25-Sec 01 00 00 Basic Requirements.pdf

PDF 182 KB Posted

Attached to
82 W. Indian Lane - FEMA Demolition
Solicitation number
US.230082
Issued by
Montgomery County, Pennsylvania

About this file

This is a Basic Requirements specification section for a construction contract involving the demolition of a single-family home located at 82 West Indian Lane in West Norriton Township, Montgomery County, Pennsylvania, funded through FEMA. The specification establishes comprehensive procedural and administrative requirements for the contractor, including submission of a Schedule of Values within 10 days of the agreement's effective date, monthly applications for payment in triplicate, and construction progress schedules submitted as horizontal bar charts. The contractor must convene a preconstruction meeting and site mobilization meeting prior to commencing work, with the engineer presiding and distributing minutes to all participants. Key deliverables include product data, shop drawings, samples, manufacturer installation instructions, and certificates, with the contractor required to submit the necessary copies plus three additional copies retained by the engineer. The specification mandates quality control measures, mock-ups where specified, independent testing laboratory services at the contractor's expense, and manufacturer field services when required in individual specification sections.

The specification requires the contractor to provide all temporary facilities and controls, including temporary electricity from utility sources at the contractor's cost, temporary sanitary facilities, barriers and fencing, water control, dust suppression measures, security, temporary parking areas, and progress cleaning. The contractor is responsible for final cleaning, adjusting all operating equipment, and maintaining project record documents on-site that document actual construction conditions, including measured locations of utilities, field changes, and product substitutions. Equipment furnished must include manufacturer guarantees of not less than 12 months from continuous operation or 18 months from delivery, whichever occurs first. Prior to final payment, the contractor must submit a final application identifying the total adjusted contract price, previous payments, remaining amounts due, payroll certification forms for subcontractors when the price exceeds $25,000, waivers of liens, a maintenance bond, and all equipment warranties. No specific pricing terms, contract amounts, or award dates are detailed within this specification document.

View the file

Other files

File Type Posted
8-Doc 00 21 13 Instructions to Bidders.pdf PDF
14-Doc 00 61 13.16 Payment Bond.pdf PDF
1-00 82 W. Indian Lane FEMA Plans.pdf PDF
39-Sec 01 33 00 Submittals.pdf PDF
35-Sec 01 42 13 Organization and Reference Acronyms.pdf PDF
33-Sec 01 32 16 Construction Project Schedule.pdf PDF
42-Sec 01 70 00 Contract Closeout.pdf PDF
29-Doc 00 73 00 04 Appendix D - Hazard Mitigation Grant Conditions.pdf PDF
41-Sec 01 55 26 Traffic Regulation.pdf PDF
12-Doc 00 45 10 Bidders Acknowledgement Form.pdf PDF
9-Doc 00 45 13 Bidder Qualification Statement.pdf PDF
10-Doc 00 45 53 Agreement of Surety Company.pdf PDF
18-Doc 00 62 16 Certificate of Insurance.pdf PDF
27-Sec 01 11 13 Summary of Work.pdf PDF
7-Doc 00 21 13.1 Instructions for Electronic Bidding.pdf PDF
2-Doc 00 01 15 List of Drawing Sheets.pdf PDF
21-Doc 00 73 00 Supplementary Conditions.pdf PDF
28-Doc 00 73 00 01 Appendix A - Prevailing Wage Rates.pdf PDF
32-Sec 01 31 00 Coordination and Meetings.pdf PDF
31-Sec 01 29 00 Contract Considerations.pdf PDF
24-Doc 00 91 13 Addenda.pdf PDF
17-Doc 00 65 19.13 Contractors Affidavit.pdf PDF
15-Doc 00 61 19 Maintenance Bond.pdf PDF
49-Sec 32 92 00 Finish Grading, Seeding and Sodding.pdf PDF
26-Doc 00 73 00 - Supplementary Conditions.pdf PDF
50-Sec 31 23 33 Excavation, Backfill and Compaction.pdf PDF
4-Doc 00 01 10 Table of Contents.pdf PDF
13-Doc 00 52 00 Agreement.pdf PDF
16-Doc 00 61 13.13 Performance Bond.pdf PDF
45-Sec 02 41 16 Demolition.pdf PDF
40-Sec 01 56 39 Landscape Protection.pdf PDF
34-Sec 01 35 16 Alteration Project Procedures.pdf PDF
22-Doc 00 72 00 General Conditions.pdf PDF
19-Doc 00 65 19.19 Consent of Surety.pdf PDF
5-Doc 00 43 13 Bid Bond.pdf PDF
6-Doc 00 11 13 Advertisement for Bids.pdf PDF
37-Sec 01 50 00 Construction Facilities and Temporary Controls.pdf PDF
23-Doc 00 73 00 02 Appendix B - Public Works Employment Verification Form.pdf PDF
46-Sec 31 11 00 Clearing and Grubbing.pdf PDF
48-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
44-Sec 01 60 00 Material and Equipment.pdf PDF
20-Doc 00 65 19.16 Contractors Release of Liens.pdf PDF
3-Doc 00 01 01 Project Title Page.pdf PDF
38-Sec 01 40 00 Quality Control.pdf PDF
43-Sec 01 57 14 Erosion Control Blanket.pdf PDF
36-Sec 01 22 00 Measurement and Payment.pdf PDF
11-Doc 00 45 19 Non-Collusion Affidavit.pdf PDF
47-Sec 31 20 00 Earthwork.pdf PDF
30-Doc 00 73 00 03 Appendix C - Chapter 106 Permit.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIC REQUIREMENTS

