL

1.01 SECTION DESCRIPTION

A. The Work of this Section Includes:

1. Provisions for landscape protection including the location and erection of protective fencing as may be appropriate for specific plant materials so as to insure their survival during and after completion of construction.

1.02 RELATED SECTIONS

A. Related Work Specified Elsewhere:

1. Section 01 57 13: Soil Erosion and Sediment Control

2. Section 31 11 00: Clearing and Grubbing

3. Section 31 23 33: Excavation, Backfill and Compaction

4. Section 32 92 00: Finish Grading, Seeding, and Sodding

1.03 QUALITY ASSURANCE

A. Reference Standards

1. Pennsylvania Dept. of Transportation Publication 408 Specifications.

1.04 JOB CONDITIONS

A. Contractor is responsible for determining through site inspection and assessment of construction requirements what protection standards are necessary and practical based on plant type and location.

B. Engineer will arrange for a site inspection with Contractor prior to initiation of construction to review specific landscape protection concerns.

PART 2 - PRODUCTS

2.01 FABRICATED PRODUCTS

A. Temporary Fencing:

1. Undamaged, standard picket snow fence, 4' high, formed of wooden slats, tightly woven with wire cable; orange, open mesh construction fencing; or other acceptable, highly visible, weather resistant, easily maintained fencing that provides a substantial barrier.

2. High carbon channel bar steel posts, 7 feet in length. Designed to drive satisfactorily into the ground and with at least ten fence holding lugs of the rivet type. Alternate post types may be approved by Engineer.

01 56 39-2

PART 3 - EXECUTION

3.01 PREPARATION

A. Prior to initiating construction, Contractor shall assess the site area and determine the protection standards required in addition to any specifically noted on the Drawings. Unusual circumstances or exceptions to the standards specified shall be resolved by agreement with Engineer.

3.02 GENERAL REQUIREMENTS

A. Grade changes and excavation shall not encroach upon a protection area.

B. No toxic materials shall be stored within 100 feet of a protection area including petroleum based and/or derived products.

C. The area within a protection area shall not be built upon, nor shall any materials be stored there either temporarily or permanently. Vehicles and equipment shall not be parked in a protection area.

D. When tree stumps are located within ten feet of a protection area the stumps shall be removed by means of a stump grinder to minimize the effect on surrounding root systems.

E. Tree roots which must be severed shall be cut by a backhoe or similar equipment aligned radially to the tree to reduce the lateral movement of the roots during excavation, which could damage the intertwined roots of adjacent trees. Within four (4) hours of any severance of roots, all tree roots that have been exposed and/or damaged shall be trimmed cleanly and covered temporarily with moist peat moss, moist burlap or other moist biodegradable material to keep them from drying out until permanent cover can be installed.

F. Sediment, retention and detention basins shall not be located within the protection area or discharge into the protection area.

3.03 ERECTION OF TEMPORARY FENCING

A. Prior to start of construction or earthmoving, a snow fence or approved alternate shall be placed around plant material specified to remain at a distance of 15' from the trunk of the plant material or the distance from the trunk to the dripline whichever is greater. For a group of trees or woodlands, the fence location shall be determined by the aggregate distance or driplines for the individual plant. Exceptions to this requirement must be approved by Engineer.

B. Temporary fencing shall be periodically inspected and repairs accomplished to ensure continued integrity during the construction period.

C. Temporary fencing shall remain in place until final restoration of the site is to occur.

3.04 PRUNING

A. All final cuts shall be made sufficiently close to the trunk or parent limb but without cutting into the branch collar or leaving a protruding stub, according to National Arborist Association Standards. All necessary pruning cuts must be made to prevent bark from being torn from the tree and to facilitate rapid healing. Flush cuts are unacceptable.

01 56 39-3

3.05 FERTILIZATION

A. All trees which have experienced any disturbance or have had damage to the roots or branches shall be fertilized.

B. Trees shall be fertilized in early fall (September-October) or mid-spring (April-May). Fall applications are preferred.

C. Fertilizer grade shall have approximately 3 parts nitrogen to 1 part phosphorus and potassium (3-1-1 ratio).

D. Fertilizer shall be broadcast over the soil surface in an area twice the size of the protection zone at a rate of 1 pound nitrogen per 1000 square feet. A minimum of 1000 square feet per tree shall receive fertilization.

END OF SECTION