01 00 00-1

SECTION 01 00 00

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Contract Considerations:

1. Schedule of Values.

2. Applications for Payment.

3. Change Procedures.

B. Coordination and Meetings:

1. Coordination.

2. Field Engineering.

3. Preconstruction Meeting.

4. Site Mobilization Meeting.

5. Progress Meetings.

6. Pre-installation Meetings.

7. Cutting and Patching.

C. Submittals:

1. Submittal Procedures.

2. Construction Progress Schedules.

3. Product Data.

4. Shop Drawings.

5. Samples.

6. Manufacturer Installation Instructions.

7. Manufacturer Certificates.

D. Quality Control:

1. Quality Assurance-Control of Installation.

2. Examination.

3. Preparation.

4. Tolerances.

5. References.

6. Mock-ups.

7. Testing Laboratory Services.

8. Observation Services.

9. Manufacturers' Field Services.

E. Construction Facilities and Temporary Controls:

1. Temporary Electricity.

2. Temporary Sanitary Facilities.

3. Barriers and Fencing.

4. Water Control.

5. Protection of Installed Work.

6. Security.

7. Access Roads.

01 00 00-2

8. Parking.

9. Progress Cleaning and Waste Removal.

10. Project Identification.

11. Removal of Utilities, Facilities and Controls.

12. Dust Control.

F. Material and Equipment:

1. Products.

2. Transportation and Handling

3. Storage and Protection.

4. Product Options.

5. Substitutions.

6. Equipment Guarantee.

G. Starting of Systems:

1. Starting Systems.

H. Contract Closeout:

1. Contract Closeout Procedures.

2. Final Cleaning.

3. Adjusting.

4. Project Record Documents.

5. Other Documentation.

1.02 SCHEDULE OF VALUES

A. Submit a printed schedule on Contractor's standard form or electronic media printout.

B. Submit Schedule of Values in duplicate within 10 days after Effective Date of the Agreement.

See Supplementary Conditions for format relative to a lump sum contract.

1.03 APPLICATIONS FOR PAYMENT

A. Submit three (3) copies of each application in an acceptable format.

B. Content and Format: Utilize Schedule of Values for listing items in Application for Payment.

C. Payment Period: Monthly.

1.04 CHANGE PROCEDURES

A. Submit each Change Order in an acceptable format.

B. Stipulated Price Change Order: Based on proposal request and Contractor’s fixed price quotation.

C. Unit Price Change Order: For pre-determined unit prices and quantities, the Change Order will be on a fixed unit price basis. For unit costs or quantities of units of work which are not pre-determined, the Change Order price shall be based on a proposal request and Contractor’s proposed unit prices and quantities of units as approved by Engineer.

01 00 00-3

1.05 COORDINATION

A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.

B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities.

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable.

D. In finished areas, conceal pipes, ducts, and wiring within the construction.

1.06 FIELD ENGINEERING

A. Establish elevations, lines, and levels and certify that elevations and locations of the Work conform with the Contract Documents.

B. Verify that field measurements are as indicated on Shop Drawings or as instructed by the manufacturer.

1.07 PRECONSTRUCTION MEETING

A. Engineer will schedule a meeting after Effective Date of Agreement and prior to commencement of the Work for all affected parties.

B. Engineer shall preside at the meeting, record minutes and distribute copies to Owner and all other participants.

1.08 SITE MOBILIZATION MEETING

A. Engineer will schedule a site mobilization meeting after Effective Date of the Agreement and prior to Contractor occupancy for all affected parties.

B. Engineer shall preside at the meeting, record minutes, and distribute copies to Owner and all other participants.

1.09 PROGRESS MEETINGS

A. Resident Project Representative shall schedule and administer meetings throughout progress of the Work on an as-needed basis.

B. Resident Project Representative shall preside at meetings, record minutes, and distribute copies within five (5) working days to Owner, Engineer and all other participants.

1.10 PRE-INSTALLATION MEETINGS

A. When required in individual specification section, convene a pre-installation meeting at Project site prior to commencing work of the section.

1.11 CUTTING AND PATCHING

A. Employ a skilled and experienced installer to perform cutting and patching of new Work.

01 00 00-4

B. Submit written request in advance of cutting or altering structural or building enclosure elements.

C. Execute cutting, fitting and patching including excavation and fill, to complete Work, and to:

1. Fit the several parts together, to integrate with other Work.

2. Uncover Work to install or correct ill-timed Work.

3. Remove and replace defective and non-conforming Work.

4. Remove samples of installed Work for testing.

5. Provide openings in elements of Work for penetrations of mechanical and electrical

Work.

D. Cut masonry and concrete materials using masonry saw or core drill.

E. Restore Work with new Products in accordance with requirements of Contract Documents.

F. Fit Work tight to adjacent elements and to pipes, sleeves, ducts, conduit and other penetrations through surfaces. Maintain integrity of wall, ceiling, or floor construction;

completely seal voids.

G. Refinish surfaces to match adjacent finishes.

1.12 SUBMITTAL PROCEDURES

A. Submittal form to identify Project, Contractor, Subcontractor or supplier; and pertinent Contract Document references.

B. Apply Contractor's stamp, signed or initialed, certifying that review, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.

C. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work.

D. Revise and resubmit submittals as required; identify all changes made since previous submittal.

1.13 CONSTRUCTION PROGRESS SCHEDULES

A. Submit preliminary progress schedule in duplicate within 10 days after Effective Date of the Agreement for Engineer's review.

B. Submit revised progress schedule in duplicate with each Application for Payment, identifying changes since previous version. Indicate estimated percentage of completion for each item of Work at each submission.

C. Submit a horizontal bar chart with separate line for each section of Work, identifying first work day of each week.

1.14 PRODUCT DATA

A. Product Data For Review:

1. Submit to Engineer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

01 00 00-5

2. After review, provide copies and distribute in accordance with Submittal Procedures article above and for record documents purposes.

Product Data For Information:

1. Submit for Engineer’s benefit as contract administrator or for Owner.

Product Data For Project Closeout:

1. Submit for Owner’s benefit during and after project completion.

B. Submit the number of copies which Contractor requires, plus three copies which will be retained by Engineer.

C. Mark each copy to identify applicable Products, models, options, and other data. Supplement manufacturers’ standard data to provide information specific to this project.

1.15 SHOP DRAWINGS

A. Shop Drawings For Review:

2. After review, provide copies and distribute in accordance with Submittal Procedures article above and for record documents purposes.

Shop Drawings For Information:

Shop Drawings For Project Closeout:

1. Submit for Owner’s benefit during and after project completion.

B. Submit the number of opaque reproductions which Contractor requires, plus three copies which will be retained by Engineer.

1.16 SAMPLES

A. Samples For Review:

2. After review, provide duplicates and distribute in accordance with Submittal Procedures article above and for record documents purposes.

Samples For Information:

01 00 00-6

Samples For Selection:

1. Submit to Engineer for aesthetic, color, or finish selection.

2. After review, produce duplicates and distribute in accordance with Submittal Procedures article above and for record documents purposes.

B. Submit samples to illustrate functional and aesthetic characteristics of the Product.

C. Submit samples of finishes from the full range of manufacturers’ standard colors, textures, and patterns for Engineer’s selection.

1.17 MANUFACTURER INSTALLATION INSTRUCTIONS

A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, adjusting, and finishing to Engineer in quantities specified for Product Data.

1.18 MANUFACTURER CERTIFICATES

A. When specified in individual specification sections, submit certifications by manufacturer to Engineer, in quantities specified for Product Data.

B. Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

1.19 QUALITY ASSURANCE/CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions.

C. Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

1.20 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.

B. Verify that utility services are available, of the correct characteristics, and in the correct locations.

1.21 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Apply manufacturer required or recommended substrate primer, sealer or conditioner prior to applying new material or substance in contact or bond.

1.22 TOLERANCES

A. Monitor fabrication and installation tolerance control of installed Products over suppliers, 01 00 00-7 manufacturers, Products, site conditions, and workmanship, to produce acceptable Work. Do not permit tolerances to accumulate.

B. Comply fully with manufacturers’ tolerances.

1.23 REFERENCES

A. Conform to reference standard by date of issue current on date for receiving bids, except where a specific date is established by code.

B. Should specified reference standard conflict with Contract Documents, request clarification from Engineer before proceeding.

1.24 MOCK-UPS

A. Tests will be performed under provisions identified in this section and identified in the respective Product specification sections.

B. Accepted mock-ups are representative of the quality required for the Work.

C. Where mock-up has been accepted by Engineer and is specified in Product specification sections to be removed; remove mock-up and clear area when directed to do so.

1.25 TESTING LABORATORY SERVICES

A. Contractor shall furnish to Engineer duplicate certified copies of all routine tests made by the mill, shop or factory at which material or equipment is fabricated or manufactured for the Work.

B. An independent firm will perform tests, and other services when so specified in individual specification sections.

C. Cooperate with independent firm; furnish samples as requested.

D. Re-testing required because of non-conformance to specified requirements shall be performed by an independent firm on instruction by Engineer.

E. Contractor shall pay for all testing and laboratory services and/or test reports as are required in individual specification sections including any required re-testing.

1.26 OBSERVATION SERVICES

A. Owner will employ and pay for observation services during construction of the Project.

B. Cooperate with construction observer; furnish safe access and incidental assistance as requested.

1.27 MANUFACTURERS' FIELD SERVICES

A. When specified in individual specification sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions and to initiate instructions when necessary.

B. Report observations and site decisions or instructions that are supplemental or contrary to manufacturers' written instructions.

01 00 00-8

1.28 TEMPORARY ELECTRICITY

A. Cost: Contractor provide and pay for power service required from utility source.

1.29 TEMPORARY SANITARY FACILITIES

A. Provide, maintain and pay for required facilities and enclosures.

1.30 BARRIERS AND FENCING

A. Provide barriers and/or fencing to prevent unauthorized entry to construction areas to protect existing facilities, materials, equipment, designated vegetation, and adjacent properties from damage from construction operations and demolition.

B. Provide protection for plants designated to remain. Replace damaged plants.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.31 WATER CONTROL

A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.

B. Protect site from puddling or running water.

1.32 PROTECTION OF INSTALLED WORK

A. Protect installed Work and provide special protection where specified in individual specification sections.

B. Prohibit traffic or storage upon waterproofed or roofed surfaces.

C. Prohibit traffic from landscaped areas.

1.33 SECURITY

A. Provide security and facilities to protect Work from unauthorized entry, vandalism, or theft.

1.34 ACCESS ROADS

A. Construct and maintain temporary roads accessing public thoroughfares to serve construction area.

B. Extend and relocate as Work progress requires. Provide detours necessary for unimpeded traffic flow.

C. Provide and maintain access to fire hydrants, free of obstructions.

D. Provide means of removing mud from vehicle wheels before entering streets.

E. Designated existing on-site roads may be used for construction traffic.

01 00 00-9

1.35 PARKING

A. Provide temporary gravel surface parking areas to accommodate construction personnel.

B. When site space is not adequate, provide additional off-site parking as coordinated with Engineer.

1.36 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, and other closed or remote spaces, prior to enclosing the space.

C. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.

1.37 PROJECT IDENTIFICATION – SIGN NOT REQUIRED

A. No other signs are allowed except those required by law.

1.38 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion inspection.

B. Remove underground installations to a minimum depth of 2 ft. Grade site as indicated.

C. Clean and repair damage caused by installation or use of temporary work.

D. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.

1.39 DUST CONTROL

A. Execute Work by methods to minimize raising dust from construction operations.

B. Provide positive means (e.g. use of sprinkling water or other methods approved by the Resident Project Representative) to prevent air-borne dust from dispersing into atmosphere.

C. Dust control measures shall be employed when required in the opinion of the Resident

Project Representative at no additional cost to Owner.

1.40 PRODUCTS

A. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents.

B. Provide interchangeable components of the same manufacturer for components being replaced.

1.41 TRANSPORTATION, HANDLING, STORAGE AND PROTECTION

A. Transport and handle Products in accordance with manufacturer's instructions.

01 00 00-10

B. Promptly inspect shipments to assure that Products comply with requirements, quantities are correct, and Products are undamaged.

C. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage.

1.42 STORAGE AND PROTECTION

A. Store and protect Products in accordance with manufacturers’ instructions.

B. Store with seals and labels intact and legible.

C. Store sensitive Products in weather tight, climate controlled, enclosures in an environment favorable to Product.

D. For exterior storage of fabricated Products, place on sloped supports above ground.

E. Provide off-site storage and protection when site does not permit on-site storage or protection.

F. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of Products.

G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.

H. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement, or damage.

I. Arrange storage of Products to permit access for inspection. Periodically inspect to assure

Products are undamaged and are maintained under acceptable condition.

1.43 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named in accordance with the following Article on Substitutions.

1.44 SUBSTITUTIONS

A. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.

B. Document each request with complete data substantiating compliance of proposed

Substitution with Contract Documents.

C. A request constitutes a representation that Contractor:

01 00 00-11

1. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.

2. Will provide the same warranty for the Substitution as for the specified Product.

3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner.

4. Waives claims for additional costs or time extension which may subsequently become apparent.

5. Will reimburse Owner and Engineer for review or redesign services associated with re-approval by authorities.

D. Substitutions will not be considered when they are indicated or implied on shop drawing or Product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.

E. Substitution Submittal Procedure:

1. Submit three copies of request for Substitution for consideration. Limit each request to one (1) proposed Substitution.

2. Submit Shop Drawings, Product data, and certified test results attesting to the proposed Product equivalence. Burden of proof is on proposer.

3. Engineer will notify Contractor in writing of decision to accept or reject request.

F. For each equipment item in which the manufacturer was listed on the Bid Form, Engineer reserves the right to require Contractor to use the equipment item of the listed manufacturer.

1.45 EQUIPMENT GUARANTEE

A. All equipment furnished shall be guaranteed by the manufacturer to be free from all defects in workmanship, design and material for a period of not less than 12 months from the date that the equipment is placed in continuous operation or not less than 18 months from the date of delivery to the job site, whichever occurs first.

B. This guarantee shall be in addition to the correction period provided by Contractor under

Article 13, paragraph 13.07 of the General Conditions and the Maintenance Bond provided by Contractor under Paragraph 1.09 of the Supplementary Conditions.

C. The manufacturer shall furnish all parts necessary to correct defective work and Contractor shall be responsible for the installation of all parts.

D. If the continuous operation of a piece of equipment is interrupted due to a defect requiring the replacement of the equipment, or part thereof, the equipment manufacturer's 12-month guarantee shall restart from the beginning when the required replacement item is installed and the equipment is returned to continuous operation.

1.46 STARTING SYSTEMS

A. Coordinate schedule for start-up of various equipment and systems.

B. Verify that each piece of equipment or system has been checked for proper lubrication, drive

01 00 00-12 rotation, belt tension, control sequence, and for conditions which may cause damage.

C. Verify that tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer.

D. Verify wiring and support components for equipment are complete and tested.

1.47 CONTRACT CLOSEOUT PROCEDURES

A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's review.

B. Engineer shall make a final inspection and prepare a punchlist of items remaining to be completed or corrected prior to final acceptance in accordance with Article 14, paragraph

14.06 of the General Conditions.

C. Complete all items on the punchlist, plus any new items that may be subsequently added, as soon as possible and within the Contract Time.

D. Provide submittals to Engineer that are required by governing or other authorities.

E. Submit final Application for Payment identifying total adjusted Contract Price, previous payments, and remaining amount due.

F. Final Payment will not be made until final completion and acceptance of the Work.

1.48 FINAL CLEANING

A. Execute final cleaning prior to final Project inspection.

B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

C. Clean or replace filters of operating equipment.

D. Clean debris from gutters, and drainage systems.

E. Clean site; sweep paved areas, rake clean landscaped surfaces.

F. Remove waste and surplus materials, rubbish, and construction facilities from the site.

1.49 ADJUSTING

A. Adjust operating Products and equipment to ensure smooth and unhindered operation.

1.50 PROJECT RECORD DOCUMENTS

A. Maintain on-site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

01 00 00-13

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed Shop Drawings, Product data, and samples.

6. Manufacturer’s instructions for assembly, installation and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by Owner.

C. Store record documents separate from documents used for construction.

D. Record information concurrent with construction progress.

E. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates utilized.

3. Changes made by Addenda and modifications.

F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:

1. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

2. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.

3. Field changes of dimension and detail.

4. Details not on original Contract Drawings.

G. Delete Engineer's title block and seal from all documents.

H. Submit documents to Engineer with claim for final Application for Payment.

1.51 OTHER DOCUMENTATION

A. Provide data and documentation properly completed and executed prior to final Application for Payment as Engineer may reasonably require including:

1. Payroll Certification forms by Contractor and all Subcontractors (if price exceeds

$25,000).

2. Waiver of Liens by all Subcontractors and Suppliers or Contractor’s Affidavit, Contractor’s Release of Liens and Consent of Surety Company to Final Payment.

3. Maintenance Bond.

4. Any Change Orders with supporting documentation which remain to be submitted.

01 00 00-14

5. Test and/or sample results.

6. Equipment warranties.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION